Search NASA⌕ Search

SEARCH · Search NASA

Results for “Probabilistic risk”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 217 records · Page 12

Regulatory Treatment of Non-Core Sources of Radioactivity for Advanced Reactor Designs

The recent resurgence in advance (non-light water) reactor development has been paralleled by the development of risk-informed performance-based (RIPB) licensing pathways. Specifically, the creation of the RIPB Licensing Modernization Project (LMP) approach and subsequent endorsement by the U.S. Nuclear Regulatory Commission (NRC) now provides advanced reactor vendors with a defined RIPB method to develop an affirmative safety case for licensing. In addition, the Technology Inclusive Content of Applications Project (TICAP) has published guidance on developing a license application based on the LMP approach. To support the utilization of risk information as part of advanced reactor design and licensing efforts, the American Society of Mechanical Engineers (ASME)/American Nuclear Society (ANS) Joint Committee on Nuclear Risk Management (JCNRM) has developed a probabilistic risk assessment (PRA) standard for advanced reactors. The standard, which was formerly approved by the American National Standards Institute (ANSI) in 2021 and recently endorsed by the NRC in trial use Regulatory Guide (RG) 1.247, is an integral standard, covering from initiating events to offsite consequence. A major feature of the standard is that it permits the inclusion of any source of radioactivity material at the site within the plant PRA. Therefore, non-core sources of radioactivity, such as fuel storage, fuel processing, and purification systems, can be included within a single comprehensive plant PRA. For those advanced reactor vendors utilizing a RIPB licensing approach, there is an opportunity to include the non-core sources of radioactivity within the RIPB framework for licensing decision-making, such as the categorization of events, classification of structures, systems, and components (SSCs), and evaluation of the adequacy of defense-in-depth (DID). For advanced reactor designs that contain multiple non-core sources of radioactivity, or for monolithic plant sites that include associated fuel facilities, this approach could potentially simplify licensing applications through the use of a single, uniform, and consistent decision-making framework across all radioactive sources at the site. In addition, a RIPB approach could provide additional insights regarding plant behavior, flexibility regarding licensing decision-making, and potentially allow the use of risk information as part of the plant oversight process. Risk-informing these aspects of advanced reactor licensing would also be consistent with the NRC’s risk policy statement. However, there is diverse regulation and guidance regarding the licensing of non-core sources of radioactivity and generally limited experience using RIPB approaches for the evaluation as part of licensing.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Reducing the Risk of Human Space Missions with INTEGRITY

The INTEGRITY Program will design and operate a test bed facility to help prepare for future beyond-LEO missions. The purpose of INTEGRITY is to enable future missions by developing, testing, and demonstrating advanced human space systems. INTEGRITY will also implement and validate advanced management techniques including risk analysis and mitigation. One important way INTEGRITY will help enable future missions is by reducing their risk. A risk analysis of human space missions is important in defining the steps that INTEGRITY should take to mitigate risk. This paper describes how a Probabilistic Risk Assessment (PRA) of human space missions will help support the planning and development of INTEGRITY to maximize its benefits to future missions. PRA is a systematic methodology to decompose the system into subsystems and components, to quantify the failure risk as a function of the design elements and their corresponding probability of failure. PRA provides a quantitative estimate of the probability of failure of the system, including an assessment and display of the degree of uncertainty surrounding the probability. PRA provides a basis for understanding the impacts of decisions that affect safety, reliability, performance, and cost. Risks with both high probability and high impact are identified as top priority. The PRA of human missions beyond Earth orbit will help indicate how the risk of future human space missions can be reduced by integrating and testing systems in INTEGRITY.

Jones, Harry W.↗

Dynamic Medical Risk Assessment Supported by Inference Networks

The Human Research Program's next generation risk model, the Medical Extensible Dynamic Probabilistic Risk Assessment Tool (MEDPRAT), provides researchers with estimates of astronaut medical and health risk. MEDPRATs Susceptibility Inference Network (SIN) facilitates the dynamic component of this tool. The SIN provides MEDPRAT with a "memory" that allows the system to use knowledge of what simulation events have occurred to alter the representative probability that future simulation events will occur during a given trial. The SIN allows for the medical events being simulated to be related to, and influence the likelihood of one another, providing a more robust risk estimate. We present initial work of our efforts to mathematically quantify and represent these dependent relationships between medical events.

McIntyre, L.↗

Probabilistic Methods for Structural Reliability and Risk

A probabilistic method is used to evaluate the structural reliability and risk of select metallic and composite structures. The method is a multiscale, multifunctional and it is based on the most elemental level. A multifactor interaction model is used to describe the material properties which are subsequently evaluated probabilistically. The metallic structure is a two rotor aircraft engine, while the composite structures consist of laminated plies (multiscale) and the properties of each ply are the multifunctional representation. The structural component is modeled by finite element. The solution method for structural responses is obtained by an updated simulation scheme. The results show that the risk for the two rotor engine is about 0.0001 and the composite built-up structure is also 0.0001.

Chamis, Christos C.↗

Probabilistic Methods for Structural Reliability and Risk

A probabilistic method is used to evaluate the structural reliability and risk of select metallic and composite structures. The method is a multiscale, multifunctional and it is based on the most elemental level. A multi-factor interaction model is used to describe the material properties which are subsequently evaluated probabilistically. The metallic structure is a two rotor aircraft engine, while the composite structures consist of laminated plies (multiscale) and the properties of each ply are the multifunctional representation. The structural component is modeled by finite element. The solution method for structural responses is obtained by an updated simulation scheme. The results show that the risk for the two rotor engine is about 0.0001 and the composite built-up structure is also 0.0001.

Chamis, Christos C.↗

Advancing Multi-Hazard Risk and Safety Considerations for Aging Nuclear Facilities

While probabilistic risk assessment (PRA) of nuclear facilities is expected to include internal and external hazards for a risk-informed and performance-based design, the current state of practice treats each hazard independently. However, such an independent treatment of hazards may not account for the correlations between different hazards and their response of and damage to the structures, systems, and components (SSCs) in a plant resulting in underestimating the overall risk. This project proposes to advance the multi-hazard PRA of nuclear facilities to more adequately evaluate concurrent hazards and contribute to an increased safety of nuclear plants. A framework for multi-hazard PRA will be developed by identifying concurrent hazard events (both internal and external) and event sequences that include interdependencies through the response of SSCs. An example application of the multi-hazard PRA framework will be demonstrated by considering a generic pressurized water reactor (PWR) subjected to seismic and internal flooding hazards. Computational models for the response of components will be developed to generated multi-hazard fragility surfaces under seismic and flooding loads. A PRA model consisting of event and fault trees will also be developed to quantify the multi-hazard risk profile and compare it with the independent hazard risk profile. Overall, by advancing the multi-hazard PRA of nuclear facilities, this project enhances nuclear safety and reduces costs by mitigating unforeseen consequences caused by correlations between concurrent hazards.

97 - MATHEMATICS AND COMPUTING↗

First-of-a-Kind Risk-Informed Digital Twin for Operational Decision Making

A digital twin (DT) is a digital model or a collection of models of a physical entity. DTs in the nuclear arena can be used from plant design through decommissioning. Decisions are typically a priori or made offline. Risk-informed decision making is identifying what can go wrong, its frequency, and the consequences of its failure. Ideally risk-informed decision making reflects the current state of the plant and provides a decision in real time. Traditionally, probabilistic risk assessments (PRAs) evaluate the failures of safety systems, the risk of core damage, and the offsite dose as the consequence. However, this DT evaluates the decisions on the control side rather than the protection side. It uses the same risk methods to probabilistically inform the decision-making process but in a different way. Rather than evaluating the risk of core damage, this DT evaluates the likelihood of avoiding a trip set point while maintaining plant safety. Performance-based assessments are identified via its probabilistic evaluation of operational alternatives based on system status. Because the purpose of the control system is to maintain system variables within prescribed operating ranges, upsets or challenges that can exceed a trip set point resulting in a plant transient and a challenge to plant mitigating systems based on actual plant conditions, are evaluated to safely maintain the plant within the operating ranges. The probabilistic portion of the model is autonomously and automatically adjusted, and the metric of interest (i.e. likelihood of avoiding a trip set point) is recalculated. The digital representation of the physical system (i.e. the DT) performs a deterministic performance–based assessment of the probabilistically identified alternatives identified to validate the probabilistic assessment. A decision-making algorithm selects the appropriate option based on the probabilistic and deterministic assessments and transmits a control signal to a component(s) to initiate a corrective action or informs an operator of its decision.

digital twin↗

Cost- and Risk-Based Seismic Design Optimization of Nuclear Power Plant Safety Systems

Seismic analysis, design, and qualification of systems, structures, and components (SSCs) is a significant contributor to the capital cost of a nuclear power plant. To reduce capital costs of advanced nuclear power plants and make commercial nuclear energy more competitive, innovations are needed in their structural design and construction, and not just in the reactor core and associated systems. Seismic isolation has been identified as an important cost-cutting technology that enables standardization of equipment across various sites. This paper develops and demonstrates a cost- and risk-based seismic design optimization of a representative safety system in a nuclear power plant with the dual goals of minimizing overnight capital cost and meeting safety goals. The design optimization can also include component seismic isolation, in which case, the optimized design includes a set of equipment that needs to be seismically isolated to minimize capital cost. The open-source codes MASTODON and Dakota are used for seismic probabilistic risk assessment and design optimization, respectively. A generic nuclear facility with a safety system comprising SSCs that are common to nuclear power plants is considered for the demonstration of the design optimization and is assumed to be located at the Idaho National Laboratory site. Generic costs and seismic design cost functions are assumed for the SSCs of the safety system. The sum of the costs of the SSCs is minimized in the optimization process, while the risk of failure of the safety system is provided as a constraint. Furthermore, results show that the optimization process reduces capital costs significantly while automatically prioritizing the safety of SSCs that contribute most to the risk of the safety system.

42 ENGINEERING↗

Limitations of traditional tools for beyond design basis external hazard PRA

Probabilistic risk assessment (PRA) is being used increasingly by the nuclear industry for safety during normal operations as well as for the protection against external hazards. Computation of total risk in an external hazard PRA is dependent on hazard assessment, fragility assessment, and systems analysis. A systems analysis for propagation of component fragilities is conducted using event and fault trees. The event and fault trees for an actual power plant can be fairly large in size, which imposes computational challenges. Hence, certain assumptions are employed for computational efficiency. These assumptions typically represent the conditions imposed during the design basis (DB) scenario. The traditional PRA tools based on these assumptions are also widely applied to perform risk assessment in the context of beyond design basis (BDB) scenarios. However, some of these assumptions may not be valid for certain BDB scenarios. In addition, the probability of dependent failures also increases in BDB scenarios due to common cause failures (CCF) which usually results from design modifications, human errors, etc. In this manuscript, a simple and a relatively more complex illustrative examples are used to show the limitation of these assumptions in the numerical quantification of risk for the case of BDB conditions. Case studies with CCF events across multiple fault trees are also presented to illustrate the effect of these assumptions when traditional approach is used in BDB risk assessment. It is shown that the assumptions are valid for the case of DB conditions but may lead to excessively conservative risk estimates in the case of BDB conditions. Finally, a Bayesian network based top-down algorithm is proposed as an alternative tool for accurate numerical quantification of total risk in systems analysis.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Impact, a Tool Suite for Crew Health and Performance System Trade Analyses and Decision Support - Status of Development

Mission planners, systems engineers, and clinicians that support crew health and performance face very difficult choices on upcoming exploration missions. Given that there will be a heavily constrained mass and volume allocation for a medical system on these missions, what medical capability should be manifested to minimize both medical risk and mission risk? Given that not all promising research and technology proposals can be funded, how can proposals be prioritized so that those funded research investments produce the maximum benefit in reducing overall medical risk? The Informing Mission Planning via Analysis of Complex Tradespaces (IMPACT) project seeks to answer these kinds of questions and others to support upcoming exploration missions. IMPACT enables risk-informed and evidence-based trade space analysis for future space vehicles, missions, and systems. This presentation will discuss the long-term HRP and ExMC vision for the larger ecosystem of tools, which include an updated medical database (consisting of an Evidence Library for medical conditions and a medical item database (MedID) for medical resources), dynamic Probabilistic Risk Assessment (PRA) capabilities, System Modeling Language (SysML) models, and contextual data visualizations of output data. IMPACT is the result of a multi-center collaborative effort. The trade space analyses performed by IMPACT can directly inform mission, vehicle, and habitat development by quantifying medical risk, given a design reference mission, crew attributes and a set of medical capabilities. This presentation will update the audience on the development status of the tool suite, its constituent parts and the plans for when it will deploy as an operational product, currently scheduled for the end of FY22. Recent development successes on the IMPACT project include the ability to cluster medical resources into medical capabilities and mutually-dependent bundles, the ability to perform trade analyses on different medical sets, different DRMs, and different crew complements, and the ability to specify mission segments as periods of time assigned to one or more members of the crew during which unique mission events occur (e.g., extravehicular activities, surface operations, gravity well adaptations, etc.). IMPACT is gearing up for its verification and validation phase to compile the data package necessary for a successful Transition to Operations (TtO), per the guidance in NPR 8900.1B .

IMPACT↗

Dynamic Simulation Probabalistic Risk Assessment Model for an Enceladus Sample Return Mission

Enceladus, a moon of Saturn, has geyser-like jets that spray plumes of material into orbit. These jets could enable a free-flying spacecraft to collect samples and return them to Earth for study to determine if they contain the building blocks of life. The Office of Planetary Protection at NASA requires containment of any unsterilized samples and prohibits destructive impact of the spacecraft upon return to Earth, with a sample release probability of less than 1 in 1,000,000 as a recommended goal. This paper describes a probabilistic risk assessment model that uses dynamic simulation techniques to capture the physics-based, time- and state-dependent interactions between the sample return system and the environment, which drive the risk of sample release. The dynamic approach uses a Monte Carlo-style simulation to integrate the many phases and sources of risk for a sample return mission. The model is used to assess the achievability of the planetary protection reliability goal. This is accomplished by performing sensitivity studies assessing the impact of modeling assumptions to identify where uncertainties drive the risk. These results, in turn, are used to examine the feasibility of meeting key design and performance parameters that are needed to achieve the reliability goal for a given architecture with existing technologies.

Dynamic Simulation↗

Development of Dry Cask Risk Tools

The Nuclear Regulatory Commission (NRC) has repeatedly expressed a desire to increase the use of risk in its decision-making. The Probabilistic Risk Assessment (PRA) Policy Statement published in 1995 formalized the Commission’s commitment to risk-informed regulation through the expanded use of PRA. While a great deal of work has been done to incorporate risk insights into the regulatory framework for at-power nuclear reactors. Far less progress has been made to risk inform the dry-casks and nuclear waste transportation areas of the nuclear fuel cycle. INL was tasked with incorporating the information from the two completed dry cask PRAs as well as any additional available information into a tool that helps the NRC use those insights to identify levels of risk at various stages in the nuclear waste cycle. The first task was to address the License Amendment Request (LAR) Process for Dry Cask storage, the second task is for the incorporate transportation into the tool, and the third and final task will be incorporate any additional regulatory applications for dry cask storage. This report covers the first task of the tool and will eventually incorporate the remaining two tasks may be completed in the future and built off the model described here. Task 1 specifically asked to incorporate the risk insights into the process for determining and prioritizing review of license amendment changes related to storage applications by outlining a resource allocation strategy and defining recommendations of for the depth and breadth of the LAR review. It was requested that the tool be similar in design to the SDP notebooks/worksheets and contain quantitative, qualitative, or semi-quantitative approaches to assessing the risk of the change. The final tool that was selected by INL to be developed was a flowchart and associated rationale document that allows the reviewer to quickly assess potential LAR changes and their associated risks as well as the rationale behind the risk categorization. This risk categorization will lead to specific actionable recommendations to expect from a change of that specific category. This allows for a more consistent review process as well as improving the overall efficiency of the review itself.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

Risk Management of NASA Projects

Various NASA Langley Research Center and other center projects were attempted for analysis to obtain historical data comparing pre-phase A study and the final outcome for each project. This attempt, however, was abandoned once it became clear that very little documentation was available. Next, extensive literature search was conducted on the role of risk and reliability concepts in project management. Probabilistic risk assessment (PRA) techniques are being used with increasing regularity both in and outside of NASA. The value and the usage of PRA techniques were reviewed for large projects. It was found that both civilian and military branches of the space industry have traditionally refrained from using PRA, which was developed and expanded by nuclear industry. Although much has changed with the end of the cold war and the Challenger disaster, it was found that ingrained anti-PRA culture is hard to stop. Examples of skepticism against the use of risk management and assessment techniques were found both in the literature and in conversations with some technical staff. Program and project managers need to be convinced that the applicability and use of risk management and risk assessment techniques is much broader than just in the traditional safety-related areas of application. The time has come to begin to uniformly apply these techniques. The whole idea of risk-based system can maximize the 'return on investment' that the public demands. Also, it would be very useful if all project documents of NASA Langley Research Center, pre-phase A through final report, are carefully stored in a central repository preferably in electronic format.

Sarper, Hueseyin↗

Shuttle Risk Progression by Flight

Understanding the early mission risk and progression of risk as a vehicle gains insights through flight is important: . a) To the Shuttle Program to understand the impact of re-designs and operational changes on risk. . b) To new programs to understand reliability growth and first flight risk. . Estimation of Shuttle Risk Progression by flight: . a) Uses Shuttle Probabilistic Risk Assessment (SPRA) and current knowledge to calculate early vehicle risk. . b) Shows impact of major Shuttle upgrades. . c) Can be used to understand first flight risk for new programs.

Hamlin, Teri↗

Quantifying the Sensitivity of Condition Incidence Parameters in the Evidence Library

One approach to quantifying spaceflight risk at NASA makes use event driven probabilistic techniques. The Medical Extensible Dynamic Probabilistic Risk Assessment Tool (MEDPRAT) is such a tool that estimates medical risk metrics via simulation and enables optimization of medical resources subject to mission constraints [1]. Previous analyses have informed medical set composition, exercise countermeasures, and water intake, where each analysis quantifies the risk associated with proposed variations in system design. As future mission profiles extend beyond Low-Earth Orbit (LEO) and lengthen in duration, understanding these risks and contributing factors is critical. MEDPRAT employs Monte Carlo sampling techniques to simulate missions and track the occurrence of medical events. These events follow fault-tree-like progressions through levels of severity and mitigation via medical treatment to many possible outcomes and these are reported throughout the mission. Making this possible, are the medical databases that contain evidence gathered by the Human Research Program (HRP). Quantifying the impact of uncertainty or variability in the input data is an important step in evaluating the credibility of modeling and simulation results. In this work, we investigate the sensitivity of medical risk metrics with respect to the condition incidence parameters within the Evidence Library (EL) [2] as the medical database input for MEDPRAT. The medical conditions, contained in the EL, are equipped with incidence rates that describe the likelihood that the condition will occur. These incidence rates reflect historical spaceflight data or when appropriate, terrestrial data. In this presentation, we will explore how uncertainty in these rates propagate to the medical risk described by MEDPRAT. These results identify the conditions and parameters with the largest contribution to medical risks.

Ian Lim↗

The Meaning of Risk for Safety, Security, and Safeguards in the Design of Advanced Nuclear Reactors

What is the meaning of risk as it applies to the design of advanced reactors in the disciplines of safety, security, and safeguards? How can we find common terminology for the concept of risk and how can we find interfaces between these disciplines? These are important questions that should be explored in order that they may be applied in an integrated manner for the most effective and efficient design approaches. Eliminating or minimizing risks is a key design driver that motivates and informs the development of nuclear reactors. For safety, risk is well understood and applied in Probabilistic Risk Assessments. For security, the risk-based concepts of vulnerability assessments and vital areas are all considered in designing security systems. For safeguards, the concept of risk is not formally defined, as it relates to the design and operation of nuclear reactors. International nuclear safeguards seek to reduce the risk of proliferation in the nuclear fuel cycle and as such the concept of risk does exist. Therefore, the current understanding of the “3S’ approach, which seeks to find the interfaces and conflicts between safety, security, and safeguards requires a thorough understanding of the role that the reduction of risk plays in all three disciplines. The intersection of risk for safety and security is now being developed as there is a strong correlation between reactor design and operations and their vulnerability to sabotage. The intersection of risk for security and safeguards has to date chiefly been focused on the nuclear material control and accounting systems, which are relied on by both the operator (State) and the IAEA. This paper explores the concept of risk in each of the three disciplines, how they interact, potential conflicts and interfaces , how these might be addressed and leveraged, and a notional framework for how this could be achieved.

Kovacic, Donald N↗

Causal CCF Parameter Estimations 2020

This report documents the quantitative results of the causal common-cause failure (CCF) parameter estimations for the failure cause groups “component,” “design,” “environment,” “human,” and “other,” based on CCF data through 2020 in the U.S. Nuclear Regulatory Commission (NRC) CCF database: https://rads.inl.gov/Pages/CCF.aspx. This report utilizes the same data period (2006–2020) and CCF templates as INL/EXT-21-62940, Revision 1, CCF Parameter Estimations, 2020 Update. The 2015 causal CCF prior distributions for the specific failure cause groups (instead of the 2015 generic CCF prior distributions) were used in this report to estimate the associated causal CCF parameters. All the 2015 causal CCF prior distributions and generic CCF prior distributions were developed in INL/EXT-21-43723, Developing Generic Prior Distributions for Common Cause Failure Alpha Factors and Causal Alpha Factors, using CCF data from 1997 to 2015. These quantitative results were developed to support the causal alpha factor model and should be used as appropriate in probabilistic risk assessment (PRA) studies such as the NRC Significance Determination Process for commercial nuclear power plants in the United States.

99 GENERAL AND MISCELLANEOUS↗

MASTODON: An Open-Source Software for Seismic Analysis and Risk Assessment of Critical Infrastructure

Seismic analysis and risk assessment of safety-critical infrastructure like hospitals, nuclear power plants, dams, and facilities handling radioactive materials involve computationally intensive numerical models and coupled multiphysics scenarios. They are also performed in a strict regulatory environment that requires high software quality assurance standards, and in the case of safety-related nuclear facilities, a conformance to the American Society of Mechanical Engineers Nuclear Quality Assurance (NQA-1) standard. This paper introduces the open-source finite-element software, MASTODON (Multi-hazard Analysis of Stochastic Time-Domain Phenomena), which implements state-of-the-art seismic analysis and risk assessment tools in a quality-controlled environment. MASTODON is built on MOOSE (Multi-physics Object-Oriented Simulation Environment), which is a highly parallelizable, NQA-1 conforming, coupled multiphysics, finite-element framework developed at Idaho National Laboratory. MASTODON is capable of fault rupture and source-to-site wave propagation using the domain reduction method, nonlinear site response, and soil-structure interaction analysis, implicit and explicit time integration, automated stochastic simulations, and seismic probabilistic risk assessment. When coupled with other MOOSE applications, MASTODON can also solve strongly and weakly coupled multiphysics problems. This paper presents a summary of the capabilities of MASTODON and some demonstrative examples.

42 ENGINEERING↗