Search NASA⌕ Search

SEARCH · Search NASA

Results for “Dispatcher”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 217 records · Page 12

Absorbing the Sun: Operational Practices and Balancing Reserves in Florida's Municipal Utilities

The Florida Reliability Coordinating Council (FRCC) power system is comprised of multiple balancing authorities ranging in size from Gainesville Regional Utilities (GRU) with a 2019 summer net firm demand of 429 MW to Florida Power & Light with a 2019 summer net firm demand of 22,510 MW; and including cooperative, municipal, and investor-owned utilities. As all of these balancing authorities are and have plants to continue installing significant quantities of utility-scale solar photovoltaics, one relevant question is how much operating reserves they will need to hold as solar penetrations increase. While there are estimates of how regulating and flexibility reserve requirements change with solar penetration, the literature almost exclusively focuses on large balancing authorities with sub-hourly dispatch. In this work we analyze how reserve needs change not only with solar photovoltaic penetration, but also balancing authority size and operational practices. We find that, measured as a fraction of load, smaller balancing authorities with less frequent load and solar forecasts and less frequent dispatch need more reserves. Such utilities' reserve needs also increase more with increasing solar deployment as compared to larger or more frequently dispatched balancing authorities. These impacts are most acute for GRU. We find that moving from day-ahead to hour-ahead load and solar forecasting and system dispatch could enable GRU to incorporate 32% solar generation with median reserves at 20% instead of 60% of load; and that median reserve needs could drop further to about 10% of load if Florida's municipal utilities formed a reserve sharing group and moved to sub-hourly dispatch.

14 SOLAR ENERGY↗

Liquid Salt Combined-Cycle Pilot Plant Design

The work described in this report is responsive to the Office of Fossil Energy program ‘Energy Storage for Fossil Power Generation.’ This Phase I report has been prepared by Pintail Power LLC, with support from Nexant ECA, Electric Power Research Institute (EPRI) and Southern Company Services as a deliverable for the U.S. Department of Energy for NETL Award DE-FE-00320016. The Liquid Salt Combined Cycle™ (LSCC™) technology provides large-scale energy storage integrated with Fossil Electric Generating Units (FEGUs) to meet critical needs in the energy transition by providing: • the lowest cost large-scale storage for time-shifting of renewable energy, • superior fuel efficiency to reduce GHGs from dispatchable resources, • flexible capacity and ramping to balance variability of wind and solar resources, • essential grid stability services to assure reliability of a low-carbon grid. The LSCC approach: • employs equipment that has already been proven in utility service, • uses safe, non-toxic, non-degrading, perpetual-life storage medium, • leverages and repurposes existing FEGU assets, • expands the value stack of energy storage to reduce market, financing, and commodity risks. Pintail Power has developed the LSCC technology to meet the need for reliable, efficient, and cost-effective integration of Variable Renewable Energy (VRE) into a low-carbon electric grid by coupling proven thermal energy storage with proven gas turbines, steam turbines, and heat transfer equipment. This novel approach is intended to address the key issues facing the grid and operators of renewable and fossil generating units including: • Overgeneration and curtailment of renewables, • Need for fast ramping dispatchable resources, • Improved efficiency and flexibility of fossil units, • Additional peaking capacity to support electrification of transportation and heating, • Provision of reliability services to support high penetration of VRE, especially synchronous inertia and fast frequency response. A Technology Readiness assessment by EPRI confirmed that LSCC technology consists of commercially proven hardware used in industrial and utility applications. Although the novel LSCC approach has not yet been demonstrated as a complete system, interfaces between major components have been conservatively specified. A Phase III pilot is planned to demonstrate equipment integration and operation. The patented innovation is removal of the evaporator section from the exhaust heat recovery system, with the evaporation performed by stored energy in a separate steam generator. This arrangement couples renewable and fossil power generation via long-duration energy storage to deliver cost, performance, and operational synergies, including superior charging and discharging flexibility, reduced fuel consumption and lower CO 2 emissions compared to conventional Combined Cycle Power Plants, and low-cost, large-scale energy storage. The LSCC technology is composed of proven equipment integrated with gas turbine exhaust heat in a novel system. During charging, electric heaters raise the salt temperature as it flows from the Cold Salt Tank to the Hot Salt Tank. During discharging, hot salt produces steam from feedwater that is heated with gas turbine exhaust, which also superheats steam to drive a steam turbine. LSCC technology can be added to any combustion-turbine to integrate renewable energy, provide needed grid services, and increase the value of fossil electric generating units based on the technology’s following attributes: • Long-duration storage enables time-shifting of VRE to avoid curtailment and impairment of renewable assets. • Long storage duration combined with fast-charging capability increases arbitrage opportunities by storing more energy when the price is low and discharging more hours when the price is high. • Long storage duration allows resource adequacy to be supplied across multiple days to increase reliability and reduce risk. • The stored energy reduces fuel heat rate and GHG emissions, and increases merit, so the LSCC dispatches earlier and longer to increase the plant’s capacity factor and asset value. • The stored energy enables pre-heating and startup of the steam cycle, without operating the gas turbine, to enable fast startup and ramping when dispatched for discharge. • The steam turbine can operate without the gas turbine so it can provide valuable synchronous inertia during charging without consuming fuel. • Fast frequency response and regulation services can be provided during charging using solid-state heater and pump controls to vary the charge power input in response to grid signals. • The LSCC system can be configured for resilience including black start, islanded/micro-grid operation, and even self-recharging of storage using either gas turbine power or gas turbine exhaust heat. The commercialization plan is to add LSCC technology to existing simple cycle gas turbine power plants with the 50MW GE LM6000 aero-derivative gas turbine as the reference design basis. A Techno-economic assessment of the reference design evaluated the benefits (Levelized Avoided Cost of Energy) and costs (Levelized Cost of Energy). The plant definition included all major systems and budgetary vendor quotes. Pintail Power and NexantECA developed the overall cost estimate for the LSCC plant up to the total plant cost level, following the DOE-NETL cost estimate guidelines at AACE Class 3 (-20%/+30%). This includes the equipment cost, bulk material, direct and indirect labor costs to arrive at the bare erected cost. Engineering costs are factored from the BEC and added to it to arrive at the EPC cost. Process and project contingencies were then factored from the EPC cost and rolled-up to yield the total plant cost of $\$$184 million for 1746 MWh of discharge electricity. • At $\$$105/kWh, the reference plant costs less than any of the Energy Storage Systems evaluated by PNNL in 2020 for the Energy Storage Grand Challenge. Operations and Maintenance cost estimates were scaled from combined cycle practice, assuming that the LSCC unit was co-located with and sharing some labor expense with other units, to arrive at $\$$2.2 million per year. Plant economics were evaluated using prices from the ERCOT Day-Ahead Market for calendar year 2019 (excluding the market disruptions from the COVID pandemic and the February 2020 deep freeze event). Assuming economic dispatch in the ERCOT Day-Ahead market, the reference plant capacity factor would have discharged for 2777 hours at 91.9 MW, a 31.66% capacity factor, with a marginal cost of $\$$25.59/MWh, and a LACE of $\$$82.41/MWh. Fixed charges were calculated according to EIA guidelines to arrive at an LCOE of $\$$83.48. The benefit-to-cost ratio of 0.99 suggests that the reference plant would have been cost-effective and competitive in the market. EPRI interviewed selected utilities to gauge the need for, applicability of and interest in the LSCC system. Several utilities are currently managing increased load growth along with the inclusion of increasing levels of renewable generation, putting pressure on conventional generation by requiring increased turndown requirements and ultimately lower capacity factors. All of the utilities interviewed have CO 2 reduction targets in the 2030-2050 timeframe that will severely limit the participation of fossil generation and require better utilization of carbon free generation. While there is limited opportunity for storage in the current markets, the utilities interviewed stated that there will be a substantial need for long duration energy storage in the future given the expected trends. Utilizing an energy storage system will generally be preferred over new gas capacity in some cases, with the capabilities of the LSCC system being a potential option for retrofit to existing simple cycle gas turbine units, allowing them to deliver greater participation in the market with lower carbon intensity. A technology gap assessment and technology maturation plan identified a pilot-scale demonstration as the final step before commercialization. Key gaps to be addressed during the Phase II FEED (Front-End Engineering Design) are component selection and design, commissioning procedures, and operational procedures and the control system for LSCC charging and discharging. The project team has been expanded to include Wood Group PLC as EPC. The proposed Phase II work leads to a pilot-scale engineering demonstration (TRL 6) to be conducted at Southern Company’s Plant Rowan, where the prototype system will perform “all the functions that will be required of the operational system.” The proposed pilot will facilitate commercialization (TRL-9) by scale-up to utility-scale systems integrated with peaking GTs or directly to facility scale systems using industrial GTs. The conceptual design for the pilot plant focuses on the novel integration aspects of LSCC technology. A slipstream of gas turbine exhaust will feed a waste heat recovery unit coupled to a molten salt steam generator heated by stored energy. The pilot is intended to demonstrate all key operating modes of the LSCC technology during charging, discharging and standby. The pilot equipment will be approximately one-seventh scale of the LM6000 commercial target and is expected to have commercial off-ramp potential for facility-scale applications.

01 COAL, LIGNITE, AND PEAT↗

Methods for Computing Physically Realistic Estimates of Electric Water Heater Demand Response Resource Suitable for Bulk Power System Planning Models

Demand response is commonly called on to reduce load during system peak times or to respond to contingency events. In future power systems with higher shares of wind and solar generation (which we describe together as variable generation [VG]), demand response could have more opportunities to provide energy shifting or operating reserve services. This report evaluates the ability of residential electric water heaters, both electric resistance water heaters (ERWHs) and heat pump water heaters (HPWHs), to provide such services starting from detailed whole-building energy models that realistically represent New England single family home stock. We use a parsimonious surrogate model to represent operational flexibility in a form suitable for linear and mixed integer programming. This enables relatively fast determination of aggregate contingency reserve resource, price-taking energy shifting outcomes, and in some cases the determination of aggregate models at the megawatt (MW) scale that can be directly included in large-scale grid models. After selecting modeling methods and parameters through various computational experiments, we find interquartile ranges of contingency reserve resource in ISO-NE for about 603,400 ERWHs of 45 MW - 69 MW for Claim10 (50 minute responses provided with 10 minutes of advanced notification) and 65 MW - 102 MW for Claim30 (30 minute responses provided with 30 minutes of advanced notification), and for about 619,000 HPWHs of 48 MW - 88 MW for Claim10 and 52 MW - 90 MW for Claim30. The overall reserve resource is up to 32% of total load for ERWHs providing Claim10 service, 47% for ERWHs providing Claim30 service, 93% for HPWHs providing Claim10 service, and 97% for HPWHs providing Claim30 service. More work is required to determine if HPWHs are inherently more suitable than ERWHs for providing contingency reserve or if these results reflect idiosyncrasies of the single family home stock model used in this study. The value of this contingency resource in a Near-term VG model of ISO-NE is $\$ 0.40$ to $\$1.20$ per water heater-year, and significantly larger, $\$ 3.80$ to $\$ 5.30$ per water heater-year in a Mid-term VG model of ISONE. Aggregating surrogate models to the MW-scale for energy shifting service is more challenging than for contingency service and we only present such results for ERWHs, because we were unable to determine satisfactory ways to deal with HPWHs' time-varying and path dependent operational characteristics. Individual surrogate models suitable for evaluating the energy shifting resource from both ERWHs and HPWHs are created, however, and dispatched against day-ahead prices from the Near-Term VG and Mid-Term VG models of ISO-NE. The individual surrogate models are able to access and potentially shift all 640 GWh of HPWH load and 1,547 GWh of ERWH load we modeled in two different single family home stock models. In contrast, the most effective model of aggregate ERWH shifting resource we created only captured 34.7% of the total ERWH load. Energy shifting affected by price-taking dispatch against modeled day-ahead energy prices produces per water heater year profits of $\$19.44$ - $\$22.93$ for individual HPWHs, $\$39.11$ - $\$40.54$ for individual ERWHs, and up to $\$4.00$ - $\$4.24$ for aggregated ERWHs, with the variations mainly due to grid conditions (more or less VG). When the supply-side response to these changes is accounted for, the per water heater year production cost savings for ISO-NE are $\$7.50$ to $\$17.70$ for the most effective set of endogenously dispatched aggregate ERWHs, $\$15.60$ to $\$15.70$ for individual ERWHs dispatched against the DA prices, and $\$10.70$ to $\$11.20$ for individual HPWHs dispatched against DA prices. Those ranges primarily represent the difference between Near-Term VG and Mid-Term VG grid conditions.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Residential Battery Modeling for Control-Oriented Techno-Economic Studies: Preprint

Electrochemical batteries, which serve as electric energy storage devices, are becoming increasingly popular among residential buildings that incorporate solar photovoltaic (PV) systems to help meet their energy needs. Battery economics are affected by performance degradation over time, and managing this degradation can help extend the battery's lifespan. The tradeoff between operational costs/benefits and managing battery degradation is of significant research interest. One of the key factors for assessing battery degradation is the dispatch strategy used to control the charging and discharging of the battery. Conventional dispatch strategies typically use simple rule-based methods, and these overly aggressive charging/discharging cycles can significantly reduce a battery’s life span. Our research seeks to develop optimized dispatch strategies for grid-connected PV homes with a goal of extending battery life while simultaneously taking into consideration utility costs and occupant comfort. To achieve this goal, we adapted lithium-ion battery life- and cyclic-degradation models for use in high-fidelity building simulations, so whole-building and grid-interactive controllers can dispatch the batteries along with other flexible loads. With the help of a co-simulation platform, we performed a simulation study to compute the optimized dispatch strategies for relevant operating conditions brought about by changing geographical locations, weather conditions, and utility pricing. Comparing the optimized strategies with the conventional strategies resulted in a >50% decrease in capacity degradation and >10% average reduction in operational costs during the months of January and July in Fort Collins, Colorado; Phoenix, Arizona; and Portland, Oregon.

30 DIRECT ENERGY CONVERSION↗

Absorbing the Sun: Operational Practices and Balancing Reserves in Florida's Municipal Utilities

The Florida Reliability Coordinating Council (FRCC) power system is comprised of multiple balancing authorities ranging in size from Gainesville Regional Utilities (GRU) with a 2019 summer net firm demand of 429 MW to Florida Power & Light with a 2019 summer net firm demand of 22,510 MW; and including cooperative, municipal, and investor-owned utilities. As all of these balancing authorities are and have plants to continue installing significant quantities of utility-scale solar photovoltaics, one relevant question is how much operating reserves they will need to hold as solar penetrations increase. While there are estimates of how regulating and flexibility reserve requirements change with solar penetration, the literature almost exclusively focuses on large balancing authorities with sub-hourly dispatch. In this work we analyze how reserve needs change not only with solar photovoltaic penetration, but also balancing authority size and operational practices. We find that, measured as a fraction of load, smaller balancing authorities with less frequent load and solar forecasts and less frequent dispatch need more reserves. Such utilities' reserve needs also increase more with increasing solar deployment as compared to larger or more frequently dispatched balancing authorities. These impacts are most acute for GRU. We find that moving from day-ahead to hour-ahead load and solar forecasting and system dispatch could enable GRU to incorporate 32% solar generation with median reserves at 20% instead of 60% of load; and that median reserve needs could drop further to about 10% of load if Florida's municipal utilities formed a reserve sharing group and moved to sub-hourly dispatch.

balancing authority↗

An economic assessment of behind-the-meter photovoltaics paired with batteries on the Hawaiian Islands.

Due to natural variability and uncertainty, the ever-increasing penetration of solar generation in Hawaii presents challenges to power grid operators to maintain reliable system operation. Demand response (DR) has the potential to be a cost-effective tool for Hawaii to reach its aggressive renewable energy goals while maintaining the reliability of power grids. The Hawaii Public Utilities Commission has approved the Hawaiian Electric Company's revised portfolio of DR programs. The companies have released a grid services purchase agreement and subscribed an initial tranche of load into their DR programs. This paper presents innovative analytical methods and comprehensive economic assessment for distributed photovoltaics (PV) paired with battery energy storage systems (BESSs) for two new DR programs, including fast frequency response and capacity grid service. Optimal dispatch and sizing methods are proposed for the paired system considering different tariff schedules and PV compensation programs across five islands. It was found that while the best resource configuration and potential economic benefits vary with tariff structure, a BESS paired with PV can be optimally dispatched to generate multiple value streams simultaneously. Compensation from DR programs is an important value stream to help increase the cost-effectiveness of the integrated system.

Battery energy storage system↗

Experimental Analysis of Distribution Network Voltage Regulation Using Smart Inverters

Smart inverters (SIs) have demonstrated their potential to provide grid services for both transmission and distribution systems. One of these grid services, distribution network voltage regulation by SIs, has the potential to improve network voltage regulation through controlling the reactive and active power output of the SIs. Voltage regulation by SIs will be distributed and might be better suited to controlling local conditions to complement traditional voltage-regulating assets, e.g., tap-changing transformers, capacitor banks, and line voltage regulators. There is a gap in the literature on comparing the SI response characteristics when the SIs are controlled by a local controller or external control signals. This paper presents an experimental study to characterize SI reactive power regulation responses to two different control methods: autonomous control and remote dispatch. We found that SI reactive power regulation responses exhibit important differences between these methods in terms of delays and ramp rate. Finally, power-hardware-in-the-loop (PHIL) tests were conducted to evaluate the performance of these two methods. The PHIL test results show that the SI response characteristics for autonomous control and remote dispatch need to be considered when planning for distribution network voltage regulation using SIs.

autonomous control↗

Control Strategies and Validation in the Hybrid Optimization and Performance Platform (HOPP)

The Hybrid Optimization and Performance Platform (HOPP) is a tool that simulates hybrid power plants in various configurations, and also calculates the financial feasibility of these plants. This report outlines an overview of HOPP and the energy storage dispatch strategies available. It then presents three case studies which demonstrate different applications of HOPP. The first case looks at the profitability of hybrid power plants in different locations in the USA. The second case examines the availability of hybrid power plants to provide energy reliability services. The third case presents a plant that produces both hydrogen and electricity, and demonstrates a dispatch strategy that chooses the most profitable energy vector based on price signals. The next section shows the validation of HOPP on operational data, using data from both unit-scale and utility-scale power plants. This validation process demonstrated that HOPP can simulate the power output of both wind and solar PV plants at both scales with comparable fidelity to an existing commercial software tool. Finally, HOPP is applied in a field test which applies an optimal dispatch strategy to a physical battery in a unit-scale hybrid plant at NREL. HOPP's optimal dispatch strategy, applied in a real-world setting, improved this hybrid plant's ability to meet a load signal while minimizing operational costs.

14 SOLAR ENERGY↗

Advancing Concentrating Solar Thermal Modeling Using System Advisor Model (SAM)

Concentrating solar thermal (CST) technologies play a critical role in enabling dispatchable power and high-temperature industrial heat applications. Accurate and flexible modeling tools are essential for evaluating system performance, guiding technology research and development, and informing investment decisions. The National Laboratory of the Rockies's System Advisor Model (SAM) is a widely used techno-economic simulation platform for CST systems, providing detailed performance and financial modeling capabilities for multiple CST system configurations. SAM integrates physics-based performance models with financial analysis to simulate the behavior of complex energy systems under realistic operating conditions. For CST technologies (including tower, parabolic trough, and linear Fresnel), SAM enables hourly simulations using site-specific weather data that ensure feasible operating conditions and convergence of mass and energy between core system components (i.e., solar field, receiver, thermal energy storage, and power cycle). These capabilities allow researchers and developers to evaluate annual energy production, capacity factors, levelized cost of energy (LCOE), and system dispatch strategies. A key advantage of SAM lies in its flexibility for parametric analysis and large-scale computational studies. Users can vary system design parameters such as heliostat field layout, receiver dimensions, thermal energy storage capacity, power block sizing, and installation cost assumptions to investigate their impact on system performance and financial metrics. When combined with automated scripting through LK, SDKTool, or Python interfaces, SAM enables high-throughput simulation workflows that support sensitivity analysis, technology benchmarking, and optimization studies. These approaches are particularly valuable for next-generation CST concepts, where design spaces are large and system interactions are complex. Another important capability of SAM is its support for dispatch optimization and thermal energy storage modeling, which are central to the value proposition of CST technologies. The ability to simulate integrated storage and flexible power generation allows researchers to explore strategies that maximize grid value, improve capacity utilization, and enhance integration with variable resources such as photovoltaic and wind generation. This poster will present an overview of SAM's thermal system modeling capabilities including concentrating solar. Additionally, we will highlight new feature developments including: 1) implementing Google's OR-Tools optimization platform for faster and more robust dispatch optimization, 2) developing a new power load following controller for modeling behind-the-meter applications, 3) enabling direct modeling of CSP-PV hybrid systems with the inclusion of battery storage, and 4) developing a multi-receiver falling particle Gen3 system model.

14 SOLAR ENERGY↗

Optimal Strategies for Hybrid Battery‐Storage Systems Design

As stationary hybrid energy‐storage systems (HESS) for power systems applications have recently drawn interest due to their enhanced performance and decreasing cost, developing systematic approaches for HESS design while considering controls is gaining traction. Herein, a method is presented to optimally design hybrid battery storage by proposing a mathematical modeling framework, formulated as a mixed integer linear programming model. The optimization is capable of handling multiple subsystems of batteries, considering their economic and technological performance. Decisions involve sizing of the batteries, optimal temporal and strategic dispatch to end uses, and energy sources for charging each battery. The applicability of the model is tested on four case studies for three battery chemistries representing distinct objectives: high‐power, high‐energy, and second life. Compared to traditionally designed battery storage with a homogeneous battery, optimally designed hybrid systems can save 12%–26% of system costs, depending on the nature of the dispatch profile. Findings point to design preference toward the second life battery supplemented with some high‐power or high‐energy battery capacity, or both. With the utilized electricity price structure, customers can experience approximately 10%–35% reduction in their bills.

Koleva, Mariya↗

Multi-stage charging and discharging of electric vehicle fleets

Fleets of electric vehicles will likely shift electricity demand, and the effect of upstream charging emissions will come from generation sources that are dispatched in response. This study proposes a multi-stage charging and discharging problem to translate low-cost energy transactions into vehicle dispatch decisions. A day-ahead charging optimization problem minimizes electricity purchases and marginal emissions damages, with energy transactions becoming targets in an optimization-based dispatch strategy for an on-demand shared autonomous electric vehicle (SAEV) fleet. The framework was tested for Austin, Texas, using an agent-based simulator. Fleets can schedule charging to lower daily power costs (averaging 15.5% or $\$0.79$/day/SAEV) while reducing health damages from generation-related pollution (2.8% or $\$0.43$/day/SAEV). Finally, fleet managers can increase profits ($\$8$ per SAEV per day) by adopting a multi-stage charging and discharging strategy that can serve more passengers per day than price-agnostic dispatch strategies.

33 ADVANCED PROPULSION SYSTEMS↗

Distribution Feeder-Scale Fast Frequency Response via Optimal Coordination of Net-load Resources Part II: Large-Scale Demonstration

This work is the second of a two-part series in which we develop and experimentally demonstrate a hierarchical control solution for optimally coordinating thousands of deferrable loads and distributed energy resources (DERs) to provide fast frequency response (FFR) from an entire distribution feeder. In Part I, we developed and proved practical algorithms for fast, cost-based optimal dispatch and for determining the optimal amount of headroom to operate solar inverters with to support FFR dispatch while minimizing opportunity cost. Simulation results in Part I demonstrated the advantages of the hierarchical dispatch approach in being able to maintain fast solution times needed for FFR even when the problem size increases. In Part II, we implement the algorithms developed in Part I in a novel, large-scale power hardware-in-the-loop experiment including embedded controllers and more than 100 powered appliance loads and DER connected to a simulated real-world distribution system with more than 10,000 controlled devices. Experimental results from multiple scenarios confirm that the optimal FFR dispatch approach scales well and can optimally coordinate more than 10,000 net-load resources across a distribution network while achieving hardware response times within 500 ms, which is not possible using state-of-the-art optimal coordination approaches.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Evaluation of Hybrid FPOG Applications in Regulated and Deregulated Markets Using HERON

Recent changes in the U.S. energy market, such as low natural gas prices and increased electricity production for variable renewable energy (VRE) sources, have led to an economic crisis for existing light-water reactor (LWR) nuclear power plants (NPP). Many owners and operators of LWRs have elected to decommission these plants rather than continue using them as consistent sources of clean baseload power. This has led to exploration of various possibilities to increase the economic viability of these units, including market restructuring to monetize benefits LWRs already provide to the grid through ancillary markets, load following and economic dispatch, and possible integration of secondary systems directly to the NPP for production of additional products through technologies such as hydrogen electrolysis or water desalination. Previous studies have considered the technologies associated with these Integrated Energy Systems (IES) activities, and the analysis of markets for these secondary products. To analyze the economic viability of various system configurations including IES, especially given the uncertainty surrounding load demand, electricity prices, and the availability of VRE resources, the stochastic technoeconomic analysis package HERON (Heuristic Energy Resource Optimization Network) was released earlier this year as an extension of the risk analysis framework RAVEN (Risk Analysis Virtual Environment). HERON focuses foremost on making the complex uncertainty quantification analysis tools approachable for energy systems analysts, also providing general dispatch optimization algorithms for those workflows. HERON continues to be improved and tested as a significant part of the IES viability analyses performed in this work. HERON is not a capacity expansion model. To consider market and grid energy system development in a variety of scenarios, HERON is best used in coupling with modelling tools such as US-REGEN, which sacrifice some of the uncertainty analysis and resolution of HERON's modelling for the ability to efficiently predict the change in the grid energy system's profile due to economic drivers over decades. HERON can then use this information to explore the economic viability of introducing changes to the predicted outcomes, such as the introduction of an IES. In this work, experts at EPRI using US-REGEN provide six projection scenarios for use in HERON stochastic technoeconomic analysis (STEA) in considering the options available for increasing LWR economic viability through introduction of a hydrogen-centric IES using a high-temperature steam electrolysis plant (HTSE), hydrogen storage, and a constant-rate contracted hydrogen consumer. The results obtained are differential in nature; they do not report expected profits for any configuration, but rather report on the possible increase in the NPV of a configuration with respect to a baseline no-IES configuration. Due to the uncertainty captured in the variable net load of the systems, there is likewise uncertainty in the mean values reported. We consider this viability both in terms of a regulated market, where the energy producers and IES are owned and operated by single entity, as well as a deregulated market, where the IES chooses its bid for electricity generation and is then dispatched by the grid system operator. Results indicate that for deregulated markets, the inclusion of the IES is often statistically beneficial. This is especially true in policies that are not favorable towards nuclear, as nuclear is less often dispatched and is forced to deal with frequent idle capacity. In the nominal case as well as the case of carbon tax policies, inclusion of the IES clearly benefited the economic performance of the NPP. In the regulated case, however, there was a trend towards minimizing the IES, likely due to the optimal sizing performed by US-REGEN of the NPP within the system as well as the lack of penalty for idle capacity at the NPP in the regulated market analyses.

99 GENERAL AND MISCELLANEOUS↗

GT Flex: A Coordinated Multi-Building Pilot Study

Buildings are a significant and untapped resource for providing utility electric grid services. Recent studies have estimated that buildings could reduce the peak demand on the electric grid in the U.S. by almost 25% through effective combinations of energy efficiency (EE) measures and load flexibility strategies (Langevin et al. 2021). The U.S. Department of Energy (DOE) has established a goal to triple energy efficiency and demand flexibility in both residential and commercial sections by 2030 compared to 2020 levels (Satchwell et al. 2021). Such findings place buildings alongside electric vehicles, photovoltaics, electric batteries, and other distributed energy resources (DERs) as primary technologies needed for supporting high renewable energy generation grids. Coordinating and optimizing multiple buildings and other DERs is more beneficial and valuable when compared with individual buildings and DERs operating as siloed resources, uncoordinated with others (Olgyay et al. 2020). A pilot study at the Georgia Institute of Technology (GIT) was conducted to evaluate value propositions of a multi-building scale project seeking carbon reduction, energy efficiency and grid-interactive capabilities, by demonstrating the means by which stakeholders can determine the technical and financial merits of grid-interactivity and energy efficiency technologies coordinated across multiple assets. The study focused on analyzing technical feasibility of deploying thermal load flexibility strategies at the multi-building scale, coordinated to not exceed existing infrastructure constraints at the pilot site. Results show that campus can provide 3-3.5 MW of potential load shed over a 4-hour event window through coordinated dispatch of thermal cooling load flexibility without exceeding existing infrastructure capacities. Under future high renewable scenarios, this thermal flexibility resource is also valuable when coordinated to reduce curtailment of intermittent renewables. Economic analyses were performed to effectively communicate various value propositions of grid-interactive and efficient building (GEB) thermal flexibility strategies. Load flexibility presents a financial value proposition to the campus today. By conducting rationalized, coordinated dispatch in response to real time price (RTP) fluctuations, the campus can benefit materially from daily price arbitrage. The RTP signal acts as an aggregating mechanism between the utility and customer to call on demand flexibility resources, with a large portion of the benefit deriving from a relatively small number of days. Realizing and maximizing this benefit with thermal load flexibility requires careful attention to the timing of pricing signals and parameterization of dispatch to overcome efficiency penalties. Grid value and signals are expected to evolve over time, and thermal load flexibility shows potential to adapt dispatch logic to support intermittent renewable generation.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Release a public version of HERON (HERON 2.0) with improved algorithms for the treatment of energy storage

Integrated energy systems (IESs) are essential for decarbonizing electricity and industrial sectors and fully exploiting these systems requires sophisticated planning, scheduling, and dispatching tools to maximize their socio-economic benefits. The Holistic Energy Resource Optimization Network (HERON) is a generic software plugin for the Risk Analysis Virtual Environment (RAVEN) to perform stochastic technoeconomic analysis of IES with economic drivers. This report summarizes the updates made to HERON 2.0. Particularly, we demonstrate one of the added features, Function-based Control Mechanics, by comparing a price-based dispatch strategy with the original perfect foresight baselines. Our case studies successfully demonstrate that the model is capable to incorporate artificial control algorithm into the dispatch of IES components. In addition, our results from the price-based strategy indicate that the control strategies of IES components are key to the economic and temporal performance of our model; therefore, more sophisticated dispatch strategies are required to improve the model performance.

25 ENERGY STORAGE↗

A Technical and Economic Assessment of LWR Flexible Operation for Generation and Demand Balancing to Optimize Plant Revenue

With increased penetration of subsidized variable renewable energy (VRE) resources and competition from low natural gas prices, existing light water reactor (LWR) nuclear power plants (NPPs) are struggling to remain economically competitive. This work examines the potential economic competitiveness of various thermal energy storage (TES) technologies when coupled directly or indirectly with a NPP. To highlight their relative economic competitiveness, we contrast several energy storage solutions in stochastic dispatch optimization. We leverage data from recent work analyzing a range of TES technologies with varying capital costs, performance, and technology readiness level (TRL) to establish our case. We explore inserting these technologies into an electricity market with existing nuclear generation and large projected variable renewable energy (VRE) penetration. Although these technologies' projected capital costs may make them unlikely candidates in their current state, this analysis demonstrates a high-fidelity techno-economic analysis of energy storage. Furthermore, as the projected cost of energy storage technologies evolves, this analysis sets a precedent for similar future investigations. One region with projected trends that may be unfavorable for existing nuclear capacity is the New York Independent System Operator (NYISO) market. New York state’s baseload generation has been historically provided by fossil-fired and nuclear assets. However, amid economic pressures from subsidized VREs and low natural gas prices, the state has recently deactivated Indian Point nuclear power plant units 2 and 3. Furthermore, the state plans to meet its zero-emission generation target by 2040 by replacing fossil-fired capacity with significant investments in VRE resources like wind and solar photovoltaic (PV) and battery storage. Increased intermittent resource penetration lowers the baseload power requirement, adding further economic pressure to the state’s three remaining NPPs still in operation. With three NPPs still in operation in New York, this work analyzes potential economic benefits to NPPs on the New York grid when directly or indirectly coupled with various TES technologies. This work requires two modeling steps to analyze the potential economic benefits of various system configurations of the TES directly or indirectly coupled with nuclear. First, this analysis leverages capacity expansion modeling by experts at the Electric Power Research Institute (EPRI). Using their deterministic capacity expansion model, U.S. Regional Economy, Greenhouse Gas, and Energy (US-REGEN), EPRI analysts evaluated the capacity and generation evolution of the New York state energy market under four projection scenarios. These four projection scenarios were developed to represent the potential evolution of the capacity and generation in NYISO from 2015 to 2050 under various economic, technology, and policy constraints. The results from these capacity expansion models are then used as boundary conditions in the second modeling step. The second modeling step uses the Holistic Energy Resource Optimization Network (HERON) for a set of stochastic techno-economic analyses (STEAs) to investigate the potential increase in the economic viability of various configurations of the TES. With no current capacity expansion capabilities, HERON takes the data generated from US-REGEN for 2050 to generate synthetic load, solar, and wind data. Then HERON economically optimizes the capacity and dispatch of the various TES configurations. The potential economic benefit is the differential net present value (NPV) of the TES configurations from the no-TES baseline. As a stochastic techno-economic analysis package, HERON introduces uncertainty into the economic metrics, while US-REGEN trades resolution for reduced computational complexity. Using HERON also allows the modeling of direct thermal coupling, a feature not common in capacity and dispatch models. As expected, with high capital costs, the costs of introducing energy storage for all the technologies considered outweighed the potential economic benefit of this strategy for flexible plant operation. The benefit of this analysis is primarily in demonstrating a workflow that examines innovative solutions to increase NPP revenue via TES coupling. HERON’s stochastic capacity and dispatch optimization process used in this work has proven an effective tool in observing and evaluating the impact of introducing storage technologies in a grid energy system.

25 ENERGY STORAGE↗

Time dependent supervisory control update with FARM using rolling window

This report describes improvements to the Feasible Actuator Range Modifier (FARM) component of the RAVEN-based HYBRID framework for analysis of Integrated Energy Systems (IES). FARM supports the HERON plug-in that solves the power dispatch problem. The solution to the dispatch problem involves economically optimal dispatches that satisfy limits on production variables and their rates of variation (explicit constraints) as well as process variables tied to the service life of equipment (implicit constraints). FARM serves to validate or confirm that a HERON solution for explicit constraints also satisfies the implicit constraints. FARM-alpha was released by Argonne National Laboratory in January 2021 followed by FARM-Beta in January 2022 with the latter providing increased flexibility for the user. In this report, FARM-Gamma, the latest version of the code, is described. The major improvement is the implementation of a system identification algorithm based on the Dynamic Mode Decomposition with Control (DMDc) coupled with a “Rolling Window” scheme that allows obtaining linear time-varying state-space models. This feature equips FARM with the most accurate approximation of system dynamics, and it relieves the user from the burden of performing an exhaustive off-line characterization of the dynamics. FARM-Gamma capabilities are assessed by solving the power dispatch problem for a representative IES unit. The simulation times corresponding to the different releases are estimated and compared. These values capture the increasing computational burden of the successively higher fidelity state-space models adopted by FARM-Alpha, FARM-Beta and FARM-Gamma. The code implementation provides significant flexibility, i.e., the user can always select the most suitable version of FARM according to the problem to be solved and the available computational resources. It is anticipated that FARM will play a role in addressing several future IES applications. We outline how it can support the coordinated management and safe operation of a nuclear plant coupled to industrial processes to produce hydrogen and synfuels.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

FARM User Guidance and Instructions

The FARM (Feasible Actuator Range Modifier) module is a component of the RAVEN-based FORCE framework for the analysis of Integrated Energy Systems (IES). FARM aids HERON in the solution of the power dispatch problem by evaluating feasible set-point signals to be issued to the control systems of the different IES unit components. Set-points need to satisfy limits on both production variables (i.e., the variables to be optimized such as the electrical power, etc.) and process variables tied to the service life of equipment (e.g., steam flowrate, vessel pressure, turbine firing temperature, etc.). To enforce all these limits, a two-stage approach is adopted. First, the power dispatcher algorithm in HERON module estimates set-points that meet the constraints on the production variables, e.g., power levels and power ramp rate limits. These constraints are called explicit constraints. Then, if necessary, FARM adjusts these set-points to ensure the respect of the limits on the process variables of interest, given the knowledge of the system dynamics acquired through machine learning algorithms. These constraints are called implicit constraints. From this standpoint, FARM constitutes a bridge between the HERON power dispatcher that adopts a simplified description of the IES unit (low-resolution physics) and the HYBRID high-fidelity models (high-resolution physics). In this report, the general workflow and the software requirements of FARM module are summarized, and the detailed instructions for installing FARM software, running built-in example cases, deriving Linear Parameter-Varying (LPV) state-space models, and using FARM for user-defined power dispatch problems are provided.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗