Search NASA⌕ Search

SEARCH · Search NASA

Results for “ORBITAL ASSEMBLY”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 217 records · Page 12

Development, Qualification and Integration of the Optical Fiber Array Assemblies for the Lunar Reconnaissance Orbiter

The NASA Goddard Fiber Optics Team in the Electrical Engineering Division of the Applied Engineering and Technology Directorate, designed, developed and integrated the space flight optical fiber array hardware for the Lunar Reconnaissance Orbiter (LRO). The two new assemblies that were designed and manufacturing at GSFC for the LRO exist in configurations that are unique in the world for the application of ranging and LIDAR. Described here is an account of the journey and the lessons learned from design to integration for the Lunar Orbiter Laser Altimeter and the Laser Ranging Application on the LRO.

Ott, Melanie N.↗

The design and development of a mounting and jettison assembly for the shuttle orbiter advanced gimbal system

This paper describes the requirements, design development, and qualification of the mounting and jettison assembly (MJA) which serves as the base structure for the advanced gimbal system (AGS) developed for NASA, Marshall Space Flight Center, for use during shuttle missions. An engineering model of the MJA has been built and subjected to the following testing: stiffness and modal characterization, sine and random vibration, and a jettison function and energy release. A qualitative summary of the results and the problems encountered during testing, together with the design solutions, is presented.

Korzeniowski, E. S.↗

Analysis of Direct Solar Illumination on the Backside of Space Station Solar Cells

The International Space Station (ISS) is a complex spacecraft that will take several years to assemble in orbit. During many of the assembly and maintenance procedures, the space station's large solar arrays must he locked, which can significantly reduce power generation. To date, power generation analyses have not included power generation from the backside of the solar cells in a desire to produce a conservative analysis. This paper describes the testing of ISS solar cell backside power generation, analytical modeling and analysis results on an ISS assembly mission.

Delleur, Ann M.↗

NASA's Exploration and In-Space Services (NExIS) Division OSAM-1 Propellant Transfer Subsystem Progress 2020

National Aeronautics and Space Administration (NASA)’s Exploration and In-Space Services (NExIS) Division of Goddard Space Flight Center has been developing technology for the On-orbit Servicing, Assembly and Manufacturing Mission 1 (OSAM-1) to robotically refuel heritage and new satellites on-orbit. OSAM-1, formerly known as Restore-L, successfully passed an important NASA milestone called Key Decision Point-C (KDP-C), receiving agency-level approval for its implementation. The decision point also establishes the mission’s official schedule and budget. The OSAM-1 spacecraft, Servicing Payload and the Space Infrastructure Dexterous Robot (SPIDER) payload will refuel a satellite in space, assemble a communications antenna and manufacture a beam. By demonstrating these capabilities, the mission is advancing never-before tested technologies for use in future missions (by NASA and other government organizations and private industry). The mission is funded by the Technology Demonstration Missions program within NASA’s Space Technology Mission Directorate. This paper covers a review of servicing extensibility and critical technologies that are being developed within NExIS with a focus on the fluid transfer refueling technology within the framework of the Propellant Transfer Subsystem (PTS). An overview of the planned initial technology demonstration servicing mission via the OSAM-1 Space Vehicle is provided as an extension of the technology development progress reported in 20181, and 20192. The general objectives, challenges, and key technologies are presented as an introduction to the context of the OSAM-1 mission, and a precursor to the OSAM-1 PTS specific development status. Development and progress of the Hose Management Assembly (HMA) and Propellant Transfer Assembly (PTA) are discussed. HMA risk reduction test results including those of thermal vacuum testing are presented. Important analytical results are discussed and progress of drawings and procedures developed for the fabrication and testing phase are shown. A summary of the PTS overall verification status and design activities prepared for the critical design peer review are presented. Procurement progress is shown with status on long, medium, and short term efforts to acquire the hardware required to support the mission objectives. Technology development, challenges, and testing status are discussed with particular regard to the OSAM-1 specific key assemblies including the PTA and HMA along with the overall integrated flight mockup of the spacecraft to client fluid transfer testing conducted in the servicing testbeds. The paper concludes with key milestones leading to the goal of on-orbit refueling to be demonstrated in 2024. The overall mission Launch Readiness Date (LRD) has been realigned to accommodate budget profiles and incorporation of additional on-orbit assembly and manufacturing demonstration efforts.

Propellant transfer, satellite servicing↗

International Space Station (ISS) Carbon Dioxide Removal Assembly (CDRA) Desiccant/Adsorbent Bed (DAB) Orbital Replacement Unit (ORU) Redesign

The Carbon Dioxide Removal Assembly (CDRA) is a part of the International Space Station (ISS) Environmental Control and Life Support (ECLS) system. The CDRA provides carbon dioxide (CO2) removal from the ISS on-orbit modules. Currently, the CDRA is the secondary removal system on the ISS, with the primary system being the Russian Vozdukh. Within the CDRA are two desiccant/adsorbent beds (DAB), which perform the carbon dioxide removal function. The DAB adsorbent containment approach required improvements with respect to adsorbent containment. These improvements were implemented through a redesign program and have been implemented on units returning from orbit. This paper presents a DAB design modification implementation description, a hardware performance comparison between the unmodified and modified DAB configurations, and a description of the modified DAB hardware implementation into the on-orbit CDRA.

Reysa, Richard P.↗

STS-103 Rollout From VAB

Live footage of the fully assembled Discovery Orbiter transported from the VAB (Vehicle Assembly Building) to the Launching Pad is shown.

Source record↗

Designing a Software Architecture for the Precision Assembly of Space Structures

As NASA’s space exploration and science missions expand in complexity, longevity, anddistance beyond earth’s orbit, Orbital Servicing, Assembly and Manufacturing (OSAM)technologies and concepts have become a critical area of ongoing research and innovation.Artemis’ Moon-to-Mars goals of building sustainable elements on and around the Moon andMars that allow our robots and astronauts to explore and conduct more scientific researchwill demand in situ resource utilization, construction, and maintenance to succeed. In-spaceAssembly (ISA), as a sub-component of OSAM, focuses on the on-orbit building or fabricationof mission infrastructure and payloads. One such ISA application is highlighted by the recentNASA In-Space Assembled Telescope (iSAT) study, which stated that the next generation ofspace observatories will exceed the fairing size of existing or even planned launch vehicles andISA has emerged as a viable approach for observatory assembly. Research efforts at NASALangley Research Center have led to the design of a novel TriTruss structural concept for themodular construction of large complex persistent platforms. The TriTruss design and otherdeveloping OSAM technologies enable larger and persistent space missions that would notbe possible with single-launch-sized structures. For example, 20 meter or larger telescopesor orbital platform applications. However, the increased complexity will require autonomousoperations for the construction and maintenance of long-term infrastructure to achieve missionsuccess. NASA’s Precision Assembly of Space Structures (PASS) project is focused on thestructural and autonomy capabilities required to construct an iSAT in deep space. PASSresearch efforts will develop and validate critical technologies needed for effective efficienton-orbit assembly that can be confidently adopted for future systems. PASS will utilize theTriTruss modules to demonstrate the autonomous modular assembly of a 20m-class iSAT mirrorbackbone structure including simulated mirrors and wiring harness. In this paper, we addressthe software and hardware design considerations, technologies, and challenges of designing arobust robotics framework for assembling modular space structures in support of In SpaceAssembly missions in general as well as for PASS specifically.

Benjamin N Kelley↗

Hot melt adhesive pad surface attachment assembly concept for on-orbit operations

The use of a hot melt adhesive concept to develop a Surface Attachment Assembly (SAA) for on-orbit attachment and detachment operations for the Manned Maneuvering Unit (MMU) was investigated. The concept involved impregnation of the hot melt adhesive into a fiberglass covered pad which contained electrical heating and thermoelectric cooling devices. The polyamide hot melt adhesive selected can be repeatedly heated to its melting point in a vacuum and provide good adhesion to various surfaces, i.e., reusable surface insulation tiles, metals, and composites, when cooled. After a series of adhesive screening tests, Jet-Melt 3746 was selected from a group of commercially available thermoplastic adhesive candidates which met or exceeded many of the criteria established for the SAA system. The SAA system was designed and fabricted with the goal of proving the concept with a working model rather than attempting to optimize all facets of the system. This system evolved by investigating alternate attachment concepts, designing and fabricating electronic systems to heat and cool the adhesive, and then fabricating electronic systems to heat and cool the adhesive, and then fabricating and testing two prototype full-size units.

Progar, D. J.↗

Return to Flight Resource Reel 2 of 2

A continuation of the tests performed on the Space Shuttle Discovery in preparation for its return to flight is presented. The tests include: 1) Shuttle Robot Arm Recertification; 2) Michael Hiltz Systems Group Leader; 3) Orbiter Boom Fabrication; 4) Orbiter Boom Final Development; 5) Gary Searle Manager of Orbiter Boom Sensor System (OBSS) Manufacturing and Assembly; 6) Orbiter Boom Qualification Unit; 7) STS-114 Crew Inspects Orbiter Boom at Kennedy Space Center; 8) Orbiter Boom Inspection of Thermal Protection System Animation; 9) External Tank Bipod Redesign; 10) External Tank Flange Redesign; 11) External Tank Bellows Redesign; 12) Shuttle Main Engine Testing and Delivery to Kennedy Space Center; 13) Ronnie Rigney Project Manager Space Shuttle Main Engine Program Office; 14) Gene Goldmman NASA Project Manager Space Shuttle Main Engine Project; 15) Mike Cosgrove Boeing-Rocketdyne Flow Manager; 16) Shuttle Rocket Booster Build-Up; 17) Ascent Imagery Improvements; and 18) STS-114 Flight Control Team and Mission Management Team.

Source record↗

Solar power from satellites

Microwave beaming of satellite-collected solar energy to earth for conversion to useful industrial power is evaluated for feasibility, with attention given to system efficiencies and costs, ecological impact, hardware to be employed, available options for energy conversion and transmission, and orbiting and assembly. Advantages of such a power generation and conversion system are listed, plausible techniques for conversion of solar energy (thermionic, thermal electric, photovoltaic) and transmission to earth (lasers, arrays of mirrors, microwave beams) are compared. Structural fatigue likely to result from brief daily eclipses, 55% system efficiency at the present state of the art, present projections of system costs, and projected economic implications of the technology are assessed. Two-stage orbiting and assembly plans are described.

Glaser, P. E.↗

Overview of the Lunar Transit Trajectory Performed by the Power and Propulsion Element of NASA’s Gateway

NASA has committed to returning to the moon, landing the first woman and the next man on its surface. To support a sustained lunar presence, NASA is designing an orbital platform to be assembled in an orbit near the moon called the Near Rectilinear Halo Orbit (NRHO). This platform is known as the Gateway and its purpose it to support missions primarily to the lunar south pole. As NASA continues to study ways to reduce the cost of lunar exploration, a simplification implemented in 2020combinedthe first two elements of the Gateway, the Power and Propulsion Element (PPE) and NASA’s Habitation and Logistics Outpost (HALO), onto a single commercial launch vehicle (CLV). When launched together, the PPE and HALO make up the first two elements of NASA’s Gateway and exceed the performance capacity of commercially available launch vehicles to deliver directly to the moon. The delivery of the Gateway is enabled by and takes advantage of the high efficiency of the PPEs high-power Solar Electric Propulsion (SEP) system to transfer a significant starting mass from an initial Earth orbit to final insertion into the NRHO. The PPE is a 50-kW class high power solar electric propulsion stage comprised of two different types of electric thruster strings. The SEP system is operated in two different modes, a high thrust and high Isp (specific impulse), to both maximize the final delivered mass and attempt to minimize the time spent in the Van Allen Belts early in the transit trajectory. Additionally, this SEP system brings the capability to the assembled Gateway for transfer between orbits in cislunar space. This paper captures the preliminary low thrust lunar transfer reference trajectory to be flown by the PPE it delivers itself and HALO via a spiral trajectory from launch vehicle insertion to insertion into the NRHO as well as a preliminary reference round trip transfer of the Gateway from the NRHO to a Distant Retrograde Orbit (DRO) using the PPE. Once in its final NRHO, the Gateway is being designed to enable long duration human and robotic exploration of the lunar south pole as a precursor to Mars. The Gateway’s low thrust lunar transit trajectory is envisioned to prove out the application of and flight of a high-power SEP system as a demonstration of technologies applicable to the enabling of future human space exploration.

human exploration↗

Space station assembly/servicing capabilities

The aim is to place a permanently manned space station on-orbit around the Earth, which is international in scope. The program is nearing the close of the system definition and preliminary design phase. The first shuttle launch for space station assembly on-orbit is estimated for January 1993. Topics perceived to be important to on-orbit assembly and servicing are discussed. This presentation is represented by charts.

Joyce, Joseph↗

Autonomous Robotic Manipulator Software

Autonomous robotic manipulation requires a deep and wide stack of supporting software. This paper presents Autonomous Robotic Manipulator Software (ARMS), a software suite designed at NASA Langley Research Center to support research and development of different algorithms for In-space Servicing, Assembly and Manufacturing (ISAM). ARMS solves common challenges along the autonomous manipulation software stack. Various challenges, such as integration with commercial hardware, simulation, and path planning, are solved through the use of Robot Operating System 2 and its community-developed packages. Other challenges, such as configuration management and task definition, and execution are solved in software built on those tools. The result is a modular approach to robotic system definition, agent actions, and assembly task definitions. ARMS has been used in two ISAM projects at NASA Langley Research Center, the Precision Assembled Space Structures project and the Built On-orbit Robotically assembled Gigatruss project.

Collin J Cresta↗

Autonomous Robotic Manipulator Software (ARMS)

Autonomous robotic manipulation requires a deep and wide stack of supporting software. This paper presents Autonomous Robotic Manipulator Software (ARMS), a software suite designed at NASA Langley Research Center to support research and development of different algorithms for In-space Servicing, Assembly and Manufacturing (ISAM). ARMS solves common challenges along the autonomous manipulation software stack. Various challenges, such as integration with commercial hardware, simulation, and path planning, are solved through the use of Robot Operating System 2 and its community-developed packages. Other challenges, such as configuration management and task definition, and execution are solved in software built on those tools. The result is a modular approach to robotic system definition, agent actions, and assembly task definitions. ARMS has been used in two ISAM projects at NASA Langley Research Center, the Precision Assembled Space Structures project and the Built On-orbit Robotically assembled Gigatruss project.

Collin J Cresta↗

Orbital transfer vehicle 3000 LBF thrust chamber assembly hot fire test program

The Aerojet Orbital Transfer Vehicle (OTV) Thrust Chamber Assembly (TCA) concept consists of a hydrogen cooled chamber, and annular injector, and an oxygen cooled centerbody. The hot fire testing of a heat sink version of the chamber with only the throat section using hydrogen cooling is documented. Hydraulic performance of the injector and cooled throat were verified by water flow testing prior to TCA assembly. The cooled throat was proof tested to 3000 psia to verify the integrity of the codeposited EF nickel-cobalt closeout. The first set of hot fire tests were conducted with a heat sink throat to obtain heat flux information. After demonstration of acceptable heat fluxes, the heat sink throat was replaced with the LH2 cooled throat section. Fourteen tests were conducted with a heat sink chamber and throat at chamber pressures of 85 to 359 psia. The injector face was modified at this time to add more face coolant flow. Ten tests were then conducted at chamber pressures of 197 to 620 psia. Actual heat fluxes at the higher chamber pressure range were 23 percent higher than the average of 10 Btu/in 2 predicted.

Schneider, Judy↗

Optical Fiber Array Assemblies for Space Flight on the Lunar Reconnaissance Orbiter

Custom fiber optic bundle array assemblies developed by the Photonics Group at NASA Goddard Space Flight Center were an enabling technology for both the Lunar Orbiter Laser Altimeter (LOLA) and the Laser Ranging (LR) Investigation on the Lunar Reconnaissance Orbiter (LRO) currently in operation. The unique assembly array designs provided considerable decrease in size and weight and met stringent system level requirements. This is the first time optical fiber array bundle assemblies were used in a high performance space flight application. This innovation was achieved using customized Diamond Switzerland AVIM optical connectors. For LOLA, a five fiber array was developed for the receiver telescope to maintain precise alignment for each of the 200/220 micron optical fibers collecting 1,064 nm wavelength light being reflected back from the moon. The array splits to five separate detectors replacing the need for multiple telescopes. An image illustration of the LOLA instrument can be found at the top of the figure. For the laser ranging, a seven-optical-fiber array of 400/440 micron fibers was developed to transmit light from behind the LR receiver telescope located on the end of the high gain antenna system (HGAS). The bundle was routed across two moving gimbals, down the HGAS boom arm, over a deployable mandrel and across the spacecraft to a detector on the LOLA instrument. The routing of the optical fiber bundle and its end locations is identified in the figure. The Laser Ranging array and bundle is currently accepting light at a wavelength of 532 nm sent to the moon from laser stations at Greenbelt MD and other stations around the world to gather precision ranging information from the Earth to the LRO spacecraft. The LR bundle assembly is capable of withstanding temperatures down to -55 C at the connectors, and 20,000 mechanical gimbal cycles at temperatures as cold as -20 C along the length of the seven-fiber bundle (that is packaged into the gimbals). The total bundle assembly is 10 meters long with two interconnections requiring precise clocking of the seven-fiber array pattern.

Ott, Jelanie↗

Unique methods for on-orbit structural repair, maintenance, and assembly

This paper reviews the MDA independent research and development (IRAD) efforts since 1986 in the development of two distinctly different approaches to on-orbit tube repair: (1) one-piece mechanical tube fittings that are forced, under pressure, onto the tube outer surface to effect the repair; and (2) electron beam weldings as demonstrated with the Paton-developed universal hand tool (UHT) space welding system for the repair of fluid lines and tubular components. Other areas of potential on-orbit repair using the UHT include damage to the flat or curved surfaces of habitation modules and truss assemblies. This paper will also address MDA evaluation of the Paton UHT system for on-orbit coating, cleaning, brazing, and cutting of metals. MDA development of an on-orbit compatible nondestructive evaluation (NDE) system for the inspection of tube welds is an important part of this complete space welding capability and will be discussed in a separate paper.

Anderson, Ray↗

International Space Station Common Cabin Air Assembly Water Separator On-Orbit Operation, Failure, and Redesign

The ability to control the temperature and humidity of an environment or habitat is critical for human survival. These factors are important to maintaining human health and comfort, as well as maintaining mechanical and electrical equipment in good working order to support the human and to accomplish mission objectives. The temperature and humidity of the International Space Station (ISS) United States On-orbit Segment (USOS) cabin air is controlled by the Common Cabin Air Assembly (CCAA). The CCAA consists of a fan, a condensing heat exchanger (CHX), an air/water separator, temperature and liquid sensors, and electrical controlling hardware and software. The Water Separator (WS) pulls in air and water from the CHX, and centrifugally separates the mixture, sending the water to the condensate bus and the air back into the CHX outlet airstream. Two distinct early failures of the CCAA Water Separator in the Quest Airlock forced operational changes and brought about the re-design of the Water Separator to improve the useful life via modification kits. The on-orbit operational environment of the Airlock presented challenges that were not foreseen with the original design of the Water Separator. Operational changes were instituted to prolong the life of the third installed WS, while waiting for newly designed Water Separators to be delivered on-orbit. The modification kit design involved several different components of the Water Separator, including the innovative use of a fabrication technique to build the impellers used in Water Separators out of titanium instead of aluminum. The technique allowed for the cost effective production of the low quantity build. This paper will describe the failures of the Water Separators in the Quest Airlock, the operational constraints that were implemented to prolong the life of the installed Water Separators throughout the USOS, and the innovative re-design of the CCAA Water Separator.

Balistreri, Steven F., Jr.↗