Search NASA⌕ Search

SEARCH · Search NASA

Results for “Mission planning”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 217 records · Page 12

NASA/ESMD Analogue Mission Plans

A viewgraph presentation exploring Earth and its analogues is shown. The topics include: 1) ESMD Goals for the Use of Earth Analogues; 2) Stakeholders Summary; 3) Issues with Current Analogue Situation; 4) Current state of Analogues; 5) External Implementation Plan (Second Step); 6) Recent Progress in Utilizing Analogues; 7) Website Layout Example-Home Page; 8) Website Layout Example-Analogue Site; 9) Website Layout Example-Analogue Mission; 10) Objectives of ARDIG Analog Initiatives; 11) Future Plans; 12) Example: Cold-Trap Sample Return; 13) Example: Site Characterization Matrix; 14) Integrated Analogue Studies-Prerequisites for Human Exploration; and 15) Rating Scale Definitions.

Hoffman, Stephen J.↗

An Unmanned Spacecraft Subsystem Cost Model for Advance Mission Planning

This paper reports on the development of a parametric cost model that is being built at JPL to estimate costs of future, deep space, robotic science missions. Because of the changes in the mission implementation process and technology changes, the model is being built in a dramatically different manner than past models which have had access to a data base that drew heavily on the correlation between mass and actual costs.

Parametric↗

Satellite drag prediction effects on Shuttle mission planning

Long-term factors, along with Shuttle performance limitations, are considered in order to illustrate the need for more reliable long-term drag (meaning 'solar cycle') prediction techniques. Such techniques would make it possible to confidently plan dual-objective Shuttle flights, which maximize Shuttle cargo loadings and thus reduce costs. In describing the coupled mission concept, it is pointed out that by deploying one payload while retrieving or servicing another, the Space Transportation System can maximize the usefulness of the Shuttle and reduce the cost per customer. It is shown here that the proposed mission coupling LDEF (Long Duration Exposure Facility) with ST (Space Telescope) must be rejected since the Shuttle performance limitations prohibit deployment of the ST at even 315 n mi with a subsequent LDEF retrieval. If, however, it were possible to predict solar cycles, then, depending on the prediction, a mission of this type could be feasible.

Young, K. A.↗

Representing Spacecraft Mission Planning Knowledge in ASPEN

Deep Space One (DS1) will be the first spaceraft to be controlled by an autonomous closed loop system potientially capable of carrying out a complete mission with minimal commanding from Earth.

onboard planner Deep Space One DS1 autonomous spac↗

Interplanetary mission planning

A long range plan for solar system exploration is presented. The subjects discussed are: (1) science payload for first Jupiter orbiters, (2) Mercury orbiter mission study, (3) preliminary analysis of Uranus/Neptune entry probes for Grand Tour Missions, (4) comet rendezvous mission study, (5) a survey of interstellar missions, (6) a survey of candidate missions to explore rings of Saturn, and (7) preliminary analysis of Venus orbit radar missions.

Source record↗

Skylab mission planning support through the use of a hybrid simulation

The manner in which a hybrid simulation was used in support of Skylab operations in the area of dynamics and control is described. Simulation results were used in the development of acceptable vehicle maneuvers and in the verification of acceptability when the maneuvers were integrated into daily flight plans. The criterion of acceptability was based on vehicle controllability and the minimization of thruster system propellant usage. A simulation of a representative daily flight plan containing three experimental maneuvers is included, along with thruster attitude control system propellant usage tables which show predicted and actual usage for each mission. The inherent characteristics of quick turnaround and flexibility afforded by the hybrid computer proved invaluable in the operations support required throughout the Skylab mission.

Hammer, M. W.↗

NASA mission planning for space nuclear power

An evaluation is conducted of those aspects of the Space Exploration Initiative which stand to gain from the use of nuclear powerplants. Low-power, less than 10 kW(e) missions in question encompass the Comet Rendezvous Asteroid Flyby, the Cassini mission to Saturn, the Mars Network mission, a solar probe, the Mars Rover Sample Return mission, the Rosetta comet nucleus sample return mission, and an outer planets orbiter/probe. Reactor power yielding 10-100 kW(e) can be used by advanced rovers and initial lunar and Martian outposts, as well as Jovian and Saturnian grand tours and sample-return missions.

Bennett, Gary L.↗

Small planetary mission plan: Report to Congress

This document outlines NASA's small planetary projects plan within the context of overall agency planning. In particular, this plan is consistent with Vision 21: The NASA Strategic Plan, and the Office of Space Science and Applications (OSSA) Strategic Plan. Small planetary projects address focused scientific objectives using a limited number of mature instruments, and are designed to require little or no new technology development. Small missions can be implemented by university and industry partnerships in coordination with a NASA Center to use the unique services the agency provides. The timeframe for small missions is consistent with academic degree programs, which makes them an excellent training ground for graduate students and post-doctoral candidates. Because small missions can be conducted relatively quickly and inexpensively, they provide greater opportunity for increased access to space. In addition, small missions contribute to sustaining a vital scientific community by increasing the available opportunities for direct investigator involvement from just a few projects in a career to many.

Source record↗

Humans to Mars: Fifty Years of Mission Planning, 1950-2000

Contents of this document include: On the Grand Scale; Earliest NASA Concepts; EMPIRE and After; A Hostile Environment; Apogee; Viking and the Resources of Mars; The Case for Mars; Challengers; Space Exploration Initiative; and Design Reference Mission.

David S F Portree↗

Mission planning for photogrammetry-based autonomous 3D Mapping of Dams using a commercial UAV

The application of autonomous unmanned aerial vehicles (UAVs) for conducting inspections of dams represents an innovative approach aimed at enhancing safety, efficiency, and cost-effectiveness. In this context, this paper presents algorithms for UAV mission design in autonomous dam inspections that include the creation of a 3D map based on photogrammetry. The algorithms were systematically developed to incorporate a comprehensive set of parameters that account for the geometric characteristics of the dam and adhere to photogrammetry specifications. To validate the proposed methodology, we utilized a commercial programmable quadrotor, specifically the Parrot Anafi USA Gov drone, which is equipped with high-quality cameras and can be programmed with the help of a software development kit (SDK) provided by the manufacturer. Our results demonstrate the efficacy of our method, highlighting how the generated maps can be used for hazard detection in the downstream slope of dams.

42 ENGINEERING↗

Apollo experience report: Mission planning for lunar module descent and ascent

The premission planning, the real-time situation, and the postflight analysis for the Apollo 11 lunar descent and ascent are described. A comparison between premission planning and actual results is included. A navigation correction capability, developed from Apollo 11 postflight analysis was used successfully on Apollo 12 to provide the first pinpoint landing. An experience summary, which illustrates typical problems encountered by the mission planners, is also included.

Bennett, F. V.↗

Mission planning and simulation via intelligent agents

A system that can operate from a flight manifest to plan and simulate payload preparation and transport via Shuttle flights is described. The design alternatives and the prototype implementation of the payload hardware and inventory tracking system are discussed. It is shown how intelligent agents can be used to generate mission schedules, and how, through the use of these intelligent agents, knowledge becomes separated into small manageable knowledge bases.

Gargan, Robert A., Jr.↗

Mission planning and operations of a Space Shuttle payload experiment: SIR-A

In November 1981 the first scientific payload was carried on board the second flight of the Space Shuttle. The principal instrument on that flight was a synthetic aperture radar. This paper is concerned with the operational concepts developed to achieve the objective of terrestrial geologic mapping by radar from earth orbit for this mission. Computer software was developed as an aid to mission design prior to the mission and as a replanning tool used during the mission: The first step in the development of software for future missions where such tools will become indispensable to meet the apparently contradictory objectives of complex observations and low cost.

Harris, H. M.↗

NASA/Mir Phase 1: A Lesson Learned in Long Duration Mission Planning and Operations

The NASA/Mir Phase I Program is a precursor to the assembly and operations of the International Space Station (ISS). The Phase I Program covers a four-year period and encompasses over ten shuttle flights to the Mir, culminating with the flight of STS-91 in June 1998. The Mir-Orbiting Station (Mir-OS) provides an excellent environment, both onboard and on the ground, for learning and studying the characteristics associated with crew-tended operations on long duration missions. By the end of the Phase I program, NASA astronauts will have accumulated over two years of continuous operations experience working and living onboard the Mir-OS. Ground controllers, working in Russia and at remote sites in the United States, will have gained valuable experience in the generation, maintenance, and coordination of the information and products required to support the long duration crew members onboard the Mir-OS. The experience gained by the crew and ground support personnel in the area of long duration mission operations has resulted in a number of factors that need to be considered in the definition and implementation of the processes and products for the ISS. While there are many areas in which experience has been gained, this paper focuses on the lessons learned regarding the level of detail and flexibility of crew timelines. Provided in this paper is an overview of the characteristics associated with long duration mission timeline development and execution, a summary of applicable lessons learned identified and documented through participation in the NASA/Mir Phase I Program, a detailed discussion of "Gross Timelines" as implementation which addresses the lessons learned. Also discussed are the challenges that must be overcome in getting the ISS program to recognize, evaluate, and learn from the crew and ground controller experience gained through participation in the NASA/Mir Phase I Program.

Hagopian, Jeff↗

Space Ops 2002: Bringing Space Operations into the 21st Century. Track 3: Operations, Mission Planning and Control. 2nd Generation Reusable Launch Vehicle-Concepts for Flight Operations

With the successful implementation of the International Space Station (ISS), the National Aeronautics and Space Administration (NASA) enters a new era of opportunity for scientific research. The ISS provides a working laboratory in space, with tremendous capabilities for scientific research. Utilization of these capabilities requires a launch system capable of routinely transporting crew and logistics to/from the ISS, as well as supporting ISS assembly and maintenance tasks. The Space Shuttle serves as NASA's launch system for performing these functions. The Space Shuttle also serves as NASA's launch system for supporting other science and servicing missions that require a human presence in space. The Space Shuttle provides proof that reusable launch vehicles are technically and physically implementable. However, a couple of problems faced by NASA are the prohibitive cost of operating and maintaining the Space Shuttle and its relative inability to support high launch rates. The 2nd Generation Reusable Launch Vehicle (2nd Gen RLV) is NASA's solution to this problem. The 2nd Gen RLV will provide a robust launch system with increased safety, improved reliability and performance, and less cost. The improved performance and reduced costs of the 2nd Gen RLV will free up resources currently spent on launch services. These resource savings can then be applied to scientific research, which in turn can be supported by the higher launch rate capability of the 2nd Gen RLV. The result is a win - win situation for science and NASA. While meeting NASA's needs, the 2nd Gen RLV also provides the United States aerospace industry with a commercially viable launch capability. One of the keys to achieving the goals of the 2nd Gen RLV is to develop and implement new technologies and processes in the area of flight operations. NASA's experience in operating the Space Shuttle and the ISS has brought to light several areas where automation can be used to augment or eliminate functions performed by crew and ground controllers. This experience has also identified the need for new approaches to staffing and training for both crew and ground controllers. This paper provides a brief overview of the mission capabilities provided by the 2nd Gen RLV, a description of NASA's approach to developing the 2nd Gen RLV, a discussion of operations concepts, and a list of challenges to implementing those concepts.

Hagopian, Jeff↗

Options and Uncertainties in Planetary Defense: Mission Planning and Vehicle Design for Flexible Response

This paper is part of an integrated study by NASA and the NNSA to quantitatively understand the response timeframe should a threatening Earth-impacting near-Earth object (NEO) be identified. The two realistic responses considered are the use of a spacecraft functioning as either a kinetic impactor or a nuclear explosive carrier to deflect the approaching NEO. The choice depends on the NEO size and mass, the available response time prior to Earth impact, and the various uncertainties. Whenever practical, the kinetic impactor is the preferred approach, but various factors, such as large uncertainties or short available response time, reduce the kinetic impactor's suitability and, ultimately, eliminate its sufficiency. Herein we examine response time and the activities that occur between the time when an NEO is recognized as being a sufficient threat to require a deflection and the time when the deflection impulse is applied to the NEO. To use a kinetic impactor for successful deflection of an NEO, it is essential to minimize the reaction time and maximize the time available for the impulse delivered to the NEO by the kinetic impactor to integrate forward in time to the eventual deflection of the NEO away from Earth impact. To shorten the response time, we develop tools to survey the profile of needed spacecraft launches and the possible mission payloads. We further present a vehicle design capable of either serving as a kinetic impactor, or, if the need arises, serving as a system to transport a nuclear explosive to the NEO. These results are generated by analyzing a specific case study in which the simulated Earth-impacting NEO is modeled very closely after the real NEO known as 101955 Bennu (1999 RQ36). Bennu was selected for our case study in part because it is the best-studied of the known NEOs. It is also the destination of NASA's OSIRIS-REx sample return mission, which is, at the time of this writing, enroute to Bennu following a September 2016 launch.

characterization↗