Search NASA⌕ Search

SEARCH · Search NASA

Results for “Grid planning”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 217 records · Page 12

Advanced Measurements for Resilient Integration of Inverter-Based Resources: PROGRESS MATRIX Year-1 Report

As nearly every aspect of the electric power grid undergoes rapid change, measurement technologies that support grid operation and planning must evolve as well. Recent large-scale deployments of inverter-based resources (IBRs) have brought to the forefront the critical need for new measurement technologies. Though these IBRs are vital to achieving the nation’s clean energy goals, their rapid deployment has in some cases led to negative impacts on the reliability and security of the bulk power system (BPS). Advanced power system measurements, including synchronized phasor and waveform measurements, are key to making IBR integration secure and reliable. To this end, the Department of Energy (DOE) initiated a project in 2022 to develop advanced measurement capabilities and analytics that will accelerate adoption of IBRs while improving the reliability and resilience of the BPS. This report discusses a portion of the findings from the project’s first year, which focused on surveying existing measurement capabilities of partner utilities and comparing these capabilities with the requirements of applications that support IBR integration. This report also discusses how these findings will guide the development and demonstration of a set of applications in the project’s second year.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Winter Storm Elliott: Energy Emergency Alert Lessons Learned

Power blackouts in the United States in 2022 highlighted the need for better communication and planning among power grid stakeholders. This need was further demonstrated at a 2021 workshop held by the Grid Reliability Initiative Utilizing Data Standardization (GRIDS) Project. The GRIDS Project was established to understand and address the gaps in communication between the transmission and distribution operators. With the ongoing energy transition including electrification, distributed energy resource penetration, and so on, this project aims for improved energy emergency communications at the transmission-distribution interface. In 2022, Winter Storm Elliott affected 60% of the United States population (Weather Underground 2022), resulting in rolling blackouts in many areas of the eastern United States (Knoxville Utilities Board [KUB] 2023). Information presented here is based on the GRIDS workshop findings and subsequent research and interviews with stakeholders. After a brief summary of the effects of Winter Storm Elliott, this report covers the standard energy emergency communications processes currently in use, how the storm affected power management operations for the Tennessee Valley Authority (TVA) and its local utility companies, and related experiences in other states. The report concludes with lessons learned and recommendations for improvements and a path forward.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Advanced Measurements for Resilient Integration of Inverter-Based Resources: PROGRESS MATRIX Final Report

As nearly every aspect of the electric power grid undergoes rapid change, measurement technologies that support grid operation and planning must evolve as well. The rapid large-scale deployment of inverter-based resources (IBRs) vital to achieving the nation’s clean energy goals has in some cases led to negative impacts on the reliability and security of the bulk power system (BPS). Advanced power system measurements, including synchronized phasor and waveform measurements, are key to making IBR integration secure and reliable. To this end, the Department of Energy (DOE) initiated the PROGRESS MATRIX project to develop advanced measurement capabilities and analytics that will accelerate adoption of IBRs while improving the reliability and resilience of the BPS. This report discusses the outcomes of the project, which was a joint effort between the Pacific Northwest National Laboratory (PNNL), Oak Ridge National Laboratory (ORNL), the National Renewable Energy Laboratory (NREL), and Lawrence Berkeley National Laboratory (LBNL). In the project’s first year, PNNL, NREL, and ORNL partnered with the Bonneville Power Administration (BPA), the Western Area Power Administration (WAPA), and Kauai Island Utility Cooperative (KIUC) to understand their existing measurement capabilities and the gaps limiting deployment of IBR-focused measurement systems and analytics. The other primary activity in the first year was deployment of GridSweep instruments, which provide unprecedented precision in waveform measurement while probing distribution systems. The instruments were deployed at Dominion Energy and the University of California, Riverside. In the project’s second year, the input from partner utilities and collected measurements were used to advance measurement capabilities. Twelve analytical methods spanning disturbance analysis, power plant evaluation, feeder evaluation, and modeling were developed. Two software tools were developed, one to analyze GridSweep measurements and another to automatically evaluate the control performance of power plants connected to the BPS. Testbeds at ORNL and NREL were augmented to better enable studies of IBR integration. The project culminated in demonstrations of these analytical methods, software tools, and testbeds, both in the field and in the laboratory. This report discusses these various accomplishments and documents the significant progress in developing advanced measurement capabilities to support the secure, reliable, and accelerated adoption of IBRs in the BPS.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Applications of the Coastal Zone Color Scanner in oceanography

Research activity has continued to be focused on the applications of the Coastal Zone Color Scanner (CZCS) imagery in oceanography. A number of regional studies were completed including investigations of temporal and spatial variability of phytoplankton populations in the South Atlantic Bight, Northwest Spain, Weddell Sea, Bering Sea, Caribbean Sea and in tropical Atlantic Ocean. In addition to the regional studies, much work was dedicated to developing ancillary global scale meteorological and hydrographic data sets to complement the global CZCS processing products. To accomplish this, SEAPAK's image analysis capability was complemented with an interface to GEMPAK (Severe Storm Branch's meteorological analysis software package) for the analysis and graphical display of gridded data fields. Plans are being made to develop a similar interface to SEAPAK for hydrographic data using EPIC (a hydrographic data analysis package developed by NOAA/PMEL).

Mcclain, C. R.↗

OVERFLOW Guidelines for Simulation of Supersonic Retropropulsion

General methods for obtaining satisfactory simulation accuracy across a range of supersonic retropropulsive flows are recommended using comparisons between OVERFLOW calculations and tests of two vehicles in the Langley Unitary Plan Wind Tunnel. Gridding and discretization, various measures of solution convergence, and turbulence modelling options are dicussed. While the presented guidelines were developed from OVERFLOW simulations in support of a particular test, the recommendations on numerical methods and gridding practices hold merit for simulations conducted CFD solvers in general.

CFD↗

Advanced Manufacturing and Materials for Hydropower Strategy

Advanced manufacturing and materials (AMM) are revolutionizing how the energy sector is built, and the hydropower industry stands to benefit greatly from these new opportunities. The mission of the U.S. Department of Energy’s (DOE) Water Power Technologies Office (WPTO) is to enable research, development, and testing of new technologies to advance marine energy as well as next-generation hydropower and pumped storage systems for a flexible and reliable grid. This strategic plan outlines how WPTO can support AMM technologies for hydropower and pumped storage applications.

13 HYDRO ENERGY↗

Simulating Impacts of Extreme Events on Grids with High Penetrations of Wind Power Resources

As extreme weather events become more frequent and intense, the demand for connecting grid operation and infrastructure planning with extreme event models will increase as well. We present a methodology for creating damage contingencies and scenarios for electric transmission grids during a hurricane strike. Included is an example case study: Hurricane Dolly damaging a synthetic 2000 bus test system during its landing in Southern Texas. Using WIND Toolkit meteorological data in conjunction with fragility curves for various electric grid elements, we generate stochastic damage scenarios that can be used for short- and long-term planning problems including emergency asset management. We perform statistical analysis of damages and quantify topological effects on example synthetic grid. Also, we investigate loss-of-load events during two-day economic dispatch experiment. Finally, we point out various shortcomings of our method and suggest how it can be improved.

data-driven forecasting↗

Bridging the Gap on Data, Metrics, and Analyses for Grid Resilience to Weather Events: Information that utilities can provide regulators, state energy offices, and other stakeholders

A growing number of states require regulated utilities to file resilience plans to improve the electric grid’s ability to anticipate, withstand, adapt to and recover from increasingly severe weather events. This report aims to help state regulators identify and request data, metrics, and analyses from utilities and use it in decisions on utility resilience plans and investments. The report reviews state requirements and utility plans focused on overall grid resilience, climate change resilience and vulnerabilities, infrastructure modernization, storm protection, and wildfire mitigation. It details types of data, metrics, and analyses across five categories--and provides examples of each from the utility plans. The first category is vulnerability assessments, or evaluations of the susceptibility of systems, communities, or assets to potential harm from identified hazards. The second is data on hazards and the exposure of utility assets and customers to these hazards. The third is attribute metrics, or system characteristics that contribute to or describe the resilience of a system. The fourth is performance metrics, which are impacts of resilience investments on system performance--typically a reduction of negative impacts from hazard events. Finally, evaluation and prioritization are analyses that utilities conduct to estimate impacts from resilience measures (evaluation) and prioritize measures based on costs and estimated impacts (prioritization). The report concludes with examples of key trends and emerging best practices for states and utilities, and identifies areas for further research.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Electromagnetic Transient (EMT) Simulation Algorithm for Evaluation of Photovoltaic (PV) Generation Systems

Use of inverter-based resources facilitating renewable energy resources such as photovoltaic (PV) generation is increasing rapidly with decreasing costs and reduced emissions associated. To accommodate such rapid growth of inverter-based resources like PV systems, electromagnetic transient (EMT) simulation models of both PV systems and grids are required to analyze the interaction of PVs in the grid (like the post-event analysis). In addition, the EMT simulation would help with the planning of future power grid with a large number of PVs as well as other inverter-based distributed generation systems. In this paper, the EMT simulation models of PV systems and grids are developed based on the differential algebraic equations (DAEs) representing their EMT dynamics. Furthermore, advanced simulation algorithms including numerical stiffness-based hybrid discretization, DAE clustering and aggregation, multi-order integration, and matrix splitting approaches are applied to accelerate the EMT simulation. The proposed algorithm was applied to 125 PV inverters within 52-bus medium-voltage (MV) distribution grid.

Choi, Jongchan↗

EV Charging Infrastructure Energization An Overview of Approaches for Simplifying and Accelerating Timelines to Processing EV Charging Load Service Requests

The United States has seen significant growth in electric vehicle (EV) adoption, leading to increased demand for EV charging infrastructure. Over the past decade, EV charging infrastructure site developers, site hosts, and electric distribution utilities have navigated the process to integrate chargers onto the electric grid. Site developers and site hosts have raised the alarm that the integration process for high-powered EV charging projects does not meet the needs of the EV market for timeliness or cost. High-powered charging stations typically require a load service request or an agreement with the local utility to connect to the grid. The process of energizing a new high-powered charging site can be complex and time-consuming, often taking up to 2 years. This timeline is the result of current utility energization processes having been designed for construction projects that take longer to build (i.e., buildings). The specific challenges stem from various factors, including compartmentalization in application processes, the integration of EV charging process approvals with other distributed energy resources (DERs), and the need to ensure grid reliability. The energization process needs to evolve to meet the growing demand for high-powered EV charging. This white paper compiles information gathered through various conversations with key stakeholders, including utilities, utility regulators, EV charging operators, site developers, and authorities having jurisdiction (AHJ) as well as through an extensive literature review. This document identifies the challenges and provides potential solutions to streamline the process of connecting EV charging infrastructure to the power grid in the United States, serving as a starting point for future conversations around these solutions. The solutions noted in this white paper require collaborative efforts among utilities, regulators, and EV charging infrastructure developers to streamline the grid connection process for EV charging infrastructure. They are broadly organized into four areas: 1. Increase data access and transparency: Develop automated load service request tools, integrate hosting capacity and load service request analyses, incorporate EV adoption forecasts, and provide transparency on the processing queue. 2. Improve energization processes and timing: Create fast-track options based on prescreening criteria, provide flexibility or phased approvals in the load service request/interconnection process, build internal knowledge within utilities about EV charging technologies, and provide standardized workforce training. 3. Promote economic efficiency: Right size distribution components to accurately reflect the load requirements of EV charging infrastructure, make proactive investments in grid infrastructure based on EV adoption forecasts and growth projections, and consider energy equity and environmental justice factors such as equitable access to EV charging when planning infrastructure. 4. Improve grid reliability and resilience: Use load management/power control systems (PCS) at EV charging stations, adopt and implement harmonized standards for communication protocols and information models between the EV charging and grid control infrastructure, and address cybersecurity considerations by implementing robust security measures and standards for EV charging infrastructure—with particular emphasis on clarifying the security requirements for the interface to the grid. The objective of the solutions proposed in this white paper is to accelerate the timeline and decrease costs associated with connecting EV charging infrastructure to the grid. Electric utilities, utility regulators, EV charging infrastructure developers, and site hosts will first need to understand which solutions are available in their service territory, and if warranted, which combination of solutions would support their specific needs. Through the successful implementations of solutions at scale detailed here, industry will demonstrate a new and innovative ecosystem where timely deployment and energization of EV charging infrastructure with greater grid resiliency and reliability is a reality.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Bridging the Gap on Data and Analysis for Distribution System Planning: Information That Utilities Can Provide Regulators, State Energy Offices and Other Stakeholders

Electric utilities conduct planning annually to ensure their distribution system meets technical standards, policies, and regulations; addresses forecasted grid conditions; satisfies customer needs; and advances utility priorities. The plan identifies grid deficiencies, analyzes potential solutions, and prioritizes capital investments and other expenditures. About 20 U.S. states and jurisdictions require regulated utilities to file some type of distribution system plan with the public utility commission for review. Requirements for sharing distribution system data and analyses vary widely, from few specific requirements to a detailed list of information that must be provided. While utilities conduct extensive analysis to develop distribution system plans, in most jurisdictions regulators and stakeholders do not know what data are available and how the utility uses the data in planning and investing. This report aims to bridge the gap by increasing understanding of the types of data and analyses utilities employ to develop distribution system plans and how the information affects their decision-making. The report describes information that states and stakeholders can ask for related to 11 data categories: -Forecasting loads and distributed energy resources (DERs) -Scenario analysis -Worst-performing circuits -Asset management strategy -Hosting capacity analysis -Value of DERs -Grid needs assessment -Cost-effectiveness framework for investments -Distribution system investment strategy and implementation -Geotargeted programs -Non-wires alternatives procurements.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Land of Opportunity: Potential for Renewable Energy on Federal Lands

Renewable energy (RE) in the United States has historically been deployed primarily on private lands, but the growing interest in RE development, generally across the country and specifically on federal lands, raises questions about the potential for RE on public lands. This study seeks to estimate RE technical potential on federal lands and project the amount of RE to be developed on federal lands under decarbonization scenarios for the contiguous United States. The study applied a combination of high-resolution geospatial analysis and power sector modeling and relied on multiple partner federal agencies and land administrators from the Bureau of Land Management, the U.S. Fish and Wildlife Service, the U.S. Forest Service, the U.S. Department of Defense, and the U.S. Department of Energy. In our reference siting access case, we estimate 44 million acres of federal land across the contiguous United States is potentially suitable for UPV development, which corresponds to a capacity technical potential of 5,750 gigawatts (GW) (Figure ES-1). Federal land area available for wind development is similar to UPV but wind’s generating capacity technical potential is lower (875 GW). The technical potential is estimated for two geothermal technologies, hydrothermal and enhanced geothermal systems (EGS), both of which have a smaller amount of federal land available for development (12 and 27 million acres, respectively). However, in terms of capacity, the technical potential for EGS (975 GW) is approximately equal to wind’s technical potential and there is an estimated 130 GW of hydrothermal potential. We also developed cases with more-limited land available for UPV and wind (for federal and non-federal lands) resulting in 96% reduction of wind capacity potential and 70% reduction for UPV. In a case with additional constraints applied to non-federal lands only (Limited Private), the overall (federal and non-federal) technical potential declines but the share of that technical potential on federal lands is higher than in the other siting cases. The technical potential is the maximum amount that could be developed, but only a small fraction would be developed or needed in the future. Across seven scenarios that achieve 100% carbon-free electricity by 2035, we estimate 26 GW to 270 GW of RE capacity could be deployed on federal lands by 2035. The three central scenarios have 51–84 GW of RE deployed by 2035 and requiring about 500,000 to 1,000,000 acres of total land area. Direct land consumption is less than total land use required, thus enabling co-use opportunities. The large technical potential estimates and the increasing deployment projections from the collection of scenarios show the opportunities for RE development on federal lands. Capturing these opportunities-while minimizing conflicts with other land uses, federal department or agency missions, and public interest, and simultaneously maximizing the economic, grid, and social value of the projects-would require collaborative planning among federal land administrators, grid planners, project developers, the public, and other stakeholders.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

WE-Validate: An Open-Source Framework For Wind Power Validation

Grid operators rely on historical weather time series at existing and planned wind power plants to make informed decisions when planning for a future power grid with very high penetration of renewable power. While synthetic wind power time series have been developed based on historical weather models, their validation with actual power production data remains complex due to variations in modeling practices and methodologies. This paper introduces the WE-Validate framework, originally designed for wind speed validation and now enhanced for wind power validation with a graphical user interface to support users with minimal programming experience. Validation of wind power with WE-Validate is based on robust metrics consisting of RMSE, centered RMSE, average bias, average percent bias, mean absolute error, mean absolute percent error, cross correlation, and calculation of ramping magnitude, rate, and duration. This paper showcases WE-Validate with validation of synthetically derived power for a wind plant in Washington state for one month in 2018. Validation of the synthetic power from two comparison data sets compared with observations shows both comparison series have strong correlation with observed across weekly and monthly aggregations while suffering from persistent negative bias. The suite of metrics within WE-Validate facilitates immediate insight into the utility of the comparison data sets through compression across multiple axes. This user-friendly, open-source tool can be extended beyond wind power, making it a valuable resource for system planners and operators in different domains.

Moncheur de Rieudotte, Malcolm P.↗

Solar Resource and Infrastructure Assessment for the Town of Blandford

This report is a solar resource and infrastructure assessment for the town of Blandford, Massachusetts. The assessment was funded through the National Renewable Energy Laboratory, Solar Energy Innovation Network (NREL SEIN) Solar in Rural Communities Program, as part of a project to develop a Community-Informed Proactive Solar Siting and Financing Model. As a first step, the project lead organization, UMass Clean Energy Extension prepared an assessment of existing infrastructure, resources, and potential solar development opportunities in participating municipalities, including Blandford. This assessment was designed to describe relevant bylaws and infrastructure within the town, identify the types of solar facilities that could be developed, and quantify the total space available for each type of facility. In this report, we reviewed existing electricity grid infrastructure, and the potential to interconnect additional solar facilities. At the present time, most distribution lines providing electricity to Blandford are over-saturated with authorized and proposed solar projects, and cannot accommodate additional solar projects to interconnect to the grid. We can expect significant upgrades to these circuits, if any of the in-process projects are to proceed, which might then free up additional capacity for new projects. There is one circuit which serves a section of North Blandford Road that is not over-saturated; for the immediate future, this is the most cost-effective location for new large-scale projects to be sited. Meanwhile, most three-phase lines could likely accommodate additional small-to-medium scale projects (under 200 kW), and most single-phase lines could likely accommodate additional projects under 50 kW in size. This description represents the local grid infrastructure as it is - planning for future scenarios of development could include recommendations for areas of grid infrastructure improvement to allow siting of distributed generation in preferred locations. Future scenarios may also include the addition energy storage and other "non-wires alternatives."

14 SOLAR ENERGY↗