Search NASA⌕ Search

SEARCH · Search NASA

Results for “Distributed Energy Resources,”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 217 records · Page 12

CyDER: A Cyber Physical Co-simulation Platform for Distributed Energy Resources in Smartgrids

The CyDER project aimed at developing an open-source, modular and scalable co-simulation platform for power grids with large shares of Distributed Energy Resources (DERs). The project partners are the Lawrence Berkeley National Lab (LBNL), Lawrence Livermore National Lab (LLNL), PG&E, SolarCity, and ChargePoint. The prime recipient is LBNL; SolarCity and ChargePoint were partners for the project’s first two years. Increased DER integration introduces a number of challenges in power grid operation including a more dynamic interaction between the transmission grid and distribution grids, and increased modeling complexity. Although specialized software exists to precisely model different components of the power system, it is far from trivial to integrate all various models and perform a holistic simulation. Instead of replicating all models in a common simulation program, a commonly accepted approach to tackle this model diversity is to couple third-party simulators and models through a co-simulation platform that coordinates information exchange among the various components. Following this line of research, this project’s objective was to develop a co-simulation platform based on a widely accepted industrial standard called Functional Mockup Interface (FMI). Within this process, the project developed models compliant with the FMI standard, called Functional Mockup Units (FMUs), and used them to perform various operational and planning power system analyses. Relying and building upon an industrial standard is the main differentiation of this project compared with previous or parallel efforts in the co-simulation area. Particular emphasis was put on delivering software utilities to facilitate setting up and running co-simulations by end-users. Furthermore, a strong aspect of this project is demonstrating that co-simulation techniques can be used to perform Hardware-in-the-Loop (HIL) simulations that couple software components (e.g., simulated models) with hardware components (e.g., real devices such PV systems and batteries). The long-term goal of CyDER project is to help establish FMI as a powerful standard for co-simulation and promote adoption by electric utilities and other interested stakeholders. The main accomplishments of the project include the development of several FMUs including distribution and transmission grid models, PV inverters with Volt/Var/Watt controllers, batteries, and predictive optimal controllers. Additionally, a unique software package was developed, called SimulatorToFMU, which is capable of exporting any Python-driven simulator or Python script as an FMU. This is an important contribution towards establishing FMI as one of the main co-simulation standards, because more and more third-party programs for sub-system modeling and simulation are delivered with Python APIs. The CyDER platform was used to perform PV hosting capacity analyses in real utility feeders with and without smart inverter controls, battery storage, and EV charging. Smart inverter controls include conventional Volt/Var/Watt controls for reactive power support and active power curtailment, but also predictive controls that optimize the charging and discharging profile of the battery connected on the DC side in order to minimize the customer’s economic benefit. Finally, an important result of this project is delivering an experimental setup that consists of residential-scale PV inverters with battery storage, a real-time grid simulator with an ideal voltage source as grid emulator, and micro Phasor Measurement Units (PMUs). All these components and additional software modules are coupled to one another using the FMI standard and can be co-simulated with the CyDER platform.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Centralized and Decentralized Distributed Energy Resource Access Control Implementation Considerations.

A global transition to power grids with high penetrations of renewable energy generation is being driven in part by rapid installations of distributed energy resources (DER). New DER equipment includes standardized IEEE 1547-2018 communication interfaces and proprietary communications capabilities. Interoperable DER provides new monitoring and control capabilities. The existence of multiple entities with different roles and responsibilities within the DER ecosystem makes the Access Control (AC) mechanism necessary. In this paper, we introduce and compare two novel architectures, which provide a Role-Based Access Control (RBAC) service to the DER ecosystem’s entities. Selecting an appropriate RBAC technology is important for the RBAC administrator and users who request DER access authorization. The first architecture is centralized, based on the OpenLDAP, an open source implementation of the Lightweight Directory Access Protocol (LDAP). The second approach is decentralized, based on a private Ethereum blockchain test network, where the RBAC model is stored and efficiently retrieved via the utilization of a single Smart Contract. We have implemented two end-to-end Proofs-of-Concept (PoC), respectively, to offer the RBAC service to the DER entities as web applications. Finally, an evaluation of the two approaches is presented, highlighting the key speed, cost, usability, and security features.

42 ENGINEERING↗

Workshop Report: Rural Electric Cooperative Distributed Energy Resource Business Model Development Workshops

The United States' energy future is being shaped by decades of technology innovation, rapidly changing consumer requirements, and governmental focus on securing reliable, low-cost energy sources. With expanded electrification and increased emphasis on grid reliability coupled with the heightened complexity and risks associated with transmission infrastructure, the use of distributed energy resources (DERs) is more commonly being considered a safe, efficient, and cost-effective way to maintain grid resilience and reliability. Amidst improvements in performance, decreasing costs, and unprecedented federal policy support for DERs, electric cooperatives are considering new opportunities to use these assets to ensure secure and reliable operations for millions of customers. In light of these developments, a series of workshops were held to collaborate on the development of business models for DERs in rural electric cooperative ecosystems. The first workshop was held July 11, 2024, at the Tri-State Generation and Transmission Association Inc. headquarters in Westminster, Colorado (hereafter referred to as the "Tri-State Workshop"). The second workshop was hosted by PNGC Power on Oct. 9, 2024, in Portland, Oregon (hereafter referred to as the "PNGC Power Workshop"). These workshops convened representatives from G&Ts, distribution cooperatives,2 the energy industry, the financial community, the U.S. government, national and regional organizations, and national laboratories to share perspectives on the unique needs, challenges, and opportunities that they face as DERs are further integrated into the grid. The workshops were designed to address the following objectives: (1) develop the enabling attributes of electric cooperative DER business models, (2) explore pathways for generating community benefits from these assets, and (3) identify technical challenges and market risks for DERs in rural electric cooperative service territories. This report outlines key findings and major themes identified by workshop participants that federal agencies, G&Ts, distribution cooperatives, and other entities can consider to advance electric cooperative DER business models.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Secure Control Regions for Distributed Stochastic Systems with Application to Distributed Energy Resource Dispatch

With the increasing connectedness and interdependence of systems that are stochastic in nature, the issue of how to manage and coordinate them for safe operation has evidently become more important. In many networked system architectures, the system-wide output must be delicately managed, often within a prescribed set of bounds. In this paper, a novel control framework is proposed where the bounds on the outputs are translated into independent bounds on the controllable inputs of each subsystem. The main benefit of this framework is that respecting the individual control bounds suffices to guarantee that the system-wide outputs will remain within safe boundaries. Because the systems are assumed to be stochastic, the bounds on the output are introduced as probabilistic chance constraints. The benefits of this framework are demonstrated by applying it to the control of distributed energy resources in a distribution network where the main goal is to keep the voltage magnitudes within their prescribed bounds. The control bounds are evaluated using real data on an IEEE test system.

chance constrained optimization↗

Secure Control Regions for Distributed Stochastic Systems with Application to Distributed Energy Resource Dispatch: Preprint

With the increasing connectedness and interdependence of systems that are stochastic in nature, the issue of how to manage and coordinate them for safe operation has evidently become more important. In many networked system architectures, the system-wide output has to be delicately managed; often within a prescribed set of bounds. In this paper, a novel control framework is proposed where the bounds on the outputs are translated into independent bounds on the controllable inputs of each subsystem. The main benefit of this framework is that respecting the individual control bounds suffices to guarantee that the system-wide outputs will remain within safe boundaries. Since the systems are assumed to be stochastic, the bounds on the output are introduced as probabilistic chance constraints. The benefits of this framework are demonstrated by applying it to the control of distributed energy resources in a distribution networks where main goal is to keep the voltage magnitudes with their prescribed bounds. The control bounds are evaluated using real data on an IEEE test system.

chance constrained optimization↗

Incentivizing Distributed Energy Resource Participation in Grid Services

The bulk power system is experiencing a dramatic shift as renewable generation growth continues to accelerate. Large-scale renewables adoption will help societies transition to a low-carbon, low-cost, and environmentally friendly electrical power system. However, the transition from a paradigm of generation following load to one where load follows generation will require large-scale interconnection and coordinated operation of Distributed Energy Resources (DERs), supported by open communication protocols. In this future grid scenario, DER aggregations will provide critical grid services that enable high penetration levels of renewable generation. This position paper presents an Energy Service Interface (ESI) that defines scope for ensuring secure, trustworthy information exchange between grid service providers and DERs. The goal of the ESI is to encourage large-scale participation of DERs in order to provide grid services through dispatch of DER aggregations. This position paper also presents an open smart energy communications protocol that allows DERs to advertise their characteristics and participate in grid services, within constraints established by the ESI. The paper presents several monetization incentives that grid service providers could use to encourage large-scale DER participation.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Review of Power System Support Functions for Inverter-Based Distributed Energy Resources - Standards, Control Algorithms, and Trends

Penetration of renewable energy in power systems has been increasing in the past decades in response to increased global electricity demand and concerns for the environment. Distributed energy resources (DERs) based on renewables have experienced rapid growth thanks to the incentive programs and broad-based participation. With the growing prevalence of DERs, the risk of grid instability and vulnerability increases due to the intermittent nature of renewable energy. At the same time, the voltage and frequency deviation problems emerge more often when the reverse power flow occurs under supply-demand imbalance in distributed power systems. Standards and grid codes have been issued for DER inverters to interconnect with the distribution grid. The updated standard and grid codes expect DERs to provide a variety of power system support functions in order to incorporate higher DER penetration and to maximize DER value to the grid. This paper provides an overview of the power system support functions from renewable DER inverters, which are categorized as: voltage regulation by active/reactive power control, frequency regulation by active power control, voltage ride-through, and frequency ride-through. The benefits and drawbacks of each algorithm are presented and compared with its predecessor, manifesting the logic in the evolution of the algorithms.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Hierarchical Control of Megawatt-Scale Charging Stations for Electric Trucks with Distributed Energy Resources

Electrifying medium- and heavy-duty trucks is critical to decarbonizing the transportation sector. Energy needs of electric trucks will likely require megawatt-scale charging stations, which could significantly stress the electric distribution grid. Distributed energy resources (DER) can alleviate this stress and reduce charging costs with proper management. To that end, this work develops a hierarchical predictive control algorithm for future multi-port megawatt-scale charging stations that can provide real-time energy management for stations, decide charging rates, dispatch energy storage system (ESS), and provide grid voltage support. We integrate three algorithmic components: (i) an energy management optimization (EMO) that provides supervisory control to DER assets and charging loads at minute scale, (ii) a real-time energy management system (RT-EMS) that heuristically compensates for fast disturbances at sub-second scale, and (iii) a model predictive control (MPC)-based battery management system (BMS) that communicates future charging demands to the EMO, to manage the overall megawatt-scale site. Additionally, validation in a controller hardware-in-the-loop (CHIL) environment shows that the hierarchical controller can reduce the total energy consumption from the grid by approximately 28% compared to an uncontrolled case for the station configuration in this paper, without impacting charging time.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Recommendations for Distributed Energy Resource Patching

While computer systems, software applications, and operational technology (OT)/Industrial Control System (ICS) devices are regularly updated through automated and manual processes, there are several unique challenges associated with distributed energy resource (DER) patching. Millions of DER devices from dozens of vendors have been deployed in home, corporate, and utility network environments that may or may not be internet-connected. These devices make up a growing portion of the electric power critical infrastructure system and are expected to operate for decades. During that operational period, it is anticipated that critical and noncritical firmware patches will be regularly created to improve DER functional capabilities or repair security deficiencies in the equipment. The SunSpec/Sandia DER Cybersecurity Workgroup created a Patching Subgroup to investigate appropriate recommendations for the DER patching, holding fortnightly meetings for more than nine months. The group focused on DER equipment, but the observations and recommendations contained in this report also apply to DERMS tools and other OT equipment used in the end-to-end DER communication environment. The group found there were many standards and guides that discuss firmware lifecycles, patch and asset management, and code-signing implementations, but did not singularly cover the needs of the DER industry. This report collates best practices from these standards organizations and establishes a set of best practices that may be used as a basis for future national or international patching guides or standards.

97 MATHEMATICS AND COMPUTING↗

Dynamic and Responsive Distributed Energy Resource Education Solutions for Building, Fire, and Safety Department Officials (Final Technical Report)

From April 2021 through March 2024, the Interstate Renewable Energy Council (IREC) led a collaborative project to develop a free online clearinghouse of educational resources about solar photovoltaics (PV), energy storage systems (ESS), electric vehicle supply equipment (EVSE), and grid-interactive efficient building (GEB) technologies. Two websites—the Clean Energy Clearinghouse and CleanEnergyTraining.org—housed over 70 educational resources. Over the course of the three-year project, 154,272 unique visitors accessed the learning materials. Learner feedback was overwhelmingly positive. Even through the end of the project, there was sustained demand for education and communication. A primary innovation of the project was to drive multiple complementary audiences to the same place. Building owners, designers, installation contractors and developers, authorities having jurisdiction (AHJs), and fire service personnel all benefit from a shared understanding of clean energy technologies, including safety and code-related requirements. When considering the impact on the target audience, the project team worked with partners and advisors to inform resource creation and delivery in such a way as to address key motivational factors of the target audience and compel each user to seek additional information on the topic and return to the Clean Energy Clearinghouse website as their central location for more information. Resources were intentionally developed to be concise—five to 15 minutes—and accessible, meaning not overly technical. Providing basic information demystified the technologies and invited the professional to explore additional learning opportunities. Awardee and partner collaboration was key to project success. IREC facilitated collaboration among the other Topic 2 awardees, Southface and New Buildings Institute (NBI). The three awardees shared relevant information gained through discovery and validation questionnaires that informed product development and reduced duplication of effort by coordinating the development of complementary, and not competing, educational resources. Inspired by this collaboration, IREC brought on additional partners even in the final year of the project. Five regional energy efficiency organizations were part of the project, which expanded the connection between efficiency and distributed energy resources. We also included resources on the Clearinghouse that were developed through other federally funded projects, such as the Buildings Energy Efficiency Frontiers & Innovation Technologies (BENEFIT) program. The website was developed with the learner in mind, and not solely the funding source. Feedback from stakeholders throughout the project, and especially in its final year, indicated the need for continued education and facilitated communication among stakeholders to further the safe and widespread adoption of clean energy.

14 SOLAR ENERGY↗

The impact of energy-efficiency upgrades and other distributed energy resources on a residential neighborhood-scale electrification retrofit

We report ambitious targets for carbon emissions reductions are highlighting new challenges for electrification strategies, leading to an increased focus on building load flexibility and energy management to complement the variability inherent in renewable energy generation. Over the next decade millions of existing homes could undergo electrification retrofits, and there is an urgent need to understand the potential impacts of electrifying major residential loads such as water and space heating on community load characteristics, resident energy bills, and the utility's distribution system. Behind-the-meter distributed energy resources (DERs), including efficiency measures, photovoltaics (PV), battery storage, managed electric vehicle (EV) charging, and controls such as home energy management systems (HEMS), can significantly alter a neighborhood's load profile and provide benefits to both the residents and the grid. We present a novel approach to characterizing the impact of a hypothetical neighborhood-scale residential retrofit program on individual homes' energy use profiles, associated utility bills, and the local distribution system. We modeled a mixed-fuel community of 30 single-family homes in Denver, Colorado, and compared the effects of retrofit scenarios ranging from conventional energy-efficiency upgrades to full electrification with and without more advanced DER technologies. We analyzed which packages of DERs most reliably enable demand flexibility in response to a time-of-use (TOU) rate for this and similar neighborhoods. Our buildings-to-grid co-simulation framework includes a generic secondary distribution feeder model to capture voltage profiles, transformer loading, and other grid impacts in each case. We also calculated the carbon emissions associated with energy use in the community. The methodology developed here can be broadly applied to community-scale beneficial electrification studies in other regions, climates, utility infrastructures, and building typologies to make specific, targeted recommendations based on quantified projections of energy demand in any given community. Our findings indicate that residential electrification can be achieved without negatively impacting the monthly utility bill, and that a combination of conventional energy-efficiency measures, PV, battery, controls, and managed EV charging to maximize a community's demand flexibility is a promising strategy. Adding DERs (especially PV) as part of efficient electrification produces much bigger savings than efficient electrification without DERs. A key barrier is that upgrades require upfront costs, and modest utility bill savings result in long payback periods.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Adaptive Cybersecurity for Distributed Energy Resources (AdCyDER): Online Reinforcement Learning with Stackelberg-Optimized Defenses — Pipeline Architecture, Evaluation Methodology, and Findings from a Synthetic-Data Evaluation

This report documents the design and evaluation of an integrated online-learning pipeline developed within the AdCyDER project for Distributed Energy Resource (DER) cybersecurity. The pipeline couples a Reinforcement Learning (RL) attack classifier — which produces an attack-type probability distribution — with a Stackelberg game-theoretic (GT) defense selector that consumes those distributions alongside SME-encoded priors over (defense, attack) effectiveness pairings and perdefense costs to choose grid-health-preserving defenses. The objective is not attack classification per se but production of distributions that drive effective defense selection through the Stackelberg layer, learned from delayed grid-health feedback rather than labeled attack data. AdCyDER as a whole is broader than the work presented here; this report covers the specific RL/GT loop integration and its evaluation. We present the integrated pipeline (SCADA telemetry with Fronius inverter physics, Suricata IDS, time-windowed aggregation, per-facility LSTM classifier, Stackelberg optimizer, OpenC2 actuators), an experimental campaign of 28 eight-hour iterations across three baseline modes, and a pipeline-ordered diagnostic protocol. The protocol identifies two distinct failure modes within the loop: paired supervised ceilings on the same features establish that the deployed online RL classifier (macro F1 ≈ 0.07) sits at least 4.7× below a same-architecture supervised LSTM (≈ 0.34) and 10–11× below a linear feature-signal ceiling (≈ 0.70–0.79 depending on per-facility isolation), localizing the dominant failure to the training procedure; and the reward signal driving online updates carries weak directional coupling with classifier correctness in the methodology-expected direction (multi-lens convergent: top-decile P(true) records produce more frequent state changes and slightly larger improvements, top-vs-bot Cohen’s 𝑑 ≈ −0.19), but at effect magnitudes too small to drive gradient-based learning at the campaign sample size. The original learning hypothesis is not supported by the data. The primary contributions are the diagnostic methodology — proposed as a transferable falsification protocol for online RL/GT defense pipelines learning from delayed environmental reward — and the open, reproducible experimental infrastructure. We outline reward reformulation as the highest-priority aspirational next step given the underpowered-but-aligned Q6 reading, with hardware-in-the-loop evaluation as the broadest scope-expansion option.

Blakely, Benjamin [Argonne National Laboratory (AN↗

Cybersecurity Guidance for Distributed Energy Resource Management Systems (DERMS)

As part of the Securing Solar for the Grid (S2G): Cybersecurity for Solar Systems workshop at RE + in Las Vegas, Nevada, NREL researchers discuss an ongoing effort to develop cybersecurity guidance for vendors and operators of distributed energy resource management systems (DERMS). This guide will prioritize cybersecurity best practices that can be testing and developed for a potential future standard. This presentation will highlight NREL's ongoing work in this area and future areas of research.

cyber↗

Cyber-Physical Dynamic System (CPDS) Modeling for Frequency Regulation and AGC Services of Distributed Energy Resources

The substantial integration of renewable energy brings significant challenges to balance the system in real time because of the variability and intermittency of renewable power. For the reliable system operation, the frequency regulation service is used to stabilize the system frequency through automatically balancing the system generation and load. On one hand, with the substantially increasing deployment of renewable energy in electricity system, the requirement of frequency regulation (FR) services increases significantly. On the other hand, the current main resource of FR services, the controllable conventional generation, is continuously decreasing in the system generation mix. This means that in the future high renewable penetration power system, additional and alternative reliable FR services providers such as distributed energy storage (DES) resources should be explored. Although the capability of utility-scale energy storage to provide FR services has been demonstrated, the integrated control and dynamic modeling of distributed energy resource (DER) providing frequency regulation grid services has been rarely explored. There are several challenges to adopt DERs to provide reliable grid services as illustrated in FERC 755. First, the distributed installation of DES requires a comprehensive cyber-physical dynamic system (CPDS) modeling to fully consider the impacts of the communication latency variability on its real time FR provision capability. Unlike the conventional generators, there are two-layer communication between DERs and system operators which increase the communication delay. Second, unlike the conventional generators whose dynamic models have been comprehensively studied, the difference among individual DER components' power-dynamic characteristic brings challenges in the accurate dynamic AGC modeling of its power-frequency relationship. Third, the temporal dependent state of charge uncertainty of DERs challenges DERs' power and frequency regulation capacities scheduling in the look-ahead generation scheduling. Therefore, the aggregator should optimize the frequency regulation provision from individual DER in real time. To overcome these challenges, this project proposes a cyber-physical dynamic system (CPDS) model to handle the uncertainty of DERs two-layer communication latency and power dynamics. The variability of DERs' communication delay and dynamic constraints will be comprehensively modeled. The DERs' AGC model with communication delay is designed to validate DESs' frequency regulation services. Like current performance-based frequency regulation evaluation, the delivery of DERs' frequency regulation will be assessed through post-analysis of the actual AGC response with respect to the AGC control signal from system operators. Consequently, the reliability improvement with DERs providing reliable frequency regulation services can be evaluated from a comprehensive perspective considering all the dynamics of communication and power.

24 POWER TRANSMISSION AND DISTRIBUTION↗

SOLAr Critical Infrastructure Energization (SOLACE): Leveraging Distributed Energy Resources to Provide Local Power

This document is a technical report based on a large-scale DOE-funded project conducted between 2019 and 2022. The project, called SOLAr Critical infrastructure Energization (SOLACE), is aimed at leveraging distributed energy resources (DERs) to provide local power to communities, feeders, or other regions. The project included a particular focus on high-value critical loads such as municipal water supply, telecommunication hubs, and disaster shelters. The key developments of the project were: (1) A comprehensive pre-event power system analysis methodology that identifies and characterizes the viable local power options. (2) A DMS-based example control system for activating and operating the local power solution during a time of crisis. (3) Grid-forming inverter technology to enable isolated local power operation and black-starting. (4) Cyber-security considerations for isolated systems when wider-area communication may be offline. This report describes the overall process that identifies and assesses the viable DER-based local power solutions for a given facility, region, or community. The report documents the process, including the key analysis steps, tools required, data requirements, and recommended pass/fail criteria for each step. It also provides a sample implementation of this process through a test case. Finally, it provides details of how a viable pre-event plan can be selected and activated at go-time when an event has occurred.

14 SOLAR ENERGY↗

Water and Wastewater Systems as Potential Distributed Energy Resources for California - High-level Feasibility Assessment

Water systems in California are a major electricity user, and electricity costs represent a significant portion of water utilities’ operating costs. Water and wastewater utilities have the capacity to shift demand in response to grid needs or price signals and can generate power through biogas, hydropower or onsite renewable energy systems like solar panels and wind turbines. This report points to some of the most promising opportunity areas for water and wastewater utilities to implement distributed energy resources while also carefully laying out practical considerations.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Community Resilience Through Rapid Restoration Leveraging Distributed Energy Resources (DERs) and Low-Cost Sensors

Equitable and automated bottoms-up power restoration following an extreme event will be demonstrated at a site in Puerto Rico. To do so, the team will develop enhanced grid situational awareness techniques integrating behind-the-meter (BTM) distributed energy resources (DER) discovery, impedance sweeping based outage boundary detection, and feasible restoration path identification algorithms. Resilience metric will be developed and incorporated along with situational awareness information in a distributed Model Predictive Control (MPC)-based restoration optimization algorithm to control and mobilize grid assets. These algorithms will be validated through power hardware-in-the-loop experiments and ultimately, a site demonstration to show that outage recovery time and total recovered load could be improved by >20% over the baseline.

24 POWER TRANSMISSION AND DISTRIBUTION↗