Search NASA⌕ Search

SEARCH · Search NASA

Results for “Orbit control”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 217 records · Page 12

Analysis of Envisat Orbit Maintenance Strategies to Improve/Increase Envisat ASAR Interferometry Opportunities

The biggest and most advanced Earth Observation Satellite in-orbit, developed by the European Space Agency (ESA) and its member states, is Envisat. It was launched on March 1, 2002 by an Ariane V from French Guyana and holds a total of 10 multi-disciplinary Earth observation instruments, among which an Advanced Synthetic Aperture Radar (ASAR). The ASAR user community requested the Flight Dynamics division of the European Space Operations Centre (ESOC) to investigate how the orbit control maintenance strategy for Envisat could be changed to optimize ASAR interferometry opportunities overall and in addition support the International Polar Year 2007/2008 initiative. The Polar Regions play a pivotal role in understanding our planet and our impact on it as they are recognized as sensitive barometers of environmental change. One of the main themes of the International Polar Year 2007/2008 is therefore the study of Earth s changing ice and snow, and its impact on our planet and our lives. Naturally, ESA would like to support this very important initiative. This paper presents the investigations that have been conducted to support these requests in the best possible way. It discusses the orbit maintenance strategy that has been in place since its launch, ensuring the actual orbit to be within 1 km of a so-called reference orbit, and presents the new orbit maintenance strategy that is aimed at improving/increasing the opportunities for Envisat ASAR interferometry, while preserving the fuel on board the spacecraft. The hydrazine on-board Envisat happens to be a precious resource as only approximately 300 kg of it was available at launch, like ERS-2. The difference being however that the mass of Envisat is approximately 3.2 times that of ERS-2.

Kuijper, D.↗

Optical range and range rate estimation for teleoperator systems

Range and range rate are crucial parameters which must be available to the operator during remote controlled orbital docking operations. A method was developed for the estimation of both these parameters using an aided television system. An experiment was performed to determine the human operator's capability to measure displayed image size using a fixed reticle or movable cursor as the television aid. The movable cursor was found to yield mean image size estimation errors on the order of 2.3 per cent of the correct value. This error rate was significantly lower than that for the fixed reticle. Performance using the movable cursor was found to be less sensitive to signal-to-noise ratio variation than was that for the fixed reticle. The mean image size estimation errors for the movable cursor correspond to an error of approximately 2.25 per cent in range suggesting that the system has some merit. Determining the accuracy of range rate estimation using a rate controlled cursor will require further experimentation.

Shields, N. L., Jr.↗

Simple control laws for low-thrust orbit transfers

Two methods are presented by which to determine both a thrust direction and when to apply thrust to effect specified changes in any of the orbit elements except for true anomaly, which is assumed free. The central body is assumed to be a point mass, and the initial and final orbits are assumed closed. Thrust, when on, is of a constant value, and specific impulse is constant. The thrust profiles derived from the two methods are not propellant-optimal, but are based firstly on the optimal thrust directions and location on the osculating orbit for changing each of the orbit elements and secondly on the desired changes in the orbit elements. Two examples of transfers are presented, one in semimajor axis and inclination, and one in semimajor axis and eccentricity. The latter compares favourably with a propellant-optimized transfer between the same orbits. The control laws have few input parameters, but can still capture the complexity of a wide variety of orbit transfers.

orbit transfer control algorithm↗

Auxiliary propulsion

Space shuttle auxiliary propulsion subsystems for attitude control, orbit maneuvering and power supply, discussing design requirements with emphasis on fail-operational and fail-safe criteria

Schweikle, J. D.↗

Satellite technology

An exposure to satellite design and fabrication techniques used in unmanned satellite programs is provided. Spacecraft configurations of the earth resources technology satellite (ERTS) and the improved ITOS operational satellite, which are typical of the construction and layout techniques presently in use, are discussed. Support and service subsystems are described taking the ERTS subsystems as representative. The subsystems explained comprise: power, attitude control, orbit adjustment, wideband telemetry, tracking-telemetry-command, auxiliary processing, electrical integration, and spaceborne recording devices. A number of photographs, renditions and diagrams illustrates the text.

Branchflower, G. A.↗

Orbital motion of the solar power satellite

A study on the effects of solar radiation pressure on the SPS orbit is documented. It was shown that the eccentricity of the orbit can increase from initially being zero. The SPS configuration is primarily considered but the results are applicable to any geosynchronous satellite that resembles a flat surface continually facing the sun. The orbital evolution of the SPS was investigated over its expected 30 year lifetime and the satellite was assumed to be in free flight. The satellite's motion was described with analytical formulae which could be used to develop an orbit control theory in order to minimize station keeping costs.

Graf, O. F., Jr.↗

An introduction to shuttle/LDEF retrieval operations: The R-bar approach option

Simulated orbiter direct approaches during long duration exposure facility (LDEF) retrieval operations reveal that the resultant orbiter jet plume fields can significantly disturb LDEF. An alternate approach technique which utilizes orbital mechanics forces in lieu of jets to brake the final orbiter/LDEF relative motion during the final approach, is described. Topics discussed include: rendezvous operations from the terminal phase initiation burn through braking at some standoff distance from LDEF, pilot and copilot activities, the cockpit instrumentation employed, and a convenient coordinate frame for studying the relative motion between two orbiting bodies. The basic equations of motion for operating on the LDEF radius vector are introduced. Practical considerations of implementing an R-bar approach, namely, orbiter/LDEF relative state uncertainties and orbiter control system limitations are explored. A possible R-bar approach strategy is developed and demonstrated.

Hall, W. M.↗

Flight Mechanics/Estimation Theory Symposium

Satellite attitude determination and control, orbit determination, and onboard and ground attitude determination procedures are among the topics discussed. Other topics covered include: effect of atmosphere on Venus orbiter navigation; satellite-to-satellite tracking; and satellite onboard navigation using global positioning system data.

Source record↗

Satellite aided orbit capture

The paper surveys the developments leading to the use of satellites for orbit control. Previous satellite gravity assist work is analyzed, emphasizing powered and unpowered aided capture schemes. In addition, a parametric study characterizes potential gains of satellite aided capture for various satellite systems. Finally, potential applications of aided capture such as for the Galilean System and for Saturn and Titan are given.

Nock, K. T.↗

Space Construction Experiment Definition Study (SCEDS), part 1. Volume 1: Executive summary

Definition was completed on a basic flight experiment which will provide data on the construction of large space systems from the orbiter which could not be practicably obtained from ground tests. Dynamic behavior of a representative large structure was predicted. On-orbit construction operations were studied. Orbiter control during and after construction was investigated. Evolutionary or supplemental flight experiments for the development of augmentation of a basic flight experiment were identified and defined.

Source record↗