Search NASA⌕ Search

SEARCH · Search NASA

Results for “Launch Support”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 217 records · Page 12

Ares-I-X Vehicle Preliminary Range Safety Malfunction Turn Analysis

Ares-I-X is the designation given to the flight test version of the Ares-I rocket (also known as the Crew Launch Vehicle - CLV) being developed by NASA. As part of the preliminary flight plan approval process for the test vehicle, a range safety malfunction turn analysis was performed to support the launch area risk assessment and vehicle destruct criteria development processes. Several vehicle failure scenarios were identified which could cause the vehicle trajectory to deviate from its normal flight path, and the effects of these failures were evaluated with an Ares-I-X 6 degrees-of-freedom (6-DOF) digital simulation, using the Program to Optimize Simulated Trajectories Version 2 (POST2) simulation framework. The Ares-I-X simulation analysis provides output files containing vehicle state information, which are used by other risk assessment and vehicle debris trajectory simulation tools to determine the risk to personnel and facilities in the vicinity of the launch area at Kennedy Space Center (KSC), and to develop the vehicle destruct criteria used by the flight test range safety officer. The simulation analysis approach used for this study is described, including descriptions of the failure modes which were considered and the underlying assumptions and ground rules of the study, and preliminary results are presented, determined by analysis of the trajectory deviation of the failure cases, compared with the expected vehicle trajectory.

Beaty, James R.↗

Attitude Ground System: Recent Experiences in Attitude Sensor Calibration and Upcoming Mission Support for Momentum Unloading

A key component of the mission ground system used for supporting NASA Goddard Space Flight Center space missions, known as the Attitude Ground System (AGS), is used to perform operational and analytical support for the spacecraft attitude con-trol system (ACS). The AGS is comprised of a real-time attitude analysis and moni-toring system, and a tool for performing offline analysis of the ACS system using key sensor telemetry collected and stored onboard and transmitted to the mission operations center. The AGS performs numerous functions, including independent ground attitude determination, attitude slew planning and commanding, attitude sensor calibration, and real-time monitoring of the health and safety of the ACS. The AGS is developed in MATLAB using a core library of utility functions called the Multi-Mission Three-Axis Satellite System (MTASS). The MTASS library has been used to support mission operations for over thirty NASA missions starting in the late 1990s. It is customized for each mission to meet specific mission requirements. In this paper we describe recent operational experience using the AGS to support the launch and early orbit (L&EO) phase of the Plankton, Aerosol, Cloud Ocean Ecosys-tem (PACE) and Joint Polar Satellite System (JPSS) missions. Our summary of L&EO support for PACE and JPSS includes ACS sensor calibration of the alignment and scale factors for the Star Trackers, Inertial Reference Unit, and Three-Axis Magnetometers. We will also describe new capabilities for planning and executing reaction wheel momentum unloading for the Roman Space Telescope (RST) During the spacecraft early orbit phase, the AGS is operated in the mission operations center by a team of subject matter experts that also develop and configure the AGS soft-ware. This unique approach, integrating system development and operation in a sin-gle engineering team, provides valuable expertise for quick assessment of ACS per-formance and safety; critical to anomaly resolution and mission success.

Guidance, Navigation, and Control↗

Logistics Operations Management Center: Maintenance Support Baseline (LOMC-MSB)

The Logistics Operations Management Center Maintenance Support Baseline is defined. A historical record of systems, applied to and deleted from, designs in support of future management and/or technical analysis is provided. All Flight elements, Ground Support Equipment, Facility Systems and Equipment and Test Support Equipment for which LOMC has responsibilities at Kennedy Space Center and other locations are listed. International Space Station Alpha Program documentation is supplemented. The responsibility of the Space Station Launch Site Support Office is established.

Kurrus, R.↗

Design and Testing of Non-Toxic RCS Thrusters for Second Generation Reusable Launch Vehicle

The current NASA Space Shuttle auxiliary propulsion system utilizes nitrogen tetroxide (NTO) and monomethylhydrazine (MMH), hypergolic propellants. This use of these propellants has resulted in high levels of maintenance and precautions that contribute to costly launch operations. By employing alternate propellant combinations, those less toxic to humans, the hazards and time required between missions can be significantly reduced. Use of alternate propellants can thereby increase the efficiency and lower the cost in launch operations. In support of NASA's Space Launch Initiative (SLI), TRW proposed a three-phase project structured to significantly increase the technology readiness of a high-performance reaction control subsystem (RCS) thruster using non-toxic propellant for an operationally efficient and reusable auxiliary propulsion system (APS). The project enables the development of an integrated primary/vernier thruster capable of providing dual-thrust levels of both 1000-lbf class thrust and 25-lbf thrust. The intent of the project is to reduce the risk associated with the development of an improved RCS flight design that meets the primary NASA objectives of improved safety and reliability while reducing systems operations and maintenance costs. TRW proposed two non-toxic auxiliary propulsion engine designs, one using liquid oxygen and liquid hydrogen and the other using liquid oxygen and liquid ethanol, as candidates to meet the goals of reliability and affordability at the RCS level. Both of these propellant combinations offer the advantage of a safe environment for maintenance, while at the same time providing adequate to excellent performance for a conventional liquid propulsion systems. The key enabling technology incorporated in both TRW thrusters is the coaxial liquid on liquid pintle injector. This paper will concentrate on only the design and testing of one of the thrusters, the liquid oxygen (LOX) and liquid hydrogen (LH2) thruster. The LOX/LH2 thruster design includes a LOX-centered pintle injector, consisting of two rows of slots that create a radial spoke spray pattern in the combustion chamber. The main fuel injector creates a continuous sheet of LH2 originating upstream of the LOX pintle injector. The two propellants impinge at the pintle slots, where the resulting momentum ratio and spray pattern determines the combustion efficiency and thermal effects on the hardware. Another enabling technology used in the design of this thruster is fuel film cooling through a duct, lining the inner wall of the combustion chamber barrel section. The duct is also acts as a secondary fuel injection point. The variation in the amount of LH2 used for the duct allows for adjustments in the cooling capacity for the thruster. The Non-Toxic LOX-LH2 RCS Workhorse Thruster was tested at the NASA Marshall Space Flight Center's Test Stand 500. Hot-fire tests were conducted between March 08, 2002 and April 05, 2002. All testing during the program base period were performed at sea-level conditions. During the test program, 7 configurations were tested, including 2 combustion chambers, 3 LOX injector pintle tips, and 4 LH2 injector stroke settings. The operating conditions that were surveyed varied thrust levels, mixture ratio and LH2 duct cooling flow. The copper heat sink chamber was used for 16 burns, each burn lasting from 0.4 to 10 seconds, totaling 51.4 seconds, followed by Haynes chamber testing ranging from 0.9 to 120 seconds, totaling 300.9 seconds. The total accumulated burn time for the test program is 352.3 seconds. C* efficiency was calculated and found to be within expectable limits for most operating conditions. The temperature on the Haynes combustion chamber remained below established material limits, with the exception of one localized hot spot. The test results demonstrate that both the coaxial liquid-on-liquid pintle injector design and fuel duct concepts are viable for the intended application. The thruster head-e design maintained cryogenic injection temperatures while firing, which validates the concept for minimal heat soak back. By injecting fuel into the duct, the throat temperatures were manageable, yet the split of fuel through the cooling duct does not compromise the overall combustion efficiency, which indicates that, provided proper design refinement, such a concept can be applied to a high-performance version of the thruster. These hot fire tests demonstrate the robustness of the duct design concept and good capability to withstand off-nominal operating conditions without adversely impacting the thermal response of the engine, a key design feature for a cryogenic thruster.

Calvignac, Jacky↗

Expert system decision support for low-cost launch vehicle operations

Progress in assessing the feasibility, benefits, and risks associated with AI expert systems applied to low cost expendable launch vehicle systems is described. Part one identified potential application areas in vehicle operations and on-board functions, assessed measures of cost benefit, and identified key technologies to aid in the implementation of decision support systems in this environment. Part two of the program began the development of prototypes to demonstrate real-time vehicle checkout with controller and diagnostic/analysis intelligent systems and to gather true measures of cost savings vs. conventional software, verification and validation requirements, and maintainability improvement. The main objective of the expert advanced development projects was to provide a robust intelligent system for control/analysis that must be performed within a specified real-time window in order to meet the demands of the given application. The efforts to develop the two prototypes are described. Prime emphasis was on a controller expert system to show real-time performance in a cryogenic propellant loading application and safety validation implementation of this system experimentally, using commercial-off-the-shelf software tools and object oriented programming techniques. This smart ground support equipment prototype is based in C with imbedded expert system rules written in the CLIPS protocol. The relational database, ORACLE, provides non-real-time data support. The second demonstration develops the vehicle/ground intelligent automation concept, from phase one, to show cooperation between multiple expert systems. This automated test conductor (ATC) prototype utilizes a knowledge-bus approach for intelligent information processing by use of virtual sensors and blackboards to solve complex problems. It incorporates distributed processing of real-time data and object-oriented techniques for command, configuration control, and auto-code generation.

Szatkowski, G. P.↗

Update of KSC activities for the space transportation system

The paper is a status report on the facilities and planned operations at the Kennedy Space Center (KSC) that will support Space Shuttle launches. The conversion of KSC facilities to support efficient and economical checkout and launch operations in the era of the Space Shuttle is nearing completion. The driving force behind the KSC effort has been the necessity of providing adequate and indispensable facilities and support systems at minimum cost. This required the optimum utilization of existing buildings, equipment and systems, both at KSC and at Air Force property on Cape Canaveral, as well as the construction of two major new facilities and several minor ones. The entirely new structures discussed are the Shuttle Landing Facility and Orbiter Processing Facility. KSC stands ready to provide the rapid reliable economical landing-to-launch processing needed to ensure the success of this new space transportation system.

Gray, R. H.↗

Technological Progress: A Function of User Necessity

Conducting the myriad of space launch preparations more effectively with specialized tools that improve existing processes or address new issues requires innovative technologies. Although the mission of the Applied Physics Lab at NASA's Kennedy Space Center is to deliver gadgets to support these launch missions and operations, it is the verdict of the end users of these technologies that dictates which ones succeed and are used. There have been over total 40 pieces of hardware developed at the APL to assist the safety, efficiency, and cost of shuttle program operations in the 19 years of the lab's operation.

Shkolyar, Svetlana↗

Unit Testing and Remote Display Development

The Kennedy Space Center is currently undergoing an extremely interesting transitional phase. The final Space Shuttle mission, STS-135, was completed in July of 2011. NASA is now approaching a new era of space exploration. The development of the Orion Multi- Purpose Crew Vehicle (MPCV) and the Space Launch System (SLS) launch vehicle that will launch the Orion are currently in progress. An important part of this transition involves replacing the Launch Processing System (LPS) which was previously used to process and launch Space Shuttles and their associated hardware. NASA is creating the Spaceport Command and Control System (SCCS) to replace the LPS. The SCCS will be much simpler to maintain and improve during the lifetime of the spaceflight program that it will support. The Launch Control System (LCS) is a portion of the SCCS that will be responsible for launching the rockets and spacecraft. The Integrated Launch Operations Applications (ILOA) group of SCCS is responsible for creating displays and scripts, both remote and local, that will be used to monitor and control hardware and systems needed to launch a spacecraft. It is crucial that the software contained within be thoroughly tested to ensure that it functions as intended. Unit tests must be written in Application Control Language (ACL), the scripting language used by LCS. These unit tests must ensure complete code coverage to safely guarantee there are no bugs or any kind of issue with the software.

LCS↗

Automation of Flight Software Regression Testing

NASA is developing the Space Launch System (SLS) to be a heavy lift launch vehicle supporting human and scientific exploration beyond earth orbit. SLS will have a common core stage, an upper stage, and different permutations of boosters and fairings to perform various crewed or cargo missions. Marshall Space Flight Center (MSFC) is writing the Flight Software (FSW) that will operate the SLS launch vehicle. The FSW is developed in an incremental manner based on "Agile" software techniques. As the FSW is incrementally developed, testing the functionality of the code needs to be performed continually to ensure that the integrity of the software is maintained. Manually testing the functionality on an ever-growing set of requirements and features is not an efficient solution and therefore needs to be done automatically to ensure testing is comprehensive. To support test automation, a framework for a regression test harness has been developed and used on SLS FSW. The test harness provides a modular design approach that can compile or read in the required information specified by the developer of the test. The modularity provides independence between groups of tests and the ability to add and remove tests without disturbing others. This provides the SLS FSW team a time saving feature that is essential to meeting SLS Program technical and programmatic requirements. During development of SLS FSW, this technique has proved to be a useful tool to ensure all requirements have been tested, and that desired functionality is maintained, as changes occur. It also provides a mechanism for developers to check functionality of the code that they have developed. With this system, automation of regression testing is accomplished through a scheduling tool and/or commit hooks. Key advantages of this test harness capability includes execution support for multiple independent test cases, the ability for developers to specify precisely what they are testing and how, the ability to add automation, and the ability of the harness and cases to be executed continually. This test concept is an approach that can be adapted to support other projects.

Tashakkor, Scott B.↗

Guidelines and Suggestions for Balloon Gondola Design

This paper discusses the current gondola design requirements for the Columbia Scientific Balloon Facility (CSBF). The CSBF is responsible for launching and supporting balloon borne scientific instruments and has some current updated guidelines that will be discussed in this presentation. As the sophistication of Payload systems have increased in size and complexity new guidelines have been implemented in order to make these instruments stay within the acceptable launch risks. Additionally, there is a requirement to submit a proper stress analysis report that states the flight design requirements have been met. Suggestions are discussed in this presentation that establish the proper guidelines to submit these.

Guidelines for Balloon Gondola Design↗

Completion of Launch Director Console Project and Other Support Work

There were four projects that I was a part of working on during the spring semester of 2018. This included the completion of the Launch Director Console (LDC) project and the completion and submission of a Concept of Operations (ConOps) document for the Record and Playback System (RPS) at the Launch Control Center (LCC), as well as supporting the implementation of a unit in RPS known as the CDP (Communication Data Processor). Also included was my support and mentorship of a High School robotics team that is sponsored by Kennedy Space Center. The LDC project is an innovative workstation to be used by the launch director for the future Space Launch System program. I worked on the fabrication and assembly of the final console. The ConOps on RPS is a technical document for which I produced supporting information and notes. All of this was done in the support of the IT Project Management Office (IT-F). The CDP is a subsystem that will eventually be installed in and operated by RPS.

Steinrock, Joshua G.↗

A Near-Term, High-Confidence Heavy Lift Launch Vehicle

The use of well understood, legacy elements of the Space Shuttle system could yield a near-term, high-confidence Heavy Lift Launch Vehicle that offers significant performance, reliability, schedule, risk, cost, and work force transition benefits. A side-mount Shuttle-Derived Vehicle (SDV) concept has been defined that has major improvements over previous Shuttle-C concepts. This SDV is shown to carry crew plus large logistics payloads to the ISS, support an operationally efficient and cost effective program of lunar exploration, and offer the potential to support commercial launch operations. This paper provides the latest data and estimates on the configurations, performance, concept of operations, reliability and safety, development schedule, risks, costs, and work force transition opportunities for this optimized side-mount SDV concept. The results presented in this paper have been based on established models and fully validated analysis tools used by the Space Shuttle Program, and are consistent with similar analysis tools commonly used throughout the aerospace industry. While these results serve as a factual basis for comparisons with other launch system architectures, no such comparisons are presented in this paper. The authors welcome comparisons between this optimized SDV and other Heavy Lift Launch Vehicle concepts.

Rothschild, William J.↗

PDB ‐101: Educational resources supporting molecular explorations through biology and medicine

Abstract The Protein Data Bank (PDB) archive is a rich source of information in the form of atomic‐level three‐dimensional (3D) structures of biomolecules experimentally determined using macromolecular crystallography, nuclear magnetic resonance (NMR) spectroscopy, and electron microscopy (3DEM). Originally established in 1971 as a resource for protein crystallographers to freely exchange data, today PDB data drive research and education across scientific disciplines. In 2011, the online portal PDB‐101 was launched to support teachers, students, and the general public in PDB archive exploration ( pdb101.rcsb.org ). Maintained by the Research Collaboratory for Structural Bioinformatics PDB, PDB‐101 aims to help train the next generation of PDB users and to promote the overall importance of structural biology and protein science to nonexperts. Regularly published features include the highly popular Molecule of the Month series, 3D model activities, molecular animation videos, and educational curricula. Materials are organized into various categories (Health and Disease, Molecules of Life, Biotech and Nanotech, and Structures and Structure Determination) and searchable by keyword. A biennial health focus frames new resource creation and provides topics for annual video challenges for high school students. Web analytics document that PDB‐101 materials relating to fundamental topics (e.g., hemoglobin, catalase) are highly accessed year‐on‐year. In addition, PDB‐101 materials created in response to topical health matters (e.g., Zika, measles, coronavirus) are well received. PDB‐101 shows how learning about the diverse shapes and functions of PDB structures promotes understanding of all aspects of biology, from the central dogma of biology to health and disease to biological energy.

Zardecki, Christine↗

Operational support considerations in Space Shuttle prelaunch processing

This paper presents an overview of operational support for Space Shuttle payload processing at the John F. Kennedy Space Center. The paper begins with a discussion of the Shuttle payload processing operation itself. It discusses the major organizational roles and describes the two major classes of payload operations: Spacelab mission payload and vertically-installed payload operations. The paper continues by describing the Launch Site Support Team and the Payload Processing Test Team. Specific areas of operational support are then identified including security and access, training, transport and handling, documentation and scheduling. Specific references for further investigatgion are included.

Schuiling, Roelof L.↗

Time management displays for shuttle countdown

The Intelligent Launch Decision Support System project is developing a Time Management System (TMS) for the NASA Test Director (NTD) to use for time management during Shuttle terminal countdown. TMS is being developed in three phases: an information phase; a tool phase; and an advisor phase. The information phase is an integrated display (TMID) of firing room clocks, of graphic timelines with Ground Launch Sequencer events, and of constraints. The tool phase is a what-if spreadsheet (TMWI) for devising plans for resuming from unplanned hold situations. It is tied to information in TMID, propagates constraints forward and backward to complete unspecified values, and checks the plan against constraints. The advisor phase is a situation advisor (TMSA), which proactively suggests tactics. A concept prototype for TMSA is under development. The TMID is currently undergoing field testing. Displays for TMID and TMWI are described. Descriptions include organization, rationale for organization, implementation choices and constraints, and use by NTD.

Beller, Arthur E.↗

Nimbus 4/IRLS Balloon Interrogation Package (BIP)

The balloon interrogation package (BIP), an integral part of the overall interrogation, recording, and location subsystems (IRLS) for the Nimbus 4 program, is described. The BIP is a self-contained, integrated transponder designed to be carried aloft by a constant altitude, superpressure balloon to an altitude of 67,000 or 78,000 feet. After launch the BIP senses high-altitude balloon overpressure and temperature, and upon receipt of an interrogated command from the IRLS aboard the Nimbus 4 satellite, the BIP enodes the data on a real-time basis into a pulse-code modulation (PCM) format and transmits this data to the satellite. A summary of the program activity to produce 30 BIP systems and to support balloon launches from Ascension Island is presented.

Source record↗

Second AIAA/NASA USAF Symposium on Automation, Robotics and Advanced Computing for the National Space Program

An introduction is given to NASA goals in the development of automation (expert systems) and robotics technologies in the Space Station program. Artificial intelligence (AI) has been identified as a means to lowering ground support costs. Telerobotics will enhance space assembly, servicing and repair capabilities, and will be used for an estimated half of the necessary EVA tasks. The general principles guiding NASA in the design, development, ground-testing, interactions with industry and construction of the Space Station component systems are summarized. The telerobotics program has progressed to a point where a telerobot servicer is a firm component of the first Space Station element launch, to support assembly, maintenance and servicing of the Station. The University of Wisconsin has been selected for the establishment of a Center for the Commercial Development of Space, specializing in space automation and robotics.

Myers, Dale↗