Quantitative Risk Management - Risk Informed Decision Making on High-Risk Waste Remediation Projects - 19022

For every $1 billion invested in projects, $97 million is wasted due to poor project performance. That means 9.7% of money spent on projects is wasted due to poor risk and uncertainty management. High-risk projects, similar to those in waste remediation, have the most to lose. A solid quantitative risk management program is one of the keys to increasing the likelihood that a project will succeed. A quantitative risk program solves two major problems that challenge the effective management of risk and uncertainty: 1. Risks arise at all levels of an organization; however, not all organizational levels have an effective way to identify and resolve them. This can lead to risks that, even if identified, are not reported. 2. Decision-makers are often forced to operate solely on intuition when implementing mitigation strategies, not fully understanding the effects that certain decisions have on the program's cost and schedule. A quantitative risk program uses a risk register and builds it into the project/program integrated schedule to assess the impact of these risks, typically at the 80% confidence contingency level for specific milestones and/or project completion. Implementing a quantitative risk program drives a forward-thinking, proactive mentality to problem solving into all levels of the organization. A healthy risk program for regular reporting and communication ensures that all members of an organization are thinking about risks and using their communication channels to resolve them. It gives a method of communication and incentive for all levels in the organization and helps to ensure that risks will be reported and resolved. Pacific Northwest National Laboratory (PNNL) has developed tools and methods that provide a level of realism for analyzing different scenarios and estimating contingency that does not exist in the standard industry risk tool kit. These tools and methods provide decision-makers with actionable, quantitatively based information to guide their decision making. The first tool is a probabilistic branching risk model for mitigation strategies. Current quantitative risk analysis tools in the industry simulate two cases: fully mitigated and un-mitigated. In the fully mitigated case, the user assumes that every planned mitigation activity is successful. In the un-mitigated case, the user assumes that none are successful. The truth lies between these two extremes. The PNNL team has developed a probabilistic risk model for mitigation scenarios that includes a probability that a mitigation activity will succeed and a probability that a mitigation action will be funded. These probabilities are elicited from subject matter experts and ensure that the contingency calculations at the specified confidence are approaching reality. The second tool developed at PNNL is the Risk Box, which is a tool that integrates with different scenarios in the risk register. For example, say the user is faced with two different and mutually exclusive mitigation actions to reduce a risk. The Risk Box methodology performs the contingency calculations and then displays them on a time-phased graph that shows how each scenario reduces the risk contingency needed on the project/program. This graph then provides quantitative information to show decision-makers which mitigation action provides the greatest reduction (cost and schedule) in risk contingency for the program. Implementing these and other tools within a structured risk program increases the likelihood that a project will come in on schedule and budget, ensures that all personnel are proactively thinking about problems and resolutions, creates communication channels for all members to submit and resolve potential problems, produces a prioritized list of risk rankings to focus leadership on issues that may cause the biggest problems, and implements processes that drive updates to the risk program as the risk profile changes. PNNL has been developing these methods and using them on projects for over 20 years. They have been successfully applied on waste management projects, high-tech research and development projects, and construction projects, and they continue to be used on a number of U.S. Department of Energy projects today. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Derivation of the Most Influential Medical Conditions for An Extended Duration Artemis Mission

BACKGROUND: The risk of loss of mission due to medical conditions may be influenced by loss of crew life (LOCL), need for evacuation (RTDC; return to definitive care), and crew task time lost. Predicting what medical conditions are most likely to lead to crew morbidity and mortality may influence medical system design, clinical capability prioritization, and research strategies. NASA’s Informing Mission Planning via Analysis of Complex Tradespaces tool (IMPACT) applies Probabilistic Risk Assessment (PRA) methodology to assess these risks. OVERVIEW: A team of subject matter experts (SME) from a variety of medical disciplines developed a consensus-based process to determine 120 of the most clinically relevant medical conditions for long-duration exploration missions (LDEMs) . This IMPACT Condition List (ICL) expanded upon previous work done for Integrated Medical Model (IMM). For each condition a best-case and worst-case definition were derived. These definitions were used to identify probability of occurrence, proportion of cases that are best case vs. worst case, clinical phase duration, and risk of outcomes (task time loss [TTL], RTDC, and LOCL) for both treated and untreated states. These data were sources from existing spaceflight databases (e.g. Longitudinal Survey of Astronaut Health), relevant models (e.g. the ISS fire model), and/or terrestrial literature. Each condition was then tied to diagnostic and therapeutic resources and capabilities. IMPACT was then run for the LDLOLS DRM (see Abstract #2 for this panel). DISCUSSION: This abstract will present the process for generating the IMPACT condition list, the relevant data for each clinical condition, and present results for the ten most influential conditions impacting LOCL, RTDC, and TTL for a representative extended duration Artemis mission.

A Nelson↗

Robustness of RISMC Insights under Alternative Aleatory/Epistemic Uncertainty Classifications: Draft Report under the Risk-Informed Safety Margin Characterization (RISMC) Pathway of the DOE Light Water Reactor Sustainability Program

The Risk-Informed Safety Margin Characterization (RISMC) pathway is a set of activities defined under the U.S. Department of Energy (DOE) Light Water Reactor Sustainability Program. The overarching objective of RISMC is to support plant life-extension decision-making by providing a state-of-knowledge characterization of safety margins in key systems, structures, and components (SSCs). A technical challenge at the core of this effort is to establish the conceptual and technical feasibility of analyzing safety margin in a risk-informed way, which, unlike conventionally defined deterministic margin analysis, would be founded on probabilistic characterizations of uncertainty in SSC performance. In the context of probabilistic risk assessment (PRA) technology, there has arisen a general consensus about the distinctive roles of two types of uncertainty: aleatory and epistemic, where the former represents irreducible, random variability inherent in a system, whereas the latter represents a state of knowledge uncertainty on the part of the analyst about the system which is, in principle, reducible through further research. While there is often some ambiguity about how any one contributing uncertainty in an analysis should be classified, there has nevertheless emerged a broad consensus on the meanings of these uncertainty types in the PRA setting. However, while RISMC methodology shares some features with conventional PRA, it will nevertheless be a distinctive methodology set. Therefore, the paradigms for classification of uncertainty in the PRA setting may not fully port to the RISMC environment. Yet the notion of risk-informed margin is based on the characterization of uncertainty, and it is therefore critical to establish a common understanding of uncertainty in the RISMC setting.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Advanced Mechanistic 3D Spatial Modeling and Analysis Methods to Accurately Represent Nuclear Facility External Event Scenarios

Probabilistic risk assessment of nuclear power plants initially focused on events initiated by internal faults at the plant, rather than external hazards including earthquakes and flooding. Although the importance of external hazards risk analysis is now well recognized, the methods for analyzing low probability external hazards rely heavily on subjective judgment of specialists, often resulting in substantial conservatism. This research developed a framework to integrate the risk of seismic and flooding events using realistic structural models and simulation of response of nuclear structures. The results of four application case studies are presented.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Development of Advanced Numerical Tools for the Nonlinear Seismic Analysis of Nuclear Systems

In the framework of Probabilistic Risk Assessment (PRA) of nuclear facilities, a rigorous dynamic characterization of all structural and non-structural components is of paramount concern. The common features of nuclear facilities lies in the combination of three characteristics: 1. low aspect ratio; 2. large mass; and 3. significant embedment in soil. These characteristics make the interaction between the structural system and the surrounding soil a key aspect to consider for seismic risk evaluations. The methodologies and numerical tools currently in use for simulating the seismic response of a nuclear facility with significant Soil Structure Interaction (SSI) date back to the 1970's and rely on a number of simplifying idealizations, mainly related to the characterization of the incident seismic waveforms, the assumption of linear-elastic behavior of the superstructures, and idealization of equivalent linear behavior of the supporting soils. Given this background and taking advantage of the substantial progress in computational mechanics in the last decades, the ongoing research aims at developing advanced numerical tools for the nonlinear, time history simulation of nuclear facilities. This translates into the availability of a robust nonlinear time-domain simulation tool that can accurately model the nonlinearities of coupled soil-structure systems, and whose development includes robust verification and validation. The work described herein is supported by the U.S. Department of Energy (DOE) and focuses on delivering the next-generation, high performance simulation tool in support of DOE needs and mission. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

RISMC Advanced Safety Analysis Project Plan – FY 2015 - FY 2019

In this report, a project plan is developed, focused on industry applications, using Risk-Informed Safety Margin Characterization (RISMC) tools and methods applied to realistic, relevant, and current interest issues to the operating nuclear fleet. RISMC focuses on modernization of nuclear power safety analysis (tools, methods and data); implementing state-of-the-art modeling techniques (which include, for example, enabling incorporation of more detailed physics as they become available); taking advantage of modern computing hardware; and combining probabilistic and mechanistic analyses to enable a risk informed safety analysis process. The modernized tools will maintain the current high level of safety in our nuclear power plant fleet, while providing an improved understanding of safety margins and the critical parameters that affect them. Thus, the set of tools will provide information to inform decisions on plant modifications, refurbishments, and surveillance programs, while improving economics. This set of tools will also benefit the design of new reactors, enhancing safety per unit cost of a nuclear plant. The proposed plan will focus on application of the RISMC toolkit, in particular, solving realistic problems of important current issues to the nuclear industry, in collaboration with plant owners and operators to demonstrate the usefulness of these tools in decision making.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Application of Fault Management Theory to the Quantitative Selection of a Launch Vehicle Abort Trigger Suite

The theory of System Health Management (SHM) and of its operational subset Fault Management (FM) states that FM is implemented as a "meta" control loop, known as an FM Control Loop (FMCL). The FMCL detects that all or part of a system is now failed, or in the future will fail (that is, cannot be controlled within acceptable limits to achieve its objectives), and takes a control action (a response) to return the system to a controllable state. In terms of control theory, the effectiveness of each FMCL is estimated based on its ability to correctly estimate the system state, and on the speed of its response to the current or impending failure effects. This paper describes how this theory has been successfully applied on the National Aeronautics and Space Administration's (NASA) Space Launch System (SLS) Program to quantitatively estimate the effectiveness of proposed abort triggers so as to select the most effective suite to protect the astronauts from catastrophic failure of the SLS. The premise behind this process is to be able to quantitatively provide the value versus risk trade‐off for any given abort trigger, allowing decision makers to make more informed decisions. All current and planned crewed launch vehicles have some form of vehicle health management system integrated with an emergency launch abort system to ensure crew safety. While the design can vary, the underlying principle is the same: detect imminent catastrophic vehicle failure, initiate launch abort, and extract the crew to safety. Abort triggers are the detection mechanisms that identify that a catastrophic launch vehicle failure is occurring or is imminent and cause the initiation of a notification to the crew vehicle that the escape system must be activated. While ensuring that the abort triggers provide this function, designers must also ensure that the abort triggers do not signal that a catastrophic failure is imminent when in fact the launch vehicle can successfully achieve orbit. That is, the abort triggers must have low false negative rates to be sure that real crew‐threatening failures are detected, and also low false positive rates to ensure that the crew does not abort from non‐crew‐threatening launch vehicle behaviors. The analysis process described in this paper is a compilation of over six years of lessons learned and refinements from experiences developing abort triggers for NASA's Constellation Program (Ares I Project) and the SLS Program, as well as the simultaneous development of SHM/FM theory. The paper will describe the abort analysis concepts and process, developed in conjunction with SLS Safety and Mission Assurance (S&MA) to define a common set of mission phase, failure scenario, and Loss of Mission Environment (LOME) combinations upon which the SLS Loss of Mission (LOM) Probabilistic Risk Assessment (PRA) models are built. This abort analysis also requires strong coordination with the Multi‐Purpose Crew Vehicle (MPCV) and SLS Structures and Environments (STE) to formulate a series of abortability tables that encapsulate explosion dynamics over the ascent mission phase. The design and assessment of abort conditions and triggers to estimate their Loss of Crew (LOC) Benefits also requires in‐depth integration with other groups, including Avionics, Guidance, Navigation and Control(GN&C), the Crew Office, Mission Operations, and Ground Systems. The outputs of this analysis are a critical input to SLS S&MA's LOC PRA models. The process described here may well be the first full quantitative application of SHM/FM theory to the selection of a sensor suite for any aerospace system.

Lo, Yunnhon↗

Evaluation of Physical Security Risk for Potential Implementation of FLEX using Dynamic Simulation Methods

The requirements for United States nuclear power plants to maintain a large onsite physical security force contribute to their large operational costs. The cost of maintaining the current physical security posture is approximately 10% of the overall operation and maintenance budget for commercial nuclear power plants. The goal of the Light Water Reactor Sustainability Program Physical Security Pathway is to develop tools, methods, and technologies and provide the technical basis for an optimized physical security posture. This pathway will analyze and minimize the conservatisms built into current security postures in order to reduce security costs while still ensuring adequate security and operational safety. The research performed at Idaho National Laboratory within this pathway has successfully developed a dynamic force-on-force (FOF) modeling framework using various computer simulation tools and integrated them with the dynamic assessment Event Modeling Risk Assessment using Linked Diagrams (EMRALD) tool. This document provides an overview of lessons learned in applying a dynamic computational framework that links results from a commercially available FOF simulation tool, a commercially available thermal-hydraulic tool, and EMRALD to an operating commercial nuclear power plant. This process of including plant procedures and multiple analysis results is being called Modeling and Analysis for Safety Security using Dynamic EMRALD Framework. Previous reports described how a user could integrate their plant-specific FOF models with the dynamic simulation tool EMRALD, model operator actions, integrate with probabilistic risk assessment tools, such as Computer Aided Fault Tree Analysis System or Systems Analysis Programs for Hands-on Integrated Reliability Evaluations, and with thermal-hydraulic tools, such as RELAP-5. Previous reports applied various combinations of available simulations codes with EMRALD using generic plant models to demonstrate how to perform the analysis. This report documents the results of applying the dynamic computational framework to an actual nuclear facility using their security scenarios and timelines. The purpose of this study was to verify that results achieved using generic models are similar to actual plant results and to refine our guidance of the use of the framework. Such an assessment enables further analysis, such as what-if scenarios and staff-reduction evaluation, thereby optimizing physical security at plants. NOTE: The work performed in this report is based on a generic EMRALD model with actual plant data used for the analysis. However, only the generic model and general results of the analysis are in the report. No plant’s sensitive information is discussed in this report. The discussion shows examples of insights that can be obtained from the MASS-DEF methodology.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Probabilistic analysis of air carrier accidents

In order to estimate the potential risks due to carbon fibers (CF) released from aircraft accidents, it was necessary to quantify the probability of an accident or incident at a major hub airport. This probability was contingent upon various conditions surrounding the incident including the phase of operation, aircraft type, and the weather conditions. The type of accident predicted was categorized according to its location relative to the runway and the severity of damage sustained. The methodology utilized to estimate the probability of a specific type of accident is outlined and the various models that were developed in the course of this work are described.

Source record↗

RAVEN as Control Logic and Probabilistic Risk Assessment Driver for RELAP-7

The Next Generation of System Analysis Code (NGSAC) [1] aims to model and simulate the Nuclear Power Plant (NPP) thermo-hydraulic behavior with high level of accuracy. In this respect, Idaho National Laboratory (INL) is developing a NGSAC (known as RELAP-7) which will allow to model NPP responses for a set of accident scenarios (e.g., loss of off-site power).

99 GENERAL AND MISCELLANEOUS↗

Comparison of Artemis 2 and Artemis 5 Model Outcomes Using the Impact Probabilistic Risk Assessment Tool

BACKGROUND The Artemis campaign is a Moon exploration program with a series of six planned missions, five of which will be crewed. These five crewed missions will contain a single mission segment (space flight), or multiple mission segments involving space flight (Orion), lunar landing (LTV) and/or space habitat (Gateway). Each crewed segment faces the risk of unique medical conditions, necessitating medical sets/kits tailored to those specificities. To support and enable a data-driven and evidence-based decision-making process through out a mission’s life cycle, a software tool called IMPACT was developed. Using probabilistic risk assessment (PRA) methodologies, IMPACT (Informing Mission Planning via Analysis of Complex Tradespaces) is a novel tool built for analyzing the possibility of encountering complex medical risks during space flight, and for identifying the medical resources and capabilities needed to treat those potential at-risk medical conditions. This presentation will seek to compare IMPACT’s computational results upon potential complex space medical conditions (e.g., sprain/strain back or sleep disturbance) using IMPACT’s risk metrics and the associated optimized medical sets/kits between two Artemis missions: single segment Artemis 2 and multi-segmented Artemis 5. OVERVIEW By identifying potential medical conditions in space using input criteria such as crew quantity and composition, certain crew physical characteristics, mission duration and mission activities, IMPACT can produce analyses on the type of medical resources and capabilities needed to produce an optimized medical set/kit to address those medical conditions. IMPACT achieves this by performing hundreds of thousands of Monte Carlo simulations of missions to build aggregate pictures of medical risk. IMPACT’s risk metrics include loss of crew life (LOCL) – a measure of crew mortality due to medical conditions in space, return to definitive care (RTDC) – the need to perform crew evacuation, and task time lost (TTL) – a measure of the inability to perform activities due to crew disability. These risk metrics are applied to every medical condition identified by IMPACT’s computation analyses for every segment of the mission. Medical sets/kits are optimized to address these medical conditions but must fit within the stated Artemis Design Reference Mission (DRM) request for mass and volume physical size constraints. ANTICIPATED ANALYSIS AND CONCLUSION Using two Artemis missions, Artemis 2 and Artemis 5, IMPACT will provide the analyses for comparison of medical set/kit contents based upon mass and/or volume requirements and identify the at-risk medical conditions within both missions. This paper serves as an initial exploration of probabilistic risk assessment (PRA) medical risk calculations between two crewed Artemis missions and is not intended to be deemed the official medical response for the Artemis campaign.

probabilistic risk assessment↗

Reliability and risk assessment of structures

Development of reliability and risk assessment of structural components and structures is a major activity at Lewis Research Center. It consists of five program elements: (1) probabilistic loads; (2) probabilistic finite element analysis; (3) probabilistic material behavior; (4) assessment of reliability and risk; and (5) probabilistic structural performance evaluation. Recent progress includes: (1) the evaluation of the various uncertainties in terms of cumulative distribution functions for various structural response variables based on known or assumed uncertainties in primitive structural variables; (2) evaluation of the failure probability; (3) reliability and risk-cost assessment; and (4) an outline of an emerging approach for eventual certification of man-rated structures by computational methods. Collectively, the results demonstrate that the structural durability/reliability of man-rated structural components and structures can be effectively evaluated by using formal probabilistic methods.

Chamis, C. C.↗

Adapting Traditional Hazards Analysis Methods to Address Cyber Risks

Traditional hazards analysis (HA) methods, originally developed to address physical and operational risks, often fall short when it comes to identifying and mitigating cyber threats. These cyber threats pose unique and evolving risks to critical infrastructure and industrial control systems (ICS). This report explores the integration of Cyber-Informed Engineering (CIE) principles into existing HA methods to enhance their ability to address cyber-induced risks. CIE provides organizations with a practical, cost-effective approach to closing the gap between traditional HA methods and the need for cyber risk mitigation. By leveraging existing safety processes and controls, CIE allows users to examine and mitigate cyber vulnerabilities without overhauling existing HA methods. This report identifies areas where HA and CIE naturally align and where their approaches diverge. It emphasizes how CIE principles can be used to adapt HA methods, broadening their scope to include cyber risks and enabling the mitigation of cyber- induced impacts alongside traditional hazards and failure scenarios. This report examines how CIE can be applied across various HA methods—such as Hazard and Operability Studies (HAZOP), Probabilistic Risk Assessment (PRA), Failure Modes and Effects Analysis (FMEA), Systems-Theoretic Process Analysis (STPA), Hazard and Consequence Analysis for Digital Systems (HAZCADS), and Layers of Protection Analysis (LOPA). It provides strategies for integrating CIE to strengthen the identification, assessment, and mitigation of cyber-induced risks. The findings offer a structured entry point for organizations to embed CIE concepts into hazards and safety analyses, as well as broader engineering processes, ultimately supporting the design and operation of a more resilient infrastructure.

42 ENGINEERING↗

Adapting Traditional Hazards Analysis Methods to Address Cyber Risks

Traditional hazards analysis (HA) methods, originally developed to address physical and operational risks, often fall short when it comes to identifying and mitigating cyber threats. These cyber threats pose unique and evolving risks to critical infrastructure and industrial control systems (ICS). This report explores the integration of Cyber-Informed Engineering (CIE) principles into existing HA methods to enhance their ability to address cyber-induced risks. CIE provides organizations with a practical, cost-effective approach to closing the gap between traditional HA methods and the need for cyber risk mitigation. By leveraging existing safety processes and controls, CIE allows users to examine and mitigate cyber vulnerabilities without overhauling existing HA methods. This report identifies areas where HA and CIE naturally align and where their approaches diverge. It emphasizes how CIE principles can be used to adapt HA methods, broadening their scope to include cyber risks and enabling the mitigation of cyber- induced impacts alongside traditional hazards and failure scenarios. This report examines how CIE can be applied across various HA methods—such as Hazard and Operability Studies (HAZOP), Probabilistic Risk Assessment (PRA), Failure Modes and Effects Analysis (FMEA), Systems-Theoretic Process Analysis (STPA), Hazard and Consequence Analysis for Digital Systems (HAZCADS), and Layers of Protection Analysis (LOPA). It provides strategies for integrating CIE to strengthen the identification, assessment, and mitigation of cyber-induced risks. The findings offer a structured entry point for organizations to embed CIE concepts into hazards and safety analyses, as well as broader engineering processes, ultimately supporting the design and operation of a more resilient infrastructure.

42 - ENGINEERING↗

Electrical Substation Configuration Effect on Substation Reliability

The nation’s electrical grid must be reliable because of its critical role in the economy, defense, and security of the nation. Many common tasks and industrial operations rely on proper electrical power distribution. In the design of new bus systems or evaluation of existing bus systems, the type of bus configuration affects the risk, reliability, maintenance, and cost of the system. This work utilizes Systems Analysis Programs for Hands-on Integrated Reliability Evaluations (SAPHIRE) to perform a probabilistic risk assessment (PRA) based sensitivity study on the reliability of substations with differing bus configurations. This study examines single bus, main and transfer, breaker and a half, double bus/double breaker, and ring bus configurations applied to busses of varying number of lines. The case variances, methods, and rankings presented can provide a guide for bus configuration for future electrical grid design and analysis.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Developing and Implementing the Data Mining Algorithms in RAVEN

The RAVEN code is becoming a comprehensive tool to perform probabilistic risk assessment, uncertainty quantification, and verification and validation. The RAVEN code is being developed to support many programs and to provide a set of methodologies and algorithms for advanced analysis. Scientific computer codes can generate enormous amounts of data. To post-process and analyze such data might, in some cases, take longer than the initial software runtime. Data mining algorithms/methods help in recognizing and understanding patterns in the data, and thus discover knowledge in databases. The methodologies used in the dynamic probabilistic risk assessment or in uncertainty and error quantification analysis couple system/physics codes with simulation controller codes, such as RAVEN. RAVEN introduces both deterministic and stochastic elements into the simulation while the system/physics code model the dynamics deterministically. A typical analysis is performed by sampling values of a set of parameter values. A major challenge in using dynamic probabilistic risk assessment or uncertainty and error quantification analysis for a complex system is to analyze the large number of scenarios generated. Data mining techniques are typically used to better organize and understand data, i.e. recognizing patterns in the data. This report focuses on development and implementation of Application Programming Interfaces (APIs) for different data mining algorithms, and the application of these algorithms to different databases.

97 MATHEMATICS AND COMPUTING↗

Science-Based Simulation Model of Human Performance for Human Reliability Analysis

Human reliability analysis (HRA), a component of an integrated probabilistic risk assessment (PRA), is the means by which the human contribution to risk is assessed, both qualitatively and quantitatively. However, among the literally dozens of HRA methods that have been developed, most cannot fully model and quantify the types of errors that occurred at Three Mile Island. Furthermore, all of the methods lack a solid empirical basis, relying heavily on expert judgment or empirical results derived in non-reactor domains. Finally, all of the methods are essentially static, and are thus unable to capture the dynamics of an accident in progress. The objective of this work is to begin exploring a dynamic simulation approach to HRA, one whose models have a basis in psychological theories of human performance, and whose quantitative estimates have an empirical basis. This paper highlights a plan to formalize collaboration among the Idaho National Laboratory (INL), the University of Maryland, and The Ohio State University (OSU) to continue development of a simulation model initially formulated at the University of Maryland. Initial work will focus on enhancing the underlying human performance models with the most recent psychological research, and on planning follow-on studies to establish an empirical basis for the model, based on simulator experiments to be carried out at the INL and at the OSU.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

ROBUSTNESS OF DECISION INSIGHTS UNDER ALTERNATIVE ALEATORY/EPISTEMIC UNCERTAINTY CLASSIFICATIONS

The Risk-Informed Safety Margin Characterization (RISMC) pathway is a set of activities defined under the U.S. Department of Energy Light Water Reactor Sustainability Program. The overarching objective of RISMC is to support plant life-extension decision-making by providing a state-of-knowledge characterization of safety margins in key systems, structures, and components (SSCs). A key technical challenge is to establish the conceptual and technical feasibility of analyzing safety margin in a risk-informed way, which, unlike conventionally defined deterministic margin analysis, would be founded on probabilistic characterizations of SSC performance. Evaluation of probabilistic safety margins will in general entail the uncertainty characterization both of the prospective challenge to the performance of an SSC ("load") and of its "capacity" to withstand that challenge. The RISMC framework contrasts sharply with the traditional probabilistic risk assessment (PRA) structure in that the underlying models are not inherently aleatory. Rather, they are largely deterministic physical/engineering models with ambiguities about the appropriate uncertainty classification of many model parameters. The current analysis demonstrates that if the distinction between epistemic and aleatory uncertainties is to be preserved in a RISMC-like modeling environment, then it is unlikely that analysis insights supporting decision-making will in general be robust under recategorization of input uncertainties. If it is believed there is a true conceptual distinction between epistemic and aleatory uncertainty (as opposed to the distinction being primarily a legacy of the PRA paradigm) then a consistent and defensible basis must be established by which to categorize input uncertainties.

probabilistic risk assessment↗