Search NASA⌕ Search

SEARCH · Search NASA

Results for “Peer Review”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 217 records · Page 12

A review of challenges, barriers, and opportunities for large-scale deployment of cool surfaces

Major urban centers are warming due to a combination of global and local phenomena. City governments are increasingly adopting strategies to mitigate the causes and impacts of extreme heat on their populations. Among these strategies are high solar-reflectance (cool) surfaces installed on building roofs and walls. Use of cool surfaces is a cost-effective and simple strategy that replaces conventional darker surfaces with surfaces that have a high reflectance to shortwave (solar) energy. This report reviews the recent history of cool-surface deployment efforts. This includes peer-reviewed literature, conference proceedings, and grey literature to identify challenges and barriers to wide-scale deployment of cool surfaces. We have also researched heat action plans and programs from cities and different codes and standards, as well as available incentive and rebate programs. The review identifies challenges, barriers, and opportunities associated with large-scale deployment of cool surfaces and categorize them broadly as being related to product development & performance or policies & mandates. It provides a foundation upon which we intend to build a roadmap for rapidly accelerating future deployments of cool surfaces. Finally, this roadmap will address identified challenges and incorporate lessons learned from historical efforts to generate a practical and actionable plan.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

A global assessment of policy tools to support climate adaptation

Governments, businesses, and civil society organizations have diverse policy tools to incentivize adaptation. Policy tools can shape the type and extent of adaptation, and therefore, function either as barriers or enablers for reducing risk and vulnerability. Using data from a systematic review of academic literature on global adaptation responses to climate change (n = 1549 peer-reviewed articles), we categorize the types of policy tools used to shape climate adaptation. We apply qualitative and quantitative analyses to assess the contexts where particular tools are used, along with equity implications for groups targeted by the tools, and the tools’ relationships with transformational adaptation indicators such as the depth, scope, and speed of adaptation. We find diverse types of tools documented across sectors and geographic regions. We also identify a mismatch between the tools that consider equity and those that yield more transformational adaptations. Direct regulations, plans, and capacity building are associated with higher depth and scope of adaptation (thus transformational adaptation), while economic instruments, information provisioning, and networks are not; the latter tools, however, are more likely to target marginalized groups in their design and implementation. We identify multiple research gaps, including a need to assess instrument mixes rather than single tools and to assess adaptations that result from policy implementation. Key policy insights Information-based approaches, networks, and economic instruments are the most frequently documented adaptation policy tools worldwide. Direct regulations, plans, and capacity building are associated with higher depth and scope of adaptation, and thus more transformational adaptation. Capacity building, economic instruments, networks, and information provisioning approaches are more likely to target specific marginalized groups and thus equity challenges. There are many regions and sectors where certain tools are not widely documented (e.g. regulations and plans in Africa and Asia), representing a key research gap.

54 ENVIRONMENTAL SCIENCES↗

Electromagnetic and Light Scattering by Nonspherical Particles XV: Celebrating 150 Years of Maxwell's Electromagnetics

The 15th Electromagnetic and Light Scattering Conference (ELS-XV) was held in Leipzig, Germany from 21 to 26 of June 2015. This conference built on the great success of the previous meetings held in Amsterdam (1995), Helsinki(1997) [2], New York City(1998) [3], Vigo (1999),Halifax (2000), Gainesville (2002), Bremen (2003), Salobreña (2005), St. Petersburg (2006), Bodrum (2007), Hatfield (2008), Helsinki (2010), Taormina (2011), and Lille as well as the workshops held in Bremen (1996,1998) and Moscow (1997). As usual, the main objective of this conference was to bring together scientists, engineers, and PhD students studying various aspects of electromagnetic scattering and to provide a relaxed atmosphere for in-depth discussion of theory, measurements, and applications. Furthermore, ELS-XV supported the United Nations "Year of Light" and celebrated the150th anniversary of Maxwell's electromagnetics. Maxwell's paper on "A Dynamical Theory of the Electromagnetic Field" was published in1865 and has widely been acknowledged as one of the supreme achievements in the history of science. The conference was attended by136 scientists from 22 countries. The scientific program included two plenary lectures, 16 invited reviews, 88 contributed oral talks, and 70 poster presentations. The program and the abstracts of conference presentations are available at the conference website http://www.els-xv-2015.net/home.html. Following the well-established ELS practice and with Elsevier's encouragement, we solicited full-size papers for a topical issue of the Journal of Quantitative Spectroscopy and Radiative Transfer (JQSRT). The result of this collective effort is now in the reader's hands. As always, every invited review and regular paper included in this topical issue has undergone the same rigorous peer review process as any other manuscript published in the JQSRT.

light scattering↗

The Integrated Medical Model: Outcomes from Independent Review

In 2016, the Integrated Medical Model (IMM) v4.0 underwent an extensive external review in preparation for transition to an operational status. In order to insure impartiality of the review process, the Exploration Medical Capabilities Element of NASA's Human Research Program convened the review through the Systems Review Office at NASA Goddard Space Flight Center (GSFC). The review board convened by GSFC consisted of persons from both NASA and academia with expertise in the fields of statistics, epidemiology, modeling, software development, aerospace medicine, and project management (see Figure 1). The board reviewed software and code standards, as well as evidence pedigree associated with both the input and outcomes information. The board also assesses the models verification, validation, sensitivity to parameters and ability to answer operational questions. This talk will discuss the processes for designing the review, how the review progressed and the findings from the board, as well as summarize the IMM project responses to those findings. Overall, the board found that the IMM is scientifically sound, represents a necessary, comprehensive approach to identifying medical and environmental risks facing astronauts in long duration missions and is an excellent tool for communication between engineers and physicians. The board also found IMM and its customer(s) should convene an additional review of the IMM data sources and to develop a sustainable approach to augment, peer review, and maintain the information utilized in the IMM. The board found this is critically important because medical knowledge continues to evolve. Delivery of IMM v4.0 to the Crew Health and Safety (CHS) Program will occur in the 2017. Once delivered for operational decision support, IMM v4.0 will provide CHS with additional quantitative capability in to assess astronaut medical risks and required medical capabilities to help drive down overall mission risks.

medical equipment↗

Use of Tethys Engineering by the Marine Energy Community (User Review Report)

In partial fulfillment of the Annual (SMART) Milestone for Q3 of FY22, this report details the results of the peer review process carried out on the use and function of Tethys Engineering. During Q3 of FY22, Pacific Northwest National Laboratory (PNNL) solicited broad feedback from a self-selected subset of the marine energy community on the use and effectiveness of key pages on Tethys Engineering. A total of 39 responses were collected from the greater marine energy community.

42 ENGINEERING↗

Three Proposed Compendia for Genesis Solar Wind Samples: Science Results, Collector Materials Characterization and Cleaning Techniques

Final Paper and not the abstract is attached. Introduction: Planetary material and cosmochemistry research using Genesis solar wind samples (including the development and implementation of cleaning and analytical techniques) has matured sufficiently that compilations on several topics, if made publically accessible, would be beneficial for researchers and reviewers. We propose here three compendia based on content, organization and source of documents (e.g. published peer-reviewed, published, internal memos, archives). For planning purposes, suggestions are solicited from potential users of Genesis solar wind samples for the type of science content and/or organizational style that would be most useful to them. These compendia are proposed as living documents, periodically updated. Similar to the existing compendia described below, the curation compendia are like library or archival finding aids, they are guides to published or archival documents and should not be cited as primary sources.

Allton, J. H.↗

Independent Review Support for Phoenix Mars Mission Robotic Arm Brush Motor Failure

The Phoenix Project requested the NASA Engineering and Safety Center (NESC) perform an independent peer review of the Robotic Arm (RA) Direct Current (DC) motor brush anomalies that originated during the Mars Exploration Rover (MER) Project and recurred during the Phoenix Project. The request was to evaluate the Phoenix Project investigation efforts and provide an independent risk assessment. This includes a recommendation for additional work and assessment of the flight worthiness of the RA DC motors. Based on the investigation and findings contained within this report, the IRT concurs with the risk assessment Failure Cause / Corrective Action (FC/CA) by the project, "Failure Effect Rating "3"; Major Degradation or Total Loss of Function, Failure Cause/Corrective Action Rating Currently "4"; Unknown Cause, Uncertainty in Corrective Action."

McManamen, John P.↗

Production Agency Quality Assurance Management Execution Strategy [Thesis]

There are multiple federal directives that Los Alamos National Laboratory (LANL) must follow for the proper implementation of quality assurance, strategic planning, and execution of manufacturing and surveillance operations. Recent assessments identified that manufacturing in all processing areas is dynamic due to influencing scope changes, design modifications, funding adjustments, and staff attrition. In response, this project was started to develop a comprehensive PAQ execution strategy to support the success of LANL’s manufacturing mission. This project’s method for developing an updated architecture was to create an integrated, flexible, reliable, and agile strategic process. The execution plan has five deliverables: 1) an integrated schedule view of PAQ work scope, 2) a resource management plan that aligns with the required scope, 3) a metrics monitoring dashboard, 4) a project management plan for sustaining NAP 401.1A implementation, and 5) a risk management plan. The research design is a mixed-method approach focused on data collection for each deliverable. The methodology entails qualitative and quantitative research, metrics monitoring, data analysis, and the creation of a dashboard. The qualitative methods used include literature reviews and interviews. The quantitative methods include resource, financial, schedule and survey data analysis. Preliminary and final results were peer reviewed by subject matter experts both within the ALDWP organization and deployed support.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Qualification of Digitized Legacy Fast Reactor Data

The Integral Fast Reactor (IFR) fuel compatibility test program (1984-1994) included a variety of fuel pin examinations conducted at the Hot Fuel Examination Facility (HFEF) and the Alpha-Gamma Hot Cell Facility (AGHCF). Hard copy data records of these examinations have been recovered, scanned, and preserved in PDF format. Many hard copy records are now qualified in accordance with an NRC-approved Quality Assurance Program Plan (QAPP), and there is an ongoing effort to qualify additional legacy records. This legacy fuel performance data is vital to support design and licensing of fast reactors with validation of state-of-the-art codes and advanced methods for design and analysis. Stakeholders can most easily utilize this data when the PDF scans have been converted into digital data tables. However, qualification of the scanned hard copy data does not qualify the digital data file resulting from the digitization of the data contained in the record; the subject matter expert (SME) must make a review of the digitized data table as well before it can be designated as qualified. This report outlines a peer review process to qualify the digital data file(s), typically in CSV format, corresponding to hard copy records in accordance with the existing QAPP.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

NASA Engineering and Technology Advancement Office: A proposal to the administrator

NASA has continually had problems with cost, schedule, performance, reliability, quality, and safety aspects in programs. Past solutions have not provided the answers needed, and a major change is needed in the way of doing business. A new approach is presented for consideration. These problems are all engineering matters, and therefore, require engineering solutions. Proper engineering tools are needed to fix engineering problems. Headquarters is responsible for providing the management structure to support programs with appropriate engineering tools. A guide to define those tools and an approach for putting them into place is provided. Recommendations include establishing a new Engineering and Technology Advancement Office, requesting a review of this proposal by the Administrator since this subject requires a top level decision. There has been a wide peer review conducted by technical staff at Headquarters, the Field Installations, and others in industry as discussed.

Schulze, Norman R.↗

External Tank Liquid Hydrogen (LH2) Prepress Regression Analysis Independent Review Technical Consultation Report

The request to conduct an independent review of regression models, developed for determining the expected Launch Commit Criteria (LCC) External Tank (ET)-04 cycle count for the Space Shuttle ET tanking process, was submitted to the NASA Engineering and Safety Center NESC on September 20, 2005. The NESC team performed an independent review of regression models documented in Prepress Regression Analysis, Tom Clark and Angela Krenn, 10/27/05. This consultation consisted of a peer review by statistical experts of the proposed regression models provided in the Prepress Regression Analysis. This document is the consultation's final report.

Parsons, Vickie s.↗

Status of the International Criticality Safety Benchmark Evaluation Project

The International Criticality Safety Benchmark Evaluation Project (ICSBEP) has continued its work generating evaluations of new and historical criticality benchmark experiments since the last update to the nuclear criticality safety community at the 11th International Conference on Nuclear Criticality Safety (ICNC 2019) in Paris, France. Three additional versions of the ICSBEP Handbook have been published since that update, and the Technical Review Group (TRG) held two in-person (in 2019 and 2023) and three virtual (2020 and 2021) meetings to review and approve additional benchmarks. The 2019 edition of the ICSBEP Handbook included five new evaluations with 79 new configurations, the 2020 version of the ICSBEP Handbook contained five new evaluations totaling 76 new configurations, and the 2021 version of the ICSBEP handbook contained five new evaluations with a total of 57 different configurations. The ICSBEP TRG met in October and December 2021, to review benchmarks for potential inclusion in the 2022 ICSBEP Handbook, with seven evaluations receiving provisional approval pending resolution of review group comments. Final comment resolution for some of these evaluations is currently underway and handbook publication should be completed soon. The ICSBEP TRG met again in person in April 2023 to review benchmarks for the 2023 ICSBEP Handbook, provisionally approving 7 new evaluations. The ICSBEP continues to deliver high-quality, peer reviewed evaluations of experiments relevant to the nuclear criticality safety community.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Approach to Quality Assurance for Complex Environmental Modeling - 20407

A strong Quality Assurance (QA) program for complex environmental modeling is essential for regulatory and public acceptance and trust, but it does not have to be onerous. Neptune and Company, Inc. (Neptune) has developed a strong QA program that improves transparency, traceability, reproducibility, and therefore, defensibility and trust. Neptune's QA program has evolved over the past 27 years, transitioning from an ad hoc QA program, to a program that is currently Nuclear Quality Assurance-1 (NQA-1) compliant, and will soon be NQA-1/DOE approved for DOE EM modeling work. In addition, Neptune is a qualified laboratory assessor and qualified auditor for reference materials, a proficiency testing provider, and fully complies with the Environmental Protection Agency (EPA) QA program. Neptune's President and CEO, Kelly Black, was recently named the Chairperson of the International Organization for Standardization (ISO) Technical Committee 69, Application of Statistical Methods. A strong QA program has been developed for Neptune's radiological performance assessment (PA) program. Although pieces of their QA program are currently in development, their current program includes document control using Subversion, issue tracking and work flow tracking using JIRA, and transparency and traceability via a system of 'calc sheets' for documentation of all data analysis and modeling combined with 'check print' documentation of QA checking, and rigorous model testing and configuration control. All work is reviewed by an independent subject matter expert who is not associated with the collection and assembly of information, for an internal peer review. The program is enforced with a handful of Standard Operation Procedures (SOPs), Work Instructions, QA Project Plans (QAPPs), and Quality Management Plans (QMPs) that are updated frequently, with required annual training and acknowledgment. In addition, effective communication of modeling approaches and results to clients and stakeholders are integral to their QA program. Many of their models are built using the GoldSim modeling platform, for which their models are well-known for their level of transparency, documentation, and QA traceability. This level of QA is also applied to their process-level models. Neptune has taken some lessons learned from the extremely rigorous QA program required for the Yucca Mountain Project (YMP), and imposed the YMP requirements of complete traceability, transparency, and reproducibility, but avoided the inflexibility of a QA program that likely contributed to the suspect e-mails in 2005 that resulted in loss of trust in the YMP, and in nuclear waste disposal (and nuclear power) in general. There are far too many examples of loss of public trust due to poor QA that could have been easily avoided with a simple and straight-forward QA program combined with stakeholder engagement. The purpose of this paper is to share features of Neptune's Radiological Performance Assessment program QA program, and some of their QA related lessons learned over the past 27 years of QA for complex environmental modeling. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

NORTH DAKOTA CARBONSAFE PHASE III: SITE CHARACTERIZATION AND PERMITTING OF GEOLOGIC STORAGE OF CARBON DIOXIDE

The Energy & Environmental Research Center (EERC), in partnership with Minnkota Power Cooperative Inc. (Minnkota), SLB, and Computer Modelling Group Ltd. (CMG), supported wide-scale deployment of carbon capture and storage (CCS) as part of the U.S. Department of Energy (DOE) National Energy Technology Laboratory Carbon Storage Assurance Facility Enterprise (CarbonSAFE) Initiative Phase III. This phase included the acquisition, analysis, and development of information to fully characterize two storage complexes to demonstrate viable storage resources for commercial volumes of CO2 (defined by DOE as a minimum of 50 million tonnes [MMt] of CO2 within a 30-year period) (National Energy Technology Laboratory, 2024). Phase III also involved the preparation, submission, and approval of North Dakota underground injection control (UIC) Class VI storage facility permits (SFPs)—required precursors to applications for Class VI injection well permits. The presumed viability of commercial-scale CCS, situated adjacent to Minnkota’s Milton R. Young Station (MRYS), is validated by Minnkota’s continued pursuit of Project Tundra—an initiative to build the world’s largest lignite-based CCS project in central North Dakota (www.projecttundrand.com). Project Tundra comprises two scopes of work, Tundra Capture (installation of postcombustion CO2 capture at MRYS) and Tundra SGS (secure geologic storage). The efforts of North Dakota CarbonSAFE Phase III, Site Characterization and Permitting, supported Tundra SGS. Extensive site-specific characterization activities included a successful multimeasurement geophysical approach and drilling a stratigraphic test well (J-ROC 1, subsequently renamed Liberty-1) adjacent to MRYS. Core collection and analyses, downhole testing and fluid sampling, and geophysical logging were performed on J-ROC 1 and on a nearby stratigraphic test well (known as J-LOC 1), which was drilled, cored, and tested under a complementary project funded by the North Dakota Lignite Research Program. The injection tests performed on J-LOC 1 positively impacted the CarbonSAFE project, resulting in fewer proposed injection wells and significant construction, operations, and monitoring cost savings. The characterization data collected and analyses performed were integrated into geologic models, and successive numerical simulations were run to determine CO2 plume extent and subsurface pressure buildup associated with the planned CO2 injection rate of nearly 4 MMt per year. The latter doubles the CarbonSAFE Initiative goal with an estimated 100 MMt of CO2 stored in 20 years. Application of the U.S. Environmental Protection Agency’s (EPA’s) method for estimating the Class VI Rule area of review (AOR) to the overpressurized Broom Creek Formation inspired an alternative method of calculation, called risk-based AOR delineation. This peer-reviewed method was applied for the first time during the storage facility-permitting process. The two SFP applications submitted in 2021 successfully resulted in North Dakota Industrial Commission (NDIC) orders in 2022 authorizing the creation of the storage facility areas and amalgamation of pore space as well as establishing financial responsibility requirements. After approval of the SFPs, Minnkota filed in 2022 applications for permits to reenter the J-ROC 1 well and to drill two new wells—all with the intended purpose to become Class VI injection wells. To establish eligibility under the Internal Revenue Code for Section 45Q tax incentives, a monitoring, reporting, and verification (MRV) plan was prepared and submitted by Minnkota to EPA in 2022, resulting in the first such plan approved in North Dakota. Also in 2022, under the National Environmental Policy Act (NEPA), Minnkota prepared and submitted an environmental information volume (EIV) describing the proposed CCS project and associated potential environmental impacts. Based on the EIV, DOE determined that the proposed construction project required an environmental assessment, and Minnkota submitted the first draft in 2023 and a revised draft in 2024. Both submissions were followed by a public comment period. Subsequently, DOE issued a finding of no significant impact (FONSI) on September 13, 2024. A successful outreach program, strongly based in the production, presentation, and dissemination of informational material, fostered an environment to aid stakeholders in making informed decisions regarding the planned project. Opportunities for public input were provided at various steps along the way, including at county planning and zoning meetings, before and during the SFP administrative hearing, and during environmental assessment public comment periods. In addition, land/pore space owners and mineral owners had various points of contact, including granting access rights, securing pore space leasing, and mineral owner notifications. Based upon the successful storage facility permitting issued by NDIC, approval of the MRV plan by EPA, and receipt of a FONSI under the NEPA, Minnkota is continuing its pursuit of Project Tundra. In December 2023, the Office of Clean Energy Demonstrations under its Carbon Capture Demonstrations Projects Program announced funding for the capture system (Office of Clean Energy Demonstrations, 2023) and a proposal for CarbonSAFE Phase IV: Construction funding was submitted in March 2024 for the storage project. A go/no-go decision to proceed with construction and operations in the Broom Creek Formation is anticipated in 2024. References National Energy Technology Laboratory, CarbonSafe Initiative, https://netl.doe.gov/carbon-management/carbon-storage/carbonsafe (accessed August 2024). Office of Clean Energy Demonstrations, 2023, OCED selects three projects in CA, ND, and TX to reduce harmful carbon pollution, create new economic opportunities, and advance carbon reducing technologies, December, www.energy.gov/oced/articles/oced-selects-three-projects-ca-nd-and-tx-reduce-harmful-carbon-pollution-create-new (accessed August 2024).

Peck, Wesley↗

Critical Role of Water for Energy Transitions Technologies: A Literature Review

This report summarizes the water inputs associated with four technologies playing diverse roles in energy transitions: hydrogen, solar photovoltaics (PV), wind, and batteries. Information in this report is drawn from multiple sources, including peer-reviewed literature, industry and international agency reports, EcoInvent life cycle inventory database, and subject matter expert (SME) consultations. Where possible, insights that characterized water requirements for specific stages of the technology development (e.g., operations, manufacturing, and mining) were prioritized over broader cradle-to-gate assessment values. Furthermore, both direct and indirect water requirements (i.e., associated with associated energy inputs) were considered in this literature review.

08 HYDROGEN↗

Knowledge, attitudes, and practices associated with bioterrorism preparedness in healthcare workers: a systematic review

Introduction Bioterrorism is an important issue in the field of biosecurity, and effectively dealing with bioterrorism has become an urgent task worldwide. Healthcare workers are considered bioterrorism first responders, who shoulder essential responsibilities and must be equipped to deal with bioterrorism. This study aims to extract and summarize the main research components of the bioterrorism knowledge, attitude, and practice dimensions among healthcare workers. Method This study utilized a systematic review research design based on the PRISMA 2020 guidelines. A literature search was conducted in the PubMed, Web of Science, and Scopus databases for peer-reviewed literature, and the Mixed Methods Appraisal Tool (MMAT) version 2018 was used to assess the quality of the literature. Result A total of 16 studies were included in the final selection. Through the analysis and summary of the included studies, three main aspects and 14 subaspects of the knowledge dimension, three main aspects and 10 subaspects of the attitude dimension, and two main aspects and six subaspects of the practice dimension were extracted. Conclusion This study conducted a literature review on bioterrorism knowledge, attitudes, and practices for healthcare workers based on the PRISMA 2020 guidelines. The findings can guide improvements in health literacy and provide beneficial information to professional organizations that need to respond effectively to bioterrorism.

Li, Tiantian↗

A Review of Factors Affecting the Susceptibility of Juvenile Salmonids to Avian Predation

Abstract We reviewed studies of piscivorous colonial waterbird predation on juvenile salmonids to synthesize current knowledge of factors affecting fish susceptibility to avian predators. Specifically, we examined peer-reviewed publications and reports from academic, governmental, and nongovernmental agencies to identify commonalities and differences in susceptibility of salmonids to avian predation, with a focus on mark–recovery studies in the Columbia River basin. Factors hypothesized to influence salmonid susceptibility to avian predation were grouped into four general categories: (1) salmonid species and populations, (2) environmental factors, (3) prey density, predator density, and migration timing, and (4) prey characteristics. Our review focused on predation by Caspian terns Hydroprogne caspia, double-crested cormorants Nannopterum auritum, and gull species Larus spp. as these are the most well-studied avian predators of salmonids. Results indicated that predator–prey interactions varied across salmonid species and populations and species of avian predator. Inferences across studies supported multiple hypotheses regarding predator–prey dynamics, including environmental factors that influence prey exposure to predators (e.g., river flows, turbidity, alternative prey), variation in predator and prey abundances, predator characteristics (e.g., foraging behavior, colony location), and prey characteristics (e.g., fish length, condition). Mark–recovery studies of avian predation on fish populations have greatly improved our understanding of the factors affecting fish susceptibility to avian predation, the relative contributions of abiotic and biotic factors to predation susceptibility, and the extent to which avian predation affects fish survival and the viability of prey populations. Future studies that jointly model predation and survival and the factors affecting those processes will further broaden our understanding of predator–prey dynamics and directly evaluate the effects of predation on prey population dynamics.

Hostetter, Nathan J. (ORCID:0000000160752157)↗

Atmospheric Research Over the Extended Western North Atlantic Ocean Region and North American East Coast: A Review of Past Work and Challenges Ahead

Decades of atmospheric research have focused on the extended Western North Atlantic Ocean (WNAO) region, including the East Coast of North America and the island of Bermuda, because of its unique location that offers accessibility, gradients in important atmospheric parameters, and a range of meteorological regimes leading to diverse conditions that are poorly understood. This work reviews decades of scientific investigations for the extended WNAO region. Approximately 40 combined field campaigns and long-term monitoring programs, in addition to 563 peer-reviewed publications between 1950 and 2019 have provided a firm foundation of knowledge for the extended WNAO region. Of particular importance in this region has been extensive work at the island of Bermuda that is host to important time series records of oceanic and atmospheric variables. Our review categorizes WNAO research into eight major categories, with some studies fitting into multiple categories (relative %): Aerosols (26%), Gases (23%), Development/Validation of Techniques, Models, and Retrievals (17%), Meteorology and Transport (10%), Air-Sea Interactions (9%), Wet Deposition (6%), Clouds/Storms (6%), and Aerosol-Cloud Interactions (3%). These extensive works have revealed a series of major knowledge gaps. For instance, a disproportionately low number of studies have been devoted to aerosol-cloud interactions, which is identified here as one of the most pressing research needs for the extended WNAO region. Recommendations for future research are provided in the categories highlighted above. Part 2 of this paper series will summarize major spatial and temporal features for the extended WNAO region.

Sorooshian, Armin↗