TuFF internal WRAP for Rapid Pipeline Repair (TuFF iWRAP)
The goal of “TuFF internal WRAP for Rapid Pipeline Repair” (TuFF iWRAP) program was to develop a novel material system and placement process to fabricate structural pipe within the existing deteriorated pipelines without disruption of gas delivery. The team (University of Delaware – Center for Composite Materials (UD-CCM) and Plitzie Inc.) addressed this challenge by developing a new material feedstock and pipe in pipe (PIP) repair strategy. This allows the potential for significant cost reduction and has minimum operational impact on gas customers. The new robotic based placement design allows discontinuous placement of pipe sections creating a stand-alone structural liner within the legacy pipeline without the need for pipe shutdown. Here, the material is supplied using a tethered material feeding system and is placed and UV cured with the internal Wound Rapid Automated Placement (iWRAP) system. This provides maximum placement efficiency capable of traversing 90 angle bends in 12-inch pipe and overall design customization to meet pipe repair requirements (e.g., variable wall thickness, bridging gaps, etc.). UV-curable fiber reinforced composite material has been optimized to meet structural performance and placement/cure times. Superior strength and fatigue life has been demonstrated by improving fiber-matrix adhesion using new fiber sizing for UV resins. Rapid cure approaches using new liner and resins have been evaluated with industry. The appropriate design of the section joints has been developed and tested. We estimate coating time to be ~100 hours per mile enabling typical pipe repair within 1 week.