Search NASA⌕ Search

SEARCH · Search NASA

Results for “Planning Scheduling Analysis”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 217 records · Page 12

An approach to knowledge engineering to support knowledge-based simulation of payload ground processing at the Kennedy Space Center

Planning for processing payloads was always difficult and time-consuming. With the advent of Space Station Freedom and its capability to support a myriad of complex payloads, the planning to support this ground processing maze involves thousands of man-hours of often tedious data manipulation. To provide the capability to analyze various processing schedules, an object oriented knowledge-based simulation environment called the Advanced Generic Accomodations Planning Environment (AGAPE) is being developed. Having nearly completed the baseline system, the emphasis in this paper is directed toward rule definition and its relation to model development and simulation. The focus is specifically on the methodologies implemented during knowledge acquisition, analysis, and representation within the AGAPE rule structure. A model is provided to illustrate the concepts presented. The approach demonstrates a framework for AGAPE rule development to assist expert system development.

Mcmanus, Shawn↗

Process-Based Cost Estimation for Ramjet/Scramjet Engines

Process-based cost estimation plays a key role in effecting cultural change that integrates distributed science, technology and engineering teams to rapidly create innovative and affordable products. Working together, NASA Glenn Research Center and Boeing Canoga Park have developed a methodology of process-based cost estimation bridging the methodologies of high-level parametric models and detailed bottoms-up estimation. The NASA GRC/Boeing CP process-based cost model provides a probabilistic structure of layered cost drivers. High-level inputs characterize mission requirements, system performance, and relevant economic factors. Design alternatives are extracted from a standard, product-specific work breakdown structure to pre-load lower-level cost driver inputs and generate the cost-risk analysis. As product design progresses and matures the lower level more detailed cost drivers can be re-accessed and the projected variation of input values narrowed, thereby generating a progressively more accurate estimate of cost-risk. Incorporated into the process-based cost model are techniques for decision analysis, specifically, the analytic hierarchy process (AHP) and functional utility analysis. Design alternatives may then be evaluated not just on cost-risk, but also user defined performance and schedule criteria. This implementation of full-trade study support contributes significantly to the realization of the integrated development environment. The process-based cost estimation model generates development and manufacturing cost estimates. The development team plans to expand the manufacturing process base from approximately 80 manufacturing processes to over 250 processes. Operation and support cost modeling is also envisioned. Process-based estimation considers the materials, resources, and processes in establishing cost-risk and rather depending on weight as an input, actually estimates weight along with cost and schedule.

Singh, Brijendra↗

Preliminary Analysis of Ground-based Orbit Determination Accuracy for the Wide Field Infrared Survey Telescope (WFIRST)

The Wide Field Infrared Survey Telescope is a 2.4-meter telescope planned for launch to the Sun-Earth L2 point in 2026. This paper details a preliminary study of the achievable accuracy for WFIRST from ground-based orbit determination routines. The analysis here is divided into two segments. First, a linear covariance analysis of early mission and routine operations provides an estimate of the tracking schedule required to meet mission requirements. Second, a simulated operations scenario gives insight into the expected behavior of a daily Extended Kalman Filter orbit estimate over the first mission year given a variety of potential momentum unloading schemes.

Estimation↗

Preliminary Analysis of Ground-Based Orbit Determination Accuracy for the Wide Field Infrared Survey Telescope (WFIRST)

The Wide Field Infrared Survey Telescope is a 2.4-meter telescope planned for launch to the Sun-Earth L2 point in 2026. This paper details a preliminary study of the achievable accuracy for WFIRST from ground-based orbit determination routines. The analysis here is divided into two segments. First, a linear covariance analysis of early mission and routine operations provides an estimate of the tracking schedule required to meet mission requirements. Second, a simulated operations'' scenario gives insight into the expected behavior of a daily Extended Kalman Filter orbit estimate over the first mission year given a variety of potential momentum unloading schemes.

Libration Point↗

Forecasting Lightning at Kennedy Space Center/Cape Canaveral Air Force Station, Florida

The Applied Meteorology Unit (AMU) developed a set of statistical forecast equations that provide a probability of lightning occurrence on Kennedy Space Center (KSC) I Cape Canaveral Air Force Station (CCAFS) for the day during the warm season (May September). The 45th Weather Squadron (45 WS) forecasters at CCAFS in Florida include a probability of lightning occurrence in their daily 24-hour and weekly planning forecasts, which are briefed at 1100 UTC (0700 EDT). This information is used for general scheduling of operations at CCAFS and KSC. Forecasters at the Spaceflight Meteorology Group also make thunderstorm forecasts for the KSC/CCAFS area during Shuttle flight operations. Much of the current lightning probability forecast at both groups is based on a subjective analysis of model and observational data. The objective tool currently available is the Neumann-Pfeffer Thunderstorm Index (NPTI, Neumann 1971), developed specifically for the KSCICCAFS area over 30 years ago. However, recent studies have shown that 1-day persistence provides a better forecast than the NPTI, indicating that the NPTI needed to be upgraded or replaced. Because they require a tool that provides a reliable estimate of the daily thunderstorm probability forecast, the 45 WS forecasters requested that the AMU develop a new lightning probability forecast tool using recent data and more sophisticated techniques now possible through more computing power than that available over 30 years ago. The equation development incorporated results from two research projects that investigated causes of lightning occurrence near KSCICCAFS and over the Florida peninsula. One proved that logistic regression outperformed the linear regression method used in NPTI, even when the same predictors were used. The other study found relationships between large scale flow regimes and spatial lightning distributions over Florida. Lightning, probabilities based on these flow regimes were used as candidate predictors in the equation development. Fifteen years (1 989-2003) of warm season data were used to develop the forecast equations. The data sources included a local network of cloud-to-ground lightning sensors called the Cloud-to-Ground Lightning Surveillance System (CGLSS), 1200 UTC Florida synoptic soundings, and the 1000 UTC CCAFS sounding. Data from CGLSS were used to determine lightning occurrence for each day. The 1200 UTC soundings were used to calculate the synoptic-scale flow regimes and the 1000 UTC soundings were used to calculate local stability parameters, which were used as candidate predictors of lightning occurrence. Five logistic regression forecast equations were created through careful selection and elimination of the candidate predictors. The resulting equations contain five to six predictors each. Results from four performance tests indicated that the equations showed an increase in skill over several standard forecasting methods, good reliability, an ability to distinguish between non-lightning and lightning days, and good accuracy measures and skill scores. Given the overall good performance the 45 WS requested that the equations be transitioned to operations and added to the current set of tools used to determine the daily lightning probability of occurrence.

Lambert, Winfred↗

Stardust Navigation Covariance Analysis

The Stardust spacecraft was launched on February 7, 1999 aboard a Boeing Delta-II rocket. Mission participants include the National Aeronautics and Space Administration (NASA), the Jet Propulsion Laboratory (JPL), Lockheed Martin Astronautics (LMA) and the University of Washington. The primary objective of the mission is to collect in-situ samples of the coma of comet Wild-2 and return those samples to the Earth for analysis. Mission design and operational navigation for Stardust is performed by the Jet Propulsion Laboratory (JPL). This paper will describe the extensive JPL effort in support of the Stardust pre-launch analysis of the orbit determination component of the mission covariance study. A description of the mission and it's trajectory will be provided first, followed by a discussion of the covariance procedure and models. Predicted accuracy's will be examined as they relate to navigation delivery requirements for specific critical events during the mission. Stardust was launched into a heliocentric trajectory in early 1999. It will perform an Earth Gravity Assist (EGA) on January 15, 2001 to acquire an orbit for the eventual rendezvous with comet Wild-2. The spacecraft will fly through the coma (atmosphere) on the dayside of Wild-2 on January 2, 2004. At that time samples will be obtained using an aerogel collector. After the comet encounter Stardust will return to Earth when the Sample Return Capsule (SRC) will separate and land at the Utah Test Site (UTTR) on January 15, 2006. The spacecraft will however be deflected off into a heliocentric orbit. The mission is divided into three phases for the covariance analysis. They are 1) Launch to EGA, 2) EGA to Wild-2 encounter and 3) Wild-2 encounter to Earth reentry. Orbit determination assumptions for each phase are provided. These include estimated and consider parameters and their associated a-priori uncertainties. Major perturbations to the trajectory include 19 deterministic and statistical maneuvers planned for the mission. The spacecraft is three axis stabilized and has unbalanced thrusters for attitude control. Accelerations due to the attitude control system are treated stochastically. The tracking scenario for the study is patterned after the actual schedule employed during the different phases of the mission. Conventional X-band two-way Doppler and SRA range data was simulated and the standard accuracy for these data types was assumed throughout most of the mission. However, a deweighting scheme was used for the Doppler data during times of low Sun-Earth-Probe angles, especially in the case of the DSM. Optical data is assumed to be available starting at 50 days prior to the comet encounter. The optical data will be used to improve the ephemeris of Wild-2, which is considered crucial to properly target the comet flyby. Results of the covariance analysis are presented for all mission phases. Navigation capability will be discussed in terms of the uncertainty in the encounter B-Plane (B.R and B.T) and linearized time of flight. Delivery errors based on the final maneuver prior to the comet encounter will be presented. The most stringent navigation requirement is for the Earth reentry. The uncertainty in the flight path angle must be less than 0.02 degree (orbit determination and maneuver performance) to assure successful recovery of the SRC. Results presented show that this requirement can be met.

Menon, Premkumar R.↗

Research in extreme ultraviolet and far ultraviolet astronomy

Analysis and interpretation continued on data generated by the flight of 27.086 in April of 1986 and by the successful UVX mission. Optical and mechanical design of the 1 meter EUV telescope, planned for launch with the large SPARTAN type carrier, ASTRO-SPAS, was also continued. The major effort centered on the preparation of flight 27.106, scheduled to launch in September, 1986. Work which was performed included: design of the skins and bulkheads; completion of the optical, mechanical, and electrical design; purchase of the major components of the instruments; assemblage of the electrical components; and performance of theoretical work, to support the data interpretation.

Bowyer, C. S.↗

User modeling techniques for enhanced usability of OPSMODEL operations simulation software

The PC based OPSMODEL operations software for modeling and simulation of space station crew activities supports engineering and cost analyses and operations planning. Using top-down modeling, the level of detail required in the data base can be limited to being commensurate with the results required of any particular analysis. To perform a simulation, a resource environment consisting of locations, crew definition, equipment, and consumables is first defined. Activities to be simulated are then defined as operations and scheduled as desired. These operations are defined within a 1000 level priority structure. The simulation on OPSMODEL, then, consists of the following: user defined, user scheduled operations executing within an environment of user defined resource and priority constraints. Techniques for prioritizing operations to realistically model a representative daily scenario of on-orbit space station crew activities are discussed. The large number of priority levels allows priorities to be assigned commensurate with the detail necessary for a given simulation. Several techniques for realistic modeling of day-to-day work carryover are also addressed.

Davis, William T.↗

Generic mission planning and scheduling: The AXAF solution

During SpaceOps 92 the idea of generic mission planning concepts for space astronomy missions, that could be applied to future missions in order to simplify software development, was introduced. It was proposed that mission planning systems could be decomposed into functional elements that could be standardized and then organized into optimal functional flows for each individual mission. In addition, it was further suggested that these flows themselves could be reduced to a small set of possibilities by describing them in terms of generic mission type, such as manned, unmanned, high orbit, low orbit, etc. The Advanced X-ray Astrophysics Facility (AXAF), planned for launch in the latter part of '98, represents the first application of this idea on an unmanned mission. This paper examines the AXAF Mission Planning and Scheduling concept in light of the generic system theory. Each functional element is evaluated according to AXAF characteristics and requirements and then compared to its generic counterpart. Functional flow considerations are then derived from the overall AXAF mission planning concept to determine the viability and sensitivity of the generic flow to actual requirements. The results of this analysis are then used to update the generic system concept and to define the level of commonality and core system components that are practical to achieve across multiple missions.

Guffin, O. T.↗

Generic astronomy mission planning and scheduling: The AXAF solution

During SpaceOps 92 the idea of generic mission planning concepts for space astronomy missions, that could be applied to future missions in order to simplify software development, was introduced. It was proposed that mission planning systems could be decomposed into functional elements that could be standardized and then organized into optimal functional flows for each individual mission. In addition, it was further suggested that these flows themselves could be reduced to a small set of possibilities by describing them in terms of generic mission type, such as manned, unmanned, high orbit, low orbit, etc. The Advanced X-ray Astrophysics Facility (AXAF), planned for launch in the latter part of 1998, represents the first application of this idea on an unmanned mission. This paper examines the AXAF Mission Planning and Scheduling concept in light of the generic system theory. Each functional element is evaluated according to AXAF characteristics and requirements and then compared to its generic counterpart. Functional flow considerations are then derived from the overall AXAF mission planning concept to determine the viability and sensitivity of the generic flow to actual requirements. The results of this analysis are then used to update the generic system concept and to define the level of commonality and core system components that are practical to achieve across multiple missions.

Guffin, O. T.↗

Earth Sciences Data and Information System (ESDIS) program planning and evaluation methodology development

An Earth Sciences Data and Information System (ESDIS) Project Management Plan (PMP) is prepared. An ESDIS Project Systems Engineering Management Plan (SEMP) consistent with the developed PMP is also prepared. ESDIS and related EOS program requirements developments, management and analysis processes are evaluated. Opportunities to improve the effectiveness of these processes and program/project responsiveness to requirements are identified. Overall ESDIS cost estimation processes are evaluated, and recommendations to improve cost estimating and modeling techniques are developed. ESDIS schedules and scheduling tools are evaluated. Risk assessment, risk mitigation strategies and approaches, and use of risk information in management decision-making are addressed.

Dickinson, William B.↗

Precision Departure Release Capability (PDRC) Final Report

After takeoff, aircraft must merge into en route (Center) airspace traffic flows that may be subject to constraints that create localized demand/capacity imbalances. When demand exceeds capacity, Traffic Management Coordinators (TMCs) and Frontline Managers (FLMs) often use tactical departure scheduling to manage the flow of departures into the constrained Center traffic flow. Tactical departure scheduling usually involves a Call for Release (CFR) procedure wherein the Tower must call the Center to coordinate a release time prior to allowing the flight to depart. In present-day operations release times are computed by the Center Traffic Management Advisor (TMA) decision support tool, based upon manual estimates of aircraft ready time verbally communicated from the Tower to the Center. The TMA-computed release time is verbally communicated from the Center back to the Tower where it is relayed to the Local controller as a release window that is typically three minutes wide. The Local controller will manage the departure to meet the coordinated release time window. Manual ready time prediction and verbal release time coordination are labor intensive and prone to inaccuracy. Also, use of release time windows adds uncertainty to the tactical departure process. Analysis of more than one million flights from January 2011 indicates that a significant number of tactically scheduled aircraft missed their en route slot due to ready time prediction uncertainty. Uncertainty in ready time estimates may result in missed opportunities to merge into constrained en route flows and lead to lost throughput. Next Generation Air Transportation System plans call for development of Tower automation systems capable of computing surface trajectory-based ready time estimates. NASA has developed the Precision Departure Release Capability (PDRC) concept that improves tactical departure scheduling by automatically communicating surface trajectory-based ready time predictions and departure runway assignments to the Center scheduling tool. The PDRC concept also incorporates earlier NASA and FAA research into automation-assisted CFR coordination. The PDRC concept reduces uncertainty by automatically communicating coordinated release times with seconds-level precision enabling TMCs and FLMs to work with target times rather than windows. NASA has developed a PDRC prototype system that integrates the Center's TMA system with a research prototype Tower decision support tool. A two-phase field evaluation was conducted at NASA's North Texas Research Station in Dallas/Fort Worth. The field evaluation validated the PDRC concept and demonstrated reduced release time uncertainty while being used for tactical departure scheduling of more than 230 operational flights over 29 weeks of operations. This paper presents research results from the PDRC research activity. Companion papers present the Concept of Operations and a Technology Description.

tactical departure scheduling↗

Precision Departure Release Capability (PDRC): NASA to FAA Research Transition

After takeoff, aircraft must merge into en route (Center) airspace traffic flows which may be subject to constraints that create localized demand-capacity imbalances. When demand exceeds capacity, Traffic Management Coordinators (TMCs) and Frontline Managers (FLMs) often use tactical departure scheduling to manage the flow of departures into the constrained Center traffic flow. Tactical departure scheduling usually involves use of a Call for Release (CFR) procedure wherein the Tower must call the Center to coordinate a release time prior to allowing the flight to depart. In present-day operations release times are computed by the Center Traffic Management Advisor (TMA) decision support tool based upon manual estimates of aircraft ready time verbally communicated from the Tower to the Center. The TMA-computed release time is verbally communicated from the Center back to the Tower where it is relayed to the Local controller as a release window that is typically three minutes wide. The Local controller will manage the departure to meet the coordinated release time window. Manual ready time prediction and verbal release time coordination are labor intensive and prone to inaccuracy. Also, use of release time windows adds uncertainty to the tactical departure process. Analysis of more than one million flights from January 2011 indicates that a significant number of tactically scheduled aircraft missed their en route slot due to ready time prediction uncertainty. Uncertainty in ready time estimates may result in missed opportunities to merge into constrained en route flows and lead to lost throughput. Next Generation Air Transportation System plans call for development of Tower automation systems capable of computing surface trajectory-based ready time estimates. NASA has developed the Precision Departure Release Capability (PDRC) concept that improves tactical departure scheduling by automatically communicating surface trajectory-based ready time predictions and departure runway assignments to the Center scheduling tool. The PDRC concept also incorporates earlier NASA and FAA research into automation-assisted CFR coordination. The PDRC concept reduces uncertainty by automatically communicating coordinated release times with seconds-level precision enabling TMCs and FLMs to work with target times rather than windows. NASA has developed a PDRC prototype system that integrates the Center's TMA system with a research prototype Tower decision support tool. A two-phase field evaluation was conducted at NASA's North Texas Research Station in Dallas-Fort Worth. The field evaluation validated the PDRC concept and demonstrated reduced release time uncertainty while being used for tactical departure scheduling of more than 230 operational flights over 29 weeks of operations.

ATM↗

Exploration Systems Development (ESD) Approach to Enterprise Risk Management

The National Aeronautics and Space Administration (NASA) Exploration Systems Development (ESD) Division has implemented an innovative approach to Enterprise Risk Management under a unique governance structure and streamlined integration model. ESD's mission is to design and build the capability to extend human existence to deep space. The Enterprise consists of three Programs: Space Launch System (SLS), Orion, and Ground Systems Development and Operations (GSDO). The SLS is a rocket and launch system that will be capable of powering humans, habitats, and support systems to deep space. Orion will be the first spacecraft in history capable of taking humans to multiple destinations within deep space. GSDO is modernizing Kennedy's spaceport to launch spacecraft built and designed by both NASA and private industry. ESD's approach to Enterprise Risk Management is commensurate with affordability and a streamlined management philosophy. ESD Enterprise Risk Management leverages off of the primary mechanisms for integration within the Enterprise. The Enterprise integration approach emphasizes delegation of authority to manage and execute the majority of cross-program activities and products to the individual Programs, while maintaining the overall responsibility for all cross-program activities at the Division. The intent of the ESD Enterprise Risk Management approach is to improve risk communication, to avoid replication and/or contradictory strategies, and to minimize overhead process burden. This is accomplished by the facilitation and integration of risk information within ESD. The ESD Division risks, Orion risks, SLS risks, and GSDO risks are owned and managed by the applicable Program. When the Programs have shared risks with multiple consequences, they are jointly owned and managed. When a risk is associated with the integrated system that involves more than one Program in condition, consequence, or mitigation plan, it is considered an Exploration Systems Integration (ESI) Risk. An ESI risk may require visibility and risk handling by multiple organizations. The Integrated Risk Working Group (IRWG) is a small team of Risk experts that are responsible for collaborating and communicating best practices. In addition, the forum facilitates proper integration of risks across the Enterprise. The IRWG uses a Continuous Risk Management approach for facilitating the identification, analysis, planning, tracking, and controlling of ESI Risks. The ESD Division, Programs, and Integrated Task Teams identify ESI Risks. The IRWG maintains a set of metrics for understanding Enterprise Risk process and the overall Risk Posture. The team is also actively involved in the modeling of risk for Enterprise Performance Management. With the Enterprise being constrained in Schedule and Budget, and with significant technical complexity, the appropriate use of Risk Management techniques is crucial to the success of the Enterprise. The IRWG achieves this through the modified approach, providing a forum for collaboration on risks that cross boundaries between the separate entities.

Bauder, Stephen P.↗

NEEMO - NASA's Extreme Environment Mission Operations: On to a NEO

During NEEMO missions, a crew of six Aquanauts lives aboard the National Oceanic and Atmospheric Administration (NOAA) Aquarius Underwater Laboratory the world's only undersea laboratory located 5.6 km off shore from Key Largo, Florida. The Aquarius habitat is anchored 62 feet deep on Conch Reef which is a research only zone for coral reef monitoring in the Florida Keys National Marine Sanctuary. The crew lives in saturation for a week to ten days and conducts a variety of undersea EVAs (Extra Vehicular Activities) to test a suite of long-duration spaceflight Engineering, Biomedical, and Geoscience objectives. The crew also tests concepts for future lunar exploration using advanced navigation and communication equipment in support of the Constellation Program planetary exploration analog studies. The Astromaterials Research and Exploration Science (ARES) Directorate and Behavioral Health and Performance (BHP) at NASA/Johnson Space Center (JSC), Houston, Texas support this effort to produce a high-fidelity test-bed for studies of human planetary exploration in extreme environments as well as to develop and test the synergy between human and robotic curation protocols including sample collection, documentation, and sample handling. The geoscience objectives for NEEMO missions reflect the requirements for Lunar Surface Science outlined by the LEAG (Lunar Exploration Analysis Group) and CAPTEM (Curation and Analysis Planning Team for Extraterrestrial Materials) white paper [1]. The BHP objectives are to investigate best meas-ures and tools for assessing decrements in cogni-tive function due to fatigue, test the feasibility study examined how teams perform and interact across two levels, use NEEMO as a testbed for the development, deployment, and evaluation of a scheduling and planning tool. A suite of Space Life Sciences studies are accomplished as well, ranging from behavioral health and performance to immunology, nutrition, and EVA suit design results of which will directly support the investigation of open questions and operational concepts that will enable NASA to continue its plan for planetary exploration.

Bell, M. S.↗

Precision Departure Release Capability (PDRC) Technology Description

After takeoff, aircraft must merge into en route (Center) airspace traffic flows which may be subject to constraints that create localized demand-capacity imbalances. When demand exceeds capacity, Traffic Management Coordinators (TMCs) often use tactical departure scheduling to manage the flow of departures into the constrained Center traffic flow. Tactical departure scheduling usually involves use of a Call for Release (CFR) procedure wherein the Tower must call the Center TMC to coordinate a release time prior to allowing the flight to depart. In present-day operations release times are computed by the Center Traffic Management Advisor (TMA) decision support tool based upon manual estimates of aircraft ready time verbally communicated from the Tower to the Center. The TMA-computed release is verbally communicated from the Center back to the Tower where it is relayed to the Local controller as a release window that is typically three minutes wide. The Local controller will manage the departure to meet the coordinated release time window. Manual ready time prediction and verbal release time coordination are labor intensive and prone to inaccuracy. Also, use of release time windows adds uncertainty to the tactical departure process. Analysis of more than one million flights from January 2011 indicates that a significant number of tactically scheduled aircraft missed their en route slot due to ready time prediction uncertainty. Uncertainty in ready time estimates may result in missed opportunities to merge into constrained en route flows and lead to lost throughput. Next Generation Air Transportation System (NextGen) plans call for development of Tower automation systems capable of computing surface trajectory-based ready time estimates. NASA has developed the Precision Departure Release Capability (PDRC) concept that uses this technology to improve tactical departure scheduling by automatically communicating surface trajectory-based ready time predictions to the Center scheduling tool. The PDRC concept also incorporates earlier NASA and FAA research into automation-assisted CFR coordination. The PDRC concept helps reduce uncertainty by automatically communicating coordinated release times with seconds-level precision enabling TMCs to work with target times rather than windows. NASA has developed a PDRC prototype system that integrates the Center's TMA system with a research prototype Tower decision support tool. A two-phase field evaluation was conducted at NASA's North Texas Research Station (NTX) in Dallas-Fort Worth. The field evaluation validated the PDRC concept and demonstrated reduced release time uncertainty while being used for tactical departure scheduling of more than 230 operational flights over 29 weeks of operations. This paper presents the Technology Description. Companion papers include the Final Report and a Concept of Operations.

tactical departure scheduling↗

Precision Departure Release Capability (PDRC) Concept of Operations

After takeoff, aircraft must merge into en route (Center) airspace traffic flows which may be subject to constraints that create localized demandcapacity imbalances. When demand exceeds capacity Traffic Management Coordinators (TMCs) often use tactical departure scheduling to manage the flow of departures into the constrained Center traffic flow. Tactical departure scheduling usually involves use of a Call for Release (CFR) procedure wherein the Tower must call the Center TMC to coordinate a release time prior to allowing the flight to depart. In present-day operations release times are computed by the Center Traffic Management Advisor (TMA) decision support tool based upon manual estimates of aircraft ready time verbally communicated from the Tower to the Center. The TMA-computed release is verbally communicated from the Center back to the Tower where it is relayed to the Local controller as a release window that is typically three minutes wide. The Local controller will manage the departure to meet the coordinated release time window. Manual ready time prediction and verbal release time coordination are labor intensive and prone to inaccuracy. Also, use of release time windows adds uncertainty to the tactical departure process. Analysis of more than one million flights from January 2011 indicates that a significant number of tactically scheduled aircraft missed their en route slot due to ready time prediction uncertainty. Uncertainty in ready time estimates may result in missed opportunities to merge into constrained en route flows and lead to lost throughput. Next Generation Air Transportation System (NextGen) plans call for development of Tower automation systems capable of computing surface trajectory-based ready time estimates. NASA has developed the Precision Departure Release Capability (PDRC) concept that uses this technology to improve tactical departure scheduling by automatically communicating surface trajectory-based ready time predictions to the Center scheduling tool. The PDRC concept also incorporates earlier NASA and FAA research into automation-assisted CFR coordination. The PDRC concept helps reduce uncertainty by automatically communicating coordinated release times with seconds-level precision enabling TMCs to work with target times rather than windows. NASA has developed a PDRC prototype system that integrates the Center's TMA system with a research prototype Tower decision support tool. A two-phase field evaluation was conducted at NASA's North Texas Research Station (NTX) in DallasFort Worth. The field evaluation validated the PDRC concept and demonstrated reduced release time uncertainty while being used for tactical departure scheduling of more than 230 operational flights over 29 weeks of operations. This paper presents the Concept of Operations. Companion papers include the Final Report and a Technology Description. ? SUBJECT:

tactical departure scheduling↗

IpexT: Integrated Planning and Execution for Military Satellite Tele-Communications

The next generation of military communications satellites may be designed as a fast packet-switched constellation of spacecraft able to withstand substantial bandwidth capacity fluctuation in the face of dynamic resource utilization and rapid environmental changes including jamming of communication frequencies and unstable weather phenomena. We are in the process of designing an integrated scheduling and execution tool which will aid in the analysis of the design parameters needed for building such a distributed system for nominal and battlefield communications. This paper discusses the design of such a system based on a temporal constraint posting planner/scheduler and a smart executive which can cope with a dynamic environment to make a more optimal utilization of bandwidth than the current circuit switched based approach.

Plaunt, Christian↗