Search NASASearch

SEARCH · Search NASA

Results for “Project Implementation Plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 217 records · Page 12

Software Development: 3D Animations and Creating User Interfaces for Realistic Simulations

My fall 2015 semester was spent at the Lyndon B. Johnson Space Center working in the Integrated Graphics, Operations, and Analysis Laboratory (IGOAL). My first project was to create a video animation that could tell the story of OMICS. OMICS is a term being used in the field of biomedical science to describe the collective technologies that study biological systems, such as what makes up a cell and how it functions with other systems. In the IGOAL I used a large 23 inch Wacom monitor to draw storyboards, graphics, and line art animations. I used Blender as the 3D environment to sculpt, shape, cut or modify the several scenes and models for the video. A challenge creating this video was to take a term used in biomedical science and describe it in such a way that an 8th grade student can understand. I used a line art style because it would visually set the tone for what we thought was an educational style. In order to get a handle on the perspective and overall feel for the animation without overloading my workspace, I split up the 2 minute animation into several scenes. I used Blender's python scripting capabilities which allowed for the addition of plugins to add or modify tools. The scripts can also directly interact with the objects to create naturalistic patterns or movements. After collecting the rendered scenes, I used Blender's built-in video editing workspace to output the animation. My second project was to write software that emulates a physical system's interface. The interface was to simulate a boat, ROV, and winch system. Simulations are a time and cost effective way to test complicated data and provide training for operators without having to use expensive hardware. We created the virtual controls with 3-D Blender models and 2-D graphics, and then add functionality in C# using the Unity game engine. The Unity engine provides several essential behaviors of a simulator, such as the start and update functions. A framework for Unity, which was developed in the lab, provided a way to place the different widgets on the virtual console dock and have them resize correctly based on the window dimensions.. My task in this project was to create the controls and visualizations for the data coming in from the simulator for the boat portion of the project. I wrote a class for each control window to handle the functionality of that widget. I implemented 11 widgets that make up the ship portion of the simulator. The members of the lab were each masters of their craft and I'm glad I had the opportunity to learn from them. I learned to plan strategically so I could finish this project on time. I allotted time for storyboarding, development, and refinement. In regards to animating I learned to use modifiers like lattice, boolean and build deformers. I also learned how to animate with drivers, how to use the dope sheet, and how to use the graph editor. In coding I learned to limit the chances for bugs by privatizing functions that should be exclusive to their class. I learned how to use the GIT repository to commit, stash and pull the latest build. I learned a bit of everything because I had the chance to see the entire application development process from the artwork, to the implementation.

Gordillo, Orlando Enrique

Software Management Environment (SME) concepts and architecture, revision 1

This document presents the concepts and architecture of the Software Management Environment (SME), developed for the Software Engineering Branch of the Flight Dynamic Division (FDD) of GSFC. The SME provides an integrated set of experience-based management tools that can assist software development managers in managing and planning flight dynamics software development projects. This document provides a high-level description of the types of information required to implement such an automated management tool.

Hendrick, Robert

The NASA Low-Pressure Turbine Flow Physics Program

An overview of the NASA Lewis Low-Pressure Turbine (LPT) Flow Physics Program will be presented. The program was established in response to the aero-engine industry's need for improved LPT efficiency and designs. Modern jet engines have four to seven LPT stages, significantly contributing to engine weight. In addition, there is a significant efficiency degradation between takeoff and cruise conditions, of up to 2 points. Reducing the weight and part count of the LPT and minimizing the efficiency degradation will translate into fuel savings. Accurate prediction methods of LPT flows and losses are needed to accomplish those improvements. The flow in LPT passages is at low Reynolds number, and is dominated by interplay of three basic mechanisms: transition, separation and wake interaction. The affecting parameters traditionally considered are Reynolds number, freestream turbulence intensity, wake frequency parameter, and the pressure distribution (loading). Three-dimensional effects and additional parameters, particularly turbulence characteristics like length scales, spectra and other statistics, as well as wake turbulence intensity and properties also play a role. The flow of most interest is on the suction surface, where large losses are generated as the flow tends to separate at the low Reynolds numbers. Ignoring wakes, a common flow scenario, there is laminar separation, followed by transition on the separation bubble and turbulent reattachment. If transition starts earlier the separation will be eliminated and the boundary layer will be attached leading to the well known bypass transition issues. In contrast, transition over a separation bubble is closer to free shear layer transition and was not investigated as well, particularly in the turbine environment. Unsteadiness created by wakes complicates the picture. Wakes induce earlier transition, and the calmed regions trailing the induced turbulent spots can delay or eliminate separation via shear stress modification. Three-dimensional flow physics and geometry will have strong effects. Altogether a very complex and challenging problem emerges. The objective of the program is to provide improved models and physical understanding of the complex flow, which are essential for accurate prediction of flow and losses in the LPT. Experimental, computational and analytical work as complementing and augmenting approaches are used. The program involves industry, universities and research institutes, and other government laboratories. It is characterized by strong interaction among participants, quick dissemination of results, and responsiveness to industry's needs. The presentation will describe the work elements. Highlighting some activities in progress are experiments on simulated blade suction surface in low-speed wind tunnels, on curved wall, and on a flat-plate, both with pressure gradient. In the area of computation, assessment of existing models is performed using RANS (Reynolds Averaged Navier Stokes) simulations. Laminar flow DNS was completed. Analytical studies of instability and receptivity in attached and separated flows were started. In the near future the program is moving to include wake effects and development of improved modeling. Experimental work in preparation stages are: (1) Addition of wakes to the curved tunnel experiment; (2) Low-speed rotating rig experiment on GE90 engine LPT; and (3) Transonic cascade. In the area of computation, it is expected to move from model assessment towards development of improved models. In addition, a new project of Large Eddy Simulation (LES) of LPT is to begin and will provide numerical data bases. It is planned to implement the emerging improved models in a multistage turbomachinery code and to validate against the GE90 engine LPT.

Ashpis, David E.

General Aviation in Nebraska: Nebraska SATS Project Background Paper No. 1

The Nebraska SATS project is a state-level component of NASA's Small Aircraft Transportation System (SATS). During the next several years the project will examine several different factors affecting SATS implementation in Nebraska. These include economic and taxation issues, public policy issues, airport planning processes, information dissemination strategies, and systemic change factors. This background paper profiles the general aviation system in Nebraska. It is written to provide information about the "context" within which SATS will be pursued. The primary focus is thus on describing and providing background information about the current situation. A secondary focus is on drawing general conclusions about the ability of the current system to incorporate the types of changes implied by SATS. First, some brief information on the U.S. aviation system is provided. The next two sections profile the current general aviation aircraft and pilot base. Nebraska's system of general aviation airports is then described. Within this section of the paper, information is provided on the different types of general aviation airports in Nebraska, airport activity levels and current infrastructure. The fourth major section of the background paper looks at Nebraska's local airport authorities. These special purpose local governments oversee the majority of the general aviation airports in the state. Among the items examined are total expenditures, capital expenditures and planning activities. Next, the paper provides background information on the Nebraska Department of Aeronautics (NDA) and recent Federal funding for general aviation in Nebraska. The final section presents summary conclusions.

Smith, Russell

Adapting a Trusted AI Framework to Space Mission Autonomy

As artificial intelligence (AI) is increasingly pro- posed for new and future capabilities in space missions, the question of how to trust AI-enabled space autonomy has been explored. Recently, a collaboration between The Aerospace Corporation (Aerospace) and NASA’s Jet Propulsion Labora- tory (JPL) investigated how Aerospace’s Trusted AI Frame- work could be applied to two JPL projects that planned on lev- eraging AI for critical autonomous tasks. This combined effort led to many insights in the practical implementation of trusted AI along with considerable updates to the Trusted AI Frame- work that tailored its topic threads to space exploration. This document cohesively summarizes the enhanced framework as tailored to space missions as well as estimation of the level of trust required as a function of mission criticality and key stakeholders. The goal of this work is to provide a set of best practices to inform autonomy researchers, flight engineers, mission and proposal reviewers, and instrument and mission principal investigators (PI’s) to drive AI-based autonomy that maximizes trust and lowers the barriers to mission adoption for both science and engineering applications.

Amini, Rashied

DEVELOPMENT OF AN INTEGRATED SECURITY AND SAFETY MONITORING SYSTEM FOR SPENT NUCLEAR FUEL AND HIGH-LEVEL WASTE TRANSPORTATION

This paper provides an overview of the progress to date, and discussion of the path forward, related to designing, fabricating, and testing an integrated security and safety monitoring system (ISSMS) for railcars used to transport spent nuclear fuel (SNF) and high-level radioactive waste (HLW) in the United States. The system will comply with the US Department of Energy’s (DOE) Order 460.2B “Departmental Materials Transportation Management” and the Association of American Railroads’ (AAR) standard S-2043 “Performance Specification for Trains Used to Carry High-level Radioactive Material” [1] developed specifically for railcars used to transport high-level radioactive material (HLRM). DOE is in the process of developing and testing an ISSMS that will satisfy both DOE requirements and AAR standards. DOE has already developed railcar designs for transportation of HLRM. In 2024, DOE’s Atlas railcar project completed the design, fabrication and testing of three railcar types: transportation cask-carrying, buffer, and security escort, resulting in AAR conditional approval to operate on freight rail networks in North America. DOE decided to combine the required security and safety systems into one system, and this combined system is the subject of the current effort. DOE is developing and proposes to implement the ISSMS for these railcars as part of the build out of the railcar fleet. DOE began planning for development of the ISSMS in February 2020. The project is divided into seven phases starting with conceptual design and continuing through production design, as shown in Figure 1. An earlier version of the system was tested as part of the Atlas railcar consist demonstration test run in 2023. This paper describes the design features and system testing using the Atlas project railcars, and laboratory testing completed to date. The paper will also describe the activities planned to support the DOE project to ship the High Burn-Up Research Cask (HBRC) in 2027.

Schultze, Michael [ORNL] (ORCID:0000000283205671)

Airport Ground Support Equipment Analysis

Ground support equipment (GSE) plays a critical role in providing services to aircraft at arrival and departure gates, ensuring smooth and efficient airport operations. As the airline industry seeks to reduce costs and expand energy options, electric GSE (eGSE) is emerging as a promising solution. This project examines the integration of eGSE into airport operations, addressing key considerations such as vehicle deployment, charging infrastructure, and grid impacts. We developed a flexible, bottom-up modeling framework to evaluate energy demands and infrastructure requirements across more than 300 U.S. airports, providing actionable insights to support electrification planning and implementation. The study focuses on eight major types of GSE with commercially available electric counterparts: aircraft tractors, ground power units, baggage tractors, belt loaders, cargo loaders, catering trucks, lavatory trucks, and water trucks. Project results include annual charging load profiles, total energy consumption, and the charger and fleet requirements for each airport.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI

Financial Analysis of the Smallmouth Bass Flows implemented at the Glen Canyon Dam during Water Year 2024

The Glen Canyon Dam (GCD) is a Colorado River Storage Project (CRSP) power resource that is a component of the Salt Lake City Area Integrated Projects (SLCA/IP). The 2016 record of decision (ROD) for the GCD long-term experimental and management plan (LTEMP) final Environmental Impact Statement (EIS) specifies criteria for GCD monthly water releases, daily and hourly operating limits, and experimental releases. This report presents a financial analysis of the Smallmouth bass (Micropterus dolomieu) (SMB) flows implemented at GCD during Water Year (WY) 2024. These bypass flows were introduced by the U.S. Bureau of Reclamation (USBR) as an emergency response to the growing threat posed by invasive SMB in the Colorado River ecosystem downstream of the dam. SMB are a non-native predatory species that pose a significant threat to native fish populations, including the endangered humpback chub (Gila cypha). The thermal regime below GCD, typically cold due to hypolimnetic releases from Lake Powell, has historically served as a thermal barrier limiting SMB establishment. However, persistently low reservoir levels in recent years have reduced stratification in Lake Powell, allowing warmer water to be released downstream. This has enabled SMB to spawn successfully below the dam, prompting urgent ecological concerns. To mitigate the risk of SMB proliferation, the USBR implemented a series of bypass flows in WY 2024. Drawn from a lower elevation than the penstocks, the bypass structures released cooler water downstream. These short-duration bypass flows aimed to keep temperatures cool enough to prevent SMB from spawning, thereby reducing the ecological threat posed by this invasive species. Although motivated by ecological objectives, these bypass flows came with financial tradeoffs. Releasing water through the bypass structures instead of the turbines at GCD reduced hydropower generation, resulting in a significantly lower financial position for Western Area Power Administration (WAPA), which is responsible for marketing the electricity produced by the GCD Powerplant. This report analyzes the financial impact of the SMB flows implemented from July to November 2024. These experimental releases led to an estimated financial cost of approximately $18.9 million, primarily driven by the substantial volume of water diverted through the bypass structures. This study applies an integrated set of tools to estimate WAPA financial impacts by simulating GCD under two types of cases; namely, (1) a “With Experiment” case that mimics the water operations that actually occurred, including the SMB bypass flows, and (2) a “Without Experiment” case that simulates operations under the assumption that the SMB flows did not occur. Both cases comply with LTEMP hourly and daily operating criteria, and the monthly water release volumes are assumed to be identical under both cases. The Colorado River Storage Project Python-based model (CRiSPPy) model was the main modeling tool used to simulate the dispatch of the GCD hydropower plant and associated water releases from Lake Powell. In the modeling process, the research team used extensive data sets and historical information on SLCA/IP power plant characteristics, hydrologic conditions, and WAPA’s power purchases and sales prices.

13 HYDRO ENERGY

Data Service Provider Cost Estimation Tool

The Data Service Provider Cost Estimation Tool (CET) and Comparables Database (CDB) package provides to NASA s Earth Science Enterprise (ESE) the ability to estimate the full range of year-by-year lifecycle cost estimates for the implementation and operation of data service providers required by ESE to support its science and applications programs. The CET can make estimates dealing with staffing costs, supplies, facility costs, network services, hardware and maintenance, commercial off-the-shelf (COTS) software licenses, software development and sustaining engineering, and the changes in costs that result from changes in workload. Data Service Providers may be stand-alone or embedded in flight projects, field campaigns, research or applications projects, or other activities. The CET and CDB package employs a cost-estimation-by-analogy approach. It is based on a new, general data service provider reference model that provides a framework for construction of a database by describing existing data service providers that are analogs (or comparables) to planned, new ESE data service providers. The CET implements the staff effort and cost estimation algorithms that access the CDB and generates the lifecycle cost estimate for a new data services provider. This data creates a common basis for an ESE proposal evaluator for considering projected data service provider costs.

Fontaine, Kathy

System Validation on the Europa Clipper mission in Early Implementation Phase

NASA’s next flag-ship mission - Europa Clipper, will embark on a journey to Jupiter’s icy moon Europa in 2024 to assess its environment and habitability with a highly capable spacecraft. Post Jupiter-Orbit-Insertion, the spacecraft will be commanded to perform intricate, yet meticulously planned Europa flybys to perform science investigations using a suite of instruments, while withstanding Jupiter’s harsh radiation environment. The success of this mission is dependent on a well-coordinated project and its elements such as the flight hardware and software, the ground support and mission operations teams, procedures and other cross-cutting elements. The Europa Clipper project needs to ensure that these elements are realized at a reasonable confidence level prior to launch and other mission critical events. System Validation test and analysis activities exercise and confirm the integrity of the system of all project elements in the expected flight environment with reasonable stressing conditions. These activities go beyond system design requirements verification and are driven by validation objectives that describe the end-to-end functional and operational capabilities required during nominal and off-nominal flight-like scenarios and critical events. The challenges associated with validating that the Europa Clipper project as a whole can function and perform correctly to meet the intended mission objectives with the as-delivered capabilities of all of its elements are daunting. This paper discusses the systematic methodology established in the early implementation phase of the Europa Clipper project for developing System Validation activities and their validation objectives, and addressing any validation-related challenges on the project. Approaches include decomposition of mission objectives using activity timelines in the Mission Design plan for developing nominal scenarios, use of fault trees for exploring off-nominal cases and system boundaries, and use of Model-based Systems Engineering (MBSE) tools for planning and prioritizing these activities.

Wang, Xu

Spectrum Interference from Commercial devices in 6 & 7/8 GHz

FCC repurposed spectrum in the 6 GHz band allocated to DOE for commercial use of Wi-Fi 6E/7 in 2020.The 2024 National Spectrum Strategy (NSS) implementation plan is now considering 7/8 GHz band as well for co-existence of commercial devices with federal incumbents such as DOE. This poster summarizes INL’s work on a scientific study on the potential harmful interference caused by the commercial devices in real-world scenarios. It includes research in INL for the following projects funded by DOE: 1) DOE-CIO: Spectrum security for advanced wireless technologies; 2) DOE-OE: 7 GHz Spectrum interference study; 3) DOE-CESER: Harmful interference in 6 GHz from commercial Wi-Fi 6E/7 devices on utility links in the energy sector; 4) DOE/NTIA for NSS Implementation plan: Interference study in 7/8 GHz bands identified in the NSS. 5) NSF: Spectrum Innovation Initiative- National Radio Dynamic Zones (SII-NRDZ).

6 GHz

A city invests in its future

Events occurring during the past four years which led to the City of Burbank's decision to acquire an energy source adequate for the city's present and future power requirements are discussed. The community reaction to this unprecedented move is also covered. Burbank's long-range plans for the development of geothermal energy are outlined as well as the challenges which confront a public utility in implementing its projected goals. There are several advantages accurring to the city which in the opinion of the Burbank City Council and the administration justify this venture. The need for a cooperative climate which will enable all electrical utilities to better meet their obligations to the public, which is their prime responsibility before all other considerations, is analyzed.

Baker, J. N.

Future Directions in Rotorcraft Technology at Ames Research Center

Members of the NASA and Army rotorcraft research community at Ames Research Center have developed a vision for 'Vertical Flight 2025'. This paper describes the development of that vision and the steps being taken to implement it. In an effort to realize the vision, consistent with both NASA and Army Aviation strategic plans, two specific technology development projects have been identified: (1) one focused on a personal transportation system capable of vertical flight (the 'Roto-Mobile') and (2) the other on small autonomous rotorcraft (which is inclusive of vehicles which range in grams of gross weight for 'MicroRotorcraft' to thousands of kilograms for rotorcraft uninhabited aerial vehicles). The paper provides a status report on these projects as well as a summary of other revolutionary research thrusts being planned and executed at Ames Research Center.

Aiken, Edwin W.

Portfolio Management

Enterprise Business Information Services Division (EBIS) supports the Laboratory and its functions through the implementation and support of business information systems on behalf of its business community. EBIS Five Strategic Focus Areas: (1) Improve project estimating, planning and delivery capability (2) Improve maintainability and sustainability of EBIS Application Portfolio (3) Leap forward in IT Leadership (4) Comprehensive Talent Management (5) Continuous IT Security Program. Portfolio Management is a strategy in which software applications are managed as assets

Information Technology Applications

X-57 Traction Power and Command Systems Development

This paper describes the final, as-built design of the X‑57 Maxwell aircraft power and command system architecture that implements the electrified propulsion capability. The development of the traction power, command, and avionics power subsystems proceeded as planned at the initial project critical design review, but improvements to the design were identified following the development of detailed operations concepts and integrated subsystem and system testing. The redundant architecture with A‑side and B‑side buses provided a robust framework for a developmental system that would turn out to have a lower technology readiness than had been assumed upon project formulation. As the project team identified reliability or performance gaps in the electrified propulsion powertrain components and their interactions with the other vehicle systems, the traction power, command, and avionics architectures were modified to accommodate the modified systems. Following the publication of the planned design approach at the critical design review milestone [1], the project team developed the flight hardware and software, integrated the systems, and adjusted the design and qualification activities to address gaps in the components, system architecture, and requirements as the gaps were realized. In addition to inherent challenges in development of these subsystems, the integration of this new technology with adjacent critical systems in an aircraft configuration posed additional challenges that drove design considerations across the subsystem development and the other vehicle systems. Integration complications included electromagnetic compatibility, thermal performance, and tolerance of single-point failures internal and external to the powerplant. Development of a qualification program was required for the new motors, inverters, and batteries, and hardware performance during component qualification fed back into the development process and led lessons learned and redesign of key elements.

distributed propulsion

Spatial Link Coverage Projections for the Glenn Research Center Communication Analysis Suite (GCAS)

Space communications are a fundamental part of every NASA mission, and reliable space communications are essential. Precise planning, simulation, and analysis of communications abilities are needed to know exactly what data rates, visibility times, and signal strength can be expected during the real missions. The goal of this work was to take a 3D icosphere, where each face was a point to be evaluated, and display the link performance onto a 2D projection of celestial bodies for links to a node location that could be spatially located at any of the icosahedral faces. 2D projections were produced for a wide range of spatial link grid sizes and compressed into low-size MAT files for ease of access and rapid implementation. The final icosahedral projections can be displayed onto various celestial body maps, using ultra-high-resolution maps for stitching. The results have proven satisfactory and are planned to support various simulation efforts.

communication link analysis

NASA's Planned Fuel Cell Development Activities for 2009 and Beyond in Support of the Exploration Vision

NASA s Energy Storage Project is one of many technology development efforts being implemented as part of the Exploration Technology Development Program (ETDP), under the auspices of the Exploration Systems Mission Directorate (ESMD). The Energy Storage Project is a focused technology development effort to advance lithium-ion battery and proton-exchange-membrane fuel cell (PEMFC) technologies to meet the specific power and energy storage needs of NASA Exploration missions. The fuel cell portion of the project has as its focus the development of both primary fuel cell power systems and regenerative fuel cell (RFC) energy storage systems, and is led by the NASA Glenn Research Center (GRC) in partnership with the Johnson Space Center (JSC), the Jet Propulsion Laboratory (JPL), the Kennedy Space Center (KSC), academia, and industrial partners. The development goals are to improve stack electrical performance, reduce system mass and parasitic power requirements, and increase system life and reliability.

Hoberecht, Mark A.

The ISIS project: Fault-tolerance in large distributed systems

The semi-annual status report covers activities of the ISIS project during the second half of 1989. The project had several independent objectives: (1) At the level of the ISIS Toolkit, ISIS release V2.0 was completed, containing bypass communication protocols. Performance of the system is greatly enhanced by this change, but the initial software release is limited in some respects. (2) The Meta project focused on the definition of the Lomita programming language for specifying rules that monitor sensors for conditions of interest and triggering appropriate reactions. This design was completed, and implementation of Lomita is underway on the Meta 2.0 platform. (3) The Deceit file system effort completed a prototype. It is planned to make Deceit available for use in two hospital information systems. (4) A long-haul communication subsystem project was completed and can be used as part of ISIS. This effort resulted in tools for linking ISIS systems on different LANs together over long-haul communications lines. (5) Magic Lantern, a graphical tool for building application monitoring and control interfaces, is included as part of the general ISIS releases.

Birman, Kenneth P.