Search NASA⌕ Search

SEARCH · Search NASA

Results for “Mars Base”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 217 records · Page 12

A new model for Mars atmospheric dust based upon analysis of ultraviolet through infrared observations from Mariner 9, Viking, and Phobos

We propose key modifications to the Toon et al. (1977) model of the particle size distribution and composition of Mars atmospheric dust, based on a variety of spacecraft and wavelength observations of the dust. A much broader (r(sub eff) variance approximately 0.8 micrometers), smaller particle size (r(sub mode) approximately 0.02 micrometers) distribution coupled with a 'palagonite-like' composition is argued to fit the complete ultraviolet-to-30-micrometer absorption properties of the dust better than the montmorillonite-basalt, r(sub eff) variance = 0.4 micrometers, r(sub mode) = 0.40 dust model of Toon et al. Mariner 9 (infrared interferometer spectrometer) IRIS spectra of high atmospheric dust opacities during the 1971-1972 Mars global dust storm are analyzed in terms of the Toon et al. dust model, and a Hawaiian palagonite sample (Rousch et al., 1991) with two different size distribution models incorporating smaller dust particle sizes. Viking Infrared Thermal Mapper (IRTM) emmission-phase-function (EPF) observations at 9 micrometers are analyzed to retrieve 9-micrometer dust opacities coincident with solar band dust opacities obtained from the same EPF sequences (Clancy and Lee, 1991). These EPF dust opacities provide an independent measurement of the visible/9-micrometer extinction opacity ratio (greater than or = 2) for Mars atmospheric dust, which is consistent with a previous measurement by Martin (1986). Model values for the visible/9-micrometer opacity ratio and the ultraviolet and visible single-scattering albedos are calculated for the palagonite model with the smaller particle size distributions compared to the same properties for the Toon et al. model of dust. The montmorillonite model of the dust is found to fit the detailed shape of the dust 9-micrometer absorption well. However, it predicts structured, deep aborptions at 20 micrometers which are not observed and requires a separate ultraviolet-visible absorbing component to match the observed behavior of the dust in this wavelength region. The modeled palagonite does not match the 8-to 9-micrometer absorption presented by the dust in the IRIS spectra, probably due to its low SiO2 content (31%). However, it does provide consistent levels of ultraviolet/visible absorption, 9-to 12-micrometer absorption, and a lack of structured absorption at 20 micrometers. The ratios of dust extinction opacities at visible, 9 micrometers, and 30 micrometers are strongly affected by the dust particle size distribution. The Toon et al. dust size distribution (r(sub mode) = 0.40,r(sub eff) variance = 0.4 micrometers, r(sub cwmu) = 2.7 micrometers) predicts the correct ratio of the 9- to 30-micrometer opacity, but underpredicts the visible/9-micrometer opacity ratio considerably (1 versus greater than or = 2). A similar particle distribution width with smaller particle sizes (r(sub mode) = 0.17, r(sub eff) variance = 0.4 micrometers, r(sub cwmu) = 1.2 micrometers) will fit the observed visible/9-micrometer opacity ratio, but overpredicts the observed 9-micrometer/30-micrometer opacity ratio. A smaller and much broader particle size distribution (r(sub mode) = 0.002, r(sub eff) variance = 0.8 micrometers, r(sub cwmu) = 1.8 micrometers) can fit both dust opacity ratios. Overall, the nanocrystalline structure of palagonite coupled with a smaller, broader distribution of dust particle sizes provides a more consistent fit than the Toon et al. model of the dust to the IRIS spectra, the observed visible/9-micrometer dust opacity ratio, the Phobos occulation measurements of the dust particle sizes (Chassefiere et al., 1992), and the weakness of surface near IR absorptions expected for clay minerals (Clark, 1992; Bell and Crisp, 1993).

Clancy, R. T.↗

The case for Mars concept

The Case for Mars workshops conducted in 1984 dealt with a program to establish a permanent scientific research base at Mars. The participants, viewed a Mars base as the much needed long-term focus for the space program. A permanent base was chosen rather than the more conventional concept of a series of individual missions to different sites became the permanent base offers much greater scientific return plus greater crew safety and the potential for growth into a true colony. This paper summarizes the results of the workshops. The Mars base will strive for self-sufficiency and autonomy from Earth. Martian resources will be used to provide life support materials and consumables. The Martian atmosphere will provide a convenient source of volatiles: C0 2 , N 2 , and water. Rocket propellant, fuels for surface and air vehicles and possibly power plants, breathable air, and fertilizers will be manufactured from the Mars atmosphere. Food will be grown on Mars using Martian regolith as a growth substrate. A permanent human presence will be maintained on Mars beginning with the first manned landing via a strategy of crew overlap. This permanent presence will ensure safety and reliability of systems through continuous tending, maintenance, and expansion of the base's equipment and systems. A permanent base will allow the development of a substantial facility on Mars for the same cost (in terms of Earth departure mass) as a series of temporary camps. A base equipped with surface rovers, airplanes, and the ability to manufacture consumables and propellant will provide far more extensive planetary exploration over a given period of years than would an Apollo-style approach.

J R French↗

JSC-Rocknest: A Large-Scale Mojave Mars Simulant (MMS) Based Soil Simulant for In-Situ Resource Utilization Water-Extraction Studies

The Johnson Space Center-Rocknest (JSC-RN) simulant was developed in response to a need by NASA's Advanced Exploration Systems (AES) In-Situ Resource Utilization (ISRU) project for a simulant to be used in component and system testing for water extraction from Mars regolith. JSC-RN was designed to be chemically and mineralogically similar to material from the aeolian sand shadow named Rocknest in Gale Crater, particularly the 1-3 wt.% low temperature (<450 ºC) water release as measured by the Sample Analysis at Mars (SAM) instrument on the Curiosity rover. Sodium perchlorate, goethite, pyrite, ferric sulfate, regular and high capacity granular ferric oxide, and forsterite were added to a Mojave Mars Simulant (MMS) base in order to match the mineralogy, evolved gases, and elemental chemistry of Rocknest. Mineral and rock components were sent to the United States Geological Survey (USGS) in Denver for mixing. Approximately 800 kg of JSC-RN was sent back to NASA in 5 gallon buckets, which were subsampled and characterized. All samples of the USGS-produced simulants had similar evolved gas profiles as a small prototype batch of JSC-RN made in JSC laboratories, with the exception of HCl, and were similar in terms of mineralogy and total chemistry. Also, all JSC-RN subsamples were homogenous and had similar mineralogy, total chemistry, and low-temperature evolved gas profiles as the Rocknest aeolian sand shadow examined with Curiosity’s instrument suite on Mars. In particular, the low temperature water releases were similar and the amount of water evolved from JSC-RN at <450 ºC was similar to the water content of Rocknest based on SAM water peak integrations. Overall, JSC-RN is ideally suited for ISRU studies of water extraction of global martian soil due to its excellent agreement with measured properties of martian soils and its proven feasibility for large-scale production.

Simulant↗

Mars 2020 Model Based Systems Engineering Pilot

The pilot study is led by the Integration Engineering group in NASA's Launch Services Program (LSP). The Integration Engineering (IE) group is responsible for managing the interfaces between the spacecraft and launch vehicle. This pilot investigates the utility of Model-Based Systems Engineering (MBSE) with respect to managing and verifying interface requirements. The main objectives of the pilot are to model several key aspects of the Mars 2020 integrated operations and interface requirements based on the design and verification artifacts from Mars Science Laboratory (MSL) and to demonstrate how MBSE could be used by LSP to gain further insight on the interface between the spacecraft and launch vehicle as well as to enhance how LSP manages the launch service. The method used to accomplish this pilot started through familiarization of SysML, MagicDraw, and the Mars 2020 and MSL systems through books, tutorials, and NASA documentation. MSL was chosen as the focus of the model since its processes and verifications translate easily to the Mars 2020 mission. The study was further focused by modeling specialized systems and processes within MSL in order to demonstrate the utility of MBSE for the rest of the mission. The systems chosen were the In-Flight Disconnect (IFD) system and the Mass Properties process. The IFD was chosen as a system of focus since it is an interface between the spacecraft and launch vehicle which can demonstrate the usefulness of MBSE from a system perspective. The Mass Properties process was chosen as a process of focus since the verifications for mass properties occur throughout the lifecycle and can demonstrate the usefulness of MBSE from a multi-discipline perspective. Several iterations of both perspectives have been modeled and evaluated. While the pilot study will continue for another 2 weeks, pros and cons of using MBSE for LSP IE have been identified. A pro of using MBSE includes an integrated view of the disciplines, requirements, and verifications leading up to launch. The model allows IE to understand the relationships between disciplines throughout test activities and verifications. Additionally, the relationships between disciplines and integration tasks are generally consistent. The model allows for the generic relationships and tasks to be captured and used throughout multiple mission models should LSP further pursue MBSE. A con of MBSE is the amount of time it takes upfront to understand MBSE and create a useful model. The upfront time it takes to create a useful model is heavily discussed in MBSE literature and is a consistent con throughout the known applications of MBSE. The need to understand SysML and the software chosen also poses the possibility of a "bottleneck" or one person being the sole MBSE user for the working group. The utility of MBSE will continue to be evaluated through the remainder of the study. In conclusion, the original objectives of the pilot study were to use artifacts from MSL to model key aspects of Mars 2020 and demonstrate how MBSE could be used by LSP to gain insight into the spacecraft and launch vehicle interfaces. Progress has been made in modeling and identifying the utility of MBSE to LSP IE and will continue to be made until the pilot study's conclusion in mid-August. The results of this study will produce initial models, modeling instructions and examples, and a summary of MBSE's utility for future use by LSP.

Dukes, Alexandra Marie↗

Measurement Acceptance Region (MAR) Assessment Results Based On Sludge Batch 10 Projections from December 2021, February 2022 and August 2022

The Defense Waste Processing Facility (DWPF) is currently preparing to initiate processing of Sludge Batch 10 (SB10), which is comprised of material from Tanks 11H, 13H, 15H, and 26F, Alternate Feed Stock-2 and Sodium Reactor Experiment material from H-Canyon. Frit 473 (8B 2 O 3 -8Li 2 O-5Na 2 O-79SiO 2 , in weight percent) was recommended for sludge-only (SO) and coupled processing with the Salt Waste Processing Facility (SWPF) based on previous assessments of SB10 projections with the DWPF Product Composition Control System (PCCS) glass property models and their associated Measurement Acceptance Region (MAR) constraints. Due to the lower processing rate of Sludge Batch 9 (SB9), the heel in Tank 40 is anticipated to be greater than 40 inches at the projected start of SB10 processing to meet the upcoming Accelerated Basin Deinventory addition dates in Tank 51 for Sludge Batch 11. In December 2021 and February 2022, Savannah River Remediation System Planning provided updated SB10 Tank 40 blend projections based on heels of 74 inches, 84 inches, 94 inches and 103.4 inches. Savannah River Mission Completion (SRMC) subsequently pursued Wash Cycle Y to further reduce the total sulfur in the sludge batch and increase processing flexibility at DWPF. In August 2022, SRMC System Planning provided an updated SB10 Tank 40 blend projection with a 76 inch-heel representing Decant Y2 and 60 kilogallons of bearing water inleakage that is anticipated during the Tank 51 to Tank 40 transfer. The objectives of this task were to: • Determine the impact on the operating windows for SO and coupled processing • Determine whether any composition gaps exist between the already completed SB10 variability study and the reprojected SB10 glass composition region • Compare the SB10 reprojected glass composition region to the DWPF PCCS model development and validation ranges to ensure that compositional gaps do not exist between the data sets. This report documents the results of these evaluations. Calculation-based frit assessments were performed using the DWPF PCCS glass property models and their associated MAR constraints. Evaluated parameters for coupled processing included the following transfer volumes per Sludge Receipt and Adjustment Tank batch: 5700 gallons of Tank 40 sludge, 2400-4500 gallons of the SWPF monosodium titanate (MST) and sludge solids stream, and 15,000 gallons of strip effluent. Based on these MAR assessment results, Frit 473 remains viable for SB10 processing. A target waste loading (WL) of 36% is possible for SO operation and single strike (0.4 g/L MST) coupled processing up to 600 mg/L of SB9 insoluble sludge solids at a nominal transfer volume of ~2800 gallons. Increasing the single strike transfer volume to 4500 gallons may reduce the maximum WL below 40%. Operating windows are 12 percentage points for SO processing and 14-16 percentage points for coupled processing. Frit 625 allows for a target WL of 36% and is acceptable for use during the SB9 to SB10 transition to deplete remaining inventory as needed. Operating windows are 8 percentage points for SO processing and 12-14 percentage points for coupled processing. Predictive PCCS evaluations performed at DWPF will provide insight into batch-specific acceptability at desired WLs for compositions having expected oxide ratios during processing versus the extreme vertices (corner points) evaluated in this study. The reprojected SB10 glass composition region generally overlaps the previously evaluated SB10 variability study composition region. Thus, the minor composition shift of these updated SB10 projections indicates that no additional glasses are necessary to demonstrate acceptability relative to the chemical durability of the Environmental Assessment benchmark glass and predictability using the current PCCS models for durability. Based on a comparison of the PCCS model development and validation data to the reprojected SB10 glass composition region, the viscosity and liquidus temperature models will reliably predict SB10 compositions. No additional glasses are necessary to demonstrate predictability of these models.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The case for Mars II

Among the topics discussed are: the political aspects of the exploration of Mars, preparatory mission scenarios in advance of manned Martian exploration, and scientific programs for a base on Mars. Consideration is also given to: mission strategies and spacecraft design for a Mars base program; concepts for the realization of a manned mission to Mars; dirigible airship applications to Martian surface exploration; and the power requirements of several Martian base designs. Additional topics include: the impact of propellant manufacturing on early manned exploration of the solar system; water supply issues for a manned Mars base; and psychological and interpersonal adaptation to life on Mars.

Mckay, C. P.↗

Electrical power systems for Mars

Electrical power system options for Mars Manned Modules and Mars Surface Bases were evaluated for both near-term and advanced performance potential. The power system options investigated for the Mission Modules include photovoltaics, solar thermal, nuclear reactor, and isotope power systems. Options discussed for Mars Bases include the above options with the addition of a brief discussion of open loop energy conversion of Mars resources, including utilization of wind, subsurface thermal gradients, and super oxides. Electrical power requirements for Mission Modules were estimated for three basic approaches: as a function of crew size; as a function of electric propulsion; and as a function of transmission of power from an orbiter to the surface of Mars via laser or radio frequency. Mars Base power requirements were assumed to be determined by production facilities that make resources available for follow-on missions leading to the establishment of a permanently manned Base. Requirements include the production of buffer gas and propellant production plants.

Giudici, Robert J.↗

In Situ Noble-Gas Based Chronology on Mars

Determining radiometric ages in situ on another planet's surface has never been done, and there are good reasons to think that it will be extremely difficult. It is certainly hard to imagine that such ages could be measured as precisely as they could be measured on returned samples in state-of-the-art terrestrial laboratories. However, it may be possible, by using simple noble-gas-based chronology techniques, to determine ages on Mars to a precision that is scientifically useful. This abstract will: (1) describe the techniques we envision; (2) give some examples of how such information might be scientifically useful; and (3) describe the system we are developing, including the requirements in terms of mass, power, volume, and sample selection and preparation.

Swindle, T. D.↗

Mars gravity field based on a short-arc technique

The magnitudes of 92 surface mass points at designated locations were estimated from the radio tracking data of the Mariner Mars 1971 (M9) orbiter. This result is the first mass point model of a global field. The derived surface mass distribution correlates positively with the visible topography. The Hellas basin contains a mass deficiency, in contrast to some of the lunar basins which contain mass excesses. The Mars gravity field represented by the four parameters of an optimally located mass point (superimposed on an oblate spheroid) has third- and fourth-degree harmonics comparable to those of the complete model.

Sjogren, W. L.↗

Measurement Acceptance Region (MAR) Assessment Results Based on Confirmation Sample Sludge Batch 10 Projections

The Defense Waste Processing Facility (DWPF) is currently preparing to initiate processing of Sludge Batch 10 (SB10), which is comprised of material from Tanks 11H, 13H, 15H, 26F, 40H (heel only), and Alternate Feed Stock-2 and Sodium Reactor Experiment material from H-Canyon. Frit 473 was recommended for sludge-only (SO) and coupled processing with the Salt Waste Processing Facility (SWPF) based on previous assessments of SB10 projections with the DWPF Product Composition Control System (PCCS) glass property models and their associated Measurement Acceptance Region (MAR) constraints. Savannah River Mission Completion (SRMC) subsequently pursued Wash Cycle Y to further reduce the total sulfur in the sludge batch and increase processing flexibility at DWPF. In October 2022, SRMC System Planning provided an updated SB10 Tank 40H blend baseline projection based on the Tank 51 confirmation sample results. Due to the reduced Na concentration relative to previous SB10 projections, two additional projections based on the addition of 7,000 gallons of caustic were provided in November 2022.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

JSC-Rocknest: a Large-Scale Mojave Mars Simulant (MMS) Based Soil Simulant for In-Situ Resource Utilization Water-Extraction Studies

The Johnson Space Center Rocknest (JSC-RN) simulant was developed in response to a need by NASA's Advanced Exploration Systems (AES) In Situ Resource Utilization (ISRU) project for a simulant to be used in component and system testing for water extraction from Mars regolith. JSC-RN was de-signed to be chemically and mineralogically similar to material from the aeolian sand shadow named Rocknest in Gale Crater, particularly the 1-3 weight percentage water release as measured by the Sample Analysis at Mars (SAM) instrument. Rocknest material is a proxy for average martian soils, which are unconsolidated and could be easily scooped by rovers or landers in order to extract water. One way in which water can be extracted from aeolian material is through heating, where adsorbed and structural water is thermally removed from minerals. The water can then be condensed and used as drinking water or split and used as propellant for spacecraft or as a source of breathable O2. As such, it was essential that JSC-RN contained evolved gas profiles, especially low temperature water (less than 400 degrees Centigrade), that mimicked what is observed in martian soils. Because many of these ISRU tests require hundreds of kilograms of Mars soil simulant, it was essential that JSC-RN be cost-effective and based on com-ponents that could be purchased commercially (i.e., not synthesized in the lab). Here, we describe the JSC-RN martian soil simulant, which is ideal for large-scale production and use in ISRU water extraction studies.

Hogancamp, J. V.↗

Ground-Based Localization of Mars Rovers

The document discusses a procedure for localizing the Mars rovers in site frame, a locally defined reference frame on the Martian surface. MER onboard position within a site frame is estimated onboard and is based on wheel odometry. Odometry estimation of rover position is only reliable over relatively short distances assuming no wheel slip, sinkage, etc. As the rover traverses, its onboard estimate of position in the current site frame accumulates errors and will need to be corrected on occasions via relocalization on the ground (mission operations). The procedure provides a systematic process for ground operators to localize the rover. The method focuses on analysis of acquired images used to declare a site frame and images acquired post-drive. Target selection is performed using two main steps. In the first step, the user identifies features of interest from the images used to declare the current site. Each of the selected target s position in site frame is recorded. In the second step, post-traverse measurements of the selected features positions are recorded again, this time in rover frame, using images acquired post-traverse. In the third step, we transform the post-traverse target s positions to local level frame. In the fourth step, we compute the delta differences in the pre- and post-traverse target s position. In the fifth step, we analyze the delta differences with techniques that compute their statistics to determine the rover s position in the site frame.

Trebi-Ollennu, Ashitey↗

Failure-rate computations based on Mariner Mars 1969 spacecraft data

An analysis of in-flight spacecraft part hours and failure data from the Mariner Mars 1969 Project is given. It contains failure rates computed from this data for all electronic and electromagnetic parts on the Mariners 6 and 7 spacecraft. Also included are failure rates based on combining flight data from Mariners 4,5,6, and 7.

Chelson, P. O.↗

The magnetic field of Mars - Mars 3 evidence reexamined

Dolginov et al. (1972, 1973) presented evidence for a Mars magnetic field based on Mars 2 and 3 measurements. This evidence is somewhat complex, based on a combination of arguments including the position of the bow shock, the identification of magnetopause crossings, and the simultaneous behavior of the plasma and the field. The evidence rests most heavily on one pass of Mars 3 on December 1, 1972 from which Dolginov et al. deduce the direction and orientation of the magnetic moment of Mars. It is the purpose of the present note that there is no reason to suppose that Mars 3 penetrated the Mars magnetosphere on this pass, that because of their locations all other putative magnetopause crossings are suspect and that the effective obstacle height is coincident with the height of the Mars ionosphere to within the accuracy of our knowledge of the proper scaling law for planetary bow shocks.

Russell, C. T.↗

Advanced Technology-Based Low Cost Mars Sample Return Missions

Mars Sample Return (MSR) has for many years been considered one of the most ambitious as well as most scientifically interesting of the suite of desired future planetary missions. This paper defines low- cost MSR mission concepts based on several exciting new technologies planned for space missions launching over the next 10 years. Key to reducing cost is use of advanced spacecraft & electronics technology.

Mars Sample Return MSR Mars Advanced Technology Sp↗