ERTS 1 flight evaluation report, 23 July 1974 to 23 October 1974
Analyses of ERTS-1 performance during the ninth quarter of its operation are presented. Topics discussed include orbital parameters, power subsystem, attitude control subsystem, command/clock subsystem, telemetry subsystem, orbit adjust subsystem, magnetic moment compensating assembly, unified S band/premodulation processor, electrical interface subsystem, thermal subsystem, narrowband tape recorders, wideband telemetry subsystem, attitude measurement sensor, wideband video tape recorders, return beam vidicon subsystem, multispectral scanner subsystem, and data collection system.