Process-Based Cost Estimation for Ramjet/Scramjet Engines

Process-based cost estimation plays a key role in effecting cultural change that integrates distributed science, technology and engineering teams to rapidly create innovative and affordable products. Working together, NASA Glenn Research Center and Boeing Canoga Park have developed a methodology of process-based cost estimation bridging the methodologies of high-level parametric models and detailed bottoms-up estimation. The NASA GRC/Boeing CP process-based cost model provides a probabilistic structure of layered cost drivers. High-level inputs characterize mission requirements, system performance, and relevant economic factors. Design alternatives are extracted from a standard, product-specific work breakdown structure to pre-load lower-level cost driver inputs and generate the cost-risk analysis. As product design progresses and matures the lower level more detailed cost drivers can be re-accessed and the projected variation of input values narrowed, thereby generating a progressively more accurate estimate of cost-risk. Incorporated into the process-based cost model are techniques for decision analysis, specifically, the analytic hierarchy process (AHP) and functional utility analysis. Design alternatives may then be evaluated not just on cost-risk, but also user defined performance and schedule criteria. This implementation of full-trade study support contributes significantly to the realization of the integrated development environment. The process-based cost estimation model generates development and manufacturing cost estimates. The development team plans to expand the manufacturing process base from approximately 80 manufacturing processes to over 250 processes. Operation and support cost modeling is also envisioned. Process-based estimation considers the materials, resources, and processes in establishing cost-risk and rather depending on weight as an input, actually estimates weight along with cost and schedule.

Singh, Brijendra↗

Risk Management of NASA Projects

Various NASA Langley Research Center and other center projects were attempted for analysis to obtain historical data comparing pre-phase A study and the final outcome for each project. This attempt, however, was abandoned once it became clear that very little documentation was available. Next, extensive literature search was conducted on the role of risk and reliability concepts in project management. Probabilistic risk assessment (PRA) techniques are being used with increasing regularity both in and outside of NASA. The value and the usage of PRA techniques were reviewed for large projects. It was found that both civilian and military branches of the space industry have traditionally refrained from using PRA, which was developed and expanded by nuclear industry. Although much has changed with the end of the cold war and the Challenger disaster, it was found that ingrained anti-PRA culture is hard to stop. Examples of skepticism against the use of risk management and assessment techniques were found both in the literature and in conversations with some technical staff. Program and project managers need to be convinced that the applicability and use of risk management and risk assessment techniques is much broader than just in the traditional safety-related areas of application. The time has come to begin to uniformly apply these techniques. The whole idea of risk-based system can maximize the 'return on investment' that the public demands. Also, it would be very useful if all project documents of NASA Langley Research Center, pre-phase A through final report, are carefully stored in a central repository preferably in electronic format.

Sarper, Hueseyin↗

Probabilistic/Fracture-Mechanics Model For Service Life

Computer program makes probabilistic estimates of lifetime of engine and components thereof. Developed to fill need for more accurate life-assessment technique that avoids errors in estimated lives and provides for statistical assessment of levels of risk created by engineering decisions in designing system. Implements mathematical model combining techniques of statistics, fatigue, fracture mechanics, nondestructive analysis, life-cycle cost analysis, and management of engine parts. Used to investigate effects of such engine-component life-controlling parameters as return-to-service intervals, stresses, capabilities for nondestructive evaluation, and qualities of materials.

Watkins, T., Jr.↗

An Example of Risk Informed Design

NASA Engineering requested a Probabilistic Risk Assessment (PRA) to compare the difference in the risk of Loss of Crew (LOC) and Loss of Mission (LOM) between different designs of a fluid assembly. They were concerned that the configuration favored by the design team was more susceptible to leakage than a second proposed design, but realized that a quantitative analysis to compare the risks between the two designs might strengthen their argument. The analysis showed that while the second design did help improve the probability of LOC, it did not help from a probability of LOM perspective. This drove the analysis team to propose a minor design change that would drive the probability of LOM down considerably. The analysis also demonstrated that there was another major risk driver that was not immediately obvious from a typical engineering study of the design and was therefore unexpected. None of the proposed alternatives were addressing this risk. This type of trade study demonstrates the importance of performing a PRA in order to completely understand a system's design. It allows managers to use risk as another one of the commodities (e.g., mass, cost, schedule, fault tolerance) that can be traded early in the design of a new system.

Banke, Rick↗

Probabilistic Blast Damage Modeling Uncertainties and Sensitivities

Blast overpressure is the predominant source of ground damage posed by potentially hazardous asteroid strikes. Estimates of the extent, severity, and likelihoods of potential blast damage regions will be one of the key metrics needed to mount civil defense or disaster response plans in the face of an impending impact. However, there are many inherent sources of uncertainty in evaluating the damage, both in characterizing the properties of the incoming object and in the approaches used to model the entry/impact and resulting damage, which make it difficult to produce a single ‘accurate’ or ‘best guess’ prediction of ground damage. The current 2021 PDC hypothetical impact scenario poses a particular challenge due to its short warning time. The need for rapid disaster response to prepare for an immanent impact, combined with lack of observational opportunities to refine basic knowledge about the object’s basic size and properties, make understanding the range and relative likelihood of consequences particularly critical. The potential damage caused by these blasts can be evaluated using a range of modeling and simulation approaches and levels of fidelity. Fast-running engineering-level models can be used to run large numbers of probabilistically sampled cases covering wide variations of uncertain properties or parameters. High-fidelity simulations, on the other hand, can capture more detailed/accurate blast physics, but can only be performed for a small selection of specific cases, requiring many assumptions to be made about the initial object and its unpredictable entry/breakup characteristics. In order to provide a more complete picture of the potential threat for effective disaster response, both types of analysis need to be employed together. In this approach, high-fidelity simulations are used to refine and anchor engineering models, and the probabilistic engineering models are used to evaluate broad parameters spaces and guide selection of the most pertinent simulation cases for a given scenario. This presentation expands upon the probabilistic asteroid impact risk assessments being performed as part of the 2021 PDC hypothetical impact exercise, focusing on key aspects of blast damage modeling uncertainties and sensitivities. We review the current modeling and simulation approaches employed in the current assessment, compare the relative levels of uncertainty stemming from each main element of the problem (i.e., knowledge of the asteroid properties, modeling of the atmospheric entry/breakup and airburst, and estimates of the ground damage from the resulting blasts waves), and highlight any notable trends and sensitivities for the current scenario case.

SMD↗

Probabilistic Modeling of a Three-Stage Human Landing System Architecture

Space Policy Directive-1 has led to NASA partnerships with commercial entities on procurement which includes the development of the Human Landing System (HLS) [1]. With the goal of delivering human crew to the lunar surface by 2024, system uncertainties become an important obstacle to the maturation of multiple new, driving technologies and mission concepts of the HLS program. As unmitigated uncertainties have previously led to failed development programs, these risks and their impacts must be understood and handled to ensure program success [2]. Sources of uncertainty include novel engine designs and configurations, increased reliance on cryogenic fluid management(CFM), and refueling technologies—which propagate as high-level performance metrics such as overall propellant mass and engine performance. Also, the occurrence of operational uncertainties—e.g. launch conditions or need to abort during the mission—can cause cascading effects on the rest of the mission that are difficult to definitively quantify, and are outside the scope of control. These concrete examples and other occurrences can be categorized as either epistemic or aleatory uncertainties.Epistemic uncertainty arises due to a lack of knowledge and can be alleviated with design and program maturation. Aleatory uncertainty is due to the inherent randomness of the system and cannot be directly reduced, unlike epistemic uncertainty. Robust design and probabilistic methods can compensate for aleatory effects. A taxonomy of uncertainty is referred to for this work [3]. In this paper, a probabilistic methodology to handle uncertainties has been demonstrated on a three-element HLS concept [1, 4], which allows tracking of current best estimates of the concept and assessment of concept design robustness against uncertainties. A sample case has been completed for this abstract, and an expansion on the methodology will be included in the final paper. This methodology has two key parts: first, the creation of a dynamic architecture model of a three-element HLS concept; and second, its use with surrogate modeling and range estimating techniques to capture and propagate uncertainties. This abstract will cover the basics of the approach used, and further details and justifications will be in the final paper.The mission profile associated with this three-element concept (Fig 1) was modeled as a set of mission events that facilitated mass changes, idles, or spacecraft maneuvers. The mission profile scope starts with each element’s NRHO orbit insertion and aggregation and ends at post-sortie rendezvous with Orion. More detail on the mission profile will be in the final paper. The DYnamic Rocket EQuation Tool (DYREQT), a space systems synthesis and sizing framework used by NASA, was used as the physics framework to model the HLS architecture for applying the probabilistic methodology [5, 6]. Specifically, a parametric representation of the lander, ascent, and transfer elements and the mission profile of each element was established, with vehicle and mission parameters available as inputs to allow for a dynamic model. Each vehicle stage was modeled with high-level performance metrics, using Isp and propellant mass fraction (PMF) to remain parametric. For the probabilistic analysis, uncertainties of interest within the HLS concept were enumerated and represented as parameters within the DYREQT model as inputs for vehicle stages or mission profile events. These parameters were frozen at their nominal values for the purposes of baselining architecture performance and sizing the vehicle appropriately based on reference documentation [1]. Range estimating—a probabilistic method that combines Monte Carlo sampling, focus on critical parameters, and heuristics to assess risk and opportunities—is traditionally used with Mass Equipment Lists (MELs), but has been adapted with operational parameters as well as vehicle parameters in theDYREQT model to capture mission uncertainty alongside vehicle uncertainty [7, 3]. This method was selected due to its application and insight on a system from a bottom-up perspective, independence from historical rules of thumb, and ability to generate sensitivities based on design decisions and uncertainties. As a sample case for the abstract, the boiloff rates of the vehicle elements and the loiter times during the mission (simulating launch time variations and changing window of opportunities) were used with range estimating to provide preliminary results. To perform the range estimation portion of this methodology (depicted in Fig. 3, further details in final paper), the DYREQT model was sampled using a Design of Experiments (DoE) to efficiently explore the architecture design space with respect to the sample set of uncertainty parameters; 5,000 cases via Latin Hypercube Sampling were computed on the DYREQT architecture model. Then, the results were used to create surrogate models, multivariate regressions that can visualize hypercube trends in the design space, of the architecture with respect to the uncertainty parameters. Range estimating was applied to the surrogates instead of the actual models, which saves computational expense due to the bulk of cases needed for the Monte Carlo simulation as part of range estimating. Uncertainty parameters were sampled independently from triangular distributions using the DoE ranges as ‘min’ and ‘max’, and the nominal value as ‘most likely’. Based engineering intuition, some uncertainty parameters are correlated—e.g. if the main propellant has a high boil-off rate, the oxidizer should follow suit as both are related to CFM technology.While a Monte Carlo simulation samples all inputs as independent, the results would show model correlations; thus, it is efficient to sample the inputs as correlated. Using a correlation matrix constructed for the uncertainty parameters, previously independent samples were transformed to perform a Correlated Monte Carlo. A table for the DoE ranges and probability distribution parameters is shown in Table 1, and more details on Correlated Monte Carlo Simulations will be discussed in the final paper. The model’s resulting DoE showed that multivariate polynomial equations fit via least squares method captured its behavior accurately for the sample case. For the Correlated Monte Carlo Simulation, a positive correlation between fuel and oxidizer boiloff rates was used as a demonstration. 10,000 cases were computed with the surrogates and the launched masses for each vehicle element was collated. The results can be displayed in a probability density function (PDF), showing the impact of the uncertainty parameters chosen. Integrating the PDFs will yield a cumulative distribution function (CDF) that shows the cumulative probability of a given value on the x-axis. For the sample case, the elements’ launch mass margin was calculated and represented in as CDFs, as a demonstrated representation of figures of merit for the HLS concept. For the lander and ascent elements, the NRHO mass insertion limit is 16t; the transfer element has a limit of 30t [1]. It can be seen with Figure 2 that this probabilistic methodology can provide insight into mass margin with respect to the uncertainties being modeled. Currently, the results show that the lander (descent) vehicle element has the most restrictive design space; it is the only element to show a 10% probability of negative margin. Further analysis on the Monte Carlo results will show sensitivities for driving constraints and parameters for architecture feasibility, which can lead to establishing potential mission rules.The combination of range estimating with a parametric architecture model for HLS demonstrated the capability of this probabilistic methodology in a sample case. As the HLS development progresses, this methodology has the potential for keeping current best estimates of architecture performance for awarded concepts due to the flexibility in DYREQT’s modeling framework and its parametric nature. Concept maturation and increased epistemic knowledge can be injected into the model probabilistic modeling, and thus continue to track probability of mission success.

Stephanie Y Zhu↗

Statistical Prediction of Solar Particle Event Frequency Based on the Measurements of Recent Solar Cycles for Acute Radiation Risk Analysis

Large solar particle events (SPEs) present significant acute radiation risks to the crew members during extra-vehicular activities (EVAs) or in lightly shielded space vehicles for space missions beyond the protection of the Earth's magnetic field. Acute radiation sickness (ARS) can impair performance and result in failure of the mission. Improved forecasting capability and/or early-warning systems and proper shielding solutions are required to stay within NASA's short-term dose limits. Exactly how to make use of observations of SPEs for predicting occurrence and size is a great challenge, because SPE occurrences themselves are random in nature even though the expected frequency of SPEs is strongly influenced by the time position within the solar activity cycle. Therefore, we developed a probabilistic model approach, where a cumulative expected occurrence curve of SPEs for a typical solar cycle was formed from a non-homogeneous Poisson process model fitted to a database of proton fluence measurements of SPEs that occurred during the past 5 solar cycles (19 - 23) and those of large SPEs identified from impulsive nitrate enhancements in polar ice. From the fitted model, the expected frequency of SPEs was estimated at any given proton fluence threshold (Phi(sub E)) with energy (E) >30 MeV during a defined space mission period. Corresponding Phi(sub E) (E=30, 60, and 100 MeV) fluence distributions were simulated with a random draw from a gamma distribution, and applied for SPE ARS risk analysis for a specific mission period. It has been found that the accurate prediction of deep-seated organ doses was more precisely predicted at high energies, Phi(sub 100), than at lower energies such as Phi(sub 30) or Phi(sub 60), because of the high penetration depth of high energy protons. Estimates of ARS are then described for 90th and 95th percentile events for several mission lengths and for several likely organ dose-rates. The ability to accurately measure high energy protons (50-300 MeV) in real-time is shown to be a crucial issue for crew protection.

Myung-Hee, Y. Kim↗

Application of Deterministic and Probabilistic System Design Methods and Enhancements of Conceptual Design Tools for ERA Project

This report documents work done by the Aerospace Systems Design Lab (ASDL) at the Georgia Institute of Technology, Daniel Guggenheim School of Aerospace Engineering for the National Aeronautics and Space Administration, Aeronautics Research Mission Directorate, Integrated System Research Program, Environmentally Responsible Aviation (ERA) Project. This report was prepared under contract NNL12AA12C, "Application of Deterministic and Probabilistic System Design Methods and Enhancement of Conceptual Design Tools for ERA Project". The research within this report addressed the Environmentally Responsible Aviation (ERA) project goal stated in the NRA solicitation "to advance vehicle concepts and technologies that can simultaneously reduce fuel burn, noise, and emissions." To identify technology and vehicle solutions that simultaneously meet these three metrics requires the use of system-level analysis with the appropriate level of fidelity to quantify feasibility, benefits and degradations, and associated risk. In order to perform the system level analysis, the Environmental Design Space (EDS) [Kirby 2008, Schutte 2012a] environment developed by ASDL was used to model both conventional and unconventional configurations as well as to assess technologies from the ERA and N+2 timeframe portfolios. A well-established system design approach was used to perform aircraft conceptual design studies, including technology trade studies to identify technology portfolios capable of accomplishing the ERA project goal and to obtain accurate tradeoffs between performance, noise, and emissions. The ERA goal, shown in Figure 1, is to simultaneously achieve the N+2 benefits of a cumulative noise margin of 42 EPNdB relative to stage 4, a 75 percent reduction in LTO NOx emissions relative to CAEP 6 and a 50 percent reduction in fuel burn relative to the 2005 best in class aircraft. There were 5 research task associated with this research: 1) identify technology collectors, 2) model technology collectors in EDS, 3) model and assess ERA technologies, 4) LTO and cruise emission prediction, and 5) probabilistic analysis of technology collectors and portfolios.

Mavris, Dimitri N.↗

Lunar Exploration Architecture Level Key Drivers and Sensitivities

Strategic level analysis of the integrated behavior of lunar transportation and lunar surface systems architecture options is performed to assess the benefit, viability, affordability, and robustness of system design choices. This analysis employs both deterministic and probabilistic modeling techniques so that the extent of potential future uncertainties associated with each option are properly characterized. The results of these analyses are summarized in a predefined set of high-level Figures of Merit (FOMs) so as to provide senior NASA Constellation Program (CxP) and Exploration Systems Mission Directorate (ESMD) management with pertinent information to better inform strategic level decision making. The strategic level exploration architecture model is designed to perform analysis at as high a level as possible but still capture those details that have major impacts on system performance. The strategic analysis methodology focuses on integrated performance, affordability, and risk analysis, and captures the linkages and feedbacks between these three areas. Each of these results leads into the determination of the high-level FOMs. This strategic level analysis methodology has been previously applied to Space Shuttle and International Space Station assessments and is now being applied to the development of the Constellation Program point-of-departure lunar architecture. This paper provides an overview of the strategic analysis methodology and the lunar exploration architecture analyses to date. In studying these analysis results, the strategic analysis team has identified and characterized key drivers affecting the integrated architecture behavior. These key drivers include inclusion of a cargo lander, mission rate, mission location, fixed-versus- variable costs/return on investment, and the requirement for probabilistic analysis. Results of sensitivity analysis performed on lunar exploration architecture scenarios are also presented.

Goodliff, Kandyce↗

Schedule Risks Due to Delays in Advanced Technology Development

This paper discusses a methodology and modeling capability that probabilistically evaluates the likelihood and impacts of delays in advanced technology development prior to the start of design, development, test, and evaluation (DDT&E) of complex space systems. The challenges of understanding and modeling advanced technology development considerations are first outlined, followed by a discussion of the problem in the context of lunar surface architecture analysis. The current and planned methodologies to address the problem are then presented along with sample analyses and results. The methodology discussed herein provides decision-makers a thorough understanding of the schedule impacts resulting from the inclusion of various enabling advanced technology assumptions within system design.

Reeves, John D. Jr.↗

Probabilistic evaluation of uncertainties and risks in aerospace components

A methodology is presented for the computational simulation of primitive variable uncertainties, and attention is given to the simulation of specific aerospace components. Specific examples treated encompass a probabilistic material behavior model, as well as static, dynamic, and fatigue/damage analyses of a turbine blade in a mistuned bladed rotor in the SSME turbopumps. An account is given of the use of the NESSES probabilistic FEM analysis CFD code.

Shah, A. R.↗

Proposed Reliability-Based Damage Tolerance Guidelines for Space Systems

Deterministic damage tolerance guidelines for highly reusable and efficiently designed launch systems can be challenging to meet and result in overly conservative assessments for tightly controlled manufacturing processes. Deterministic approaches may be unconservative when the structure is workmanship sensitive and there is a wide spread in fracture properties. Reliability-based damage tolerance assessments targeting a component reliability over the service life commensurate to mission risk posture is a promising alternative. Low production rates, short fleets, and lack of standards or guidance has slowed down widespread adoption of this method. Guidance for the robust application of reliability-based damage tolerance for space systems are proposed. These guidelines cover the treatment of uncertainty in damage tolerance analysis, the collection of data to develop probabilistic distributions, uncertainty propagation methods, and types of hardware.

Reliability-Based Damage Tolerance↗

Structural reliability methods: Code development status

The Probabilistic Structures Analysis Method (PSAM) program integrates state of the art probabilistic algorithms with structural analysis methods in order to quantify the behavior of Space Shuttle Main Engine structures subject to uncertain loadings, boundary conditions, material parameters, and geometric conditions. An advanced, efficient probabilistic structural analysis software program, NESSUS (Numerical Evaluation of Stochastic Structures Under Stress) was developed as a deliverable. NESSUS contains a number of integrated software components to perform probabilistic analysis of complex structures. A nonlinear finite element module NESSUS/FEM is used to model the structure and obtain structural sensitivities. Some of the capabilities of NESSUS/FEM are shown. A Fast Probability Integration module NESSUS/FPI estimates the probability given the structural sensitivities. A driver module, PFEM, couples the FEM and FPI. NESSUS, version 5.0, addresses component reliability, resistance, and risk.

Millwater, Harry R.↗

LLMs and GenAI Tools to Depict Contributions of Human Systems to Spaceflight Tasks Execution

Recent advancements in Artificial Intelligence and Machine Learning (AI/ML) technologies, particularly Large Language Models (LLMs) capable of sophisticated syntax analysis, offer substantial potential in automating complex processes, thereby saving time and human resources. This study explores the development of an LLM-driven model designed to analyze and categorize a diverse set of Mars mission tasks into 18 predefined Human System Task Categories (HSTCs) based on their textual descriptions. As part of developing the Crew Health and Performance – Probabilistic Risk Assessment (CHP-PRA projects Performance Risk Model (PRisM) proof-of-concept, we established a framework to project performance scores from small-scale tests onto a preliminary list of Mars tasks. The foundation of our model was a comprehensive spreadsheet populated by NASA experts and clinicians, which detailed each Mars task alongside binary indicators of HSTC involvement. This dataset enabled the initial application of supervised ML, training and testing on existing HSTC labels. The HSTCs were originally defined from a medical system perspective, focusing on task impairments due to deteriorated human health. To expand our model's scope to include categories impacting performance, we face the challenge of generating binary labels (0 or 1) for new categories without pre-existing data. We address this by employing Generative AI (GenAI) software to determine whether a given task involved a new category by asking, "Does task A involve using category B?" We validate our approach by comparing the GenAI's binary classifications with the expert-provided labels for existing HSTCs. Notably, we utilize Ollama [4], a locally hosted GenAI tool that does not require cloud access, thus safeguarding NASA's proprietary data from unauthorized exposure. This study demonstrates the feasibility of leveraging cutting-edge AI tools to advance research, paving the way for automation and rapid decision-making in space exploration.

Mona Matar↗

Quantifying Medical Risk on a Long Duration Lunar Mission: A Demonstration of NASA’s IMPACT Tradespace Analysis Tool

Background NASA’s human exploration spaceflight missions to the Moon and Mars present unprecedented challenges for in-mission medical care. The distance from Earth will mean increased mission durations, communication delays, limited to no resupply opportunities, and constraints on the medical evacuation of astronauts. Mass, volume, power, and data will be limited while higher demands will be placed on the crew to manage medical care. NASA’s Moon to Mars exploration strategy lays out increasingly complex Artemis missions both in terms of duration and operations. In these more challenging deep space missions, it is important to quantitatively estimate the human medical risk to inform a traditional heuristic approach to medical risk. Prior tools have been developed for missions in low Earth orbit, but a new tool is required to plan for future exploration missions. Methods IMPACT (Informing Mission Planning via Analysis of Complex Tradespaces) is a risk assessment tool developed by NASA to advance exploration mission medical system design by quantitatively estimating mission medical risk. IMPACT v1.0 includes a novel evidence library baselined to exploration environments; an expanded list of 119 medical conditions; the addition of medical resources; and the ability for rapid and iterative analysis. Medical system risk estimates include loss of crew life, consideration of the need for return to definitive care (medical evacuation), and an estimate of crew time affected due to medical conditions. A notional long duration lunar orbit and lunar surface design reference mission (DRM) was chosen with a 4-astronaut crew to represent a sustained exploration Artemis mission. Results/Discussion Overall, IMPACT successfully quantified medical risk and derived an optimized medical system to support crew on a long duration lunar mission. In this DRM, the calculated loss of crew life from a medical event was 0.008 events per mission, risk of potential need for evacuation was 0.30 events per mission, and cumulative crew time affected by medical conditions was 103 days. The medical conditions that most contributed to overall medical risk were decompression sickness, trauma conditions, and respiratory failure. The conditions that had the largest effects on crew performance included musculoskeletal injuries and lunar dust exposure. The IMPACT-generated medical system included resources that target the most common and highest risk conditions. This systematic analysis demonstrates the value of the IMPACT tool in medical system design for human exploration spaceflight missions.

Missions to Mars↗

Quantifying Medical Risk on a Long Duration Lunar Mission: A Demonstration of NASA’s IMPACT Tradespace Analysis Tool

Background NASA’s human exploration spaceflight missions to the Moon and Mars present unprecedented challenges for in-mission medical care. The distance from Earth will mean increased mission durations, communication delays, limited to no resupply opportunities, and constraints on the medical evacuation of astronauts. Mass, volume, power, and data will be limited while higher demands will be placed on the crew to manage medical care. NASA’s Moon to Mars exploration strategy lays out increasingly complex Artemis missions both in terms of duration and operations. In these more challenging deep space missions, it is important to quantitatively estimate the human medical risk to inform a traditional heuristic approach to medical risk. Prior tools have been developed for missions in low Earth orbit, but a new tool is required to plan for future exploration missions. Methods IMPACT (Informing Mission Planning via Analysis of Complex Tradespaces) is a risk assessment tool developed by NASA to advance exploration mission medical system design by quantitatively estimating mission medical risk. IMPACT v1.0 includes a novel evidence library baselined to exploration environments; an expanded list of 119 medical conditions; the addition of medical resources; and the ability for rapid and iterative analysis. Medical system risk estimates include loss of crew life, consideration of the need for return to definitive care (medical evacuation), and an estimate of crew time affected due to medical conditions. A notional long duration lunar orbit and lunar surface design reference mission (DRM) was chosen with a 4-astronaut crew to represent a sustained exploration Artemis mission. Results/Discussion Overall, IMPACT successfully quantified medical risk and derived an optimized medical system to support crew on a long duration lunar mission. In this DRM, the calculated loss of crew life from a medical event was 0.008 events per mission, risk of potential need for evacuation was 0.30 events per mission, and cumulative crew time affected by medical conditions was 103 days. The medical conditions that most contributed to overall medical risk were decompression sickness, trauma conditions, and respiratory failure. The conditions that had the largest effects on crew performance included musculoskeletal injuries and lunar dust exposure. The IMPACT-generated medical system included resources that target the most common and highest risk conditions. This systematic analysis demonstrates the value of the IMPACT tool in medical system design for human exploration spaceflight missions.

Missions to Mars↗

Performance Risk Model Validation with Operationally Relevant Tasks

Human Research Program aims to develop methods to support astronauts’ health and productivity during spaceflight. The Crew Health and Performance Probabilistic Risk Assessment (CHP-PRA) team uses powerful computational methods to predict mission risk in both domains: medical and performance. Here, we show how CHP-PRA uses the Performance Risk Model (PRisM) to quantify the performance risk and show an application of the model on operationally relevant tasks. There are various metrics adopted across performance researchers that PRisM can accommodate. For data analysis, interpretation, and integration, we use a method of unifying data from multiple sources by converting each to a single metric. We consult subject matter experts prior to integrating the converted data into PRisM. The method we use is inspired by the Cooper-Harper rating scale [1]. Using this unified metric, we can easily combine data from various tests and lab groups. We explain our conversion method in detail and show how it pertains to the process of testing and validation of PRisM on operational tasks. We conducted an initial validation in collaboration with the Behavioral Health and Performance (BHP) lab. We test PRisM using data on their operationally relevant task ROBoT-r, a track-and-capture task for grappling incoming resupply vehicles [2]. Several other labs at NASA Johnson Space Center worked together to design 7 Functional Task Tests (FTTs) in pursuit of simulating the tasks required after landing on a planetary surface and after return to Earth [3]. Here we use the results from both ROBoT-r and the 7 FTTs and compare their experiment data to PRisM’s computational output to demonstrate how PRisM can support operations by predicting crew performance on future missions.

performance modeling↗

Shuttle Risk Progression: Use of the Shuttle Probabilistic Risk Assessment (PRA) to Show Reliability Growth

It is important to the Space Shuttle Program (SSP), as well as future manned spaceflight programs, to understand the early mission risk and progression of risk as the program gains insights into the integrated vehicle through flight. The risk progression is important to the SSP as part of the documentation of lessons learned. The risk progression is important to future programs to understand reliability growth and the first flight risk. This analysis uses the knowledge gained from 30 years of operational flights and the current Shuttle PRA to calculate the risk of Loss of Crew and Vehicle (LOCV) at significant milestones beginning with the first flight. Key flights were evaluated based upon historical events and significant re-designs. The results indicated that the Shuttle risk tends to follow a step function as opposed to following a traditional reliability growth pattern where risk exponentially improves with each flight. In addition, it shows that risk can increase due to trading safety margin for increased performance or due to external events. Due to the risk drivers not being addressed, the risk did not improve appreciably during the first 25 flights. It was only after significant events occurred such as Challenger and Columbia, where the risk drivers were apparent, that risk was significantly improved. In addition, this paper will show that the SSP has reduced the risk of LOCV by almost an order of magnitude. It is easy to look back afte r 30 years and point to risks that are now obvious, however; the key is to use this knowledge to benefit other programs which are in their infancy stages. One lesson learned from the SSP is understanding risk drivers are essential in order to considerably reduce risk. This will enable the new program to focus time and resources on identifying and reducing the significant risks. A comprehensive PRA, similar to that of the Shuttle PRA, is an effective tool quantifying risk drivers if support from all of the stakeholders is given.

Hamlin, Teri L.↗