Search NASA⌕ Search

SEARCH · Search NASA

Results for “Human Mars lander”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 217 records · Page 12

Real-time Terrain Relative Navigation Test Results from a Relevant Environment for Mars Landing

Terrain Relative Navigation (TRN) is an on-board GN&C function that generates a position estimate of a spacecraft relative to a map of a planetary surface. When coupled with a divert, the position estimate enables access to more challenging landing sites through pin-point landing or large hazard avoidance. The Lander Vision System (LVS) is a smart sensor system that performs terrain relative navigation by matching descent camera imagery to a map of the landing site and then fusing this with inertial measurements to obtain high rate map relative position, velocity and attitude estimates. A prototype of the LVS was recently tested in a helicopter field test over Mars analog terrain at altitudes representative of Mars Entry Descent and Landing conditions. TRN ran in real-time on the LVS during the flights without human intervention or tuning. The system was able to compute estimates accurate to 40m (3 sigma) in 10 seconds on a flight like processing system. This paper describes the Mars operational test space definition, how the field test was designed to cover that operational envelope, the resulting TRN performance across the envelope and an assessment of test space coverage.

Pin-point Landing↗

NASA's Space Launch System: Positioning Assets for Tele-Robotic Operations

The National Aeronautics and Space Administration (NASA) is designing and developing America's most capable launch vehicle to support high-priority human and scientific exploration beyond Earth's orbit. The Space Launch System (SLS) will initially lift 70 metric tons (t) on its first flights, slated to begin in 2017, and will be evolved after 2021 to a full 130-t capability-larger than the Saturn V Moon rocket. This superior lift and associated volume capacity will support game-changing exploration in regions that were previously unattainable, being too costly and risky to reach. On the International Space Station, astronauts are training for long-duration missions to asteroids and cis-martian regions, but have not had transportation out of Earth's orbit - until now. Simultaneously, productive rovers are sending scientists - and space fans - unprecedented information about the composition and history of Mars, the planet thought to be most like Earth. This combination of experience and information is laying the foundation for future missions, such as those outlined in NASA's "Mars Next Decade" report, that will rely on te1e-robotic operations to take exploration to the next level. Within this paradigm, NASA's Space Launch System stands ready to manifest the unique payloads that will be required for mission success. Ultimately, the ability to position assets - ranging from orbiters, to landers, to communication satellites and surface systems - is a critical step in broadening the reach of technological innovation that will benefit all Earth's people as the Space Age unfolds. This briefing will provide an overview of how the Space Launch System will support delivery of elements for tele-robotic operations at destinations such as the Moon and Mars, which will synchronize the human-machine interface to deliver hybrid on-orbit capabilities. Ultimately, telerobotic operations will open entirely new vistas and the doors of discovery. NASA's Space Launch System will be a safe, affordable, and sustainable platform for these purposes and more.

May, Todd A.↗

A Phobos-Deimos Mission as an Element of the NASA Mars Design Reference Architecture 5.0

NASA has conducted a series of mission studies over the past 25 years examining the eventual exploration of the surface of Mars by humans. The latest version of this evolutionary series of design reference missions/architectures - Design Reference Architecture 5 or DRA-5 - was completed in 2007. This paper examines the implications of including a human mission to explore the moons of Mars and teleoperate robots in various locations, but not to land the human crews on Mars, as an element of this reference architecture. Such a mission has been proposed several times during this same 25 year evolution leading up to the completion of DRA-5 primarily as a mission of testing the in-space vehicles and operations while surface vehicles and landers are under development. But such a precursor or test mission has never been explicitly included as an element of this Architecture. This paper will first summarize the key features of the DRA-5 to provide context for the remainder of the assessment. This will include a description of the in-space vehicles that would be the subject of a shakedown test during the Mars orbital mission. A decision tree will be used to illustrate the factors that will be analyzed, and the sequence in which they will be addressed, for this assessment. The factors that will be analyzed include the type of interplanetary transfer orbit (opposition class versus conjunction class), the type of parking orbit (circular versus elliptical), and the type of propulsion technology (high thrust chemical versus nuclear thermal rocket). The manner in which each of these factors impacts an individual mission will be described. In addition to the direct impact of these factors, additional considerations impacting crew health and overall programmatic outcomes will be discussed. Numerical results for each of the factors in the decision tree will be grouped with derived qualitative impacts from crew health and programmatic consideration. These quantitative and qualitative results will be summarized in a pros/cons table as a summary for this analysis.

Hoffman, Stephen J.↗

In Situ Resource Utilization (ISRU) Envisioned Future Priorities

The National Aeronautics and Space Administration (NASA) of the United States of America (US) has initiated the Artemis Moon to Mars program to send astronauts (the first woman and person of color) back to the lunar surface, create a sustainable human lunar exploration program, and lead the first human exploration mission to the Mars surface in the 2030’s. A major objective of this program is to characterize the resources that exist on the Moon and Mars, and learn how to utilize them for sustained and affordable exploration. Commonly known as In Situ Resource Utilization (ISRU), the search for, acquisition, and processing of resources in space has the potential to greatly reduce the dependency on transporting mission consumables and infrastructure from Earth, thereby reducing mission costs, risks, and dependency on Earth. Through the extraction and processing of resources into mission commodities such as rocket propellants, life support consumables, and fuel cell reactants, ISRU enhances and evolves the cis-lunar, lander, and surface transportation systems required for human exploration; expanding and ehancing HOW humans get to, explore, and return from the Moon. Through the extraction and processing of resources into metals, silicon, and other manufacturing and construction feedstock, ISRU enhances and allows for the expansion of critical infrastructure through in situ manufacturing and construction capabilities needed for WHAT humans do on the Moon and in cis-lunar space. Because of this, ISRU supports and enables commercial involvement beyond NASA and governmental agencies by both lowering the cost of sustained transportation to/from/on the Moon as well as supporting the market required for needing these transportation systems. To achieve this vision, NASA’s Space Technology Mission Directorate (STMD) ensures the coordinated development of ISRU and other critical space and surface infrastructure elements such as propulsion, power, manufacturing, construction, and robotics through the Strategic Technology Architecture Roundtable (STAR) process. Through STAR, an integrated framework and process has been created allowing for capabilities and technologies to be linked and assessed, gaps to be identified, specifications and metrics to be established, and provide a means to prioritize and implement technology development and missions. For lunar ISRU, three primary areas of development have been initiated, (1) understanding, mapping, extracting, and processing water and other volatiles found in polar permanently shadowed regions (PSRs), (2) methods, technologies to extract oxygen from regolith, and (3) methods, technologies, and use cases for metals, silicon, and other feedstock commodities extracted and produced from lunar resources. This presentation will briefly discuss the STAR process and elaborate on the current status and future plans for ISRU development, demonstration, and architecture implementation of NASA’s Envisioned Future Priorities plan for ISRU.

In Situ Resource Utilization↗

In-Space Transportation for NASA's Evolvable Mars Campaign

As the nation embarks on a new and bold journey to Mars, significant work is being done to determine what that mission and those architectural elements will look like. The Evolvable Mars Campaign, or EMC, is being evaluated as a potential approach to getting humans to Mars. Built on the premise of leveraging current technology investments and maximizing element commonality to reduce cost and development schedule, the EMC transportation architecture is focused on developing the elements required to move crew and equipment to Mars as efficiently and effectively as possible both from a performance and a programmatic standpoint. Over the last 18 months the team has been evaluating potential options for those transportation elements. One of the key aspects of the EMC is leveraging investments being made today in missions like the Asteroid Redirect Mission (ARM) mission using derived versions of the Solar Electric Propulsion (SEP) propulsion systems and coupling them with other chemical propulsion elements that maximize commonality across the architecture between both transportation and Mars operations elements. This paper outlines the broad trade space being evaluated including the different technologies being assessed for transportation elements and how those elements are assembled into an architecture. Impacts to potential operational scenarios at Mars are also investigated. Trades are being made on the size and power level of the SEP vehicle for delivering cargo as well as the size of the chemical propulsion systems and various mission aspects including Inspace assembly and sequencing. Maximizing payload delivery to Mars with the SEP vehicle will better support the operational scenarios at Mars by enabling the delivery of landers and habitation elements that are appropriately sized for the mission. The purpose of this investigation is not to find the solution but rather a suite of solutions with potential application to the challenge of sending cargo and crew to Mars. The goal is that, by building an architecture intelligently with all aspects considered, the sustainable Mars program wisely invests limited resources enabling a long-term human Mars exploration program.

Percy, Thomas K.↗

Proposal to Simultaneously Profile Wind and CO2 on Earth and Mars With 2-micron Pulsed Lidar Technologies

2-micron lidar technology has been in use and under continued improvement for many years toward wind measurements. But the 2-micron wavelength region is also rich in absorption lines of CO2 (and H2O to a lesser extent) that can be exploited with the differential absorption lidar (DIAL) technique to make species concentration measurements. A coherent detection receiver offers the possibility of making combined wind and DIAL measurements with wind derived from frequency shift of the backscatter spectrum and species concentration derived from power of the backscatter spectrum. A combined wind and CO2 measurement capability is of interest for applications on both Earth and Mars. CO2 measurements in the Earth atmosphere are of importance to studies of the global carbon cycle. Data on vertically-resolved CO2 profiles over large geographical observations areas are of particular interest that could potentially be made by deploying a lidar on an aircraft or satellite. By combining CO2 concentration with wind measurements an even more useful data product could be obtained in the calculation of CO2 flux. A challenge to lidar in this application is that CO2 concentration measurements must be made with a high level of precision and accuracy to better than 1%. The Martian atmosphere also presents wind and CO2 measurement problems that could be met with a combined DIAL/Doppler lidar. CO2 concentration in this scenario would be used to calculate atmospheric density since the Martian atmosphere is composed of 95% CO2. The lack of measurements of Mars atmospheric density in the 30-60 km range, dust storm formation and movements, and horizontal wind patterns in the 0-20 km range pose significant risks to aerocapture, and entry, descent, and landing of future robotic and human Mars missions. Systematic measurement of the Mars atmospheric density and winds will be required over several Mars years, supplemented with day-of-entry operational measurements. To date, there have been 5 successful robotic landings on Mars. Atmospheric density and wind reconstruction has been performed for 3 of these entries (the two Viking landers and Mars Pathfinder). At present, all Mars atmospheric density and wind models have these 3 entries (at widely scattered positions and seasons) as their basis, supplemented by coarse orbital measurements of atmospheric opacity and temperature. This lack of data leads to a large uncertainty in prediction of the Mars atmospheric density and winds in the altitude regime where deceleration of landers will occur. This uncertainty will have a dramatically large impact on mass, cost and risk. The precision and accuracy for application to Mars is not as stringent as Earth, but Mars does pose a challenge in needing a high level of wavelength stability and control in order to reference wavelength to the narrow linewidths found in the low atmospheric pressure of Mars, as illustrated in Figure 1.

Singh, Upendra N.↗

Concept of Operations for a Prospective "Proving Ground" in the Lunar Vicinity

NASA is studying a "Proving Ground" near the Moon to conduct human space exploration missions in preparation for future flights to Mars. This paper describes a concept of operations ("conops") for activities in the Proving Ground, focusing on the construction and use of a mobile Cislunar Transit Habitat capable of months-long excursions within and beyond the Earth-Moon system. Key elements in the conops include the Orion spacecraft (with mission kits for docking and other specialized operations) and the Space Launch System heavy-lift rocket. Potential additions include commercial launch vehicles and logistics carriers, solar electric propulsion stages to move elements between different orbits and eventually take them on excursions to deep space, a node module with multiple docking ports, habitation and life support blocks, and international robotic and piloted lunar landers. The landers might include reusable ascent modules which could remain docked to in-space elements between lunar sorties. The architecture will include infrastructure for launch preparation, communication, mission control, and range safety. The conops describes "case studies" of notional missions chosen to guide the design of the architecture and its elements. One such mission is the delivery of a ~10-ton pressurized element, co-manifested with an Orion on a Block 1B Space Launch System rocket, to the Proving Ground. With a large solar electric propulsion stage, the architecture could enable a year-long mission to land humans on a near-Earth asteroid. In the last case, after returning to near-lunar space, two of the asteroid explorers could join two crewmembers freshly arrived from Earth for a Moon landing, helping to safely quantify the risk of landing deconditioned crews on Mars. The conops also discusses aborts and contingency operations. Early return to Earth may be difficult, especially during later Proving Ground missions. While adding risk, limited-abort conditions provide needed practice for Mars, from which early return is likely to be impossible.

Love, Stanley G.↗

Reconsidering the Theological and Ethical Implications of Extraterrestrial Life

As we stand on the threshold of a new millennium, we also find ourselves at the brink of a new and exciting era in space exploration. In fact, this new era has already begun, with the successful landing and exploration of Mars by the Pathfinder mission in July 1997. Pathfinder represents an important scientific accomplishment for NASA because it demonstrated the agency's ability to successfully explore space at a relatively modest price. At the same time, Pathfinder revealed once again the genuine interest and fascination that people all over planet Earth have for space exploration. The recent Pathfinder mission to Mars was only the first in an ambitious series of NASA missions planned for exploration of Mars, Earth's nearest planetary neighbor where extraterrestrial life is a real possibility. In March 1998, the next step in this exploration takes place, when the Mars Global Surveyor--which is already in orbit around Mars--begins photographing and mapping the Martian surface. NASA plans to continue its exploration with additional landers and orbiters taking off for Mars every 26 months, when the paths of Mars and Earth bring them in closer proximity. By the year 2005, NASA hopes to launch a mission that will return martian samples to Earth. And, as early as 2011, astronauts could be rocketing from Earth for the first human landing on the Red Planet. In the distant future, there may be even more grandiose plans, including the possibility of engineering an atmosphere on Mars that could support biological life.

Randolph, Richard O.↗

Comments about "Earth 3.0"

Dr. Christopher P. McKay, Planetary Scientist with the Space Science Division of NASA Ames. Chris received his Ph.D. in AstroGeophysics from the University of Colorado in 1982 and has been a research scientist with the NASA Ames Research Center since that time. His current research focuses on the evolution of the solar system and the origin of life. He is also actively involved in planning for future Mars missions including human exploration. Chris been involved in research in Mars-like environments on Earth, traveling to the Antarctic dry valleys, Siberia, the Canadian Arctic, and the Atacama desert to study life in these Mars-like environments. His was a co-I on the Titan Huygen s probe in 2005, the Mars Phoenix lander mission for 2007, and the Mars Science Lander mission for 2009.

Dator, Jim↗

The MECA Payload as a Dust Analysis Laboratory on the MSP 2001 Lander

In a companion abstract, the "Mars Environmental Compatibility Assessment" (MECA) payload for Mars Surveyor Program 2001 (MSP 2001) is described in terms of its capabilities for addressing exobiology on Mars. Here we describe how the same payload elements perform in terms of gathering data about surface dust on the planet. An understanding of the origin and properties of dust is important to both human exploration and planetary geology. The MECA instrument is specifically designed for soil/dust investigations: it is a multifunctional laboratory equipped to assess particulate properties with wet chemistry, camera imagery, optical microscopy (potentially with LTV fluorescence capability), atomic force microscopy (AFM; potentially with mineral-discrimination capabilities), electrometry, active & passive external materials-test panels, mineral hardness testing, and electrostatic & magnetic materials testing. Additionally, evaluation of soil chemical and physical properties as a function of depth down to about 50 cm will be facilitated by the Lander/MECA robot arm on which the camera (RAC) and electrometer are mounted. Types of data being sought for the dust include: (1) general textural and grain-size characterization of the soil as a whole --for example, is the soil essentially dust with other components or is it a clast-supported material in which dust resides only in the clast interstices, (2) size frequency distribution for dust particles in the range 0.01 to 10.00 microns, (3) particle-shape distribution of the soil components and of the fine dust fraction in particular, (4) soil fabric such as grain clustering into clods, aggregates, and cemented/indurated grain amalgamations, as well as related porosity, cohesiveness, and other mechanical soil properties, (5) cohesive relationship that dust has to certain types of rocks and minerals as a clue to which soil materials may be prime hosts for dust "piggybacking", (6) particle, aggregate, and bulk soil electrostatic properties, (7) particle hardness, (8) particle magnetic properties, (9) bulk dust geochemistry (solubility, reactivity, ionic and mineral species). All of these quantities are needed in order for the human exploration program to make assessments of hazards on Mars, and to better enable the production on earth, of soil/dust simulants that can act as realistic test materials in terms of those properties that render dust a contaminant.Such properties include the small grain size that enables penetration of space-suit joints, mechanical interfaces and bearings, seals, etc., and presents difficulty for filtration systems. Size also plays a critical role in the potential for lung disease in long-term habitats. The properties of grain shape and hardness are important parameters in determining the abrasiveness of dust as it enters mechanical systems, or bombards helmet visors and habitat windows in dust-laden winds. Adhesive electrostatic and magnetic properties of dust will be prime causes of contamination of space suits and equipment. Contamination causes mechanical malfunction, tracking of dirt into habitats, "piggybacking" of toxins on dust into habitats, changes in albedo and efficiency of solar arrays and heat exchangers, and changes in electrical conductivity of suit surfaces and other materials that may have specific safety requirements regarding electrical conductivity. Other potentially hazardous properties of dust include the possibility of high solubility of some component grains (rendering them reactive), and toxicity of some materials --grains of superoxidants and heavy metals (there is always the slim, but not inconceivable possibility of biogenic components such as spores). Because Mars has no active surface aqueous regime, volcanic emissions, meteoritic debris, weathering products, and photochemical products of Mars have nowhere to go except reside in the surface; there are few mechanical or chemical (buffering) processes to remove the accumulation of eons. From a planetology perspective, there are many enigmatic issues relating to dust and the aeolian regime in general. MECA will be able to address many questions in this area. For example, if MECA determines a particular particle size distribution (size and sorting values), it will be possible to make inferences about the origin of the dust - - is it all aeolian, or a more primitive residue of weathering, volcanic emissions, and meteoritic gardening? Trenching with the Lander/MECA robot arm will enable local stratigraphy to be determined in terms of depositional rates, amounts and cyclicity in dust storms and/or local aeolian transport. Grain shape will betray the origin of the dust fragments as being the product of recent or ancient weathering, or the comminution products of aeolian transport --the dust-silt ratio might be a measure of aeolian comminution energy. Additional information is contained in the original.

Marshall, J.↗

Chemical, Mineralogical, and Physical Properties of Martian Dust and Soil

Global and regional dust storms on Mars have been observed from Earth-based telescopes, Mars orbiters, and surface rovers and landers. Dust storms can be global and regional. Dust is material that is suspended into the atmosphere by winds and has a particle size of 1-3 micrometer. Planetary scientist refer to loose unconsolidated materials at the surface as "soil." The term ''soil'' is used here to denote any loose, unconsolidated material that can be distinguished from rocks, bedrock, or strongly cohesive sediments. No implication for the presence or absence of organic materials or living matter is intended. Soil contains local and regional materials mixed with the globally distributed dust by aeolian processes. Loose, unconsolidated surface materials (dust and soil) may pose challenges for human exploration on Mars. Dust will no doubt adhere to spacesuits, vehicles, habitats, and other surface systems. What will be the impacts on human activity? The objective of this paper is to review the chemical, mineralogical, and physical properties of the martian dust and soil.

Ming, D. W.↗

Human Mars Entry, Descent, and Landing Architecture Study: Phase 3 Summary

Over the past four years, NASA has directed the Entry, Descent and Landing Architecture Study (EDLAS) to evaluate candidate technologies to deliver human-scale vehicles (carrying 20t payloads) to the surface of Mars. The study focused on two vehicles in Phase 3 (during 2018 and 2019), one low and one mid lift-to-drag (L/D) vehicle. This paper summarizes updates to the structural and aeroshell outer mold line design for the mid-L/D Mars entry lander vehicle that occurred during EDLAS Phase 3. The design efforts used parametric optimization to arrive at a solution for total vehicle primary and secondary structure mass, and vehicle center-of-gravity location. Additionally, the end of Phase 2 provided an updated surface payload manifest that required three 22 t landers. This paper also summarizes the results of the packaging feasibility study of the updated payload configurations for those three reference missions. The study verified an arrangement of the payload elements within the mid-L/D vehicle that satisfied the center of gravity location limitations for flight.

Calderon, Damien↗

NASA Engineering and Safety Center Lunar Rover Design Concepts Assessments

Mass is a significant risk to programs and projects as they transition from formulation to implementation, especially in larger human space systems where delivery mass or volume can be a constrained commodity. • Concepts developed without an adequate systems-engineering basis, including design and operations experience, may miss significant functionality and subsequent mass required for integration or operations. • Further uncertainty can be associated with not fully understanding design best practices and standards that drive mass, such as design for minimum risk or fault tolerance.1 • Finally, the appropriate systems engineering mass properties management rigor and technical discipline insight are required to set the mass baseline, including appropriate mass growth allowance (MGA) to ensure program success. Mass is a key quantity that should be constantly monitored by the systems engineer and the program/project management stakeholder to ensure mission compatibility throughout the project life cycle. In addition, mass is a key programmatic performance metric monitored by the NASA Chief Financial Officer for current and future program cost estimating. NASA Exploration Systems sought an assessment of reasonableness with respect to different potential rover concepts that balances mass needs and human-class cargo lander capabilities. Appropriate systems engineering mass properties management rigor and technical discipline insight were used, and are required to set the mass baseline, including appropriate MGA to ensure program success. Two independent Lunar rover concepts were evaluated, with a goal to understand concept credibility and the Lunar rover designs potential extensibility for Mars surface operations. A notional generic rover concept is shown in Figure 1.

Systems Engineering↗

Outpost Assembly Using the ATHLETE Mobility System

A planetary surface outpost will likely consist of elements delivered on multiple manifests, that will need to be assembled from a scattering of landings. Using the All-Terrain Hex-Limbed Extra-Terrestrial Explorer (ATHLETE) limbed robotic mobility system, the outpost site can be prepared in advance through leveling, paving, and in-situ structures. ATHLETE will be able to carry pressurized and non-pressurized payloads overland from the lander descent stage to the outpost location, and perform precision docking and assembly of components. In addition, spent descent stages can be carried to assembly locations to form elevated decks for external work platforms above the planet surface. This paper discusses several concepts that have been studied for possible inclusion in the NASA Evolvable Mars Campaign human exploration mission scenarios.

Mars outpost↗

Application of a Detached Eddy Simulation Approach with Finite-Rate Chemistry to Mars-Relevant Retropropulsion Operating Environments

Human-scale Mars vehicles will require retropropulsion for descent and landing, replacing heritage supersonic parachute systems with an extended phase of powered flight. Due to the limitations of terrestrial testing in Mars-relevant conditions, design and analysis will increasingly rely on computational modeling and simulation. This paper provides an overview of a computational campaign investigating the aerodynamics of a Mars lander concept along various points on a powered descent trajectory including supersonic, transonic, and subsonic conditions using finite-rate chemistry. Simulations using unstructured grids containing billions of elements are performed at scale using thousands of Graphics Processing Units, enabling run-times of a few days for each simulation presented. At each freestream condition, significant minor species concentrations are observed external to the nozzles in the large mixing region upstream of the vehicle. While the flowfields are highly non-stationary in all cases, the mean integrated forces and moments on the vehicle remain small in comparison to the deceleration provided through retropropulsion.

Ashley Korzun↗

Baseline Assumptions and Ersatz Waste Streams for Partial Gravity Habitats with Mobile Female and Male Crew

Effective and reliable water management and recovery systems will be required to support human missions beyond the low Earth orbit (LEO) of the International Space Station (ISS). Lunar and Mars surface missions will introduce new challenges to managing water and associated waste streams from mobile crew members who are transiting between up to six living shelters in extreme environmental conditions under a range of gravity conditions. A review of baseline assumptions for the human activities and associated air and water cycles in and between transit vehicle, orbiting station, lander-ascent vehicle, surface habitat, pressurized rover, and suits is conducted. The paper updates ersatz formulations and water flow rates for the main liquid water waste streams of urine, humidity condensate, hygiene, and laundry. Emphasis is placed on the metabolic emissions partitioning between the six vehicles during a design reference mission scenario. Ersatz to represent menses are reviewed.

Dean L Muirhead↗

Building on 50 Years of Mission Operations Experience for a New Era of Space Exploration

The U.S. National Space Policy, I the 14-nation Global Exploration Strategy,2 and the National Aeronautics and Space Administration's (NASA) 2006 Strategic Plan3 provide foundational direction for far-ranging missions, from safely flying the Space Shuttle and completing construction of the International Space Station by 2010, to fielding a next generation space transportation system consisting of the Ares I Crew Launch Vehicle!Orion Crew Exploration Vehicle and the Ares V Cargo Launch Vehicle!Altair Lunar Lander (fig. 1). Transportation beyond low-Earth orbit will open the frontier for a lunar outpost, where astronauts will harness in-situ resources while exploring this 4 billion-year-old archaeological site, which may hold answers to how the Earth and its satellite were formed. Ultimately, this experience will pave the way for the first human footprint on Mars. In October 2007, NASA" announced assignments for this lunar exploration work.4 The Marshall Space Flight Center is responsible for designing, developing, testing, and evaluating the Ares I and Ares V, which are Space Shuttle derived launch vehicles, along with a number of lunar tasks. The Marshall Center's Engineering Directorate provides the skilled workforce and unique manufacturing, testing, and operational infrastructure needed to deliver space transportation solutions that meet the requirements stated in the Constellation Architecture Requirements Document (CARD). While defining design reference missions to the Station and the Moon, the CARD includes goals that include reducing recurring and nonrecurring costs, while increasing safety and reliability. For this reason, future systems are being designed with operability considerations and lifecycle expenses as independent variables in engineering trade studies.

Onken, Jay F.↗

Baseline Assumptions and Ersatz Waste Streams for Partial Gravity Habitats with Mobile Female and Male Crew

Effective and reliable water management and recovery systems will be required to sup-port human missions beyond the low Earth orbit (LEO) of the International Space Station (ISS). Lunar and Mars surface missions will introduce new challenges to managing water and associated waste streams from mobile crew members who will be living in up to six shelters in extreme environmental conditions under a range of gravity conditions. A review of baseline assumptions for the human activities and associated air and water cycles in and between the transit vehicle, orbiting station, lander-ascent vehicle, surface habitat, pressurized rover, and suits is conducted. The paper reviews ersatz formulations and water flow rates for the main liquid water waste streams of urine, humidity condensate, hygiene, and laundry. Emphasis is placed on the metabolic emissions partitioning between the six habitat elements and the lunar exosphere during a design reference mission scenario.

Water Ersatz Habitat↗