Search NASA⌕ Search

SEARCH · Search NASA

Results for “Procurement”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 217 records · Page 12

Annual ADP planning document

The Category A computer systems at KSC (Al and A2) which perform scientific and business/administrative operations are described. This data division is responsible for scientific requirements supporting Saturn, Atlas/Centaur, Titan/Centaur, Titan III, and Delta vehicles, and includes realtime functions, Apollo-Soyuz Test Project (ASTP), and the Space Shuttle. The work is performed chiefly on the GEL-635 (Al) system located in the Central Instrumentation Facility (CIF). The Al system can perform computations and process data in three modes: (1) real-time critical mode; (2) real-time batch mode; and (3) batch mode. The Division's IBM-360/50 (A2) system, also at the CIF, performs business/administrative data processing such as personnel, procurement, reliability, financial management and payroll, real-time inventory management, GSE accounting, preventive maintenance, and integrated launch vehicle modification status.

Mogilevsky, M.↗

Space shuttle orbiter fracture control plan

The criteria are presented for preventing space shuttle structural failure associated with crack initiation or propagation during fabrication, test, handling, and the operational life of the vehicle. The criteria discussed include: engineering responsibilities, assurance management, production, operation and test, procurement, critical parts selection, design, and structural analysis.

Space Division↗

Design, fabrication, and test of lightweight shell structure

A cylindrical shell skirt structure was subjected to a design and analysis study using a wide variety of structural materials and concepts. The design loading, axial compression, and torsion is representative of that expected on a typical space tug skirt section. Structural concepts evaluated included honeycomb sandwich, truss, isogrid, and skin/stringer/frame. The materials considered included a wide variety of structural metals as well as glass, graphite, and boron-reinforced composites. Honeycomb sandwich with aluminum faceskins, honeycomb sandwich with graphite/epoxy faceskins, and aluminum truss with fiberglass meteoroid protection layers were the designs selected for further evaluation. Procurement of materials required for fabrication is reported and the structural test plan and fabrication drawings are included. Construction of the graphite/epoxy faceskins, chem mill of the aluminum faceskins, chem mill of aluminum truss components, and fabrication of the graphite/epoxy honeycomb sandwich development panel is also reported.

Source record↗

Study of materials for space processing

A handbook is presented of materials feasible for growth in space in future NASA Missions. Major emphasis was placed on a literature survey concerned with promising materials. Equipment for resistivity and hall effect set-up was procured.

Lal, R. B.↗

Flight feeding systems design and evaluation. Supplement 1: Production guides

The requirements for processing, packaging, testing, and shipment of foods selected for use in the Apollo food system are presented. Specific foodstuffs chosen from the following categories are discussed: (1) soups; (2) juices; (3) breads; (4) meat and poultry products; (5) fruits and nuts; (6) desserts; and (7) beverages. Food procurement for the mobile quarantine facility and for Apollo preflight and postflight activities is also discussed.

Source record↗

The NASA Langley building solar project and the supporting Lewis solar technology program

The use of solar energy to heat and cool a new office building that is now under construction is reported. Planned for completion in December 1975, the 53,000 square foot, single story building will utilize 15,000 square feet of various types of solar collectors in a test bed to provide nearly all of the heating demand and over half of the air conditioning demand. Drawing on its space-program-developed skills and resources in heat transfer, materials, and systems studies, NASA-Lewis will provide technology support for the Langley building project. A solar energy technology program underway at Lewis includes solar collector testing in an indoor solar simulator facility and in an outdoor test facility, property measurements of solar panel coatings, and operation of a laboratory-scale solar model system test facility. Based on results obtained in this program, NASA-Lewis will select and procure the solar collectors for the Langley test bed.

Ragsdale, R. G.↗

Some effects of applied stress on early stages of cavitation damage

The phenomenon of cavitation flow damage is discussed. The initial phases of damage and the effect of external stresses on the extent to which damage is incurred are analyzed. Three experimental facilities were used to procure the data required: (1) a water loop with venturi, (2) a mercury loop with venturi, and (3) a vibratory facility (stationary specimen, nonflow system). A description of each system is provided for the clarification of test conditions. Photographs of typical cavitation damage instances are included.

Kemppainen, D. J.↗

Management approach recommendations. Earth Observatory Satellite system definition study (EOS)

Management analyses and tradeoffs were performed to determine the most cost effective management approach for the Earth Observatory Satellite (EOS) Phase C/D. The basic objectives of the management approach are identified. Some of the subjects considered are as follows: (1) contract startup phase, (2) project management control system, (3) configuration management, (4) quality control and reliability engineering requirements, and (5) the parts procurement program.

Source record↗

Integrated utility system design concept

Conceptual design studies are performed to investigate the feasibility of the MIUS concept as an alternate method of providing utility services to communities and/or community facilities having advantages over current practices. Procured and operated is a large scale testbed of the MIUS concept in order to evaluate and test those integrated system technical details that do not lend themselves to analysis. These include materials compatibility, process instrumentation and control, predictability of water and air effluents, techniques of heat recovery, method of thermal distribution, etc.

Hays, E. L.↗

Strapdown cost trend study and forecast

The potential cost advantages offered by advanced strapdown inertial technology in future commercial short-haul aircraft are summarized. The initial procurement cost and six year cost-of-ownership, which includes spares and direct maintenance cost were calculated for kinematic and inertial navigation systems such that traditional and strapdown mechanization costs could be compared. Cost results for the inertial navigation systems showed that initial costs and the cost of ownership for traditional triple redundant gimbaled inertial navigators are three times the cost of the equivalent skewed redundant strapdown inertial navigator. The net cost advantage for the strapdown kinematic system is directly attributable to the reduction in sensor count for strapdown. The strapdown kinematic system has the added advantage of providing a fail-operational inertial navigation capability for no additional cost due to the use of inertial grade sensors and attitude reference computers.

Eberlein, A. J.↗

Long life valve design concepts

Valve concept evaluation, final candidate selection, design, manufacture, and demonstration testing of a pneumatically actuated 10-inch hybrid poppet butterfly shutoff valve are presented. Conclusions and recommendations regarding those valve characteristics and features which would serve to guide in the formulation of future valve procurements are discussed. The pertinent design goals were temperature range of plus 200 to minus 423 F, valve inlet pressure 35 psia, actuation pressure 750 psia, main seal leakage 3 x 0.00001 sccs at 35 psia valve inlet pressure, and a storage and operating life of 10 years. The valve was designed to be compatible with RP-1, propane, LH2, LO2, He, and N2.

Jones, J. R.↗

SEASAT study documentation

The proposed spacecraft consists of a bus module, containing all subsystems required for support of the sensors, and a payload module containing all of the sensor equipment. The two modules are bolted together to form the spacecraft, and electrical interfaces are accomplished via mated connectors at the interface plane. This approach permits independent parallel assembly and test operations on each module up until mating for final spacecraft integration and test operations. Proposed program schedules recognize the need to refine sensor/spacecraft interfaces prior to proceeding with procurement, reflect the lead times estimated by suppliers for delivery of equipment, reflect a comprehensive test program, and provide flexibility for unanticipated problems. The spacecraft systems are described in detail along with aerospace ground equipment, ground handling equipment, the launch vehicle, imaging radar incorporation, and systems tests.

Source record↗

Camera memory study for large space telescope

Specifications were developed for a memory system to be used as the storage media for camera detectors on the large space telescope (LST) satellite. Detectors with limited internal storage time such as intensities charge coupled devices and silicon intensified targets are implied. The general characteristics are reported of different approaches to the memory system with comparisons made within the guidelines set forth for the LST application. Priority ordering of comparisons is on the basis of cost, reliability, power, and physical characteristics. Specific rationales are provided for the rejection of unsuitable memory technologies. A recommended technology was selected and used to establish specifications for a breadboard memory. Procurement scheduling is provided for delivery of system breadboards in 1976, prototypes in 1978, and space qualified units in 1980.

Hoffman, C. P.↗

Aeronautics in the American Society

The trends in aeronautics and aeronautical education are discussed with respect to the roles of industry, government, and the universities. The importance of the aviation industry to the economy of the country is examined. The impact of reduced enrollment of aeronautical engineering students in the universities on the future of the aeronautical industry is stressed. It is stated that the role of the government should be to sponsor and conduct basic research and advanced technology programs for civil and military aviation, and the specification, development, procurement, and operation of military aircraft. Recommendations are made for approaches which may be taken to influence more qualified students to enter the field of aeronautics.

Fletcher, J. C.↗

Current and future opportunities in aeronautical engineering

Current demand for aeronautical engineers is approximately balanced with supply, with some shortfall in certain specialties. In the near term (5 years), demand will exceed supply of new graduates. A number of factors have brought on the state of imbalance: (1) the cyclic nature of the demand of our defense requirements; (2) drastic changes in DOD aircraft procurement; (3) the emergence of the space age; (4) evolution of social attitudes toward technology with resultant decline in enrollments; and (5) the universities themselves through their influences in the direction of careers selected by engineers. These factors have been counteracted somewhat by increased DOD emphasis on aircraft development programs but more importantly by the favorable growth in civil aircraft requirements.

Brizendine, J. C.↗

Operations analysis (study 2.1). Volume 1: Executive summary

Subjects related to future STS operations concepts were investigated. The majority of effort was directed at assessing the benefits of automated space servicing concepts as related to improvements in payload procurement and shuttle utilization. Another subject was directed at understanding shuttle upper stage software development and recurring costs relative to total program projections. Space serving of automated payloads is addressed by examining the broad spectrum of payload applications with the belief that shared logistic operations will be a major contributor to reduction of future program costs. However, there are certain requirements for support of payload operations, such as availability of the payload, that may place demands upon the shuttle fleet. Because future projections of the NASA Mission Model are only representative of the payload traffic, it is important to recognize that it is the general character of operations that is significant rather than service to any single payload program.

Wolfe, R. R.↗

On development of an inexpensive, lightweight thermal micrometeroid garment for space suits

A lightweight and inexpensive coverlayer developed for space suits is described. Material selection, procurement, and testing, pattern design, and prototype fabrication are discussed. By using the minimum required cross section necessary for earth orbital mission, by utilizing the lightest weight materials possible, and by decreasing the use of weight costly taping a lightweight and economical thermal micrometeroid garment was developed. Simplification of manufacturing techniques and use of off-the-shelf materials helped to reduce costs.

Source record↗

The pioneer projects: Economical exploration of the solar system

The interplanetary Pioneer missions are reviewed in terms of management implications and cost control. The responsibilities, organizational structure, and management practices of the Pioneer Projects are presented. The lines of authority and areas of responsibility of the principal organizational elements supporting the Pioneer missions are identified, and the methods employed for maintaining effective and timely interactions among these elements are indicated. The technical and administrative functions of the various organizational elements of the Pioneer Project Office at Ames Research Center are described in terms of their management responsibilities and interactions with other elements of the Project Office and with external organizations having Pioneer Project responsibilities. The management and control of activities prior to and during the hardware procurement phase are described to indicate the basis for obtaining visibility of the technical progress, utilization of resources, and cost performance of the contractors and other institutions supporting the Pioneer projects.

Spahr, J. R.↗