Search NASA⌕ Search

SEARCH · Search NASA

Results for “PUBLIC SERVICE”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 217 records · Page 12

Improving Resilience of Bus Bunching Holding Strategy through a Rolling Horizon Approach

Providing public transportation with quality service is critical to attracting more passengers to the system. However, high-demand routes are prone to the so-called bus bunching -- a tendency of buses to group as a consequence of variations in travel times and demands. Bus holding is applied to overcome this effect. In this study, we present a novel method for bus holding in which the control law is based only on the buses' position using a computationally efficient rolling horizon approach. The method uses similar inputs as linear control approaches while not increasing significantly the computational time. However, the method overcomes key a weakness of the linear control approach thanks to the explicit constraint handling that always ensures the control action effectiveness. Simulation experiments in a validation case and a model-specific for a bus rapid transit line in Curitiba, Brazil showed a reduced holding time and improved resilience, delivering more than 20% reduction in delay time accounting for the on-board and station delays.

33 ADVANCED PROPULSION SYSTEMS↗

Engaging outreach workers in the development of a farmworker health research agenda

Highlights: • Farmworker health outreach workers seek research on health services delivery. • A gap exists in translating research results for farmworker health outreach workers. • Farmworker health outreach workers are a bridge between researchers and farmworkers. Farmworker health outreach workers have not traditionally been involved in the prioritization and design of research studies. This report from the field shares the results of a survey administered to outreach workers providing health services to farmworkers in North Carolina. Priority areas of research and best practices for engaged research are presented from the perspective of the outreach worker community. The purposeful involvement of outreach workers can make farmworker health research more meaningful and solution-oriented.

54 ENVIRONMENTAL SCIENCES↗

National population mapping from sparse survey data: A hierarchical Bayesian modeling framework to account for uncertainty

Population estimates are critical for government services, development projects, and public health campaigns. Such data are typically obtained through a national population and housing census. However, population estimates can quickly become inaccurate in localized areas, particularly where migration or displacement has occurred. Some conflict-affected and resource-poor countries have not conducted a census in over 10 y. We developed a hierarchical Bayesian model to estimate population numbers in small areas based on enumeration data from sample areas and nationwide information about administrative boundaries, building locations, settlement types, and other factors related to population density. We demonstrated this model by estimating population sizes in every 10- m grid cell in Nigeria with national coverage. These gridded population estimates and areal population totals derived from them are accompanied by estimates of uncertainty based on Bayesian posterior probabilities. The model had an overall error rate of 67 people per hectare (mean of absolute residuals) or 43% (using scaled residuals) for predictions in out-of-sample survey areas (approximately 3 ha each), with increased precision expected for aggregated population totals in larger areas. This statistical approach represents a significant step toward estimating populations at high resolution with national coverage in the absence of a complete and recent census, while also providing reliable estimates of uncertainty to support informed decision making.

99 GENERAL AND MISCELLANEOUS↗

RES-E-NEXT: Next Generation of RES-E Policy Instruments

The rapid deployment of renewable sources of electricity (RES-E) is transforming power systems globally. This trend is likely to continue with large increases in investment and deployment of RES-E capacity over the coming decades. Several countries now have penetration levels of variable RES-E generation (i.e., wind and solar) in excess of 15% of their annual electricity generation; and many jurisdictions (e.g., Spain, Portugal, Ireland, Germany, and Denmark; and, in the United States, Colorado) have experienced instantaneous penetration levels of more than 50% variable generation.1 These penetration levels of variable RES-E have prompted many jurisdictions to begin modifying practices that evolved in an era of readily dispatchable, centralised power systems. Providing insights for the transition to high levels of variable RES-E generation is the focus of this document, which is the final report of the RES-E-NEXT project commissioned by the International Energy Agency’s implementing agreement on Renewable Energy Technology Deployment (IEA-RETD). It presents a comprehensive assessment of issues that will shape power system evolution during the transition to high levels of variable RES-E generation. While policy will be a central tool to sustain the growth of RES-E capacity and to enable power system transitions, the scope of the report extends beyond policy considerations to include the related domains of regulation, power market design, and system operation protocols. This broad scope is in recognition that a changing resource mix with greater penetration levels of variable RES-E has broad implications for grid operations, wholesale and retail power markets, and infrastructure needs. The next decade will be a critical transition period for power system stakeholders, as global deployment of RES-E capacity (and especially variable RES-E capacity) continues to scale-up in many regions of the world. To address increased penetration levels of RES-E in power systems and the new challenges that could emerge, coordinated portfolios of policies, market designs, regulations, and operational protocols are essential. The goal for policymakers is to facilitate investment in RES-E technologies and to enable efficient and reliable system operation, costeffective service delivery, and continued public acceptance. Although the factors that impact the speed and scale of RES-E deployment manifest uniquely in each power system, in the transition to high shares of variable RES-E this report identifies four critical domains and the changing drivers that will shape next-generation policy for each. These domains are introduced in Table I, and comprise the major sections of this report.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Cloud Computing for Complex Performance Codes.

This report describes the use of cloud computing services for running complex public domain performance assessment problems. The work consisted of two phases: Phase 1 was to demonstrate complex codes, on several differently configured servers, could run and compute trivial small scale problems in a commercial cloud infrastructure. Phase 2 focused on proving non-trivial large scale problems could be computed in the commercial cloud environment. The cloud computing effort was successfully applied using codes of interest to the geohydrology and nuclear waste disposal modeling community.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

State Performance-Based Regulation Using Multiyear Rate Plans for U.S. Electric Utilities

Electric utilities today must contain costs at a time when many need to modernize aging systems and all face major changes in technologies, customer preferences and competitive pressures.Most U.S. electric utility facilities are investor-owned, subject to rate and service regulation by state public utility commissions. Regulatory systems under which these utilities operate affect their performance and ability to meet these challenges. In this business environment, multiyear rate plans have some advantages over traditional rate regulation.The report focuses on key design issues and provides case studies of the multiyear rate plan approach, applicable to both vertically integrated and restructured states. Mark Newton Lowry and Matt Makos of Pacific Energy Group Research and Jeff Deason of Berkeley Lab authored the report; Lisa Schwartz, Berkeley Lab, was project manager and technical editor.The report is aimed primarily at state utility regulators and stakeholders in the state regulatory process. The multiyear rate approach also provides ideas on how to streamline oversight of public power utilities and rural electric cooperatives for their governing boards.Two key provisions of multiyear rate plans strengthen cost containment incentives and streamline regulation: 1. Reducing frequency of rate cases, typically to every four or five years 2. Using an attrition relief mechanism to escalate rates or revenue between rate cases to address cost pressures such as inflation and growth in number of customers, independently of the utility’s own cost Better utility performance can be achieved under well-designed multiyear rate plans while achieving lower regulatory costs. Benefits can be shared between utilities and their customers. But plans can be complex and involve significant changes in the regulatory system. Designing plans that stimulate utility performance without undue risk and share benefits fairly can be challenging.This report discusses the rationale for multiyear rate plans and their usefulness under modern business conditions. It then explains critical plan design issues and challenges and presents results from numerical research that considers the extra incentive power achieved under different plan provisions. Next, the report presents several case studies of utilities that have operated under formal multiyear rate plans or, for various reasons, have stayed out of rate cases for more than a decade. These studies consider the effect of multiyear rate plans and rate case frequency on utility cost, reliability and other performance dimensions.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Storing Affordability: Battery Storage as an Asset to Reduce Data Center Cost Shifts

This report examines how battery energy storage systems (BESS) can help utilities accommodate large load growth while protecting affordability for existing ratepayers. Rapid growth in electricity demand from artificial intelligence (AI) data centers is straining the U.S. grid. Furthermore, many new data centers are entering rural markets, which could offer economic benefits but may also pose implementation challenges for smaller utilities. At the same time, retail electricity prices are increasing faster than inflation, elevating customer affordability as a key challenge. While data centers have not been the primary driver of increases in residential prices to date, they have pushed wholesale energy and capacity prices higher in several markets. Fundamental utility cost-allocation principles show that data center growth can be rate-positive for existing customers only if new peak demand grows faster than the costs a utility must incur to serve it. Several factors, including a utility’s degree of wholesale market exposure, forecast uncertainty and stranded-asset risk, and tariff design can determine the outcome of load growth on retail rates. Energy storage can make several affordability contributions in the face of this landscape of uncertainty and market volatility, including deferral of higher-cost grid investments through improved utilization of existing assets and flexibility of new large loads, insulation from volatile wholesale prices through peak shaving, and reliability support to address grid risks stemming from the behavior of AI data center loads. Different potential BESS deployment pathways—utility-scale front-of-the-meter systems, aggregated small-scale storage installations, and data center-sited behind-the-meter storage—are compared against each other and against conventional capacity alternatives. This framework is intended as a conceptual resource to utilities, particularly smaller public utilities with rural service territories, who may be considering the role that energy storage can play in insulating existing ratepayers from data center cost shifts.

25 ENERGY STORAGE↗

Information Technology and Community Restoration Studies/Task 1: Information Technology

Executive Summary The Interagency Biological Restoration Demonstration—a program jointly funded by the Department of Defense's Defense Threat Reduction Agency and the Department of Homeland Security's (DHS's) Science and Technology Directorate—is developing policies, methods, plans, and applied technologies to restore large urban areas, critical infrastructures, and Department of Defense installations following the intentional release of a biological agent (anthrax) by terrorists. There is a perception that there should be a common system that can share information both vertically and horizontally amongst participating organizations as well as support analyses. A key question is: "How far away from this are we?" As part of this program, Pacific Northwest National Laboratory conducted research to identify the current information technology tools that would be used by organizations in the greater Seattle urban area in such a scenario, to define criteria for use in evaluating information technology tools, and to identify current gaps. Researchers interviewed 28 individuals representing 25 agencies in civilian and military organizations to identify the tools they currently use to capture data needed to support operations and decision making. The organizations can be grouped into five broad categories: defense (Department of Defense), environmental/ecological (Environmental Protection Agency/Ecology), public health and medical services, emergency management, and critical infrastructure. The types of information that would be communicated in a biological terrorism incident include critical infrastructure and resource status, safety and protection information, laboratory test results, and general emergency information. The most commonly used tools are WebEOC (web-enabled crisis information management systems with real-time information sharing), mass notification software, resource tracking software, and NW WARN (web-based information to protect critical infrastructure systems). It appears that the current information management tools are used primarily for information gathering and sharing—not decision making. Respondents identified the following criteria for a future software system. It is easy to learn, updates information in real time, works with all agencies, is secure, uses a visualization or geographic information system feature, enables varying permission levels, flows information from one stage to another, works with other databases, feeds decision support tools, is compliant with appropriate standards, and is reasonably priced. Current tools have security issues, lack visual/mapping functions and critical infrastructure status, and do not integrate with other tools. It is clear that there is a need for an integrated, common operating system. The system would need to be accessible by all the organizations that would have a role in managing an anthrax incident to enable regional decision making. The most useful tool would feature a GIS visualization that would allow for a common operating picture that is updated in real time. To capitalize on information gained from the interviews, the following activities are recommended: • Rate emergency management decision tools against the criteria specified by the interviewees. • Identify and analyze other current activities focused on information sharing in the greater Seattle urban area. • Identify and analyze information sharing systems/tools used in other regions.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Design and Implementation of Real-Time Off-Grid Detection Tool Based on FNET/GridEye

Real-time situational awareness tools are of critical importance to power system operators, especially during emergencies. The availability of electric power has become a linchpin of most post disaster response efforts as it is the primary dependency for public and private sector services, as well as individuals. Knowledge of the scope and extent of facilities impacted, as well as the duration of their dependence on backup power, enables emergency response officials to plan for contingencies and provide better overall response. Based on real-time data acquired by Frequency Disturbance Recorders (FDRs) deployed in the North American power grid, a real-time detection method is proposed. This method monitors critical electrical loads and detects the transition of these loads from an on-grid state, where the loads are fed by the power grid to an off-grid state, where the loads are fed by an Uninterrupted Power Supply (UPS) or a backup generation system. The details of the proposed detection algorithm are presented, and some case studies and off-grid detection scenarios are also provided to verify the effectiveness and robustness. Meanwhile, the algorithm has already been implemented based on the Grid Solutions Framework (GSF) and has effectively detected several off-grid situations.

Guo, Jiahui↗

Developing an Interactive Landscape for Mobility Resources: Preprint

As the world continues to be increasingly driven by data, the ways researchers and professionals sort and collect this data is critical. In the world of mobility data, new levels of data from public transportation systems, location services, and other means are being lost due to how little organization exists. Much of the data is proprietary, and there are few if any de jure or even de facto standards connecting data. There is also little knowledge about the gaps that exist in the data. In this project, we created an interactive landscape where mobility resources are categorized and organized in an easy to use, living document. We made this landscape with open-source code from the CNCF Cloud Native Landscape and repurposed it to the mobility data's needs. Additionally, unlike previous sources that organize mobility data, this document can be updated through GitHub by those in the field to keep its sources relevant. Following the creation of a beta version of the landscape, we conducted several interviews with industry researchers and professionals to ensure the landscape would be useful. The result is an online hub where mobility researchers and resource creators can easily access research and collaborate.

ADVANCED PROPULSION SYSTEMS↗

Remediation of Centre Pier, Port Hope, Ontario: Historical, Logistical, Regulatory and Technical Challenges - 13118

Centre Pier is a 3.9 ha property owned by the Commissioners of the Port Hope Harbour in the Municipality of Port Hope, Ontario, Canada. It is centrally located on the Port Hope waterfront and is bounded on the west by the Port Hope Harbour, on the east by the Ganaraska River, on the south by Lake Ontario, and on the north by a railway corridor. The property is currently leased by the Commissioners of the Port Hope Harbour to the Cameco Corporation which owns the four onsite building that are used as warehouse space for their uranium conversion facility located on the western side of the Harbour. Remediation of this site forms part of the Port Hope Project being undertaken by Atomic Energy of Canada Limited (AECL) and Public Works and Government Services Canada (PWGSC) as part of the Port Hope Area Initiative (PHAI). Soil impacts include radiological, metals and petroleum hydrocarbons resulting from long term historical industrial use. Radiological impacts in soil extend across most of the site primarily within the upper metre of fill. Metals-contaminated soil is present across the entire site in the underlying fill material. The metals-contaminated fill extends to a maximum depth of 2.0 m below grade at the north end of the site which is underlain by peat. However, the metals-contaminated soil could extend to the top of the bedrock on the remainder of the site. Based on the elevation of the bedrock in the adjacent river and Harbour Basin, the metals-contaminated soil may extend to a depth of 5.6 m or 6.5 m below existing grade. Petroleum-contaminated soil is present on the southeast side of the site, where a storage tank farm was previously located. Challenges include: - The complex history of the site both relating to site use and Pier construction. Pier development began in the 1800's and was undertaken by many different entities. Modifications and repairs were made over the years resulting in several different types of Pier walls and fill that must be considered during remediation. A wide variety of industrial activity on the Pier including extensive foundry operations as well as the industrial nature of the fill used to construct the Pier has resulted in extensive contamination distribution. The Pier structure will require reinforcement to permit both the remediation of the Pier and the adjacent Harbour and remediation techniques will need to be well suited to minimize disruption of wall structures as well as being able to deal with fill ranging from ash to boulders. - Multiple stakeholders are responsible for building demolition, remediation of radiological impacts, remediation of industrial impacts and the use of the site as a staging area for Harbour sediment remediation. The successful remediation of the Centre Pier will require careful negotiation and planning for the various remediation activities noted above. - The depth of contamination on the Pier would result in the complete removal of the Pier if all contamination were to be excavated. Therefore, a Risk Assessment will be conducted to determine the appropriate means for in situ risk management for materials to be left in place below a proposed depth of 1.5 m below current grade. With the concurrence of the property owners and Provincial regulators, the Risk Assessment will be undertaken in accordance with the Provincial requirements that will ensure adequate protection of the environment and future users of the site. - The end use of the Pier has yet to be confirmed by the Municipality. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Scheduling the Remediation of Port Hope: Logistical and Regulatory Challenges of a Multiple Site Urban Remediation Project - 13119

The Port Hope Project is part of the larger CAN$1.28 billion Port Hope Area Initiative (PHAI), a community-based program for the development and implementation of a safe, local, long-term management solution for historic Low-Level Radioactive Waste (LLRW) in the Municipalities of Port Hope and Clarington, Ontario, Canada. Atomic Energy of Canada (AECL) is the Project Proponent, Public Works and Government Services (PWGSC) is managing the procurement of services and the MMM Group Limited - Conestoga Rovers and Associates Joint Venture (MMM-CRA Joint Venture) is providing detailed design and construction oversight and administration services for the Project. The Port Hope Project includes the construction of a long-term waste management facility (LTWMF) in the Municipality of Port Hope and the remediation of 18 (eighteen) large-scale LLRW, numerous small-scale sites still being identified and industrial sites within the Municipality. The total volume to be remediated is over one million cubic metres and will come from sites that include temporary storage sites, ravines, beaches, parks, private commercial and residential properties and vacant industrial sites all within the urban area of Port Hope. Challenges that will need to be overcome during this 10 year project include: - Requirements stipulated by the Environmental Assessment (EA) that affect Project logistics and schedule. - Coordination of site remediation with the construction schedule at the LTWMF. - Physical constraints on transport routes and at sites affecting production rates. - Despite being an urban undertaking, seasonal constrains for birds and fish (i.e., nesting and spawning seasons). - Municipal considerations. - Site-specific constraints. - Site interdependencies exist requiring consideration in the schedule. Several sites require the use of an adjacent site for staging. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Investigating the interconnectedness of active transportation and public transit usage as a primer for Mobility-as-a-Service adoption and deployment

With the advent of Mobility-as-a-Service packages to reduce car usage and (by extension) greenhouse gas emissions, it is crucial that researchers and practitioners consider mutual determinants and outcomes that link the adoption of multiple alternative modes. This study therefore investigates the joint usage of active travel (walking, cycling, bike-sharing) and public transit (bus, rail) modes with respect to personal and situational contexts. Online survey data (n = 826) were collected across six Midwestern U.S. states using Amazon MTurk. Respondents indicated their average weekly usage of eight travel modes across three trip purposes so that multimodality could be assessed. Several psychological constructs were extracted via (a) the stages of change framework, used to indicate willingness to adopt new behavior, and (b) confirmatory factor analysis conducted on Likert scales rooted in theories of community, identity, norms, personality, and well-being. A multiple-indicators multiple-causes structural equation model is then employed to investigate the process of adopting a modality style that incorporates active and transit modes. The model confirms that compatible physical and social contexts, as well as navigational skills and openness to learning, are key primers of multimodalism. However, a path juncture stemming from neighborhood support for mobility innovation illustrates a potential polarity in outcomes between individuals and communities. In addition, the stage of active mobility adoption is linked to identity and norm activation, offering further guidance on what influences readiness for change. The seamless integration of mobility services is critical to matching the convenience and comfort of the private vehicle; understanding potential pathways to sustainable mobility, though, requires analyses and interventions that are driven by well-being outcomes and grounded in rigorous psychological frameworks. Here, the research findings offer practical guidance for identifying intervention opportunities to be linked with MaaS enrollment while demonstrating the need to illuminate how mobility might relate to social cohesion, identity expression, and various sources of satisfaction.

42 ENGINEERING↗

Privatization of solid waste collection services: Lessons from Gaborone

Highlights: • We compared efficiency and effectiveness of waste collection by the public and private sector. • Public sector performs better than private sector in some areas and vice versa. • Outsourcing waste collection in developing countries is hindered by limited capacity on contractual issues. • Outsourcing collection in developing countries is hampered by inadequate waste information. • There is need to build capacity in the public sector of developing countries to support outsourcing. - Abstract: Formal privatization of solid waste collection activities has often been flagged as a suitable intervention for some of the challenges of solid waste management experienced by developing countries. Proponents of outsourcing collection to the private sector argue that in contrast to the public sector, it is more effective and efficient in delivering services. This essay is a comparative case study of efficiency and effectiveness attributes between the public and the formal private sector, in relation to the collection of commercial waste in Gaborone. The paper is based on analysis of secondary data and key informant interviews. It was found that while, the private sector performed comparatively well in most of the chosen indicators of efficiency and effectiveness, the public sector also had areas where it had a competitive advantage. For instance, the private sector used the collection crew more efficiently, while the public sector was found to have a more reliable workforce. The study recommends that, while formal private sector participation in waste collection has some positive effects in terms of quality of service rendered, in most developing countries, it has to be enhanced by building sufficient capacity within the public sector on information about services contracted out and evaluation of performance criteria within the contracting process.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Enterprise Credentialing Service Statement of Work (SOW)

The scope of this project includes providing professional services in support of the development and deployment of an Enterprise Credentialing Service for the Department of Energy (DOE) National Nuclear Security Administration (NNSA), which will be used for issuing and managing credentials used for authentication, digital signature, and encryption functions by users, applications, and devices in a closed computing environment. The Seller shall provide subject matter expertise for the design and deployment of the technologies and processes that comprise the Enterprise Credentialing Service, which will include a public key infrastructure (PKI) and a credential management system (CMS) that issues and manages PKI-based smartcard credentials. The Enterprise Credentialing Service will support approximately 17,000 users at 15 DOE NNSA sites and laboratories located across the continental United States.

97 MATHEMATICS AND COMPUTING↗

Fort Erie On-Demand Transit Case Study

Rural and smaller-sized communities in North America face unique mobility challenges due to their low population density, lower public transit spending per capita compared to major cities, and a high reliance on private vehicles. In recent years, communities such as Fort Erie, Ontario have restructured or advanced their public transit systems using on-demand services. Fort Erie is a relatively sparsely populated region of 32,901 residents, spread across a land area of 166 square kilometers (64 square miles), for an average population density of 193 residents per square kilometer (500 per square mile). In October 2021, the town implemented a mobility-on-demand system integrated with smartphone software to replace its fixed-route community bus system, which consisted of four buses with three routes, each with a roughly one-hour, one way loop. The new service utilizes a fleet of six minivans, two of which are retrofitted with wheelchair-accessible ramps. The system may require that a passenger requesting a standard van walk up to 400 meters (a quarter mile) to their pickup location to optimize vehicle routing while providing origin-to-destination service. The on-demand system proved effective in providing service, eclipsing pre-pandemic ridership by 40%, decreasing greenhouse gas emissions per ride by 63%, and decreasing the cost per ride to the town by 29%. This report documents both the previous system and the new system in terms of routes, ridership, costs, fuel, and other notable system parameters. This work is part of an ongoing series of case studies on providing small communities with on-demand, right-sized vehicle service coupled with a smartphone application.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗