Search NASA⌕ Search

SEARCH · Search NASA

Results for “Project Plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 217 records · Page 12

Voyager: Perils of advanced planning, 1960 - 1967

Contract proposals; phased project planning; budgetary problems; Saturn 1 B-Centaur versus Saturn V; mission guidelines and management assignments; and the origins of the Voyager project are discussed.

Source record↗

Definition of optical systems payloads

The various phases in the formulation of a major NASA project include the inception of the project, planning of the concept, and the project definition. A baseline configuration is established during the planning stage, which serves as a basis for engineering trade studies. Basic technological problems should be recognized early, and a technological verification plan prepared before development of a project begins. A progressive series of iterations is required during the definition phase, illustrating the complex interdependence of existing subsystems. A systems error budget should be established to assess the overall systems performance, identify key performance drivers, and guide performance trades and iterations around these drivers, thus decreasing final systems requirements. Unnecessary interfaces should be avoided, and reasonable design and cost margins maintained. Certain aspects of the definition of the Advanced X-ray Astrophysics Facility are used as an example.

Downey, J. A., III↗

Mixed Integer Linear Programming in Planning

This project, Activity Planning with Resources for the Exploration of Space (APRES), uses a mixed-integer linear program (MILP) to solve planning problems. This work enables APRES to interpret a model file and output a solution with improved human readability. A plan model is optimized using a MILP solver and the best solution is taken. Once a plan is generated, it is parsed allowing it to retain only desired information and modified for swift human readability.

Christina Erwin↗

Small planetary mission plan: Report to Congress

This document outlines NASA's small planetary projects plan within the context of overall agency planning. In particular, this plan is consistent with Vision 21: The NASA Strategic Plan, and the Office of Space Science and Applications (OSSA) Strategic Plan. Small planetary projects address focused scientific objectives using a limited number of mature instruments, and are designed to require little or no new technology development. Small missions can be implemented by university and industry partnerships in coordination with a NASA Center to use the unique services the agency provides. The timeframe for small missions is consistent with academic degree programs, which makes them an excellent training ground for graduate students and post-doctoral candidates. Because small missions can be conducted relatively quickly and inexpensively, they provide greater opportunity for increased access to space. In addition, small missions contribute to sustaining a vital scientific community by increasing the available opportunities for direct investigator involvement from just a few projects in a career to many.

Source record↗

International Training to Promote Successful Environmental Remediation Projects - 18636

The International Atomic Energy Agency (IAEA) supports the efforts of its Member States to manage their nuclear and radiological liabilities, including radioactive waste management, decommissioning of facilities, and remediation of contaminated sites. As part of a project addressing Constraints in Decommissioning and Environmental Remediation (the CIDER Project), the IAEA is developing initiatives to further support capacity development specifically to promote implementation of safe, appropriate, and cost-effective environmental remediation (ER) projects. The IAEA sponsors numerous initiatives to provide its Member States training on important topics related to ER. It has become clear in recent years, however, that the existing training should be augmented with more in-depth training to provide for the development of the critical expertise needed to address significant ER challenges. ER projects typically are very complex, requiring the integration of numerous scientific and engineering disciplines, along with effective project planning and management. There are many examples of ER projects where considerable work has been completed, qualified technical staff are available, and adequate funding has been obtained, yet actual progress towards a final solution has been limited. In such cases, it appears that a key barrier is the lack of capacity to develop strategies, make fully informed decisions, plan for and manage activities, and implement successful ER actions. In light of the above, the IAEA has placed a priority on capacity development across the broad spectrum of ER project implementation. Efforts are underway to develop a new training program to develop capacity at the institutional and individual levels to equip course graduates to effectively integrate all areas of expertise in the planning and execution of ER projects. The target audience includes decision-makers; project managers, planners, and implementers; and academics. The core capabilities to be developed via this program include knowledge and skills related to: (1) radiation issues and radionuclide behavior; (2) health and safety protection principles and requirements; (3) identification, evaluation, and selection of ER technologies and approaches; (4) ongoing, constructive dialogue with stakeholders; (5) project planning, management, and communication; (6) cost estimation and funding development; and (7) implementation of appropriate site monitoring activities. The IAEA is collaborating with multiple organizations to develop and implement this training program, to leverage existing training programs and materials, and to coordinate on the development of sustainable training solutions. This paper will present the status of this initiative and work accomplished thus far. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Preliminary Assessment of the Hanford Tank Waste Feed Acceptance and Product Qualification Programs

The U.S. Department of Energy Office of Environmental Management (EM) is engaging the national laboratories to provide the scientific and technological rigor to support EM program and project planning, technology development and deployment, project execution, and assessment of program outcomes. As an early demonstration of this new responsibility, Savannah River National Laboratory (SRNL) and Pacific Northwest National Laboratory (PNNL) have been chartered to implement a science and technology program addressing Hanford Tank waste feed acceptance and product qualification. As a first step, the laboratories examined the technical risks and uncertainties associated with the planned waste feed acceptance and qualification testing for Hanford tank wastes. Science and technology gaps were identified for work associated with 1) feed criteria development with emphasis on identifying the feed properties and the process requirements, 2) the Tank Waste Treatment and Immobilization Plant (WTP) process qualification program, and 3) the WTP HLW glass product qualification program. Opportunities for streamlining the accetpance and qualification programs were also considered in the gap assessment. Technical approaches to address the science and technology gaps and/or implement the opportunities were identified. These approaches will be further refined and developed as strong integrated teams of researchers from national laboratories, contractors, industry, and academia are brought together to provide the best science and technology solutions. Pursuing the identified approaches will have immediate and long-term benefits to DOE in reducing risks and uncertainties associated with tank waste removal and preparation, transfers from the tank farm to the WTP, processing within the WTP Pretreatment Facility, and in producing qualified HLW glass products. Additionally, implementation of the identified opportunities provides the potential for long-term cost savings given the anticipated facility life of WTP.

HLW glass product qualification↗

Technology Development Roadmaps - a Systematic Approach to Maturing Needed Technologies

Abstract. Planning and decision making represent important challenges for all projects. This paper presents the steps needed to assess technical readiness and determine the path forward to mature the technologies required for the Next Generation Nuclear Plant. A Technology Readiness Assessment is used to evaluate the required systems, subsystems, and components (SSC) comprising the desired plant architecture and assess the SSCs against established Technology Readiness Levels (TRLs). A validated TRL baseline is then established for the proposed physical design. Technology Development Roadmaps are generated to define the path forward and focus project research and development and engineering tasks on advancing the technologies to increasing levels of maturity. Tasks include modeling, testing, bench-scale demonstrations, pilot-scale demonstrations, and fully integrated prototype demonstrations. The roadmaps identify precise project objectives and requirements; create a consensus vision of project needs; provide a structured, defensible, decision-based project plan; and, minimize project costs and schedules.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

High Burnup Dry Storage Cask Research and Development Project, Final Test Plan

EPRI is leading a project team to develop and implement the first five years of a Test Plan to collect data from a SNF dry storage system containing high burnup fuel.12 The Test Plan defined in this document outlines the data to be collected, and the storage system design, procedures, and licensing necessary to implement the Test Plan.13 The main goals of the proposed test are to provide confirmatory data14 for models, future SNF dry storage cask design, and to support license renewals and new licenses for ISFSIs. To provide data that is most relevant to high burnup fuel in dry storage, the design of the test storage system must mimic real conditions that high burnup SNF experiences during all stages of dry storage: loading, cask drying, inert gas backfilling, and transfer to the ISFSI for multi-year storage.15 Along with other optional modeling, SETs, and SSTs, the data collected in this Test Plan can be used to evaluate the integrity of dry storage systems and the high burnup fuel contained therein over many decades. It should be noted that the Test Plan described in this document discusses essential activities that go beyond the first five years of Test Plan implementation.16 The first five years of the Test Plan include activities up through loading the cask, initiating the data collection, and beginning the long-term storage period at the ISFSI. The Test Plan encompasses the overall project that includes activities that may not be completed until 15 or more years from now, including continued data collection, shipment of the Research Project Cask to a Fuel Examination Facility, opening the cask at the Fuel Examination Facility, and examining the high burnup fuel after the initial storage period.

high burnup, dry storage cask, final test plan, fu↗

Phase 1 Final status survey plan for the West Valley demonstration project.

This plan provides the technical basis and associated protocols to support Phase 1 final status survey (FSS) data collection and interpretation as part of the West Valley Demonstration Project Phase 1 Decommissioning Plan process. This plan is consistent with the Multi-Agency Radiation Survey and Site Investigation Manual (MARSSIM). The Phase 1 Decommissioning Plan provides the relevant derived concentration guideline levels (DCGLs) for the Phase 1 radionuclides of interest. This plan includes protocols that will be applied to the deep excavations planned for Waste Management Area (WMA) 1 and WMA 2, for surface soils outside the WMA 1 and WMA 2 excavations that do not have contamination impacts at depths greater than one meter, and for areas that are used for Phase 1 contaminated soil lay-down purposes. All excavated and lay-down areas will be classified as MARSSIM Class 1 areas. Surface soils that have not been excavated, are not expected to exceed DCGLs, and do not have contamination impacts at depths greater than one meter will be divided into either Class 1 or Class 2 areas depending on the expected potential for surface soil contamination in those areas. The plan uses gamma scans combined with biased soil samples to address DCGLemc concerns. The plan uses systematic soil sampling combined with area factors to address DCGLw and DCGLemc concerns. The Sign test will be used to statistically evaluate DCGLw compliance. If the results from the characterization sampling and analysis plan (CSAP) data collection indicate that background may be a significant issue for Sign test implementation, the Wilcoxon rank sum (WRS) test will be used instead to demonstrate DCGLw compliance. A reference area will be selected on the basis of CSAP data results if the WRS test becomes a necessity. The WMA 1 excavation footprint includes approximately 476 foundation pilings that will be trimmed and left in place. Piling-specific systematic and biased sampling will be conducted to address concerns that these pilings may have served as preferential flow pathways into the underlying Lavery till. Phase 1 FSS data collection results will be summarized, presented, and interpreted in one or more FSS reports.

54 ENVIRONMENTAL SCIENCES↗

A screening model for predicting injection well pressure buildup and plume extent in CO 2 geologic storage projects

We present a new screening model for predicting injection well pressure buildup and CO 2 plume migration for CO 2 geologic sequestration projects. The model requires only limited information and is quite accurate when compared to detailed simulation results. Such models can assist project developers during the early days of project planning (e.g., for 45Q related projects), and also help regulators perform simple checks against detailed numerical models. The screening model consists of two correlations: one for injectivity index in terms of the slope of the CO 2 fractional flow curve, and the second for total storage efficiency within the footprint of plume as a function of gravity number and slope of the CO 2 fractional flow curve. Using these two correlations, as well as a knowledge of some basic reservoir characteristics and estimates of fluid properties from standard correlations, the injection-well pressure buildup and CO 2 plume extent in the formation can be readily estimated. Finally, the new correlations show a good match with the results of the underlying simulations, and also provide good agreement with independent calculations for two example problems.

42 ENGINEERING↗

Westinghouse waste simulation and optimization software tool

Applications for dynamic simulation can be found in virtually all areas of process engineering. The tangible benefits of using dynamic simulation can be seen in tighter design, smoother start-ups and optimized operation. Thus, proper implementation of dynamic simulation can deliver substantial benefits. These benefits are typically derived from improved process understanding. Simulation gives confidence in evidence based decisions and enables users to try out lots of 'what if' scenarios until one is sure that a decision is the right one. In radioactive waste treatment tasks different kinds of waste with different volumes and properties have to be treated, e.g. from NPP operation or D and D activities. Finding a commercially and technically optimized waste treatment concept is a time consuming and difficult task. The Westinghouse Waste Simulation and Optimization Software Tool will enable the user to quickly generate reliable simulation models of various process applications based on equipment modules. These modules can be built with ease and be integrated into the simulation model. This capability ensures that this tool is applicable to typical waste treatment tasks. The identified waste streams and the selected treatment methods are the basis of the simulation and optimization software. After implementing suitable equipment data into the model, process requirements and waste treatment data are fed into the simulation to finally generate primary simulation results. A sensitivity analysis of automated optimization features of the software generates the lowest possible lifecycle cost for the simulated waste stream. In combination with proven waste management equipments and integrated waste management solutions, this tool provides reliable qualitative results that lead to an effective planning and minimizes the total project planning risk of any waste management activity. It is thus the ideal tool for designing a waste treatment facility in an optimum manner, taking account of the detailed waste stream and specific requirements. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Preliminary Assessment of the Low-Temperature Waste Form Technology Coupled with Technetium Removal

The U.S. Department of Energy Office of Environmental Management (EM) is engaging the national laboratories to provide the scientific and technological rigor to support EM program and project planning, technology development and deployment, project execution, and assessment of program outcomes. As an early demonstration of this new responsibility, Pacific Northwest National Laboratory (PNNL) and Savannah River National Laboratory (SRNL) have been chartered to implement a science and technology program addressing low-temperature waste forms for immobilization of DOE aqueous waste streams, including technetium removal as an implementing technology. As a first step, the laboratories examined the technical risks and uncertainties associated with the Cast Stone waste immobilization projects at Hanford. Science and technology needs were identified for work associated with 1) conducting performance assessments and risk assessments of waste form and disposal system performance, and 2) technetium chemistry in tank wastes and separations of technetium from waste processing streams. Technical approaches to address the science and technology needs were identified and an initial sequencing priority was suggested. The following table summarizes the most significant science and technology needs and associated approaches to address those needs. These approaches and priorities will be further refined and developed as strong integrated teams of researchers from national laboratories, contractors, industry, and academia are brought together to provide the best science and technology solutions. Implementation of a science and technology program that addresses these needs by pursuing the identified approaches will have immediate benefits to DOE in reducing risks and uncertainties associated with near-term decisions regarding supplemental immobilization at Hanford. Longer term, the work has the potential for cost savings and for providing a strong technical foundation for future performance assessments at Hanford and across the DOE complex.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Assessment of the Cast Stone Low-Temperature Waste Form Technology Coupled with Technetium Removal - 14379

The U.S. Department of Energy Office of Environmental Management (EM) is engaging the national laboratories to provide the scientific and technological rigor to support EM program and project planning, technology development and deployment, project execution, and assessment of program outcomes. As an early demonstration of this new responsibility, Pacific Northwest National Laboratory (PNNL) and Savannah River National Laboratory (SRNL) were chartered to implement a science and technology program addressing low-temperature waste forms for immobilization of DOE aqueous waste streams, including technetium removal as an implementing technology. As a first step, the laboratories examined the technical risks and uncertainties associated with the Cast Stone waste immobilization and technetium removal projects at Hanford. Science and technology gaps were identified for work associated with 1) conducting performance assessments and risk assessments of waste form and disposal system performance, and 2) technetium chemistry in tank wastes and separation of technetium from waste processing streams. Technical approaches to address the science and technology gaps were identified and an initial sequencing priority was suggested. A subset of research was initiated in 2013 to begin addressing the most significant science and technology gaps. The purpose of this paper is to report progress made towards closing these gaps and provide notable highlights of results achieved to date.

Cast Stone Low-Temperature Waste Form Technology C↗

Evaluation of Minimum Detectable Activities for Stack Sample Analyses

The Rad-NESHAP program takes samples at major point sources to track how much of select nuclides are being emitted out of the stack. Samples are taken at the site where the radiological operations are being performed. The samples are then sent to analytical laboratories for analysis to determine what nuclides exist in the sample. However, due to the sensitivity of the instruments, false positives are often reported. To reduce the number of false positives, the results reported from the analytical labs are compared to set detection limits. Anything below the set detection limit is considered part of the background while anything above the limit is considered a positive hit. Therefore, the detection limit must be set low enough that any false negatives do not result in a significant dose missed at the end of the year but high enough that there are not enough false positives to skew the annual dose being reported. All detection limits listed in this section for the analyses below were designed to meet the stated equivalent emissions rate and subsequent off-site doses. These minimum detectable activities (MDAs) were developed in the 1990s and documented in the memo cited for each analysis below. These limits and memos are all currently referenced in the Quality Assurance Project Plan (QAPP) for the Rad-NESHAP Compliance Task, which is being updated to a Project Implementation Plan (PIP) concurrently with this document. As part of this update process, the original MDAs defined in this section needed to be verified that they were still conservative and meet the off-site dose levels stated.

2019 MDA↗

Funding Solar Projects at Federal Agencies: Mechanisms and Selection Criteria [Brochure]

Implementing solar energy projects at federal facilities is a process. The project planning phase of the process includes determining goals, building a team, determining site feasibility and selecting the appropriate project funding tool. This fact sheet gives practical guidance to assist decision-makers with understanding and selecting the funding tool that would best address their site goals.

14 SOLAR ENERGY↗

Integrated Energy-Water Planning in the Western and Texas Interconnections

While long-term regional electricity transmission planning has traditionally focused on cost, infrastructure utilization, environmental impact, and reliability, the availability of water is an emerging issue. Toward this growing need, thermoelectric expansion should consider competing demands from other water use sectors balanced with fresh and non-traditional water supplies subject to climate variability. To address this need the Department of Energy's Office of Electricity Delivery and Energy Reliability supported an integrated planning project with funding through the American Reinvestment and Recovery Act (2009). Specifically, an integrated energy-water analysis was performed to support transmission system planners in the Western and Texas Interconnections to explore the potential implications of water availability and cost for long-term transmission planning. The project brought together electric transmission planners (e.g., Western Electricity Coordinating Council (WECC) and the Electric Reliability Council of Texas (ERCOT)) with western water planners (e.g., Western Governors' Association and the Western States Water Council). Efforts were organized into ten specific tasks: (1) project coordination and outreach; (2) thermoelectric water use; (3) non-thermoelectric water use; (4) water availability; (5) water cost; (6) environmental risk; (7) climate variability; (8) energy for water; (9) decision support system interface; and, (10) transmission planning support. Major accomplishments associated with this effort include: For the first time water availability was used to inform generation expansion planning by WECC and ERCOT. For the first time, projections of intensifying drought and its effect on reservoir levels, and thermal effluent discharge permitting were used to inform operational and expansion planning by ERCOT. Water withdrawal and consumption were characterized for each power plant in the WECC and ERCOT service areas/regions. Water use factors were also developed for a range of unit processes that allowed projection of future water demands related to electric generation expansion planning. Working with state water managers current and future water use (withdrawal and consumption) were projected throughout the Western United States at an 8-digit Hydraulic Unit Code (HUC-8) level (over 1200 watersheds). In a similar fashion water availability and cost were mapped across the Western United States. Considered were five different sources of water: unappropriated surface water, unappropriated groundwater, appropriated water, municipal wastewater and brackish groundwater. Water basins (at the HUC-8 level) were mapped across the Western United States with regard to their potential for conflicts between aquatic and riparian species and habitats listed under the Endangered Species Act and water availability for future energy development. Water planners were engaged through the Western States Water Council and thus reflects their membership of the 17 contiguous western states (i.e., Texas up through the Dakotas and West). Power plants at greatest risk to the impacts of drought were identified. The analysis considered the hazards of low flows, insufficient reservoir storage, and elevated water temperatures under intensifying drought conditions projected for the future. The electricity used to provide water-related services was mapped at a county level throughout the Western U.S. Considered was the electricity required for interbasin conveyance, agricultural pumping, drinking water and wastewater services. To communicate our results the project has produced 6 journal articles, 1 book chapter, 11 reports, and 47 presentations at related conferences.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗