At least 217 records · Page 12

Preliminary Project Execution Plan for the Remote-Handled Low-Level Waste Disposal Project

This preliminary project execution plan (PEP) defines U.S. Department of Energy (DOE) project objectives, roles and responsibilities of project participants, project organization, and controls to effectively manage acquisition of capital funds for construction of a proposed remote-handled low-level waste (LLW) disposal facility at the Idaho National Laboratory (INL). The plan addresses the policies, requirements, and critical decision (CD) responsibilities identified in DOE Order 413.3B, 'Program and Project Management for the Acquisition of Capital Assets.' This plan is intended to be a 'living document' that will be periodically updated as the project progresses through the CD process to construction and turnover for operation.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

How Successful Site Preparation Work at a Large, Commercial, Hazardous and Toxic Waste Site Can Benefit DOE Cleanup Projects - 18111

Jacobs recently completed site preparation work supporting the private commercial development of a world-scale petrochemical complex (an 'ethylene cracker' to produce the primary building block for many forms of plastic) in Monaca, Pennsylvania - the first major U.S. project of its kind outside the Gulf Coast region in 20 years and one of the largest (multi-billion dollar) construction projects in the eastern U.S. Prior to beginning construction on the petrochemical complex, the site's previous large, industrial zinc smelter operations had to be decommissioned and the facilities had to be removed. During the previous 80 years, the smelting operations at the site were used to produce zinc, lead, mercury, and sulfuric acid (a by-product of smelting). The smelting operations left landfills and industrial soil over a large area that had to be removed or closed under regulatory review to allow development across the 81,000 m{sup 2} (200-acre) industrial site located near a major river and local populations. In order to meet Pennsylvania's site-specific Land Recycling Program (commonly referred to as 'Act 2') legislative requirements, the direct contact pathway for landfill soil and slag was removed or mitigated. The site preparation work, or 'Early Works', started in January 2015. As the selected Early Works overall Engineering, Procurement, and Construction Management (EPCM) contractor, Jacobs performed the front end engineering and design. Subsequently, Jacobs had overall responsibility for procurement, construction management, health and safety, quality, security, and environmental services for the entire site and all contractors. The Early Works project included eight separate work scope packages: 1) Site Preparation, 2) Site Development, 3) Marine Works, 4) Rail Works, 5) Road Works and Offsite Utilities, 6) Site Security, 7) Construction Facilities, and 8) High Voltage Line Relocation. The Early Works scope was successfully completed in 2017. The challenges faced by this privately funded commercial project have much in common with large DOE and government construction projects. This paper explores lessons learned from the project and compares how project challenges were addressed on this private commercial project with those anticipated at large DOE/government construction and remediation sites, particularly those in the areas of Safety, Logistics, Infrastructure, and Stakeholder Involvement. The identification of best practices demonstrated on this successful project are shared for the purpose of bringing outside, commercial perspectives to ongoing or planned DOE/government construction projects. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Treatment of Irradiated Graphite to meet Acceptance Criteria for Waste Disposal: A New IAEA Collaborative Research Program - 12443

World-wide, more than 250,000 tonnes of irradiated graphite have arisen through commercial nuclear-power operations and from military production reactors. Whilst most nations responsible for the generation of this material have in mind repository disposal alongside other radwaste, the lack of progress in this regard has led in some cases to difficulties where, for example, the site of an existing graphite-moderated reactor is required for re-utilisation. In any case, graphite as a radwaste stream has unique chemical and physical properties which may lend itself to more radical and innovative treatment and disposal options, including the recovery of useful isotopes and also recycling within the nuclear industry. Such aspects are important in making the case for future graphite-moderated reactor options (for example, High-Temperature Reactors planned for simultaneous power production and high-grade heat sources for such applications as hydrogen production for road fuel). A number of initiatives have taken place since the mid 1990s aimed at exploring such alternative strategies and, more recently, improving technology offers new options at all stages of the dismantling and disposal process. A new IAEA Collaborative Research Program aims to build upon the work already done and the knowledge achieved, in order to identify the risks and uncertainties associated with alternative options for graphite disposal, along with cost comparisons, thus enabling individual Member States to have the best-available information at their disposal to configure their own programs. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Decontamination and Decommissioning Program of a Radiopharmaceuticals Production Facility - 17103

On May 2012, Best Medical Belgium (BMB) S.A., a manufacturer of pharmaceutical products located on the nuclear site of Fleurus, was declared bankrupt. According to the Belgian law, ONDRAF/NIRAS (Belgian Radioactive Waste Management Agency) was entrusted with the clean-up and the decommissioning operations of the former BMB facilities, nowadays known as 'ONDRAF/NIRAS Site Fleurus' (ONSF). In June 2015, ONSF launched a Decontamination and Decommissioning (D and D) program, for which Tractebel supports the definition of the clean-up and decommissioning strategies; the drafting of the Final Decommissioning Plan (FDP) and License Application for decommissioning; and the follow-up of the clean-up and upcoming D and D works on site. Four nuclear buildings are part of the clean-up and D and D activities. One of them, Building 14 (B14), represents the most challenging task with the clean-up of highly contaminated areas and their further decommissioning up to greenfield. Beside its two cyclotrons successively used for the production of radioisotopes, this building features hot cells and glove boxes used for the purification of radioisotopes and the conditioning of the final pharmaceutical product. The present paper aims at presenting the development of the D and D program in terms of modifications of existing facilities to allow carrying out the clean-up and D and D activities and the management of dismantled radioactive materials in a safe, efficient and cost-effective way as well as in terms of strategic options to be developed for the FDP. To support the clean-up and D and D activities, several workshops have been designed in order to treat radioactive materials removed from the building rooms. Those workshops feature an input buffer storage area, a common output buffer storage area and installations for the treatment of radioactive materials and waste (handling devices, cutting means, decontamination means, free release measurements means, etc.). Some modifications to the existing auxiliary systems will be required in order to dispose of appropriate systems to operate those workshops in a safe way. Activated concrete structures will constitute the most important part of radioactive materials that will arise from the decommissioning activities. To limit the total decommissioning costs, and especially the costs associated to radioactive waste management, two strategies have been developed in order to manage a part of activated concrete as candidate for free release with a certain decay period or as candidate for conventional landfill. Both strategies will have to be further detailed and discussed with the competent Authorities to ensure they can actually be implemented. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The impact of council directive 2011/70/EURATOM and IAEA joint convention review meetings on the ongoing establishment of the Portuguese regulatory framework and on the future of national radioactive waste

Council Directive 2011/70/EURATOM of 19 July 2011, establishing a Community framework for the responsible and safe management of spent fuel and radioactive waste will enter in force August 2013 in all EU Member States. Portugal has already started preparing its legislative framework to accommodate the new legislative piece. However, the first report of Portugal to the Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management of the IAEA, in Vienna, 2012, has shown that Portugal still has many steps to overcome to establish a successful and effective basic regulatory framework. The existence of many competent authorities related to the radiological protection area and a newly independent commission that is still looking on how to fulfill its regulator role in other areas such as the radioactive waste management makes quite challenging the full application of the new directive as well as compliance that Portugal will have to show in the next Joint Convention review meeting in order to meet the obligations of the Convention. In this paper, the reality of the regulatory Portuguese framework on radiological protection, nuclear safety and radioactive waste management is presented. Discussion of the future impact of the new legislation and its consequences such as the need to setup the national program on radioactive waste management is critical discussed. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Acquisition Strategy for the Idaho National Laboratory Remote-Handled Low-Level Waste Disposition Project

This document describes the design-build acquisition strategy that will be applied to the Remote Handled LLW Disposal Project. The design-build delivery method will be tailored, as appropriate, to integrate the requirements of Department of Energy (DOE) Order 413.3B, 'Program and Project Management for the Acquisition of Capital Assets,' with the DOE budget formulation process and the safety requirements of DOE-STD-1189, 'Integration of Safety into the Design Process.'

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Innovative Hot Lab Concept for Advanced D and D Application - 19175

Hot Labs are used in the nuclear industry for various purposes: maintenance of nuclear reactor, sampling and testing of fuel, inspection activities and decommissioning. Despite their vast use, their current designs and operations do not meet entirely today's needs and requirements of the operations nor tomorrow's. This paper will give an overview of the research and investigations performed around Hot Cells design and concept in order to integrate new operability modes and functions. The overall idea is to bring modularity, flexibility and adaptability to the Hot Lab nuclear industry. Taking the key principles of Model Based System Engineering, an interoperable data model, the most advanced digital technologies (Building Information Modelling - BIM, Virtual Reality / Augmented Reality, Artificial Intelligence), and looking at all the life-cycle of such a facility, a concept design of a new type of Hot Lab has been developed. Four mains aspects are implemented during this study: Implement the principles of the Industry 4.0; use modular and flexible solutions; explore the concept of in service maintenance and predictive maintenance; optimise the decommissioning and dismantling process by taking into account the entire life-cycle of the facility. The design was developed as a case study taking several assumptions to adapt to any project. The design developed demonstrates that modularity and flexibility can be brought in without compromising the core safety functions of such a facility. This Hot Lab concept brings the current Hot Lab to the next level as the design has been adapted to meet the current operational needs, implement novel ideas and consider its entire life-cycle. This paper will demonstrate how decommissioning and dismantling operations can become more efficient and safer with such a concept. In addition, the Model Based System Engineering approach used from the beginning of the design phase allows to have an optimum architecture during its entire lifetime. It also allowed to flag new topics to be further developed for the benefit of the nuclear industry as a whole. A first example would be the development of the Control System using digital tools and artificial intelligence to run remotely controlled equipment inside the Hot Lab. Assystem is an international engineering group. As a key participant in the nuclear industry for over 50 years, the Group supports its clients in managing their capital expenditure throughout their asset life-cycles. Assystem can offer support in project management, design, digital engineering, industrial control systems, security and safety and industrial digitalisation. Assystem's Imagine program is an internal program intending to serve as an incubator for the development of innovations. The Innovative Hot Lab project integrates one of the four innovation projects Assystem choose to develop and invest in. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Reactor-Based Management of Used Nuclear Fuel: Assessment of Major Options

This paper discusses the current status of the ongoing Advanced Fuel Cycle Initiative (AFCI) program in the U.S. Department of Energy that is investigating the potential for using the processing and recycling of used nuclear fuel to improve radioactive waste management, including used fuel. A key element of the strategies is to use nuclear reactors for further irradiation of recovered chemical elements to transmute certain long-lived highly-radioactive isotopes into less hazardous isotopes. Both thermal and fast neutron spectrum reactors are being studied as part of integrated nuclear energy systems where separations, transmutation, and disposal are considered. Radiotoxicity is being used as one of the metrics for estimating the hazard of used fuel and the processing of wastes resulting from separations and recycle-fuel fabrication. Decay heat from the used fuel and/or wastes destined for disposal is used as a metric for use of a geologic repository. Results to date indicate that the most promising options appear to be those using fast reactors in a repeated recycle mode to limit buildup of higher actinides, since the transuranic elements are a key contributor to the radiotoxicity and decay heat. Using such an approach, there could be much lower environmental impact from the high-level waste as compared to direct disposal of the used fuel, but there would likely be greater generation of low-level wastes that will also require disposal. An additional potential waste management benefit is having the ability to tailor waste forms and contents to one or more targeted disposal environments (i.e., to be able to put waste in environments best-suited for the waste contents and forms).

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

The Ambivalent Role of Participants in Nuclear Waste Decisions - 16360

Today's global nuclear sector has entered a critical juncture. Waste management solutions have the potential to influence the prospects of whether new plants will be built and when aging plants will be decommissioned. Even in countries without nuclear power plants, the siting of nuclear waste can present communication challenges and opportunities for public involvement. As new nuclear programs withstand scrutiny, local communities share their want for solutions to nuclear waste before new plant construction commences. Developing nations have begun to explore the potential of adding nuclear power production to their energy mix. They carefully watch established nuclear players to accelerate their plans with lessons learned elsewhere. Some newcomers to nuclear energy will make decisions on new construction based on other operators' abilities to reconcile public concerns regarding radioactive waste. Distinct forms of government, cultural norms and means of public discourse present innovative approaches and changing expectations worldwide. This paper explores how practitioners are evaluating ways to activate stakeholders on nuclear waste siting in nations embarking on new nuclear programs. It investigates the incentives that people have to participate and legitimize the formation of laws, regulations and standards for nuclear materials management. Finally, it highlights examples of public participation techniques from established operating environments and posits that overly prescriptive requirements for stakeholder engagement can reduce the authenticity of public involvement and weaken confidence among participants in the decision making process. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Development of a Technical Standard for Radiological Characterization of DAW - 18062

Throughout its 70+-year history, the U.S. Department of Energy (DOE) and its predecessor agencies have performed a wide mission involving nuclear materials and weapons development, production, testing, and modernization. While the initial mission components relied heavily upon reactor physics and chemistry, the environmental programs have increasingly relied upon development of more accurate and effective measurement methodologies to determine the radiological and chemical properties of the unique waste streams that were generated during the weapons production and testing mission. Over time, the DOE laboratories and former production sites have developed a wide range of site-specific processes and procedures for conducting radiological characterization of dry active waste (DAW) that is managed as low-level radioactive waste. This has resulted in a Complex-wide variability among sites with respect to the methodologies and instrumentation used to characterize individual waste streams. The DAW-type waste was selected for development of a characterization standard since it is a simple, voluminous, and repetitive waste stream with a substantial knowledge base, established experience history at multiple site locations, and the potential for realization of programmatic benefits though standardization. The Energy Facility Contractors Group (EFCOG) Waste Management Working Group (WMWG) has proposed the development of a new DOE Technical Standard for radiological characterization of DAW. The purpose of the proposed new standard is to provide a technical resource that integrates and enhances the utilization of current site-specific methodologies and processes. A Technical Basis Document (TBD) has been prepared to support the development and utilization of the new standard by providing detailed information for use by site personnel when implementing the guidance provided in the standard. It also provides the rationale for and details concerning the recommended technical approaches for radiological characterization of representative DAW-type waste streams. The TBD will be included as an appendix to the proposed standard. Adoption of a standardized approach to DAW characterization will take advantage of multiple applications for a technology that is both mature and stable. The DAW characterization process is repetitive and lends itself to implementation at a wide range of operating locations - resulting in economies of scale, compliance with regulatory requirements, and consistent implementation of procedures which support design, operations, maintenance, and management of facilities, activities and programs. The purpose of the proposed new Technical Standard for DAW Radiological Characterization is to integrate and improve the utilization of current site-specific methodologies and processes and will include a comprehensive evaluation and comparison of current radiological characterization methodologies to determine which ones are most reliable and effective in producing relevant and valid data. In view of the long history and participation by several agencies in the regulation of nuclear programs, existing Voluntary Consensus Standards have also been reviewed for relevancy and applicability to the new proposed standard. The proposed new Standard will be developed in concert with existing scientific and regulatory guidance to produce a document that incorporates the state of current knowledge and site practices with a graded approach to applying those methodologies that are applicable and effective for characterizing a wide range of DAW-type wastes - including, but not limited to, debris, low specific activity (LSA) material, and surface contaminated objects (SCO). Under the leadership of the National Laboratory Subgroup of the EFCOG/WMWG), an EFCOG team will develop the proposed technical standard. This process will incorporate the information gathered during preparation of the TBD, which will serve as a technical resource to support the technical approach for selection of DAW characterization methodologies. Preparation of the TBD included a detailed survey of historical site practices and examination of the characterization approaches and measurement methodologies currently being applied to DAW-type wastes. Future activities include the development and submittal of a Project Justification Statement that will be submitted to the DOE Technical Standards Program for review and comment. The EFCOG/WMWG Team will respond to reviewer comments, as required. Following final concurrence by affected organizations through the DOE Technical Standards Coordination process, the EFCOG/WMWG Team will prepare the draft technical standard and respond to comments generated during RevCom review and final format review by the DOE Technical Standards Management Program. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Spent Nuclear Fuel Storage and Radioactive Waste Disposal in the United States: A Law and Policy Analysis - 20302

While Congress plays political football, spent nuclear fuel continues to sit in de facto interim nuclear waste storage sites throughout the country. This ad hoc approach - if it can even be called an approach - to nuclear waste management is in no one's best interests, because of financial, safety, environmental, and national security concerns with the status quo. Senate leadership had asserted that an up-or-down vote on the Yucca Mountain Project would take place in September or October 2019, but that did not occur. Rather, a conference bill was agreed to, and it provided that, although the nuclear program should receive some funding, funding was not made available for centralized interim storage ('CIS') or the Yucca Mountain Project. The President's FY2021 Budget Request does not contain any proposed funding for the Yucca Mountain Project ('the Project'). This paper will discuss the implications of that process, both for the Project itself and for the U.S. nuclear waste program more generally. In order to provide context for the current situation, this paper will begin by chronicling the history of U.S. nuclear waste management, from the passage of the Nuclear Waste Policy Act of 1982 and to the present day. It will discuss the roles of the U.S. Department of Energy, the Nuclear Regulatory Commission, federal and state political delegations, and the nuclear energy industry. The paper will then identify key themes that can be expected to affect the future of nuclear waste management in the United States. For example, it will consider whether development of additional CIS facilities is a viable short- to medium-term solution. CIS facilities may relieve immediate pressure at decommissioned or soon-to-be-decommissioned nuclear power plants; but with that pressure partially alleviated, support for building a long-term repository may be reduced. It will also discuss opposition by the State of New Mexico and others to the proposed New Mexico CIS project, based not only on siting concerns but also whether it might become a de facto repository, and whether the State of Texas and others may also be opposed, for similar reasons, to the proposed CIS facility in Texas. Additionally, the paper will examine consent-based siting and its implications for Nevada and other states that are potential hosts for spent nuclear fuel storage and disposal facilities. Further, if the Project is not a politically viable solution, the paper will examine whether it is now time for serious consideration of an alternate location for a permanent repository, as well as consideration of other options entirely, such as deep geologic disposal. The paper will conclude by looking ahead to the 2020 elections. It will describe the positions of candidates (particularly Presidential candidates) on spent nuclear fuel storage and disposal options, without advocating for any particular candidate or political party. Perhaps in 2020, we will at least see a start to a solution to the seemingly intractable problem of nuclear waste management in the United States. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

TANKS 18 AND 19-F STRUCTURAL FLOWABLE GROUT FILL MATERIAL EVALUATION AND RECOMMENDATIONS

Cementitious grout will be used to close Tanks 18-F and 19-F. The functions of the grout are to: (1) physically stabilize the final landfill by filling the empty volume in the tanks with a non compressible material; (2) provide a barrier for inadvertent intrusion into the tank; (3) reduce contaminant mobility by (a) limiting the hydraulic conductivity of the closed tank and (b) reducing contact between the residual waste and infiltrating water; and (4) providing an alkaline, chemically reducing environment in the closed tank to control speciation and solubility of selected radionuclides. The objective of this work was to identify a single (all-in-one) grout to stabilize and isolate the residual radionuclides in the tank, provide structural stability of the closed tank and serve as an inadvertent intruder barrier. This work was requested by V. A. Chander, High Level Waste (HLW) Tank Engineering, in HLW-TTR-2011-008. The complete task scope is provided in the Task Technical and QA Plan, SRNL-RP-2011-00587 Revision 0. The specific objectives of this task were to: (1) Identify new admixtures and dosages for formulating a zero bleed flowable tank fill material selected by HLW Tank Closure Project personnel based on earlier tank fill studies performed in 2007. The chemical admixtures used for adjusting the flow properties needed to be updated because the original admixture products are no longer available. Also, the sources of cement and fly ash have changed, and Portland cements currently available contain up to 5 wt. % limestone (calcium carbonate). (2) Prepare and evaluate the placement, compressive strength, and thermal properties of the selected formulation with new admixture dosages. (3) Identify opportunities for improving the mix selected by HLW Closure Project personnel and prepare and evaluate two potentially improved zero bleed flowable fill design concepts; one based on the reactor fill grout and the other based on a shrinkage compensating flowable fill mix design. (4) Prepare samples for hydraulic property measurements for comparison to the values in the F and H- Tank Farm Performance Assessments (PAs). (5) Identify a grout mix for the Tanks 18-F and 19-F Grout Procurement Specification [Forty, 2011 a, b, c]. Results for two flowable zero bleed structural fill concepts containing 3/8 inch gravel (70070 Series and LP-8 Series) and a sand only mix (SO Series) are provided in this report. Tank Farm Engineering and SRNL Project Management selected the 70070 mix as the base case for inclusion in Revision 0 of the Tanks 18-F and 19-F grout procurement specification [Forty 2011 a] and requested admixture recommendations and property confirmation for this formulation [Forty, 2011 b]. Lower cementitious paste mixes were formulated because the 70070 mix is over designed with respect to strength and generates more heat from hydration reactions than is desirable for mass pour application. Work was also initiated on a modification of the recommended mix which included shrinkage compensation to mitigate fast pathways caused by shrinkage cracking and poor physical bonding to the tank and ancillary equipment. Testing of this option was postponed to FY12.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Safe and Secure Management of Disused Radioactive Sealed Sources in Egypt - 19063

Radioactive sources offer many benefits in medicine, industry and education but the lack of appropriate long-term management when they eventually become disused has led to accidents, in some cases with serious consequences, and increased their vulnerability for use in a malicious act. This lack is evident in the absence of clearly defined policy and strategy, responsibilities and resources to meet those responsibilities for safe, secure and sustainable management of disused sources. The strengthening of national legislative and regulatory infrastructures globally has led to major improvements in the protection and control of radioactive sources. Nevertheless, in many countries, radioactive sources were in use before such infrastructures had been developed or adequately strengthened and were therefore not under regulatory control. The paper presents some aspects from Egyptian experience related to safe and secure measures for management of Cs-137, Ra-226 and Co-60 sealed sources. Data relating to the disused radioactive sealed sources, DSRS inventory as well as the arrangements made in order to prepare for conditioning of sources is presented. The efforts made by technical staff and radiation protection team for all arrangements and details such as conditioning set-up, working area, leakage test, certified stainless capsules, radiation protection measures and sources characterization in addition to all security measures for stored DSRS are also presented. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

In-Situ Radiological Surveys to Address Nuclear Criticality Safety Requirements During Remediation Activities at the Shallow Land Disposal Area, Armstrong County, Pennsylvania - 12268

Cabrera Services Inc. (CABRERA) is the remedial contractor for the Shallow Land Disposal Area (SLDA) Site in Armstrong County Pennsylvania, a United States (US) Army Corps of Engineers - Buffalo District (USACE) contract. The remediation is being completed under the USACE's Formerly Utilized Sites Remedial Action Program (FUSRAP) which was established to identify, investigate, and clean up or control sites previously used by the Atomic Energy Commission (AEC) and its predecessor, the Manhattan Engineer District (MED). As part of the management of the FUSRAP, the USACE is overseeing investigation and remediation of radiological contamination at the SLDA Site in accordance with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), 42 US Code (USC), Section 9601 et. seq, as amended and, the National Oil and Hazardous Substance Pollution Contingency Plan (NCP), Title 40 of the Code of Federal Regulations (CFR) Section 300.430(f) (2). The objective of this project is to clean up radioactive waste at SLDA. The radioactive waste contains special nuclear material (SNM), primarily U-235, in 10 burial trenches, Cabrera duties include processing, packaging and transporting the waste to an offsite disposal facility in accordance with the selected remedial alternative as defined in the Final Record of Decision (USACE, 2007). Of particular importance during the remediation is the need to address nuclear criticality safety (NCS) controls for the safe exhumation and management of waste containing fissile materials. The partnership between Cabrera Services, Inc. and Measutronics Corporation led to the development of a valuable survey tool and operating procedure that are essential components of the SLDA Criticality Safety and Material Control and Accountability programs. Using proven existing technologies in the design and manufacture of the Mobile Survey Cart, the continued deployment of the Cart will allow for an efficient and reliable methodology to allow for the safe exhumation of the Special Nuclear Material in existing SLDA trenches. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Refocusing an Employee Engagement Organization to Improve Participation, Member Benefits, and Impact - 19036

Washington River Protection Solutions, LLC (WRPS) provides its employees with programs and opportunities to develop professional skills and to network. Among these is an employee engagement organization called 'WRPSpeed'. WRPSpeed was founded in 2009 initially to support new employees, specifically early-career employees and those new to the Columbia Basin area surrounding the Hanford Site. It was, and remains today, an opt-in program, meaning that in order to join, employees must request to become a member; the only requirement to join is to be a WRPS employee. WRPSpeed has historically offered presentations on professional development topics along with various events and activities supporting professional networking, such as after-work-hours events and community sports teams. Since its creation, WRPSpeed has experienced an ebb and flow of interest, participation, and success. Beginning in early 2017, existing members of the WRPSpeed board examined the stagnant growth trend of the organization and determined change was needed in order to truly accomplish the mission and goals visualized by the board and by WRPS management. These changes culminated in the establishment of a new board position, Marketing and Branding, which allowed WRPSpeed to refocus their messaging and image expressed to the WRPS employee base at large. The primary objectives of the new Marketing and Branding board position were 1) to communicate the identity of WRPSpeed, 2) to communicate the benefits of participation to the WRPS employee base, and 3) to grow WRPSpeed's presence as an active community steward. During the previous years of operation, its brand had developed two main audience perception problems: a perception of exclusivity, which limited membership growth; and a lack of recognition and awareness. Though initially founded as a group for new and early-career employees, the board recognized the benefits of offering all employees the opportunity to participate. This allows more people to engage in the organization and experience the benefits, and also offers the membership and program a more robust network of professional and personal experiences and connections. Concurrent with the launch of Marketing and Branding, the WRPSpeed board reviewed their current functions and activities to determine opportunities for improvement and scale-up. The goal of this internal review was to ensure the benefits offered and advertised by WRPSpeed were high quality, valuable, and engaging. It was up to Marketing and Branding to develop strategies for the success of these efforts and reach all parties in the expanded membership. A marketing communications strategy was developed to establish a revitalized WRPSpeed image and clearly project that new image to a wider audience. The first step was to rewrite the mission statement for the organization, which established, in writing, its primary pillars: community stewardship, professional networking, and professional development. With a new mission statement and the WRPSpeed board in concurrence with - and coached on - the new image, the Marketing and Branding team launched its rebranding campaign. The campaign included a refreshed logo and theme, a new monthly newsletter for existing membership, increased and consistently stylized communications about events, a revitalized organization web page, and a ramp-up schedule for large-scale, multimedia communications to the entire company. From July 2017, when they began, to June 2018, the Marketing and Branding efforts have garnered a 20% increase in membership overall. Additionally, members surveyed in May 2018 showed 49% of respondents had been participating in WRPSpeed between 0 and 12 months; 13% responded '1-2 years'; and 38% responded '2+ years'. These results confirm an upward trend in membership, and attendance records show an increase in new people attending events. Also, parallel increases in number and quality of activities and increases in networking with employee groups from other local companies such as Bechtel National, Inc. and AECOM have improved member satisfaction and positive word of mouth among the employee population. As with any organization, employee engagement-and-retention groups like WRPSpeed face the challenges of staying relevant and beneficial to existing members while continuing to grow their program and impact. However, employee engagement organizations also have the unique opportunity to connect employees across the company and to provide them opportunities otherwise unavailable via other programs. Often these groups also have the flexibility to tailor the offerings, events, and activities to suit the specific needs and aspirations of the employees. With this exceptional position, it is important to continue to strive to offer high quality, significant, and useful benefits to the employees and, thus, the company. The strategies and campaigns employed to revitalize WRPSpeed have proven exceptionally effective in-house and are useful to other employee groups as templates for their own improvement and as opportunities for benchmarking. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Deep Geologic Nuclear Waste Disposal - No New Taxes - 12469

To some, the perceived inability of the United States to dispose of high-level nuclear waste justifies a moratorium on expansion of nuclear power in this country. Instead, it is more an example of how science yields to social pressure, even on a subject as technical as nuclear waste. Most of the problems, however, stem from confusion on the part of the public and their elected officials, not from a lack of scientific knowledge. We know where to put nuclear waste, how to put it there, how much it will cost, and how well it will work. And it's all about the geology. The President's Blue Ribbon Commission on America's Nuclear Future has drafted a number of recommendations addressing nuclear energy and waste issues (BRC 2011) and three recommendations, in particular, have set the stage for a new strategy to dispose of high-level nuclear waste and to manage spent nuclear fuel in the United States: 1) interim storage for spent nuclear fuel, 2) resumption of the site selection process for a second repository, and 3) a quasi-government entity to execute the program and take control of the Nuclear Waste Fund in order to do so. The first two recommendations allow removal and storage of spent fuel from reactor sites to be used in the future, and allows permanent disposal of actual waste, while the third controls cost and administration. The Nuclear Waste Policy Act of 1982 (NPWA 1982) provides the second repository different waste criteria, retrievability, and schedule, so massive salt returns as the candidate formation of choice. The cost (in 2007 dollars) of disposing of 83,000 metric tons of heavy metal (MTHM) high-level waste (HLW) is about $ 83 billion (b) in volcanic tuff, $ 29 b in massive salt, and $ 77 b in crystalline rock. Only in salt is the annual revenue stream from the Nuclear Waste Fund more than sufficient to accomplish this program without additional taxes or rate hikes. The cost is determined primarily by the suitability of the geologic formation, i.e., how well it performs on its own for millions of years with little engineering assistance from humans. It is critical that the states most affected by this issue (WA, SC, ID, TN, NM and perhaps others) develop an independent multi-state agreement in order for a successful program to move forward. Federal approval would follow. Unknown to most, the United States has a successful operating deep permanent geologic nuclear repository for high and low activity waste, called the Waste Isolation Pilot Plant (WIPP) near Carlsbad, New Mexico. Its success results from several factors, including an optimal geologic and physio-graphic setting, a strong scientific basis, early regional community support, frequent interactions among stakeholders at all stages of the process, long-term commitment from the upper management of the U.S. Department of Energy (DOE) over several administrations, strong New Mexico State involvement and oversight, and constant environmental monitoring from before nuclear waste was first emplaced in the WIPP underground (in 1999) to the present. WIPP is located in the massive bedded salts of the Salado Formation, whose geological, physical, chemical, redox, thermal, and creep-closure properties make it an ideal formation for long-term disposal, long-term in this case being greater than 200 million years. These properties also mean minimal engineering requirements as the rock does most of the work of isolating the waste. WIPP has been operating for twelve years, and as of this writing, has disposed of over 80,000 m{sup 3} of nuclear weapons waste, called transuranic or TRU waste (>100 nCurie/g but <23 Curie/1000 cm{sup 3}) including some high activity waste from reprocessing of spent fuel from old weapons reactors. All nuclear waste of any type from any source can be disposed in this formation better, safer and cheaper than in any other geologic formation. At the same time, it is critical that we complete the Yucca Mountain license application review so as not to undermine the credibility of the Nuclear Regulatory Commission and the scientific community. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Savannah River Site H-Canyon Collaborative Advanced Technology Demonstration (ATD) Program Review - 19499

The purpose of the Department of Energy-Environmental Management Office of Technology Development's (DOE-EM TD) Science of Safety (SOS) Robotics Initiative is to pull innovative commercial off the shelf (COTS) and near ready technologies to the field to expedite remaining EM mission clean up and enhance worker safety. A goal of this program is to demonstrate to DOE facilities the value of these available new technologies and their potential uses to solve difficult problems. In support of this goal, the Savannah River Site (SRS) H-Canyon Air Exhaust (HCAEX) tunnel biannual inspection task has been selected to demonstrate and evaluate the benefit of pulling advanced technology solutions to EM facilities. This is a highly collaborative task facilitated by SRNL and engaging SRS H-Canyon facility stakeholders, National Laboratory robotic and concrete inspection SMEs and university robotic and sensor researchers. Presently, the SRS HCAEX tunnel inspection consists of a visual examination to evaluate the structural integrity of the tunnel. Personal access is prohibited in the tunnel due to extreme conditions, thus the examination is accomplished remotely by deploying cameras mounted on a robotic crawler deployed into the tunnel. While the ability to see inside the tunnel in recent years has been highly valuable, it is desirable to have a better understanding of the environment to support a more thorough structural analysis and for long term planning purposes. This higher order of understanding can be accomplished through advanced COTS sensors and tools and those currently in development and near ready. The advanced technologies selected for demonstration will be evaluated for hosting on the FY19 HCAEX tunnel inspection crawler platform. The HCAEX ATD task is expected to be performed over a two-year period with year one now concluding. At WM2018, we presented the H-Canyon stakeholder's high priority inspection and remote handling needs, the collaboration team and the planned process of developing an integrated solution. This presentation will review the initial scope and inspection needs, then discuss the past year's progress to address these needs. The discussion includes the results of the Concrete Integrated Product Team (CIPT) formed to evaluate promising concrete NDE inspection technologies and a Lidar based tunnel mapping sensor suite solution. Highlighted in the discussion will be the engagement and pulling of university developed research and development to include student engagement through the formation and hosting of the SRNL Robotics and Sensors Intern team and collaboration with MSIPP funded Robotic Arm Concrete NDT Inspection University researchers. Lastly, the path forward to complete the demonstration will be presented. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

SLFP: A stochastic linear fractional programming approach for sustainable waste management

Highlights: > A new fractional programming (SLFP) method is developed for waste management. > SLFP can solve ratio optimization problems associated with random inputs. > A case study of waste flow allocation demonstrates its applicability. > SLFP helps compare objectives of two aspects and reflect system efficiency. > This study supports in-depth analysis of tradeoffs among multiple system criteria. - Abstract: A stochastic linear fractional programming (SLFP) approach is developed for supporting sustainable municipal solid waste management under uncertainty. The SLFP method can solve ratio optimization problems associated with random information, where chance-constrained programming is integrated into a linear fractional programming framework. It has advantages in: (1) comparing objectives of two aspects, (2) reflecting system efficiency, (3) dealing with uncertainty expressed as probability distributions, and (4) providing optimal-ratio solutions under different system-reliability conditions. The method is applied to a case study of waste flow allocation within a municipal solid waste (MSW) management system. The obtained solutions are useful for identifying sustainable MSW management schemes with maximized system efficiency under various constraint-violation risks. The results indicate that SLFP can support in-depth analysis of the interrelationships among system efficiency, system cost and system-failure risk.