Search NASA⌕ Search

SEARCH · Search NASA

Results for “EV charging infrastructure”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 217 records · Page 12

A Machine Learning Approach for Hourly Traffic Prediction Used in EV-Charging Sites

Reliable forecasting of hourly traffic volumes on highways is critical for planning and operating electric-vehicle charging infrastructure without overloading the grid. In this work, we develop and evaluate a station-specific machine-learning approach based on NeuralProphet, enhanced with conditional seasonality to better distinguish weekday, weekend, and holiday patterns. For each station, the model automatically retrieves the same calendar day from the prior years as an AR-Net initialization, fits trend and Fourier-based seasonality components, and then applies short-term auto-regressive corrections. We train and test on 2021 and 2022 TMAS data, respectively, and validate performance over the whole year. We chose to demonstrate how the model performs on a typical weekday (3/15/2022), weekend (3/27/2022), and a special holiday (12/25/2022). Our results yield MAPE of 7.4%, 23.6%, and 32.0%, respectively. Over the entire year 2022, the overall MAPE was 17%. This demonstrates that station-specific models with conditional seasonality can achieve accurate, scalable hourly forecasts for EV-charging load planning.

99 - GENERAL AND MISCELLANEOUS↗

Location Selection of Fast-Charging Station for Heavy-Duty EVs Using GIS and Grid Analysis

This work presents a systematic methodology for the location selection of fast-charging stations for heavy-duty electric vehicles (EVs) based on both geospatial and electric grid analysis. The geospatial analysis is based on real-world geographic information system (GIS) data of road networks and existing supportive infrastructures. The grid analysis is implemented based on node-level analysis of potential impacts on voltages and power losses in the distribution system. A case study using a realistic, three-phase, unbalanced distribution feeder from California and extracted real-world GIS data is used to demonstrate the intuitiveness and effectiveness of the proposed methodology for the location selection of fast-charging stations for heavy-duty EVs considering both electric and existing transportation infrastructures.

47 OTHER INSTRUMENTATION↗

Need help planning for the future of electric vehicles?

This resource provides a sampling of key U.S. Department of Energy (DOE) and national lab resources available to states and local jurisdictions to help them plan for the future of electric vehicles. In particular, these data, information, and modeling resources can help jurisdictions with community planning and developing charging infrastructure.

department of energy, DOE, electric vehicles, Volk↗

The role of infrastructure to enable and support electric drive vehicles: A Transportation Research Part D Special Issue

Widespread vehicle electrification appears to be necessary to achieve timely and deep reductions in greenhouse gases (GHG) and pollutant emissions as well as petroleum use in the transportation sector. The lack of a sufficient refuelling infrastructure has defeated many past efforts to promote alternatives to petroleum fuels. The papers in this special issue on the “Role of Infrastructure to Enable and Support Electric Drive Vehicles” address the diverse challenges posed by a transition from fossil-fuelled internal combustion engine vehicles to vehicles powered by electric motors and the special role of refuelling/recharging infrastructure in this transition. Electric drive vehicles are herein considered to be plug-in electric vehicles (PEVs), including plug-in hybrid electric vehicles (PHEVs), battery electric vehicles (BEVs), and hydrogen fuel cell electric vehicles (FCEVs). BEVs and FCEVs are also known as Zero Emission Vehicles (ZEVs) because their propulsion systems produce no tailpipe emissions.

33 ADVANCED PROPULSION SYSTEMS↗

Public EV Charging Station Site Selection Checklist

The Joint Office of Energy and Transportation (Joint Office) provides technical assistance on planning and implementation of a national network of electric vehicle (EV) chargers and zero-emission fueling infrastructure, as well as zero-emission transit and school buses. There are several considerations that should be addressed when selecting a site for EV charging stations. The following is a checklist to assist with site selection for publicly available EV charging stations.

ADVANCED PROPULSION SYSTEMS↗

Estimating Fast Charging Infrastructure Requirements to Fully Electrify Ride-Hailing Fleets Across the United States

Ride-hailing electrification is made challenging by a variety of factors, including limited driver access to overnight charging and a nascent network of public direct-current fast charging (DCFC). This article projects the DCFC infrastructure needed to electrify ride-hailing across 384 cities in the United States. Research leveraging a novel infrastructure projection tool, Electric Vehicle Infrastructure Tool for On-Demand Mobility Services model (EVI-OnDemand), estimates that 25,400 DCFC ports capable of charging vehicles at a mean power of 150 kW are required to electrify 1.45 million ride-hailing vehicles in the baseline scenario. Results show that ride-hailing vehicles require 17.5 DCFC ports per 1000 vehicles, three times that of personal electric vehicles (EVs). Infrastructure demand is also shown to vary across cities; 63% more DCFC ports are needed to support 1000 battery EVs in Chicago versus Miami. The analysis also includes sensitivity studies that explore variation in charging demand across input assumptions, finding that charging power, vehicle class, overnight charging access rates, and port utilization influence the network size needed. Projections vary from 18,600 to 41,300 DCFC ports across sensitivity scenarios, indicating that ride-hailing electrification will require significant expansion of access to fast charging even in the most optimistic scenarios, and investments into supporting assets can reduce the scale of the public charging expansion needed.

33 ADVANCED PROPULSION SYSTEMS↗

Power-to-Gas Systems for Active Load Management at EV Charging Sites with High DER Penetration

Intermittent renewable systems and increasing electric vehicle (EV) penetrations increase load intermittency—and will require expensive distribution system infrastructure upgrades. Power-to-gas (P2G) systems are highly controllable loads that can be modulated to regulate the net load behind the meter. In this work, we present an active load management approach using P2G systems to regulate the net load for an EV charging station with high penetrations of renewable generation. The system also validates the feasibility of the proposed approach using a 750-kW electrolyzer operated with the distribution system in a real-time power-hardware-in-the-loop test. Finally, we evaluate the impact of the size of the P2G system on its ability to regulate the net load.

ADVANCED PROPULSION SYSTEMS,POWER TRANSMISSION AND↗

A Data Processing Pipeline To Extract A Knowledge Graph From Sec Documents For Socio-technical Analysis Of Critical Infrastructure Influence

The code is written in Python and consists of the following pipeline that is implemented in Apache Airflow. This pipeline intends to understand the companies that are directly or indirectly involved with a type of critical infrastructure system at some point in that system's lifecycle. The pipeline takes a configuration file that specifies a list of initial companies to consider, a geographic region of interest (disk) expressed as a latitude/longitude point and distance, and a set of SEC form types from which to extract entities and relations. There are three main components to this pipeline as currently implemented: Social Network Extraction, Critical Infrastructure Network Extraction, and Inference and Fusion. First, Social Network Extraction, implemented as the `organizations_sec` component of the workflow graph queries the SEC EDGAR webservice using the list of initial companies from the configuration file. Given this, it extracts metadata that documents the number of each type of form for the given set of companies and their location. This forms metadata represents a catalog of data sources for the extracted social network knowledge graph. The pipeline then downloads these forms from the website and saves them in a build directory for further processing. These documents are then parsed for entities and relations. Second, the Critical Network Extraction component extracts entities and relations for a critical infrastructure sector. Currently, we focus on Electric Vehicle charging stations and this information is available via the Department of Energy (DOE) database on fueling stations maintained by NREL. Third, the Inference and Fusion component relates the social network graph to the critical infrastructure graph in order to understand the impact of a company within a geographic region. Relations include ownership of the EV Charging Station asset as well as maintenance/ownership of the EV payment networks. The fused network can be represented in many ways and currently we emit a knowledge graph.

Weaver, GabrielA.↗

There's No Place Like Home: Residential Parking, Electrical Access, and Implications for the Future of Electric Vehicle Charging Infrastructure

In March 2021, the cumulative sale of plug-in electric vehicles (PEVs), including plug-in hybrid electric vehicles (PHEV) and battery electric vehicles (BEV), reached 1.8 million in the United States (Argonne National Laboratory 2021). However, PEV adoption is still in its infancy; its market share has just reached around 3% of new light-duty vehicle (LDV) sales by the end of 2020 (Alliance for Automotive Innovation 2021). Current trends suggest that PEV market share in the United States is increasing. The U.S. Energy Information Administration's (EIA's) 2020 Annual Energy Outlook forecasts PEV registrations to exceed 8 million vehicles by 2030 (AEO 2020). PEV adoption is expected to be led by states that are regulating the sale of zero emission vehicles (ZEVs) (California Air Resources Board). California continues to push for more aggressive ZEV regulations; the state recently issued an executive order aimed at 100% of LDV sales being ZEVs by 2035 (Office of Governor Newsom). At the federal level, the Biden administration has shown great ambition in encouraging broader electric vehicle (EV) adoption, including setting the goal of installing 500,000 new chargers nationwide (The White House 2021). Access to charging infrastructure is consistently cited as one of the primary barriers to the increased sale of PHEVs and BEVs (Carley et al. 2019). In the United States, PEV charging options are often described using a pyramid structure, with residential charging as the foundation, workplace charging in the middle, and public charging on top (Figure 1). The existing electricity system, which generates, transmits, and distributes electric fuel to residential households, has helped PEVs partially overcome the "chicken and egg" conundrum that has haunted other alternative fuels. Viable home access to electric charging is also an important equity issue, because non-residential PEV charging options (e.g., workplace or public charging stations) are generally more expensive. Households without residential charging access may experience higher total cost of PEV ownership if non-residential charging options are more costly.

33 ADVANCED PROPULSION SYSTEMS↗

Station Impact Analysis 2025

As part of the U.S. DOE EVs@Scale consortium, the NextGen Profiles (NGP) project presents analysis and results from the study of High Power Charging Electric Vehicles and Battery Charging Infrastructure. High Power Charging equipment is capable of recharging electric vehicle traction batteries at power levels of 200KW and above. The intent of the project is to further understand the most recent technological capabilities of the electric mobility industry related to charging performance. The project aims to develop EV, EVSE, and Fleet characterization testing practices and comprehensive analysis with inputs from key industry stakeholders. The results published in this NextGen Profiles project report provide data and insight for use by numerous entities including modeling and simulation organizations, policy makers, fleet planners, industry stakeholders and the general public involved with the development, deployment and operation of electrified transportation technologies. The factors influencing Electric Vehicle (EV) Direct Current Fast Charging (DCFC), including EV battery specifications, temperature effects on lithium-ion battery and power electronics performance, lithium-ion battery SOC bounding and charging station design considerations are specifically investigated to analyze their impacts on charging station operation and recommendations are made to minimize charge station dwell time, reduce charging costs and mitigate electric grid and charge station congestion. Additional high-power charging results are anticipated in future publications in support of the U.S. DOE EVs@Scale consortium NextGen Profiles project.

33 ADVANCED PROPULSION SYSTEMS↗

County Electric Vehicle Home Charging Access Shares from the 2030 National Charging Network Study

This file contains modeled county-level home electric vehicle (EV) charging access shares from the study, "The 2030 National Charging Network: Estimating U.S. Light-Duty Demand for Electric Vehicle Charging Infrastructure" by Wood et al. (2023). These are based on modeling in "There's No Place Like Home: Residential Parking, Electrical Access, and Implications for the Future of Electric Vehicle Charging Infrastructure" by Ge et al. (2021). Wood, Eric, et al. 2023. The 2030 National Charging Network: Estimating U.S. Light-Duty Demand for Electric Vehicle Charging Infrastructure. Golden, CO: National Renewable Energy Laboratory. NREP/TP-5400-85654. https://www.nlr.gov/docs/fy23osti/85654.pdf . Ge, Yanbo, et al. 2021. There's No Place Like Home: Residential Parking, Electrical Access, and Implications for the Future of Electric Vehicle Charging Infrastructure. Golden, CO: National Renewable Energy Laboratory. NREL/TP-5400-81065. https://www.nlr.gov/docs/fy22osti/81065.pdf .

24 POWER TRANSMISSION AND DISTRIBUTION↗

Electric Vehicle Supply Equipment (EVSE) Site Assessment Report for the U.S. Army Corps of Engineers Chena Site Near Fairbanks, Alaska

This report presents an analysis of the requirements for charging station installation and electric vehicle operation at the US Army Corps of Engineers - Chena Site, located in a cold weather climate in the Fairbanks North Star Borough, AK. The report includes findings from a site visit, and a detailed electric vehicle (EV) charging site plan with cost estimates. Cost for three 50-ampere pedestal chargers located on the edge of the existing parking lot is estimated at $\$$53,100, and the cost of three 80-ampere chargers is estimated at $\$$89,400. The authors did not assess the cost of a heated garage. The USACE Chena site reaches extreme cold temperatures of -40 Degrees Celsius (-40 Degrees Fahrenheit) and below in a typical winter, often for days on end. Considerations of operating EVs as well as electrical vehicle supply equipment (EVSE) at this site can be applicable to other cold or extremely cold locations. Interviews with EV users in cold climates and a literature review indicated that EVs operate well but have significantly decreased range compared to 21 Degrees Celsius (70 Degrees Fahrenheit) operations. Some strategies such as prewarming the vehicle while it is plugged in and using heated seats and steering wheel instead of cabin heat, can improve cold weather performance. Storing the EV in a garage would mean the battery and cabin are automatically preheated, the battery would not age as rapidly as when the vehicle is stored outside, and problems with charging the vehicle are less likely. Lowest temperate-rated Electric Vehicle Supply Equipment (EVSE), as electric vehicle chargers are known as, are rated to -40 Degrees Celsius (-40 Degrees Fahrenheit), and sometimes malfunction. No EVSE is rated to the temperatures that USACE Chena site experienced for more than a week in winter 2023-4, of -50 Degrees Celsius (-45 Degrees Fahrenheit) and which are typical for the area. If reliability is a must, entities may want to consider a heated garage to minimize potential problems with charging equipment. There is a companion technical report to this titled "Electric Vehicle and Charging Infrastructure Assessment in Cold-Weather Climates: A Case Study of Fairbanks, Alaska" that examines the data on EV and EVSE cold-weather functionality in more detail. (Esparza, Truffer Moudra, and Hodge 2024).

33 ADVANCED PROPULSION SYSTEMS↗

EVI-LOCATE User Manual

One of the longest stages in the deployment of electric vehicle supply equipment (EVSE) is the initial planning of the infrastructure itself. Engineers and fleet experts from the National Renewable Energy Laboratory (NREL) have supported dozens of charging infrastructure site plans over the past couple decades, including the generation of site schematics, determinations of electric capacity, and estimates for likely costs. As the market for electric vehicles (EVs) has matured, this approach should no longer require a time and personnel intensive process. In order to shorten the time taken to develop site plans and cost estimates, NREL developed a tool that fleet managers, facility managers, electricians, EVSE installers, and members of the public can use to develop initial schematics and ballpark pricing for charging station installations. The Electric Vehicle Infrastructure - Locally Optimized Charger Assessment Tool and Estimator (EVI-LOCATE) provides a structured and consistent way for users to enter information about their planned EVSE project in a relatively simple web-based format. EVI-LOCATE then calculates electrical equipment capacity, wiring runs, and project costs. It produces a site diagram optimized around surface characteristics with differential trenching costs for softscape such as grass compared to hardscape such as asphalt that can be adjusted by users in the tool. It also stores the resulting site plans and costs in a dashboard for access at a later date, including plan revisions if necessary. This document guides users through the EVI-LOCATE screens and associated questions. It contains tip text boxes throughout on how best to interface with the tool and find additional information or context. The appendices contain the assumptions and calculations underpinning the tool. Much of the information for EVI-LOCATE was gathered through industry engagements with EVSE installers, invoices from completed EVSE installations, Gordian's RS Means construction data, and the General Services Administration blanket purchase agreement for EVSE. For a visual tutorial of the tool, users can watch EVI-LOCATE Step-by-Step Video. The tool itself is available at https://evi-locate.nrel.gov.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Flexible Charging to Unify the Grid and Transportation Sectors for EVs at Scale (FUSE)

Electric vehicle (EV) adoption will expand beyond light-duty vehicles charging at lower-power public locations and family residences to include medium- and heavy-duty applications with more powerful charging at public stations and private depots. The Vehicle Grid Integration (VGI) and Smart Charge Management (SCM) pillar in EVs@Scale supports multiple projects. The FUSE project is developing and evaluating enabling technologies, charging solutions, and infrastructure design approaches to investigate the intricacies and potential benefits of vehicle grid integration and the application of smart charge management to charging of electric vehicles at scale. This presentation summarizes the findings of this research in 2024.

ADVANCED PROPULSION SYSTEMS↗

EVs@Scale FUSE Fall '24 Deep Dive

Electric vehicle (EV) adoption will expand beyond light-duty vehicles charging at lower-power public locations and family residences to include medium- and heavy-duty applications with more powerful charging at public stations and private depots. The Vehicle Grid Integration (VGI) and Smart Charge Management (SCM) pillar in EVs@Scale supports multiple projects. The FUSE project is developing and evaluating enabling technologies, charging solutions, and infrastructure design approaches to investigate the intricacies and potential benefits of vehicle grid integration and the application of smart charge management to charging of electric vehicles at scale. This presentation delves into the technical findings of this research in 2024.

ADVANCED PROPULSION SYSTEMS,DIRECT ENERGY CONVERSI↗

MUTCD 11th Edition - What's New in Signage for Electric Vehicle Charging and Parking

This handout summarizes key changes to the Manual on Uniform Traffic Control Devices for Streets and Highways (MUTCD) with respect to signage for electric vehicle (EV) charging and parking. The final rule for the 11th edition of the MUTCD was published in the Federal Register on Dec. 19, 2023, and became effective Jan. 18, 2024. The previous edition was issued in 2009. Going forward, the Bipartisan Infrastructure Law requires updates every four years. Visit the MUTCD 11th Edition for full details.

ADVANCED PROPULSION SYSTEMS,ENERGY PLANNING, POLIC↗

USAID Colombia Young Leaders Workforce Training Program Action Plans: Planning for Electric Vehicle Charging Infrastructure in Bogotá

As part of the U.S. Agency for International Development (USAID)-National Renewable Energy Laboratory (NREL) Young Leaders Workforce Training Program in Colombia, the Grupo Energía Bogotá (GEB) participants leveraged their training and professional experience to develop an action plan for modeling and evaluating Bogotá's projected electric vehicle (EV) charging needs to meet future demand. This case study summarizes the collaboration between USAID-NREL, GEB, and the Bogotá Department of Transportation Mobility Secretariat (SDM) to estimate EV charging station needs to meet projected future EV sales in the city of Bogotá and determine high-priority locations within the greater Bogotá metropolitan area for planning and applying EVSE investment and installation.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗