Search NASA⌕ Search

SEARCH · Search NASA

Results for “PROGRAM MANAGEMENT”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 217 records · Page 12

Future integrated design process

The design process is one of the sources used to produce requirements for a computer system to integrate and manage product design data, program management information, and technical computation and engineering data management activities of the aerospace design process. Design activities were grouped chronologically and explored for activity type, activity interface, data quantity, and data flow. The work was based on analysis of the design process of several typical aerospace products, including both conventional and supersonic airplanes and a hydrofoil design. Activities examined included research, preliminary design, detail design, manufacturing interface, product verification, and product support. The design process was then described in an IPAD environment--the future.

Meyer, D. D.↗

Software Program: Software Management Guidebook

The purpose of this NASA Software Management Guidebook is twofold. First, this document defines the core products and activities required of NASA software projects. It defines life-cycle models and activity-related methods but acknowledges that no single life-cycle model is appropriate for all NASA software projects. It also acknowledges that the appropriate method for accomplishing a required activity depends on characteristics of the software project. Second, this guidebook provides specific guidance to software project managers and team leaders in selecting appropriate life cycles and methods to develop a tailored plan for a software engineering project.

Source record↗

International VLBI Service for Geodesy and Astrometry: 2000 General Meeting Proceedings

This volume is the proceedings of the first General Meeting of the International Very Long Base Interferometry (VLBI) Service for Geodesy and Astrometry (IVS), held in Koetzting, Germany, February 21-24, 2000. The content of this volume also appears on the IVS web site at: http://ivscc.gsfc.nasa.gov/publications/gm2000. The goal of the program committee for the General Meeting was to provide an interesting and informative program for a wide cross section of IVS members, including station operators, program managers, and analysts. The program included reports, tutorials, invited and contributed papers, and poster presentations. The tutorial papers should be particularly useful references because each one provides an overview and introduction to a topic relevant to VLBI.

Nancy R. Vandenberg↗

The Challenge of the Future

The presentation will focus primarily on Marketing and Branding Forms organizations and groups who are interested in competing in the future. The seven slides that pertain to the Shuttle program briefly describe the Oribital Processing Facilities and other important facilities, how big the Shuttle is in comparison to a D-9, and engine information. I talk about my role in the program through the Forms Management program and then move into the Marketing and Branding portion.

Boyer, Justiss↗

FAA/NASA UAS Traffic Management Pilot Program (UPP)

NASA Ames is leading ATM R&D organization. NASA started working on UTM in 2012, it's come a long way primarily due to close relationship with FAA and industry. We have a research transition team between FAA and NASA for UTM. We have a few other RTTs as well. UTM is a great example of collaborative innovation, and now it's reaching very exciting stage of UTM Pilot Project (UPP). NASA is supporting FAA and industry to make the UPP most productive and successful.

Johnson, Ronald D.↗

Southern Idaho Health & Air Quality II: Evaluating Atmospheric Mixing Height Estimations in the Western United States

Wildfires in the western United States have caused immense infrastructure damage and loss of human life in recent years. Wildfire smoke, which travels far from its original source, is also harmful to human health. Mixing height, which acts as a lid and prevents smoke from rising above a certain altitude in the lower troposphere, is a critical input in smoke dispersion and air quality models used by agencies that monitor wildfires. These models, coupled with forecaster expertise, are also used to decide when it is safe to execute a prescribed burn. The DEVELOPID team partnered with the National Weather Service (NWS) Fire Weather Program, Bureau of Land Management (BLM), National Interagency Fire Center (NIFC), and National Park Service (NPS) Fire Management Program Center (FMPC) to help improve reliability and confidence in mixing height estimations, and therefore the burn prescription decision-making process. To that end, the team developed a toolbox for measuring smoke-related aerosol mixing heights using Cloud-Aerosol LiDAR and Infrared Pathfinder Satellite Observations (CALIPSO) Vertical Feature Mask granules. CALIPSO mixing heights and NWS estimations covaried significantly and positively. However, substantial disagreement between the methods stymied the team’s attempts to quantify systematic bias in a meaningful way. The relative error between the methods was especially large at low mixing heights, which suggests that this method of validation may only be suitable at higher altitudes.

Dean Berkowitz↗

Project management techniques for highly integrated programs

The management and control of a representative, highly integrated high-technology project, in the X-29A aircraft flight test project is addressed. The X-29A research aircraft required the development and integration of eight distinct technologies in one aircraft. The project management system developed for the X-29A flight test program focuses on the dynamic interactions and the the intercommunication among components of the system. The insights gained from the new conceptual framework permitted subordination of departments to more functional units of decisionmaking, information processing, and communication networks. These processes were used to develop a project management system for the X-29A around the information flows that minimized the effects inherent in sampled-data systems and exploited the closed-loop multivariable nature of highly integrated projects.

Stewart, J. F.↗

STS-114: Post Launch MMT Briefing

Bill Parsons, Space Shuttle Program Manager, and Wayne Hill, Deputy Manager of the Space Shuttle Program, and Chair of the Mission Management Team talks about the flight day 2 of the Discovery. Bill noted that flight operations are extremely going on well. He also explained an unexpected debris event on a power ramp little ways down where LH2 ramp begins. Before flight and based from technical data, slight modifications were done on the power ramp to ensure safety of return to flight. Bill also noted that STS-114 is a test flight; all data collected and brought back by the crew will be analyzed to ensure that all information needed is sufficient to work on faults and defects and to make appropriate repairs. Wayne discussed on flight safety. He emphasized the need to thoroughly inspect the thermal protection system of the Orbiter to ensure safe entry. Inspection of still photographs from the ISS and the boom sensor system scan are the primary means to understand engineering data in terms of the immediate flight safety. He also reported accomplishments for the day such as survey of the Orbiter boom system, all the wing leading edge, RCC panels and the nose cap, to make sure these are in good shape and working well, and re-emphasized that these are primary methods to clear the thermal protection system of the Orbiter to prove that it is safe to come home on this flight.

Source record↗

A systems engineering management approach to resource management applications

The author presents a program management response to the following question: How can the traditional practice of systems engineering management, including requirements specification, be adapted, enhanced, or modified to build future planning and scheduling systems for effective operations? The systems engineering management process, as traditionally practiced, is examined. Extensible resource management systems are discussed. It is concluded that extensible systems are a partial solution to problems presented by requirements that are incomplete, partially immeasurable, and often dynamic. There are positive indications that resource management systems have been characterized and modeled sufficiently to allow their implementation as extensible systems.

Hornstein, Rhoda Shaller↗

Aggregate Risk Tool for Human Space Flight

This project utilized Data fusion capabilities developed from the 2020-2022 Information Fusion (IFDA) IRAD to enhance functionality of a Human Spaceflight (HSF) Aggregate Risk Product developed by the JSC Flight Safety Office. The tool compiles and presents risk data from multiple Program and Commercial Provider vehicles to provide a holistic assessment of residual risk to Program Managers and Technical Authorities prior to HSF Launches. The aggregation or coupling of risks from multiple sources (Examples: PRA, variances, anomaly data bases, Program Risk Management data bases, technical review board minutes, Hazard Analysis, etc.) when analyzed, identify potential areas of elevated risk in components, systems or mission phases that would otherwise be undetected by nonintegrated program risk management tools and possesses.

Patrick Huckaby↗

Strategic Options for International Participation in Space Exploration: Lessons from U.S.-Japan Defense Cooperation

The President's Commission on Implementation of United States Space Exploration Policy suggests that after NASA establishes the Space Exploration vision architecture, it should pursue international partnerships. Two possible approaches were suggested: multiple independently operated missions and an integrated mission with carefully selected international components. The U.S.-Japan defense sectors have learned key lessons from experience with both of these approaches. U.S.-Japan defense cooperation has evolved over forty years from simple military assistance programs to more complex joint development efforts. With the evolution of the political-military alliance and the complexity of defense programs, these cooperative efforts have engaged increasingly industrial resources and capabilities as well as more sophisticated forms of planning, technology transfers and program management. Some periods of this evolution have been marked by significant frictions. The U.S.Japan FS-X program, for example, provides a poor example for management of international cooperation. In November 1988, the United States and Japan signed a Memorandum of Understanding (MOU) to co-develop an aircraft, named FS-X and later renamed F -2, as a replacement to the aging Japan support fighter F-l. The program was marked by numerous political disputes. After over a decade of joint development and testing, F -2 production deliveries finally began in 1999. The production run was curtailed due to much higher than anticipated costs and less than desired aircraft performance. One universally agreed "lesson" from the FSX/F-2 case was that it did not represent the ideal approach to bilateral cooperation. More recent cooperative programs have involved targeted joint research and development, including component development for ballistic missile defense systems. These programs could lay the basis for more ambitious cooperative efforts. This study examines both less-than-stellar international cooperation efforts as well as more successful initiatives to identify lessons from military programs that can help NASA encourage global investment in its Space Exploration Vision. The paper establishes a basis for examining related policy and industrial concerns such as effective utilization of dual-use technologies and trans-Pacific program management of large, complex cooperative programs.

Hudiburg, John J.↗

The NASA Software Management and Assurance Program

A committee of experienced managers representing each major NASA organization guides a major development effort which seeks to ensure the acquisition of economical and reliable software for more complex future programs. The primary, near-term development objectives of the NASA Software Management and Assurance Program are: (1) to provide the best management and technical guidance available; (2) to facilitate the use of proven tools, techniques, and information; and (3) to maintain a pool of highly qualified software personnel. The software development tasks addressed involve such problems as satellite end-to-end architecture and advanced aircraft guidance and control systems.

Hall, D. L.↗

Evaluation of human engineering design standard (MSFC-STD-267A) in the design of manned space vehicles

The major conclusion of the detailed examination of the human factors engineering design standard is that it is unsuitable for future spacecraft design. The standard, published in 1966, was not intended to be a zero or reduced gravity standard and was directed primarily toward ground support equipment and technology. Futhermore, ambiguities, conflicts, and unenforceable requirements contribute to the difficulty. The role of man in future space missions and its impact on human engineering standards are also discussed, and it is concluded that greater standardization is vital to the success of future missions. A survey of NASA/MSFC contractors was made, and it was found that MSFC-STD-267A is largely ignored and the most significant problems are inaccessibility and nonspecificity of the data. The resistance of contract management and designer and of program managers is a primary reason for poor human engineering design. Specific recommendations for improvement of format and organization, including an interim solution, are given.

Rogers, J. G.↗

The personal computer and GP-B management

The Gravity Probe-B (GP-B) experiment is one of the most sophisticated and challenging developments to be undertaken by NASA. Its objective is to measure the relativistic drift of gyroscopes in orbit about the earth. In this paper, the experiment is described, and the strategy of phased procurements for accomplishing the engineering development of the hardware is discussed. The microcomputer is a very convenient and powerful tool in the management of GP-B. It is used in creating and monitoring such project data as schedules, budgets, hardware procurements and technical and interface requirements. Commercially available software in word processing, database management, communications, spreadsheet, graphics and program management are used. Examples are described of the efficacy of the application of the computer by the management team.

Neighbors, A. K.↗