Hanford construction history, Volume 3, pp. 636-983 (August 1945)
This document, Volume 3, provides a discussion of the construction of the Hanford Reservation (Du Pont Project 9536) and details historical aspects of this phase of the project.
SEARCH · Search NASA
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
This document, Volume 3, provides a discussion of the construction of the Hanford Reservation (Du Pont Project 9536) and details historical aspects of this phase of the project.
"The world’s first full-scale nuclear reactors and chemical reprocessing plants built at the Hanford Site in the desert of eastern Washington State produced two-thirds of the plutonium generated in the United States for nuclear weapons. Operating these facilities also created large volumes of radioactive and chemical waste, some of which was released into the environment exposing people who lived downwind and downstream. Hanford now contains the largest accumulation of nuclear waste in the Western Hemisphere. Hanford’s last reactor shut down in 1987 followed by closure of the last reprocessing plant in 1990. Today, Hanford’s only mission is cleanup. Most onsite radioactive waste and nuclear material lingers inside underground tanks or storage facilities. About half of the chemical waste remains in tanks while the rest persists in the soil, groundwater, and burial grounds. Six million dollars each day, or nearly two billion dollars each year, are spent on waste management and cleanup activities. There is significant uncertainty in how long cleanup will take, how much it will cost, and what risks will remain for future generations. This paper summarizes portions of the waste management history of the Hanford Site published in the book “Hanford: A Conversation about Nuclear Waste and Cleanup.”(1) "
Background: There are few occupational studies of women exposed to ionizing radiation. During World War II, the Tennessee Eastman Corporation (TEC) operated an electromagnetic field separation facility of 1152 calutrons to obtain enriched uranium (235U) used for the Hiroshima atomic bomb. Thousands of women were involved in these operations. Materials and methods: We report a new study was conducted of 13,951 women and 12,699 men employed at TEC between 1943 and 1947 for at least 90 days. Comprehensive dose reconstruction techniques were used to estimate lung doses from the inhalation of uranium dust based on airborne measurements. Vital status through 2018/2019 was obtained from the National Death Index, Social Security Death Index, Tennessee death records and online public record databases. Analyses included standardized mortality ratios (SMRs) and Cox proportional hazards models. Results: Most workers were hourly (77.7%), white (95.6%), born before 1920 (58.3%), worked in dusty environments (57.0%), and had died (94.9%). Vital status was confirmed for 97.4% of the workers. Women were younger than men when first employed: mean ages 25.0 years and 33.0 years, respectively. The estimated mean absorbed dose to the lung was 32.7 mGy (max 1048 mGy) for women and 18.9 mGy (max 501 mGy) for men. The mean dose to thoracic lymph nodes (TLNs) was 127 mGy. Statistically significant SMRs were observed for lung cancer (SMR 1.25; 95% CI 1.19, 1.31; n = 1654), nonmalignant respiratory diseases (NMRDs) (1.23; 95% CI 1.19, 1.28; n = 2585), and cerebrovascular disease (CeVD) (1.13; 95% CI 1.08, 1.18; n = 1945). For lung cancer, the excess relative rate (ERR) at 100 mGy (95% CI) was 0.01 (–0.10, 0.12; n = 652) among women, and –0.15 (–0.38, 0.07; n = 1002) among men based on a preferred model for men with lung doses <300 mGy. NMRD and non-Hodgkin lymphoma were not associated with estimated absorbed dose to the lung or TLN. Conclusions: There was little evidence that radiation increased the risk of lung cancer, suggesting that inhalation of uranium dust and the associated high-LET alpha particle exposure to lung tissue experienced over a few years is less effective in causing lung cancer than other types of exposures. There was no statistically significant difference in the lung cancer risk estimates between men and women. The elevation of certain causes of death such as CeVD is unexplained and will require additional scrutiny of workplace or lifestyle factors given that radiation is an unlikely contributor since only the lung and lymph nodes received appreciable dose.
Not Available
In a top-secret laboratory on the edge of a canyon, Mary Lucy, 40, is entrusted with the plutonium secret. She is an experienced scientist with a doctorate in chemistry from Columbia University and a soldier in the Women's Army Corps.
The study of nuclear forensics harkens back to the Manhattan Project-era, when scientists first started to analyze the debris from the 1945 Trinity test. Political turmoil stemming from the Cold War and the rehabilitation of Germany following WWII has led to new challenges in international security involving nuclear proliferation. Nuclear materials have, on occasion, been lost, misplaced, or stolen from former Soviet countries, and illicit materials have been interdicted all over the world. The National Technical Nuclear Forensics Center (NTNFC) was established in 2006, and has been at the forefront of drive to advance nuclear forensic capabilities in the United States. The ultimate goal of nuclear forensics is to examine nuclear and other radioactive materials using analytical techniques to determine origin and history of the material, particularly in the context of law enforcement investigations. Nuclear forensics can be divided into two parts: predetonation and post-detonation. Pre-detonation forensics, as the name implies, is the investigation of a nuclear material or weapon that has not been detonated or involved in an explosion, whereas postdetonation forensics is the study of activation or fission products in debris or the environment following the use of a nuclear or radiological dispersal device (RDD). Both parts require a number of analytical chemical and radiochemical techniques to determine identification of the material. Many advancements in analytical techniques, including rapidity, sample size, and forensic signatures have been made in recent years. The analytical methods that can be used in a nuclear forensic investigation, such as mass spectrometry and gamma spectroscopy, have been described in detail in previous reviews, including Straub et.al, and will not be explained here. This review will discuss recent publications (from 2016 to present) describing advancements of techniques such as radiochronometry, morphology, development of novel reference materials, and inter-laboratory collaborations for both pre- and post-detonation nuclear forensics.
This is an a submission for the Encyclopedia of Sustainable Technology on the subject of Reprocessing Spent Nuclear Fuel. No formal abstract was required for the article. The full article will be attached.
Workers from Mission Support Alliance, LLC., removed the welds around the steel door of the F Reactor before stepping inside the reactor to complete its periodic inspection. This is the first time the Department of Energy (DOE) has had the reactor open since 2008. The F Reactor is one of nine reactors along the Columbia River at the Department's Hanford Site in southeastern Washington State, where environmental cleanup has been ongoing since 1989. As part of the Tri-Party Agreement, the Department completes surveillance and maintenance activities of cocooned reactors periodically to evaluate the structural integrity of the safe storage enclosure and to ensure confinement of any remaining hazardous materials. "This entry marks a transition of sorts because the Hanford Long-Term Stewardship Program, for the first time, was responsible for conducting the entry and surveillance and maintenance activities," said Keith Grindstaff, Energy Department Long-Term Stewardship Program Manager. "As the River Corridor cleanup work is completed and transitioned to long-term stewardship, our program will manage any on-going requirements."
Episode 1 shows how the lives of East Tennesseans changed after the U.S. declared war following the Japanese attack on Pearl Harbor.
Episode 2 tells our World War II era story and describes the contribution Oak Ridge and Y-12 made to restoring peace.
This video from 2007 describes the history that led up to naming one of Y-12's new buildings after plant manager Jack Case.
Extended version with narration. This video shows our roles in making the world safer — working to end World War II, providing stable isotopes for research, providing unique precision manufacturing capabilities, and meeting nonproliferation and global security missions.
D. Ray Smith, Y-12 historian, comments on each of the A Nuclear Family episodes.
This video shows our roles in making the world safer — working to end World War II, providing stable isotopes for research, providing unique precision manufacturing capabilities, and meeting nonproliferation and global security missions.
The Alpha Calutron video shows the world's only Alpha Calutron magnets located in Building 9731 at the Y-12 National Security Complex, the first building completed on the site early in 1943. The calutrons were used to separate the first isotopes other than uranium.
Consolidated Nuclear Security, LLC (CNS), the management and operating contractor for the Y-12 National Security Complex (Y-12) in Oak Ridge, Tennessee, and the Pantex Plant (Pantex) in Amarillo, Texas, has developed an integrated strategy to address badly deteriorating excess facilities presenting risks to people, the environment, and the National Nuclear Security Administration (NNSA) mission. The comprehensive, integrated Excess Facilities Disposition Program (EFDP) incorporates NNSA scope for excess facility risk reduction, preparation of facilities to be transferred to the U.S. Department of Energy (DOE) Office of Environmental Management (EM) for demolition, and demolition of non-process contaminated facilities. The Program has been developed using the NNSA Office of Safety, Infrastructure, and Operations (NA-50) Program Management Plan as a guide. The Program has undertaken actions to address the most immediate risks associated with CNS excess facilities. At Y-12, new foam roofs have been installed on Buildings 9201-5 (Alpha 5), 9204-4 (Beta 4), and 9206 to minimize further facility degradation. Tanks and dikes outside of Alpha 5 and Beta 4 are also being disconnected, drained, and filled with concrete. In addition, Beta 4 will be getting a new electrical system as its Manhattan Project-era system will be replaced by a temporary 'construction power' setup that will provide as-needed electricity to the building that is safer, more reliable, and will ease demolition activities in the future. The EFDP is also focusing on the basement of Alpha 5 and is planning to remove the water from the aging facility's flooded basement, which in some areas contains up to 54 inches of water. The EFDP is also planning several efforts to remove excess materials from Alpha 5 and Beta 4, de-inventory the Alpha 5 Mercury House System and numerous transformers, and de-inventory Beta 4 hydraulic pumps and systems. Efforts are also underway to deactivate and decommission non-process-contaminated facilities at Y-12 and at Pantex. The EFDP has prioritized the performance of work to reduce risk while at the same time supporting the preparation of process-contaminated Y-12 facilities for transfer to EM. The Program aligns with the EM goal to have the NNSA scope completed in Alpha 5 and Beta 4 by the end of FY 2020, and Building 9206 completed by the end of FY 2024. These dates and project sequencing will support the Y-12-related DOE EM cleanup initiatives. (authors)