Search NASA⌕ Search

SEARCH · Search NASA

Results for “LAUNCH DATE”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 217 records · Page 12

Summary of JPL Activities

A viewgraph presentation outlines the Jet Propulsion Laboratory (JPL) flight programs, including past, present and future missions targeting Solar System exploration. Details, including launch dates and batteries used, are given for Deep Space 1 (Asteroid Rendezvous), Deep Space 2 (Mars Penetrator), Mars Global Surveyor, Mars Surveyor '98, Stardust, Europa Orbiter, Mars Surveyor 2001, Mars 2003 Lander and Rover, and Genesis (Solar Dust Return). Earth science projects are also outlined: Active Cavity Radiometer Irradiance Monitor (ARIMSAT), Ocean Topography Experiment (TOPEX/Poseidon), Jason-1 (TOPEX follow-on), and QuikScat/Seawinds (Ocean Winds Tracking). The status, background, and plans are given for several batteries: (1) 2.5 inch common pressure vessel (CPV), (2) 3.5 inch CPV, (3) Ni-H2, and (4) Li-Ion.

Timmerman, Paul J.↗

Performance Characteristics of Lithium-Ion Prototype Batteries for Mars Surveyor Program 2001 Lander

A viewgraph presentation outlines the scientific payload, expected launch date and tasks, and an image of the Mars Surveyor 2001 Lander components. The Lander's battery specifications are given. The program objectives for the Li-ion cells for the Lander are listed, and results performance evaluation and cycle life performance tests are outlined for different temperatures. Cell charge characteristics are described, and test data is presented for charge capacity at varying temperatures. Capacity retention and storage characteristics tests are described and results are shown.

Smart, M. C.↗

STS-102 Countdown Status Briefing

Joel Wells, NASA Public Affairs, introduces Pete Nickolenko, NASA Test Director, Glenn Chin, Leonardo Mission Manager, and Ed Priselac, Shuttle Weather Officer, in this STS-102 prelaunch press conference. Mr. Nickolenko gives an overview of the countdown and built-in hold times, the launch window, and prelaunch activities (such as activation and checkout of the onboard computer systems, closing the payload bay doors, servicing of the onboard cryogenic cell tanks, main engine tests, and power-up of the ground communications systems). Mr. Chin confirms that the payload is in the final flight configuration and is ready for launch. Mr. Priselac gives the weather forecast for the launch date. The men then answer questions from the press.

Source record↗

Use of a GCM to Explore Sampling Issues in Connection with Satellite Remote Sensing of the Earth Radiation Budget

Collocated in time and space, top-of-the-atmosphere measurements of the Earth radiation budget (ERB) and cloudiness from passive scanning radiometers, and lidar- and radar-in-space measurements of multilayered cloud systems, are the required combination to improve our understanding of the role of clouds and radiation in climate. Experiments to fly multiple satellites "in formation" to measure simultaneously the radiative and optical properties of overlapping cloud systems are being designed. Because satellites carrying ERB experiments and satellites carrying lidars- or radars-in space have different orbital characteristics, the number of simultaneous measurements of radiation and clouds is reduced relative to the number of measurements made by each satellite independently. Monthly averaged coincident observations of radiation and cloudiness are biased when compared against more frequently sampled observations due, in particular, to the undersampling of their diurnal cycle, Using the Colorado State University General Circulation Model (CSU GCM), the goal of this study is to measure the impact of using simultaneous observations from the Earth Observing System (EOS) platform and companion satellites flying lidars or radars on monthly averaged diagnostics of longwave radiation, cloudiness, and its cloud optical properties. To do so, the hourly varying geographical distributions of coincident locations between the afternoon EOS (EOS-PM) orbit and the orbit of the ICESAT satellite set to fly at the altitude of 600 km, and between the EOS PM orbit and the orbits of the PICASSO satellite proposed to fly at the altitudes of 485 km (PICA485) or 705 km (PICA705), are simulated in the CSU GCM for a 60-month time period starting at the idealistic July 1, 2001, launch date. Monthly averaged diagnostics of the top-of-the-atmosphere, atmospheric, and surface longwave radiation budgets and clouds accumulated over grid boxes corresponding to satellite overpasses are compared against monthly averaged diagnostics obtained from hourly samplings over the entire globe. Results show that differences between irregularly (satellite) and regularly (true) sampled diagnostics of the longwave net radiative budgets are the greatest at the surface and the smallest in the atmosphere and at the top-of-the-atmosphere, under both cloud-free and cloudy conditions. In contrast, differences between the satellite and the true diagnostics of the longwave cloud radiative forcings are the largest in the atmosphere and at the top-of-the-atmosphere, and the smallest at the surface. A poorer diurnal sampling of the surface temperature in the satellite simulations relative to the true simulation contributes a major part to sampling biases in the longwave net radiative budgets, while a poorer diurnal sampling of cloudiness and its optical properties directly affects diagnostics of the longwave cloud radiative forcings. A factor of 8 difference in the number of satellite overpasses between PICA705 and PICA485 and ICESAT leads to a systematic factor of 3 difference in the spatial standard deviations of all radiative and cloudiness diagnostics.

Fowler, Laura D.↗

Initial Results from the Micro-pulse Lidar Network (MPL-Net)

The micro-pulse lidar system (MPL) was developed in the early 1990s and was the first small, eye-safe, and autonomous lidar built for full time monitoring of cloud and aerosol vertical distributions. In 2000, a new project using MPL systems was started at NASA Goddard Space Flight Center. This new project, the Micro-pulse Lidar Network or MPL-Net, was created to provide long-term observations of aerosol and cloud vertical profiles at key sites around the world. This is accomplished using both NASA operated sites and partnerships with other organizations owning MPL systems. The MPL-Net sites are co-located with NASA AERONET sunphotometers to provide aerosol optical depth data needed for calibration of the MPL. In addition to the long-term sites, MPL-Net provides lidar support for a limited number of field experiments and ocean cruises each year. We will present an overview of the MPL-Net project and show initial results from the first two MPL-Net sites at the South Pole and at Goddard Space Flight Center. Observations of dust layers transported from the Gobi desert, across the Pacific Ocean, to the east coast of the United States will also be shown. MPL-Net affiliated instruments were in place at the desert source region in China, on a research vessel in the Sea of Japan, at ARM sites in Alaska and Oklahoma, and finally at our home site in Maryland (GSFC) during the massive dust storms that occurred in April 2001. The MPL observations of dust layers at each location are shown in comparison to dust layers predicted using the Georgia Tech/Goddard Global Ozone Chemistry Aerosol Radiation and Transport model (GOCART). Finally, the MPL-Net project is the primary ground-validation program for the Geo-Science Laser Altimeter System (GLAS) satellite lidar project (launch date 2002). We will present an overview demonstrating how MPL-Net results are used to help prepare the GLAS data processing algorithms and assist in the calibration/validation of the GLAS data products.

Welton, Ellsworth J.↗

Centrifuge Facility for the International Space Station Alpha

The Centrifuge Facility planned for the International Space Station Alpha has under-one considerable redesign over the past year, primarily because the Station is now viewed as a 10 year mission rather than a 30 year mission and because of the need to simply the design to meet budget constraints and a 2000 launch date. The basic elements of the Centrifuge Facility remain the same, i.e., a 2.5 m diameter centrifuge, a micro-g holding unit, plant and animal habitats, a glovebox and a service unit. The centrifuge will still provide the full range of artificial gravity from 0.01 a to 2 - as originally planned; however, the extractor to permit withdrawal of habitats from the centrifuge without stopping the centrifuge has been eliminated. The specimen habitats have also been simplified and are derived from other NASA programs. The Plant Research Unit being developed by the Gravitational Biology Facility will be used to house plants in the Centrifuge Facility. Although not as ambitious as the Centrifuge Facility plant habitat, it will provide much better environmental control and lighting than the current Shuttle based Plant Growth Facility. Similarly, rodents will be housed in the Advanced Animal Habitat being developed for the Shuttle program. The Centrifuge Facility and ISSA will provide the opportunity to perform repeatable, high quality science. The long duration increments available on the Station will permit multigeneration studies on both plants and animals which have not previously been possible. The Centrifuge Facility will accommodate sufficient number of specimens to permit statistically significant sampling of specimens to investigate the time course of adaptation to altered gravity environments. The centrifuge will for the first time permit investigators to use gravity itself as a tool to investigate fundamental processes, to investigate the intensity and duration of gravity to maintain normal structure and function, to separate the effects of micro-g from other 0 environmental factors and to examine artificial gravity as a potential countermeasure for the physical deconditioning observed during spaceflight.

Johnson, Catherine C.↗

Trajectory Design for the Microwave Anisotropy Probe (MAP)

The Microwave Anisotropy, Probe (MAP) is a Medium Class Explorers (MIDEX) Mission produced in partnership between Goddard Space Flight Center (GSFC) and Princeton University. The goal of the MAP mission is to produce an accurate fill-sky, map of the cosmic microwave background temperature fluctuations (anisotropy). The mission orbit is a Lissajous orbit about the L(sub 2) Sun-Earth Lagrange point. The trajectory design for MAP is complex, having many requirements that must be met including shadow avoidance, sun angle constraints, Lissqjous size and shape characteristics, and limited Delta-V budget. In order to find a trajectory that met the design requirements for the entire 4-year mission lifetime goal, GSFC Flight Dynamics engineers performed many analyses, the results of which are presented herein. The paper discusses the preliminary trade-offs to establish a baseline trajectory, analysis to establish the nominal daily trajectory, and the launch window determination to widen the opportunity from instantaneous to several minutes for each launch date.

Newman, Lauri Kraft↗

Brake Failure from Residual Magnetism in the Mars Exploration Rover Lander Petal Actuator

In January 2004, two Mars Exploration Rover spacecraft arrived at Mars. Each safely delivered an identical rover to the Martian surface in a tetrahedral lander encased in airbags. Upon landing, the airbags deflated and three Lander Petal Actuators opened the three deployable Lander side petals enabling the rover to exit the Lander. Approximately nine weeks prior to the scheduled launch of the first spacecraft, one of these mission-critical Lander Petal Actuators exhibited a brake stuck-open failure during its final flight stow at Kennedy Space Center. Residual magnetism was the definitive conclusion from the failure investigation. Although residual magnetism was recognized as an issue in the design, the lack of an appropriately specified lower bound on brake drop-out voltage inhibited the discovery of this problem earlier in the program. In addition, the brakes had more unit-to-unit variation in drop-out voltage than expected, likely due to a larger than expected variation in the magnetic properties of the 15-5 PH stainless steel brake plates. Failure analysis and subsequent rework of two other Lander Petal Actuators with marginal brakes was completed in three weeks, causing no impact to the launch date.

Jandura, Louise↗

Review of the ProSEDS Electrodynamic Tether Mission Development

The Propulsive Small Expendable Deployer System (ProSEDS) space experiment was ready to fly as a secondary payload on a Delta-II expendable launch vehicle in late March 2003. Concerns raised in February 2003 by the International Space Station resulted in the delay of the launch of ProSEDS. Issues associated with the delayed launch date and a change in starting altitude resulted in the cancellation of the mission. ProSEDS was intended to deploy a tether (5 km bare wire plus 10 km non-conducting Dyneema) from a Delta I1 second stage to achieve adequate drag thrust that would lower the orbit of the system over days as opposed to months due to atmospheric drag. It was also designed to utilize the tether-generated current to provide limited spacecraft power. Considerable effort and testing went in to developing the ProSEDS system by a dedicated team. Through this effort, important technological issues were identified and addressed and this presentation will discuss some of the important technical issues and hurdles that had to be addressed to successfully prepare for flight. It is intended that this information will be of use for future tether mission and experiment designers.

Vaughn, Jason A.↗

RAD750 SBC Usage for the Solar Dynamics Observatory (SDO) Program

This presentation focuses on the first space weather research mission in the Living with a Star (LWS) Program. The science objective of the mission is to understand the solar variations that influence life on Earth. The mission is developed and managed by NASA/GSFC with a launch date in 2008 on a five-year mission using a geosynchronous inclined orbit. Involved with the mission are three science instruments: a helloseisic and magnetic imagery (HMI), extreme ultraviolet variability experiment (EVE), and solar helispheric activity research prediction program (SHARPP). 6U qualification Vib test has been completed with successful results (no interrupts detected at 1 nanosecond). Other test result to be reported at workshop.

Li, Kenneth↗

The Radiation Environment for the LISA/Laser Interferometry Space Antenna

The purpose of this document is to define the radiation environment for the evaluation of degradation due to total ionizing and non-ionizing dose and of single event effects (SEES) for the Laser Interferometry Space Antenna (LISA) instruments and spacecraft. The analysis took into account the radiation exposure for the nominal five-year mission at 20 degrees behind Earth's orbit of the sun, at 1 AU (astronomical unit) and assumes a launch date in 2014. The transfer trajectory out to final orbit has not yet been defined, therefore, this evaluation does not include the impact of passing through the Van Allen belts. Generally, transfer trajectories do not contribute significantly to degradation effects; however, single event effects and deep dielectric charging effects must be taken into consideration especially if critical maneuvers are planned during the van Allen belt passes.

Barth, Janet L.↗

Solar Probe: Close Encounter with the Sun

The Solar Probe Science and Technology Definition Team (STDT) recently completed a detailed study of the Solar Probe Mission based on an earliest launch date of October 2014. Solar Probe, when implemented, will be the first close encounter by a spacecraft with a star (i.e., 3 Rs above the Sun s photosphere). The report and its executive summary were published by NASA (NASA/TM-2005-212786) in September 2005 and can be found at the website http://solarprobe.gsfc.nasa.gov/. A description of the science is being prepared for publication in Reviews of Geophysics by McComas et al. [2006]. For this talk, we will be presenting the consensus view of the STDT including a brief description of the scientific goals, a description of the overall mission, including trajectory scenarios, spacecraft description and proposed scientific payload. We will discuss all these topics and the importance of flying the Solar Probe mission both with regard to understanding fundamental issues of solar wind acceleration and coronal heating near the Sun and Solar Probe s unique role in understanding the acceleration of Solar Energetic Particles (SEPs), which is critical to future Human Exploration.

Sittler, E. C., Jr.↗

Design and Certification of the Extravehicular Activity Mobility Unit (EMU) Water Processing Jumper

The Extravehicular Mobility Units (EMUs) onboard the International Space Station (ISS) experienced a failure due to cooling water contamination from biomass and corrosion byproducts forming solids around the EMU pump rotor. The coolant had no biocide and a low pH which induced biofilm growth and corrosion precipitates, respectively. NASA JSC was tasked with building hardware to clean the ionic, organic, and particulate load from the EMU coolant loop before and after Extravehicular Activity (EVAs). Based on a return sample of the EMU coolant loop, the chemical load was well understood, but there was not sufficient volume of the returned sample to analyze particulates. Through work with EMU specialists, chemists, (EVA) Mission Operations Directorate (MOD) representation, safety and mission assurance, astronaut crew, and team engineers, requirements were developed for the EMU Water Processing hardware (sometimes referred to as the Airlock Coolant Loop Recovery [A/L CLR] system). Those requirements ranged from the operable level of ionic, organic, and particulate load, interfaces to the EMU, maximum cycle time, operating pressure drop, flow rate, and temperature, leakage rates, and biocide levels for storage. Design work began in February 2005 and certification was completed in April 2005 to support a return to flight launch date of May 12, 2005. This paper will discuss the details of the design and certification of the EMU Water Processing hardware and its components

Peterson, Laurie J.↗

STS-121: Discovery Post Flight Readiness Review Briefing

This post Flight Readiness Review (FRR) briefing begins with NASA Press Secretary Dean Acosta, introducing the panel who consist of: NASA Administrator, Dr. Michael Griffin; Associate Administrator for Space Operations, Bill Gerstenmaier; Space Shuttle Program Manager, Wayne Hale; and NASA Launch director, Mike Leinbach. The discussion begins with Dr. Michael Griffin, who expresses his gladness to be a part of the FRR. Bill Gerstenmaier talks about how they were very thorough about the subjects reviewed and that they wanted to make sure that they were ready to fly. He discusses and presents two slides. The first slide is a description of the LO2 intertank and LH2 ice/frost ramps staging location and the second are the top ten LH2 Ice/Frost Ramp Foam Loss events. Wayne Hale gives his thoughts on the human element that came into play during the FRRs. He talks about the willingness of everyone to speak their mind, instead of giving short comments. He expressed that this element is a huge step forward for NASA. Mike Leinbach reports on the processing of the vehicle and expresses that everything is going well and there is nothing to prohibit the launch. He also gives a good report on Atlantis, in case there is a need to use the vehicle. This FRR briefing ends with a short question and answer period from the press on topics such as debris, foam loss, ice/frost ramp redesign, crew risks, and launch date.

Source record↗

Space Shuttle Status News Conference

Richard Gilbech, External Tank "Tiger Team" Lead, begins this space shuttle news conference with detailing the two major objectives of the team. The objectives include: 1) Finding the root cause of the foam loss on STS-114; and 2) Near and long term improvements for the external tank. Wayne Hale, Space Shuttle Program Manager, presents a chart to explain the external tank foam loss during STS-114. He gives a possible launch date for STS-121 after there has been a repair to the foam on the External Tank. He further discusses the changes that need to be made to the surrounding areas of the plant in New Orleans, due to Hurricane Katrina. Bill Gerstemaier, NASA Associate Administrator for Space Operations, elaborates on the testing of the external tank foam loss. The discussion ends with questions from the news media about a fix for the foam, replacement of the tiles, foam loss avoidance, the root cause of foam loss and a possible date for a new external tank to be shipped to NASA Kennedy Space Center.

Source record↗

Defect measurement and analysis of JPL ground software: a case study

Ground software systems at JPL must meet high assurance standards while remaining on schedule due to relatively immovable launch dates for spacecraft that will be controlled by such systems. Toward this end, the Software Quality Improvement (SQI) project's Measurement and Benchmarking (M&B) team is collecting and analyzing defect data of JPL ground system software projects to build software defect prediction models. The aim of these models is to improve predictability with regard to software quality activities. Predictive models will quantitatively define typical trends for JPL ground systems as well as Critical Discriminators (CDs) to provide explanations for atypical deviations from the norm at JPL. CDs are software characteristics that can be estimated or foreseen early in a software project's planning. Thus, these CDs will assist in planning for the predicted degree to which software quality activities for a project are likely to deviation from the normal JPL ground system based on pasted experience across the lab.

defects↗

NASA's Global Precipitation Mission Ground Validation Segment

NASA is designing a Ground Validation Segment (GVS) as one of its contributions to the Global Precipitation Measurement (GPM) mission. The GPM GVS provides an independent means for evaluation, diagnosis, and ultimately improvement of the GPM spaceborne measurements and precipitation products. NASA's GPM GVS concept calls for a combination of direct observations executed within a Multidimensional Observing Volume (MOV) and model-based analyses executed by a Satellite Simulator Model (SSM). The MOV consists of ground-based instruments that measure local surface and atmospheric properties required for GPM validation. The SSM utilizes MOV measurements in a forward numerical model. The goal of the SSM forward modeling is calculation of the following properties: top-of-atmosphere microwave radiative quantities to within sensor noise of those measured by the GPM Core Satellite, precipitation quantities identical to those generated by the standard GPM precipitation retrieval algorithms, and quantitative/objective error estimates of both sets of quantities. At present, the GVS is in the early design stage and various scenarios have been generated to assess how it will be used in the GPM era. The GPM GVS will be operational in the year prior to the launch of the GPM core satellite, which has a launch date scheduled for December 2010.

GVS (GROUND VALIDATION SEGMENT)↗