Search NASA⌕ Search

SEARCH · Search NASA

Results for “Flight test infrastructure”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 217 records · Page 12

Design and Testing of Autonomous Distributed Space Systems

Distributed Space Systems (DSS) are an emerging class of mission designs that enable new scientific and commercial opportunities. In order to enable those new opportunities, these systems will need to have significantly expanded autonomous capabilities compared to their single-spacecraft predecessors. In this paper, we present Distributed Spacecraft Autonomy (DSA) project, a payload on NASA's Starling spacecraft experiment. We first describe a step-by-step process for characterizing what features are needed in an autonomous DSS, and show how this process applied to DSA. We then describe the Starling mission, a four-spacecraft swarm hosting multiple DSS payloads. We then describe DSA, which will mature in-space networking and autonomous planning technologies to measure topside ionosophere features using data from the Starling spacecraft's GPS receivers. We describe how DSA will coordinate observations of GPS satellites using Starling's underlying communications infrastructure combined with novel DSS technology. The flight validation of DSS technology will provide mature technology to enable future DSS missions.

Nicholas Cramer↗

A First Look at the Upcoming SISO Space Reference FOM

Spaceflight is difficult, dangerous and expensive; human spaceflight even more so. In order to mitigate some of the danger and expense, professionals in the space domain have relied, and continue to rely, on computer simulation. Simulation is used at every level including concept, design, analysis, construction, testing, training and ultimately flight. As space systems have grown more complex, new simulation technologies have been developed, adopted and applied. Distributed simulation is one those technologies. Distributed simulation provides a base technology for segmenting these complex space systems into smaller, and usually simpler, component systems or subsystems. This segmentation also supports the separation of responsibilities between participating organizations. This segmentation is particularly useful for complex space systems like the International Space Station (ISS), which is composed of many elements from many nations along with visiting vehicles from many nations. This is likely to be the case for future human space exploration activities. Over the years, a number of distributed simulations have been built within the space domain. While many use the High Level Architecture (HLA) to provide the infrastructure for interoperability, HLA without a Federation Object Model (FOM) is insufficient by itself to insure interoperability. As a result, the Simulation Interoperability Standards Organization (SISO) is developing a Space Reference FOM. The Space Reference FOM Product Development Group is composed of members from several countries. They contribute experiences from projects within NASA, ESA and other organizations and represent government, academia and industry. The initial version of the Space Reference FOM is focusing on time and space and will provide the following: (i) a flexible positioning system using reference frames for arbitrary bodies in space, (ii) a naming conventions for well-known reference frames, (iii) definitions of common time scales, (iv) federation agreements for common types of time management with focus on time stepped simulation, and (v) support for physical entities, such as space vehicles and astronauts. The Space Reference FOM is expected to make collaboration politically, contractually and technically easier. It is also expected to make collaboration easier to manage and extend.

Mueller, Bjorn↗

Urban Air Mobility System Testbed Using CAVE Virtual Reality Environment

Urban Air Mobility (UAM) refers to a system of air passenger and small cargo transportation within an urban area. The UAM framework also includes other urban Unmanned Aerial Systems (UAS) services that will be supported by a mix of onboard, ground, piloted, and autonomous operations. Over the past few years UAM research has gained wide interest from companies and federal agencies as an on-demand innovative transportation option that can help reduce traffic congestion and pollution as well as increase mobility in metropolitan areas. The concepts of UAM/UAS operation in the National Airspace System (NAS) remains an active area of research to ensure safe and efficient operations. With new developments in smart vehicle design and infrastructure for air traffic management, there is a need for methods to integrate and test various components of the UAM framework. In this work, we report on the development of a virtual reality (VR) testbed using the Cave Automatic Virtual Environment (CAVE) technology for human-automation teaming and airspace operation research of UAM. Using a four-wall projection system with motion capture, the CAVE provides an immersive virtual environment with real-time full body tracking capability. We created a virtual environment consisting of San Francisco city and a vertical take-off-and-landing passenger aircraft that can fly between a downtown location and the San Francisco International Airport. The aircraft can be operated autonomously or manually by a single pilot who maneuvers the aircraft using a flight control joystick. The interior of the aircraft includes a virtual cockpit display with vehicle heading, location, and speed information. The system can record simulation events and flight data for post-processing. The system parameters are customizable for different flight scenarios; hence, the CAVE VR testbed provides a flexible method for development and evaluation of UAM framework.

Marayong, Panadda↗

Conjunction Assessment and Deconfliction Paradigm for Co-Located Satellite Constellations With on-Spacecraft “Autonomous” Flight Dynamics Control

Satellite constellations that employ on-spacecraft flight dynamics and conjunction assessment (CA) approaches face particular challenges. First, they must arrange to obtain and upload to the constellation satellite close approach information, such as Conjunction Data Messages, so that their on-board systems will have the data they need to make informed CA decisions. Second, given current latencies in obtaining CA screening information, such systems often cannot obtain dedicated screenings of their proposed maneuvers before they are executed. Third, they usually cannot engage in real time with owner/operators (O/Os) with whom they may come into conjunction, relying instead on pre-arranged courses of action that may or may not fit a given situation well. Despite these difficulties, it is nonetheless possible, as operators such as SpaceX have demonstrated, to operate safely using on-board CA calculations, in the presence of a largely collaborative operating environment. The situation breaks down, however, when two constellations that operate with such a paradigm are placed in the same orbital region and will experience conjunctions with each other. Each may have a vague idea of where the other’s satellites are, or perhaps even a somewhat precise idea if they exchange O/O ephemerides, but neither will know the other’s more immediate maneuver intentions, especially for situations in which they are in a high-risk conjunction with each other and a mitigation maneuver is required. As there is no formalized way for these automated systems to ascertain each other’s intentions for this type of conjunction, it is quite possible that each spacecraft may choose a maneuver that results in the two objects’ colliding. An opportunity to develop a solution to this problem was presented by the NASA “Starling” project, a small experimental constellation developed to demonstrate autonomous satellite control and constellation reconfiguration and for which a launch was obtained that, serendipitously, will place this constellation close to the SpaceX Starlink constellation. Because the NASA constellation is experimental, an extended mission part of the mission has been negotiated to implement and test mechanisms for resolving the problem of co-located constellations with on-board flight dynamics control. For the last eighteen months, a consortium among NASA Ames (the Starling satellite providers), NASA CARA (the Agency organization responsible for conjunction assessment), Space X, and the Department of Commerce (in observer status) has met regularly to assemble a concept of operations for a robust solution to this problem and has developed a prototype ground node that will serve as a needed CA screening and information dispensary. The approach and methods, as well as the active employment of the developed ground node, will be tested both in simulation before actual use and then in actual spacecraft operations, which are anticipated to begin in January 2024. This paper will describe the co-located autonomously-controlled constellation problem and the developed solution in detail, outlining what ground node (i.e., government) infrastructure and features are required, what particular capabilities are needed by the constellations themselves in order to make use of this deconfliction paradigm, and the migration path forward to allow such a capability set to be incorporated by the Department of Commerce’s space traffic coordination system.

Conjunction Assessment↗

NASA's Space Launch System Takes Shape: Progress Toward Safe, Affordable Exploration

Development of NASA's Space Launch System exploration-class heavy lift rocket has moved from the formulation phase to implementation in 3 years and will make significant progress this year toward its first launch, slated for December 2017. In recognition of the current fiscal realities, SLS represents a safe, affordable, and evolutionary path to development of an unprecedented capability for future human and robotic exploration and use of space. Current development is focused on a configuration with a 70 metric ton (t) payload to low Earth orbit (LEO), more than double any operational vehicle. It is this version that will launch NASA's Orion Multi-Purpose Crew Vehicle (MPCV) on its first autonomous flight beyond the Moon and back, as well as the first crewed Orion flight. This configuration is also designed to evolve to 130 t lift capability that offers several benefits, such as reduced mission costs, simplified payload design, faster trip times, and lower overall risk for missions of national significance. The SLS Program formally transitioned from the formulation phase to implementation during the past year, passing its Preliminary Design Review in 2013 and completion of Key Decision Point C in early 2014. NASA has authorized the Program to move forward to Critical Design Review, scheduled for 2015. Among the Program's many accomplishments are manufacture of core stage test hardware, as well as preparations for testing the world's most powerful solid rocket boosters and the main engines that flew 135 successful Space Shuttle missions. The Program's success to date is due to prudent use of existing technology, infrastructure, and workforce; streamlined management approach; and judicious use of new technologies. The result is a launch vehicle that will carry human and robotic exploration on the history-making missions in the coming decades. This paper will discuss the program and technical successes over the past year and provide a look at the milestones and challenges ahead.

Askins, Bruce↗

NASA's Space Launch System Moves into Testing and Integration

NASA's Space Launch System (SLS) has moved from design and manufacturing into testing and integration for its first flight in fiscal year 2020. In 2017, the NASA/industry team completed manufacturing of all major structural elements for the launch vehicle for Exploration Mission-1 (EM-1). This work included shipping the first major flight hardware element to the launch site. Current work is focused on the initial Block 1 variant of SLS, capable of launching more than 70 metric tons (t) to low Earth orbit (LEO). As the needs of the nation's deep space exploration program grow, SLS performance is designed to evolve to a payload mass of 130 t to LEO and up to 45 metric tons (t) to trans-lunar injection (TLI). The advantages of this mass - as well as volume - are critical to the entire exploration architecture for deep space exploration. They translate to greater capability, greater infrastructure and operational simplicity, less overall mission risk, and opportunities to accomplish unprecedented exploration and discovery.

Honeycutt, John↗

A New Heavy-Lift Capability for Space Exploration: NASA's Ares V Cargo Launch Vehicle

The National Aeronautics and Space Administration (NASA) is developing new launch systems in preparation for the retirement of the Space Shuttle by 2010, as directed in the United States (U.S.) Vision for Space Exploration. The Ares I Crew Launch Vehicle (CLV) and the Ares V heavy-lift Cargo Launch Vehicle (CaLV) systems will build upon proven, reliable hardware derived from the Apollo Saturn (1961 to 1975) and Space Shuttle (1972 to 2010) programs to deliver safe, reliable, affordable space transportation solutions. This approach leverages existing aerospace talent and a unique infrastructure, as well as the vast amount of legacy knowledge gained from almost a half-century of hard-won experience in the space enterprise. Beginning early next decade, the Ares I will launch the new Crew Exploration Vehicle (CEV) to the International Space Station (ISS) or to low-Earth orbit for trips to the Moon and, ultimately, Mars. Late next decade, the Ares V's Earth Departure Stage will carry larger payloads such as the lunar lander into orbit, and the Crew Exploration Vehicle will dock with it for missions to the Moon, where astronauts will explore new territories and conduct science and technology experiments. Both the Ares I and Ares V systems are being designed to support longer future trips to Mars. The Exploration Launch Projects Office, located at NASA's Marshall Space Flight Center, is designing, developing, testing, and evaluating both launch vehicle systems in partnership with other NASA Centers, Government agencies, and industry contractors. This paper provides top-level information regarding the genesis and evolution of the baseline configuration for the Ares V heavy-lift system. It also touches on risk-based management strategies, such as building on powerful hardware and promoting common features between the Ares I and Ares V systems to reduce technical, schedule, and cost risks, as well as development and operations costs. Finally, it gives a summary of several notable accomplishments over the past year, since the Exploration Launch Projects effort officially kicked off in October 2005, and looks ahead at work planned for 2007 and beyond.

Sumrall, John P.↗

GA-ASI Final Report and Program Wrap-up for NASA System Integration and Operationalization (SIO)

The NASA SIO demonstration flight of April 3, 2020 represents a successful culmination of 18 months of coordinated effort between GA-ASI, NASA, the FAA, Collins Aerospace, and Honeywell Aerospace to operate a Medium Altitude, Long Endurance (MALE) Unmanned Aircraft System (UAS) safely in the National Airspace System (NAS) using industry leading prototype technologies. The GA-ASI team consisted of technical experts, program managers, engineers, mechanics, flight technicians, flight crews, and numerous other subject matter experts. This final report describes the most significant and potentially impactful aspects of the planning, integration, test, and flight aspects of this effort. GA-ASI successfully integrated the key technologies needed for UAS to fly in the NAS onto our prototype SkyGuardian UAS, which was designed to meet the most stringent airworthiness standards applicable to an aircraft of its size category. A proven Detect and Avoid (DAA) system, developed by GA-ASI and utilizing Honeywell Aerospace technology was integrated onto SkyGuardian for the first time, along with datalink radios from Collins Aerospace that meet the new civil standard for Control and Non-Payload Communication (CNPC) links. GA-ASI also obtained approvals from the FAA and FCC to operate the reconfigured UAS. The SIO demonstration flight represented a commercial aerial surveying operation conducted at medium altitude (>10,000ft above mean sea level). The aircraft’s onboard sensors were used to capture photographic, infrared and radar imagery of public and commercial infrastructure and land, and to subsequently produce the types of data products that would provide business value to potential customers. These survey services would supplement or replace services currently provided by manned airplanes and helicopters, small drones or satellites. A “virtual” mission was also planned, to show what additional survey data could have been captured during the flight if additional sensors had been installed on the aircraft’s external hardpoints. This revision of the final report focuses on information of value to the wider UAS community, and avoids propriety data to facilitate broad dissemination. It also includes a description of GA-ASI’s engagement with the FAA following the SIO flight, which led to the award of an updated Special Airworthiness Certificate in the Experimental Category (SAC-EC) and a Certificate of Waiver or Authorization (COA) allowing operation of the SkyGuardian UAS using its DAA system to satisfy right-of-way rules, instead of a chase plane. The associated operational limitations are described to illustrate the further steps that would be needed to remove those limitations for unhindered commercial operations.

Flight demonstration↗

Component-Level Electronic-Assembly Repair (CLEAR) Spacecraft Circuit Diagnostics by Analog and Complex Signature Analysis

The Component-Level Electronic-Assembly Repair (CLEAR) project at the NASA Glenn Research Center is aimed at developing technologies that will enable space-flight crews to perform in situ component-level repair of electronics on Moon and Mars outposts, where there is no existing infrastructure for logistics spares. These technologies must provide effective repair capabilities yet meet the payload and operational constraints of space facilities. Effective repair depends on a diagnostic capability that is versatile but easy to use by crew members that have limited training in electronics. CLEAR studied two techniques that involve extensive precharacterization of "known good" circuits to produce graphical signatures that provide an easy-to-use comparison method to quickly identify faulty components. Analog Signature Analysis (ASA) allows relatively rapid diagnostics of complex electronics by technicians with limited experience. Because of frequency limits and the growing dependence on broadband technologies, ASA must be augmented with other capabilities. To meet this challenge while preserving ease of use, CLEAR proposed an alternative called Complex Signature Analysis (CSA). Tests of ASA and CSA were used to compare capabilities and to determine if the techniques provided an overlapping or complementary capability. The results showed that the methods are complementary.

Oeftering, Richard C.↗

Evaluation Studies of a 800W Solid Oxide-Based Fuel Cells Stack for Electrical Power in Aviation

As both NASA and the aeronautics industry recognize the need for higher fuel efficiency and lower carbon emissions in both commercial airline and private aviation applications, development of all-electric or hybrid electric aircraft have garnered renewed interest in the aviation community. For the particular example of the hybrid-electric option, the solid oxide fuel cell (SOFC) is an attractive option for the power source, due to its potential to utilize aviation fuels thereby having minimal impact to aviation infrastructure. SOFC stack performance depends upon many factors, one of the most important is the way the oxidant and fuel gases are delivered to the fuel cells. System modeling of various aircraft configurations for FUELEAP (Fostering Ultra-Efficient, Low-Emitting Aviation Power) point to the need to operate SOFC stacks at high current densities. This creates challenges in the thermal profile of the stacks with potential to create large thermal gradients and hot spots. This study investigates two types of commercial solid oxide fuel cell stacks, the cross flow and co-flow gas designs, both convectively cooled with cathode air. High fuel utilization factors were also employed under varying electrical loads expected from the demands of flight. In addition, performance, range of operation and endurance were investigated under conditions of high current loads and thermal cycling. Evaluations include the study of gas kinetic using electrochemical spectroscopy. Testing took place at the facilities of NASA Glenn using a commercial test system (FuelCon AG, Magdeburg Germany). These studies are crucial to the Glenn Research Center's ability to conduct research, evaluation and development of the next-generation SOFC based stacks for cutting-edge energy technologies for aerospace applications. This study supports NASA's Convergent Aeronautics Solutions' (CAS) FUELEAP project.

Goldsby, Jon C.↗

NASA's Space Launch System Moves into Testing and Integration

NASA's Space Launch System (SLS) has moved from design and manufacturing into testing and integration for its first flight as early as December 2019. In 2017, the NASA/industry team completed manufacturing of all major structural elements for the launch vehicle for Exploration Mission-I (EM-1 ). That work included shipping the first major flight hardware element to the launch site. The team processed all four RS-25 engines for stage integration, cast all 10 booster flight motor segments, and manufactured all five major sections of the core stage. The program also completed major structural work on the B-2 test stand at Stennis Space Center, which will be used for the core stage "green run" test; delivered the core stage and engine simulators used for training; and much of the transportation equipment for the core stage. Engineers completed structural testing on the upper stage/payload section of the vehicle as well as the engine section test article. In 2018, the program will deliver the Orion Stage Adapter (OSA) to Exploration Ground Systems (EGS) at KSC and send the test articles for the core stage liquid hydrogen tank, liquid oxygen tank, and intertank to NASA's Marshall Space Flight center for structural testing. Additionally, workers will begin the challenging process of integrating the major sections of the 212-foot EM-1 core stage. This work is focused on the initial Block 1 variant of SLS, capable of launching more than 70 metric tons (t) to low Earth orbit (LEO). However, work concurrently is underway on the Block lB variant, which will enable 105 t to LEO and more than 37t to trans-lunar injection (TLI). Block lB will be the workhorse vehicle of NASA's lunar exploration plans. As the needs of the nation's deep space exploration program grow, SLS performance is designed to evolve to a payload mass of 130 t to LEO and up to 45t to TLI. The advantages of this mass - as well as volume- are critical to the entire exploration architecture for deep space exploration. They translate to greater capability, greater infrastructure and operational simplicity, less overall mission risk, and opportunities to accomplish unprecedented exploration and discovery. This paper will discuss SLS progress to date and planned future work.

Honeycutt, John↗

Preparing the Mars Relay Network for the Arrival of the Perseverance Rover at Mars

The Perseverance rover represents NASA’s latest achievement in Mars exploration. Landing successfully on 18 Feb 2021, the rover’s transmitted data during its entry, descent, and landing (EDL) were captured by the Mars Reconnaissance Orbiter (MRO) and the Mars Atmosphere and Volatile Evolution (MAVEN) orbiter. This data, broadcast in near-realtime to the world, allowed everyone to share in the excitement (and “terror”) of the day. The images returned thereafter included the first images of the new landing site, video of the landing itself taken from a variety of vantage points, and eventually the historic images of the first powered flight on another planet. Behind the scenes, the return of that data to Earth was accomplished via Mars orbiters operated by NASA and ESA, using three different ground tracking networks. Considered together, this Mars Relay Network (MRN) enabled the successful, timely, and unobtrusive return of the rover’s data. This paper describes the preparations taken by the participants of the MRN in anticipation of the arrival of Perseverance at Mars. These were not only focused on successfully acquiring the rover’s critical event telemetry during its EDL, but also on readying the network to return the rover’s data on an ongoing basis as it pursued its mission objectives. Included is a brief description of the MRN, which represents a highly successful international collaboration and continues as critical infrastructure for NASA’s and ESA’s ongoing Mars exploration. Also summarized are the activities performed prior to EDL, including landing site reconnaissance and mission test and training activities; those activities performed on EDL day, especially the recording, return, and processing of the rover’s critical event telemetry; and those activities that are now being performed on an ongoing basis during the rover’s surface operations, including an outline of the planning processes that enable relay services. Finally, a description of the performance of the network to-date on behalf of the Perseverance rover is given, summarizing the success of the network to provide support to both it and other spacecraft on the surface of Mars.

Srnka, Evan↗

Experimenting Galileo on Board the International Space Station

The SCaN Testbed is an advanced integrated communications system and laboratory facility installed on the International Space Station (ISS) in 2012. The testbed incorporates a set of new generation of Software Defined Radio (SDR) technologies intended to allow researchers to develop, test, and demonstrate new communications, networking, and navigation capabilities in the actual environment of space. Qascom, in cooperation with ESA and NASA, is designing a Software Defined Radio GalileoGPS Receiver capable to provide accurate positioning and timing to be installed on the ISS SCaN Testbed. The GalileoGPS waveform will be operated in the JPL SDR that is constituted by several hardware components that can be used for experimentations in L-Band and S-Band. The JPL SDR includes an L-Band Dorne Margolin antenna mounted onto a choke ring. The antenna is connected to a radio front end capable to provide one bit samples for the three GNSS frequencies (L1, L2 and L5) at 38 MHz, exploiting the subharmonic sampling. The baseband processing is then performed by an ATMEL AT697 processor (100 MIPS) and two Virtex 2 FPGAs. The JPL SDR supports the STRS (Space Telecommunications Radio System) that provides common waveform software interfaces, methods of instantiation, operation, and testing among different compliant hardware and software products. The standard foresees the development of applications that are modular, portable, reconfigurable, and reusable. The developed waveform uses the STRS infrastructure-provided application program interfaces (APIs) and services to load, verify, execute, change parameters, terminate, or unload an application. The project is divided in three main phases. 1)Design and Development of the GalileoGPS waveform for the SCaN Testbed starting from Qascom existing GNSS SDR receiver. The baseline design is limited to the implementation of the single frequency Galileo and GPS L1E1 receiver even if as part of the activity it will be to assess the feasibility of a dual frequency implementation (L1E1+L5E5a) in the same SDR platform.2)Qualification and test the GalileoGPS waveform using ground systems available at the NASA Glenn Research Center. Experimenters can have access to two SCaN Testbed ground based systems for development and verification: the Experimenter Development System (EDS) that is intended to provide initial opportunity for software testing and basic functional validation and the Ground Integration Unit (GIU) that is a high fidelity version of the SCaN Testbed flight system and is therefore used for more controlled final development testing and verification testing.3)Perform in-orbit validation and experimentation: The experimentation phase will consists on the collection of raw measurements (pseudorange, Carrier phase, CN0) in space, assessment on the quality of the measurements and the receiver performances in terms of signal acquisition, tracking, etc. Finally computation of positioning in space (Position, Velocity and time) and assessment of its performance.(Complete abstract in attached document).

GPS↗

Experimenting Galileo on Board the International Space Station

The SCaN Testbed is an advanced integrated communications system and laboratory facility installed on the International Space Station (ISS) in 2012. The testbed incorporates a set of new generation of Software Defined Radio (SDR) technologies intended to allow researchers to develop, test, and demonstrate new communications, networking, and navigation capabilities in the actual environment of space. Qascom, in cooperation with ESA and NASA, is designing a Software Defined Radio GalileoGPS Receiver capable to provide accurate positioning and timing to be installed on the ISS SCaN Testbed. The GalileoGPS waveform will be operated in the JPL SDR that is constituted by several hardware components that can be used for experimentations in L-Band and S-Band. The JPL SDR includes an L-Band Dorne Margolin antenna mounted onto a choke ring. The antenna is connected to a radio front end capable to provide one bit samples for the three GNSS frequencies (L1, L2 and L5) at 38 MHz, exploiting the subharmonic sampling. The baseband processing is then performed by an ATMEL AT697 processor (100 MIPS) and two Virtex 2 FPGAs. The JPL SDR supports the STRS (Space Telecommunications Radio System) that provides common waveform software interfaces, methods of instantiation, operation, and testing among different compliant hardware and software products. The standard foresees the development of applications that are modular, portable, reconfigurable, and reusable. The developed waveform uses the STRS infrastructure-provided application program interfaces (APIs) and services to load, verify, execute, change parameters, terminate, or unload an application. The project is divided in three main phases. 1)Design and Development of the GalileoGPS waveform for the SCaN Testbed starting from Qascom existing GNSS SDR receiver. The baseline design is limited to the implementation of the single frequency Galileo and GPS L1E1 receiver even if as part of the activity it will be to assess the feasibility of a dual frequency implementation (L1E1+L5E5a) in the same SDR platform.2)Qualification and test the GalileoGPS waveform using ground systems available at the NASA Glenn Research Center. Experimenters can have access to two SCaN Testbed ground based systems for development and verification: the Experimenter Development System (EDS) that is intended to provide initial opportunity for software testing and basic functional validation and the Ground Integration Unit (GIU) that is a high fidelity version of the SCaN Testbed flight system and is therefore used for more controlled final development testing and verification testing.3)Perform in-orbit validation and experimentation: The experimentation phase will consists on the collection of raw measurements (pseudorange, Carrier phase, CN0) in space, assessment on the quality of the measurements and the receiver performances in terms of signal acquisition, tracking, etc. Finally computation of positioning in space (Position, Velocity and time) and assessment of its performance.(Complete abstract in attached document).

Galileo↗

An Evidence-based Approach to Developing a Management Strategy for Medical Contingencies on the Lunar Surface: The NASA/Haughton-Mars Project (HMP) 2006 Lunar Medical Contingency Simulation at Devon Island

The lunar architecture for future sortie and outpost missions will require humans to serve on the lunar surface considerably longer than the Apollo moon missions. Although the Apollo crewmembers sustained few injuries during their brief lunar surface activity, injuries did occur and are a concern for the longer lunar stays. Interestingly, lunar medical contingency plans were not developed during Apollo. In order to develop an evidence-base for handling a medical contingency on the lunar surface, a simulation using the moon-Mars analog environment at Devon Island, Nunavut, high Canadian Arctic was conducted. Objectives of this study included developing an effective management strategy for dealing with an incapacitated crewmember on the lunar surface, establishing audio/visual and biomedical data connectivity to multiple centers, testing rescue/extraction hardware and procedures, and evaluating in suit increased oxygen consumption. Methods: A review of the Apollo lunar surface activities and personal communications with Apollo lunar crewmembers provided the knowledge base of plausible scenarios that could potentially injure an astronaut during a lunar extravehicular activity (EVA). Objectives were established to demonstrate stabilization and transfer of an injured crewmember and communication with ground controllers at multiple mission control centers. Results: The project objectives were successfully achieved during the simulation. Among these objectives were extraction from a sloped terrain by a two-member crew in a 1 g analog environment, establishing real-time communication to multiple centers, providing biomedical data to flight controllers and crewmembers, and establishing a medical diagnosis and treatment plan from a remote site. Discussion: The simulation provided evidence for the types of equipment and methods for performing extraction of an injured crewmember from a sloped terrain. Additionally, the necessary communications infrastructure to connect multiple centers worldwide was established from a remote site. The surface crewmembers were confronted with a number of unexpected scenarios including environmental, communications, EVA suit, and navigation challenges during the course of the simulation which provided insight into the challenges of carrying out a medical contingency in an austere environment. The knowledge gained from completing the objectives will be incorporated into the exploration medical requirements involving an incapacitated astronaut on the lunar surface.

Scheuring, R. A.↗

Serious Gaming for Test & Evaluation of Clean-Slate (Ab Initio) National Airspace System (NAS) Designs

Incremental approaches to air transportation system development inherit current architectural constraints, which, in turn, place hard bounds on system capacity, efficiency of performance, and complexity. To enable airspace operations of the future, a clean-slate (ab initio) airspace design(s) must be considered. This ab initio National Airspace System (NAS) must be capable of accommodating increased traffic density, a broader diversity of aircraft, and on-demand mobility. System and subsystem designs should scale to accommodate the inevitable demand for airspace services that include large numbers of autonomous Unmanned Aerial Vehicles and a paradigm shift in general aviation (e.g., personal air vehicles) in addition to more traditional aerial vehicles such as commercial jetliners and weather balloons. The complex and adaptive nature of ab initio designs for the future NAS requires new approaches to validation, adding a significant physical experimentation component to analytical and simulation tools. In addition to software modeling and simulation, the ability to exercise system solutions in a flight environment will be an essential aspect of validation. The NASA Langley Research Center (LaRC) Autonomy Incubator seeks to develop a flight simulation infrastructure for ab initio modeling and simulation that assumes no specific NAS architecture and models vehicle-to-vehicle behavior to examine interactions and emergent behaviors among hundreds of intelligent aerial agents exhibiting collaborative, cooperative, coordinative, selfish, and malicious behaviors. The air transportation system of the future will be a complex adaptive system (CAS) characterized by complex and sometimes unpredictable (or unpredicted) behaviors that result from temporal and spatial interactions among large numbers of participants. A CAS not only evolves with a changing environment and adapts to it, it is closely coupled to all systems that constitute the environment. Thus, the ecosystem that contains the system and other systems evolves with the CAS as well. The effects of the emerging adaptation and co-evolution are difficult to capture with only combined mathematical and computational experimentation. Therefore, an ab initio flight simulation environment must accommodate individual vehicles, groups of self-organizing vehicles, and large-scale infrastructure behavior. Inspired by Massively Multiplayer Online Role Playing Games (MMORPG) and Serious Gaming, the proposed ab initio simulation environment is similar to online gaming environments in which player participants interact with each other, affect their environment, and expect the simulation to persist and change regardless of any individual player's active participation.

Allen, B. Danette↗

Electrification of Aircraft: Challenges, Barriers, and Potential Impacts

Small-scale aircraft are being electrified with small e-aircraft already certified to fly and with test flights underway for retrofits of existing aircraft focused on near-term deployment. Internationally, from 2018 to 2020, the number of electric aircraft projects underway increased 50%. These technologies are projected to increase operational efficiency and reduce emissions and noise from a growing aviation sector. This emerging interest in aviation electrification includes aircraft, energy supply equipment, and battery storage manufacturers. Federal agencies are currently funding a variety of efforts including technology research as well as forecasting demand and environmental impacts and state governments have also begun pushing for further investigation in this area. This paper provides an overview of the current state and potential future development of aviation electrification. To understand the types of research questions around current and future challenges for this emerging sector, we consider a case study of the potential deployment of small commercial electric aircraft for existing, under-served markets and consider operational requirements and technical challenges as well as the range of questions that will need to be addressed around charging infrastructure, grid integration, policy and regulatory requirements, and emissions impacts. This case study also outlines potential nearer-term solutions and research areas of interest that will need to be addressed in the longer term at much larger scales and highlights NREL capabilities for addressing these challenges.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

A Multi-Center Space Data System Prototype Based on CCSDS Standards

Deep space missions beyond earth orbit will require new methods of data communications in order to compensate for increasing Radio Frequency (RF) propagation delay. The Consultative Committee for Space Data Systems (CCSDS) standard protocols Spacecraft Monitor & Control (SM&C), Asynchronous Message Service (AMS), and Delay/Disruption Tolerant Networking (DTN) provide such a method. However, the maturity level of this protocol stack is insufficient for mission inclusion at this time. This Space Data System prototype is intended to provide experience which will raise the Technical Readiness Level (TRL) of this protocol set. In order to reduce costs, future missions can take advantage of these standard protocols, which will result in increased interoperability between control centers. This prototype demonstrates these capabilities by implementing a realistic space data system in which telemetry is published to control center applications at the Jet Propulsion Lab (JPL), the Marshall Space Flight Center (MSFC), and the Johnson Space Center (JSC). Reverse publishing paths for commanding from each control center are also implemented. The target vehicle consists of realistic flight computer hardware running Core Flight Software (CFS) in the integrated Power, Avionics, and Power (iPAS) Pathfinder Lab at JSC. This prototype demonstrates a potential upgrade path for future Deep Space Network (DSN) modification, in which the automatic error recovery and communication gap compensation capabilities of DTN would be exploited. In addition, SM&C provides architectural flexibility by allowing new service providers and consumers to be added efficiently anywhere in the network using the common interface provided by SM&C's Message Abstraction Layer (MAL). In FY 2015, this space data system was enhanced by adding telerobotic operations capability provided by the Robot API Delegate (RAPID) family of protocols developed at NASA. RAPID is one of several candidates for consideration and inclusion in a new international standard being developed by the CCSDS Telerobotic Operations Working Group. Software gateways for the purpose of interfacing RAPID messages with the existing SM&C based infrastructure were developed. Telerobotic monitor, control, and bridge applications were written in the RAPID framework, which were then tailored to the NAO telerobotic test article hardware, a product of Aldebaran Robotics.

Rich, Thomas M.↗