Search NASA⌕ Search

SEARCH · Search NASA

Results for “REACTOR MAINTENANCE”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 217 records · Page 12

PGSFR General Arrangement

The Nuclear Island of the PGSFR is constructed upon the seismic isolation structure bearing a common basemat of the Reactor Building and the Auxiliary Building. The Reactor Building is divided into two different functional structures: 1) containment structure comprised of a operating floor, head access area (HAA), annulus area and etc., 2) the other areas accessible to reactor vault area outside of the containment structure via the Auxiliary Building. The arrangement of the Auxiliary Building is composed of symmetric divisional areas where there are two steam generators, heat exchangers of the Decay Heat Removal System (DHRS), facilities of the Intermediate Sodium Purification System (ISPS), the Primary Inert Gas Processing System (PIGPS), a main control room (MCR), electric equipment rooms, and main steam valve houses (MSVH), and etc. The general arrangement of the Reactor Building and the Auxiliary Building of the PGSFR is currently in development. Not only NSSS but supporting systems have not been finalized yet. Moreover, the other facility buildings such as a Turbine Generator Building, a fuel cycle facility, radwaste treatment facilities, and etc. have to be designed with relevant interfaces to the Reactor Building and the Auxiliary Building. We can expect additional modifications to optimize the general arrangement. However, the basic principles such as sodium and non-sodium segregation, convenient accessibility and maintenance, economics of architectural volume would be kept in the design. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Physics: A New Reactor Physics Analysis Toolkit

In the last year INL has internally pursued the development of a new reactor analysis tool: PHISICS. The software is built in a modular approach to simplify the independent development of modules by different teams and future maintenance. Most of the modules at the time of this summary are still under development (time dependent transport driver, depletion, cross section I/O and interpolation, generalized perturbation theory), while the transport solver INSTANT (Intelligent Nodal and Semi-structured Treatment for Advanced Neutron Transport) has already been widely used1, 2, 3, 4. For this reason we will focus mainly on the presentation of the transport solver INSTANT

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Using a Large Language Model for Accurate Technical Language Generation in the Predictive Maintenance of Circulating Water Systems in Nuclear Power Plants

Machine learning (ML) methods for predictive maintenance (PdM) are emerging as effective proactive strategies for diagnosing equipment degradation and enabling effective decision-making. However, explainability and trustworthiness of artificial intelligence are two salient challenges that need to be addressed for wider deployment of these technologies in nuclear power plants (NPPs). Large language models (LLMs) offer a unique approach to tackle these challenges by explaining PdM, work orders, diagnosis results, and ML algorithms to users, who may not be familiar with ML and PdM in general. Moreover, by dynamically retrieving relevant information from technical documents and evaluating factuality of LLM generation, the accuracy and relevance of LLM generations can be improved. This work demonstrates using LLMs to explain the causes and consequences of circulating water system failures based on multiyear NPP work orders. This work tests the capability of multimodal LLM approaches in explaining the differences in the circulating water system from both the Salem and Hope Creek NPPs using both text and image resources. This work also demonstrates the use of multimodal LLMs in describing the diagnosis tab of a predictive maintenance software named VIsualization for PrEdictive maintenance Recommendation (VIPER) to users.

22 - GENERAL STUDIES OF NUCLEAR REACTORS↗

Response time consideration for digitalized safety instrumentation applied to research reactor

A digitalized NMS (Neutron Measurement System) has a better performance than an analogue type in aspects of operating, maintenance and calibration. But some limitations in this system were found in the response time due to the inherent digital filtering time. The response time requirement as a kind of safety requirement is a significant factor that should be met. To satisfy the requirements, two approaches are herein suggested in a practical manner. Modifying conditions of the trip parameters and adjusting the testing methodology were applied to relieve the response time requirement. For a further enhanced and realistic response time, revised requirements for the response time of digitalized NMS are proposed in this paper. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Markets and Economic Requirements for Fission Batteries and Other Nuclear Systems

Fission Batteries (FBs) are nuclear reactors defined by five characteristics which enable large-scale deployment: cost competitive, standardized sizes for economic mass production, easy installation and removal, secure and safe unattended operation with high reliability. FBs are not defined by technology or power level. Technical and market considerations suggest that most FBs will produce 20 to 30 MWt. This proceedings reports on the outcomes of two workshops that were held in January 2021 to better define markets and economic challenges for FBs. Three major markets were identified. The largest market is the industrial and commercial heat market. There are about 4000 industrial users (excluding utilities) that require more than one megawatt of heat. The number of customers versus size of heat demand was determined. In a low-carbon world there is the potential for many additional customers—including expanded biofuels production and district heat. The second market is for non-grid electricity. This includes co-generation plants that produce heat and electricity for a single customer. The third market is the maritime market with ~100,000 ships worldwide. In the United States, natural gas is the low-cost energy option today and will remain so unless constraints or taxes impact its use. If restrictions on greenhouse gas emissions, the FB competition includes natural gas with carbon capture, biofuels, hydrogen and grid electricity. Natural gas with carbon capture is not economically viable on a small scale. Biofuels may be expensive but may be the economically preferred option for locations with small energy demands of a few megawatts. Hydrogen is a potential competitor with many of the characteristics of natural gas. Grid electricity is not a competitive source of heat. For FBs to be economically competitive, the price of delivered heat must be $20-50/MWh ($6-15/million BTU). The economically competitive range for non-grid electricity is estimated at $70-100/MWh. These electricity prices are competitive with the retail prices of electricity in many parts of the United States for the customer. FBs are not expected to be competitive selling wholesale electricity to the grid. To achieve the aforementioned cost targets for heat and electricity markets, FB designers must (1) maximize the power output within the constraints of a FB (e.g., truck transportability, passive decay heat removal), (2) drastically reduce the size of onsite staff, (3) adopt core designs with low fuel costs (enrichment and fabrication), and (4) develop a system design that is efficiently manufactured in factories. The business case depends upon more than being just a replacement for natural gas. The largest incentives for adoption of FBs is where they create new markets and new sources of revenue. An example is the paper and pulp industry that burns biomass wastes to provide heat and electricity to make paper. An external heat source could meet the demand for heat and electricity by the paper process and enable converting waste biomass into liquid biofuels rather than burning to provide heat. Other markets, such as data centers, are driven by special energy requirements such as extreme reliability. Most customers are not in the energy business but need heat and electricity to produce a product—a manufactured good, education, retail sales (shopping malls), marine transport or some other product. As a consequence, there will be large incentives to lease rather than own FBs. Leasing avoids the regulatory challenges that remain with the owner of the FB. Leasing creates large incentives for FP standardization of sizes and transportability to maintain the value of the FB at the end of the lease—similar to the leasing of jet engines and aircraft. The economic constraints combined with technical constraints suggest competitive FBs will likely have outputs exceeding 10 MWt. There appear to be little incentives for very long-lived reactor cores because such machines require much larger inventories of fuel. Maintenance requirements and the options to provide technology updates may favor shorter lifetimes (~5 years). The assessment is that there is the potential for FBs to be economically viable and play a major role in global decarbonization in three markets: heat, non-grid electricity and maritime applications.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Computer-based procedure for field activities: Results from three evaluations at nuclear power plants

Nearly all activities that involve human interaction with the systems of a nuclear power plant are guided by procedures. The paper-based procedures (PBPs) currently used by industry have a demonstrated history of ensuring safety; however, improving procedure use could yield tremendous savings in increased efficiency and safety. One potential way to improve procedure-based activities is through the use of computer-based procedures (CBPs). Computer-based procedures provide the opportunity to incorporate context driven job aids, such as drawings, photos, just-in-time training, etc into CBP system. One obvious advantage of this capability is reducing the time spent tracking down the applicable documentation. Additionally, human performance tools can be integrated in the CBP system in such way that helps the worker focus on the task rather than the tools. Some tools can be completely incorporated into the CBP system, such as pre-job briefs, placekeeping, correct component verification, and peer checks. Other tools can be partly integrated in a fashion that reduces the time and labor required, such as concurrent and independent verification. Another benefit of CBPs compared to PBPs is dynamic procedure presentation. PBPs are static documents which limits the degree to which the information presented can be tailored to the task and conditions when the procedure is executed. The CBP system could be configured to display only the relevant steps based on operating mode, plant status, and the task at hand. A dynamic presentation of the procedure (also known as context-sensitive procedures) will guide the user down the path of relevant steps based on the current conditions. This feature will reduce the user’s workload and inherently reduce the risk of incorrectly marking a step as not applicable and the risk of incorrectly performing a step that should be marked as not applicable. As part of the Department of Energy’s (DOE) Light Water Reactors Sustainability Program, researchers at Idaho National Laboratory (INL) along with partners from the nuclear industry have been investigating the design requirements for computer-based work instructions (including operations procedures, work orders, maintenance procedures, etc.) to increase efficiency, safety, and cost competitiveness of existing light water reactors.

99 GENERAL AND MISCELLANEOUS↗

Long-Term Stewardship at Hanford - 17023

The Hanford Site's Long-Term Stewardship (LTS) Program is responsible for 220 square miles of the Site's River Corridor, which includes 1,527 waste sites, 6 Manhattan Project Era production reactors that have been placed in interim safe storage, and 46 miles of Columbia River shoreline. More than 24,000 cleanup and historic documents have been identified, indexed, and tagged in the LTS records and document libraries. The LTS program, operated by the Mission Support Alliance, LLC (MSA) manages and provides surveillance and maintenance of facilities and institutional controls and all associated monitoring to ensure continued protectiveness of human health and the environment. Since 2010, through collaborative efforts with DOE and its prime contractors, land in 14 geographic areas and six cocooned reactor facilities were transitioned (mid-contract) from the River Corridor Closure Contractor to the LTS program. This accomplishment relied heavily on Site contractors and DOE working together to address challenges. Other stakeholders were informed of LTS progress through the Hanford LTS web site, presentations, and briefings. Hanford's LTS program is responsible for ensuring the protectiveness of cleanup remedies and the management of institutional controls once cleanup objectives have been achieved. LTS accomplishes this by adhering to post-cleanup requirements specified in the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) and the Resource Conservation and Recovery Act of 1976 (RCRA) cleanup decision documents. The LTS program conducted inspection and surveillance and maintenance (S and M) activities of the cocooned 105-F Reactor in October 2014 and the other five reactors in 2015 and 2016. Reactor entries and internal inspections typically are conducted at 5-year intervals to assess the condition of the structures and evaluate potential deterioration of the reactor core, shield walls, and roof. The cocooning process is designed to protect the reactor for 75 years while radioactive decay continues, ultimately making the structures safe for demolition and removal. The results of the recent 5-year inspections allowed DOE to negotiate an extended 10-year inspection cycle, which led to a $5 million avoidance in lifecycle inspection costs. Hanford's LTS program is successfully shifting from a program focused on transitioning land and waste sites to a program focused on data management and S and M activities for those buildings and waste sites within the program. This paper will highlight the accomplishments and collaborative efforts in addressing the challenges faced by Hanford's LTS program. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

NSUF University Research Reactor Fitness Workshop

University research reactors have been a cornerstone of nuclear engineering research and education since the first reactor was deployed at North Carolina State University in the 1950s. The population of university reactors grew to a high of almost 80 in 1970 but has dropped to 25 operating today, also shrinking the community, availability of vendors and the talent pipeline. The nation’s fleet of TRTRs serves as a vital resource for educating the next generation of nuclear engineers and as a flexible testbed for innovative reactor technologies. Typically, the reactors have a very small staff with responsibilities ranging through research and operations, isotope production, regulatory compliance, facility maintenance, and university teaching obligations. Knowledge transfer and staffing were identified as critical areas in a recent study of US university research reactor fitness. This panel discusses the unique challenges and potential solutions to these issues.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Feasibility of Recycling Discharged Microreactor Heavy Metal in Light Water and Sodium-Cooled Fast Reactors: A Neutronics Analysis

Nuclear microreactors (MRs) offer unique advantages, such as rapid deployment, potability, low maintenance requirements, and operational flexibility. Their compact size makes them a promising solution for decentralized power generation, particularly in remote areas, military bases, and disaster-stricken regions. However, MRs face challenges, including unutilized fissile material at the end of life, economic inefficiency, increased heavy metal (HM) waste complicating disposal, and the accumulation of plutonium (Pu) with high 239 Pu concentrations raising proliferation risks. Here, this study investigated the neutronics feasibility of a novel three-stage fuel cycle where discharged HM from MRs is recycled and burned in light water reactors and sodium-cooled fast reactors. This approach converts discharged HM into valuable fuel, enhancing the efficiency of MR deployments while improving the safeguardability of their final waste products. Neutronics analysis demonstrated that the safety characteristics of reactor designs in each stage were minimally impacted by the proposed cycle. For two representative MR designs, a fast-spectrum MR with solid pellet fuel and a thermal-spectrum MR with TRISO (TRi-structural-ISOtropic) fuel compacts, the proposed fuel cycle reduced the uranium disposal mass flow rate by ~60%, decreased the 235 U enrichment of the discharge fuel to ~1 wt%, eliminated plutonium disposal, and increased the cumulative fuel burnup to ~580 gigawatt-day per metric ton of initial heavy metal (GWd/t-iHM) or 60% fissions per initial metal atom. Despite the significant differences between the two MR designs, the performance and infrastructure requirements of the developed fuel cycles were remarkably similar, indicating its generalizability to a broader class of MRs.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

SAFARI - Secure Automation For Advanced Reactor Innovation (Final Technical Report)

The Secure Automation For Advanced Reactor Innovation (SAFARI) project was a pioneering initiative aimed at fundamentally changing how nuclear power plants are operated and maintained. Recognizing that current nuclear plants often rely on extensive manual procedures and large staffs, leading to higher costs compared to other energy sources like natural gas, SAFARI sought to introduce smart, automated technologies to make nuclear energy more efficient, cost-effective, and safer. This report details the research and development efforts of the SAFARI project, bringing us closer to a future where advanced nuclear reactors can operate more autonomously, adapt flexibly to energy demands, and predict their maintenance needs before issues arise. One of the key achievements of the SAFARI project is its contribution to our understanding of how Artificial Intelligence (AI) and sophisticated computer models, known as Digital Twins, can be effectively integrated with the complex physics of nuclear reactors.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

LWRS Newsletter March 2019 Issue 28

The latest issue of the LWRS Program Newsletter (Issue 28) was recently posted on the LWRS Program website. This issue includes the following articles: • Stakeholder Engagement Review Meeting • Simulating the Effects of Neutron Irradiation on Concrete with the MOSAIC Software • Risk and Cost Analysis of Utilizing FLEX Equipment for Efficient Maintenance in Nuclear Power Plants • Integration of Classical PRA models into Dynamic PRA • Toward a Predictive Model for Cabling Failure: An interdisciplinary, collaborative effort between the University of Minnesota–Duluth and the Materials Research Pathway • Compact Digital Modernization – Enabling Nuclear Power Plant Operations and Maintenance Cost Benefits • Increasing the Value of the U.S. Nuclear Reactor Fleet

42 ENGINEERING↗

Report on Year-4 of Water NSTF Matrix Testing: Facility Maintenance and Accident Testing

Under support from the Department of Energy (DOE) and the Office of Advanced Reactor Technologies (ART), a large-scale test facility has been constructed at Argonne National Laboratory to generate NQA-1 qualified validation data for passive decay heat removal systems in advanced reactors. The Natural convection Shutdown heat removal Test Facility (NSTF) reflects key features of a ½ scale, water-based, Reactor Cavity Cooling System (RCCS) and is intended to study the behavior, bound performance, and ultimately guide design decisions for passive decay heat removal systems for advanced reactors. In addition to the experimental activities detailed in this report, a supportive computational modeling effort is on-going which has been demonstrated to significantly strengthen the experimental program while also improving accuracy of the computer models. Together these create a mutually beneficial relationship integral to meeting the overall program objective of examining the heat removal performance of the RCCS concept. This report serves as a summary of maintenance and experimental activities during the program’s fourth year of water-based operation. A planned six-month maintenance period began in August 2021, during which major inspections, repairs, cleaning, and installation of new instrumentation and data acquisition hardware were conducted. Most significantly, two heaters that faulted during Year-3 were repaired, allowing the facility to resume use of the full heated section area and full range of available electric power. The remainder of the year consisted of eight months of test operations, during which the facility logged 211 hours of active heating across one bake-out (following the maintenance period) and seven matrix tests; five classifieds as Accepted per NQA-1, one as Trending, and one as Failed. Testing began by performing two repeat cases to confirm expected facility response and behavior during both single- and two-phase flow conditions, ensuring no changes were introduced during the maintenance period that might have altered the thermal-hydraulic characteristics of the facility. In continuation of the power parametric series initiated in previous years, a high-power test case was then performed examining heat removal performance at a decay heat load equivalent to 2.4 MWt, full-scale, a level exceeding maximum design targets. Additional testing then introduced various blockage scenarios along the network piping, examining the effects of partial and complete blockages of the flow paths on the system behavior and heat removal performance. A study of static boiling tests directed at understanding the geysering two-phase instability was also conducted. The loop was filled only to the bottom of the tank outlet, creating an open loop configuration that prevents any natural circulation flow from occurring, and the heaters were powered on until the facility reached saturation conditions. Following, a series of quasi-steady-state conditions were introduced by adjusting the inventory level in the adiabatic chimney piping at decreasingly lower elevations above the heated region. A strong correlation of geysering characteristics and loop level was observed, with flow and temperature excursions decreasing in intensity, but increasing in frequency, as the fill were reduced to lower elevations along the chimney piping. Once the level fell very low in the chimney, at points near the top of the heated section, the system reached a stable state of continuous boiling without any occurrence of geysering eruptions. A final significant testing accomplishment this year was successful completion of an “accident scenario” test, whose operating conditions were based on a prototypic decay heat curve provided by Framatome and scaled for the NSTF. This test began by establishing steady-state, single-phase “normal operation” conditions, before simulating an accident trip where the availability of active cooling systems was lost. Loop temperatures gradually increased until reaching saturation and subsequent two-phase boiling flow. Over the course of an extended operational period along the defined decay heat curve, steam boil-off caused gradual but continued depletion of liquid inventory until reaching a critically low level causing flow stagnation and cessation of natural circulation heat removal. At this point, after nearly 72 hours of continuous operation, a cold refill was performed to replenish the system inventory and allow the facility to re-establish closed loop natural circulation flow and return to a safe operational state.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Three Confinement Systems—Spherical Tokamak, Standard Tokamak, and Stellarator: A Comparison of Key Component Cost Elements

Since the 1950s “next-step” fusion devices and power plant studies have been developed for a number of magnetic confinement systems but an open question remains: can a magnetic fusion device be simplified to the point where it will be cost competitive and operate with high availability? Concept designs based on the ARIES advanced tokamak, spherical tokamak (ST), and the quasi-axisymmetric (QAS) stellarator option have progressed in recent years through a series of Princeton Plasma Physics Laboratory (PPPL) studies with an underlying intent to improve the engineering feasibility of each, giving special attention to concepts that simplify the device configuration and improve maintenance features. For the ST option, design details centered on a 3-m Fusion Nuclear Science Facility that evolved to incorporate vertical maintenance, high temperature superconductor magnets, a small inboard duel coolant lead lithium blanket, and a liquid metal divertor. In collaboration with the Korean fusion demonstration reactor (K-DEMO) and CFETR concept study teams the tokamak design has evolved to increase plasma component access within a vertical maintenance approach using enlarged toroidal field coils incorporating a low- and high-field Nb 3 Sn winding pack that provide a peak field of 16 T. A recent PPPL stellarator study focused on simplifying the stellarator winding topology to improve access to in-vessel components; combining coil optimization with winding surfaces that incorporated geometry constraints specified by engineering. This paper centered on a 1000-MW power plant design with a tokamak like vertical maintenance scheme that allows access to remove large internal blanket sectors. Results of three confinement studies (PPPL developed ST, K-DEMO, and QAS stellarator) will be presented to highlight concepts that simplify each device configuration and improved their maintenance features. Furthermore, scaling each option to a common 1000-MW net electric power plant mission allows comparisons to be made of key cost elements such as the size of major core components, sizing of the reactor hall, or external facilities needed to handle and store activated in-vessel components.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Performance Results for Sensor Assignment Problem as Solved on a Multi-Node Cluster

An earlier report described a procedure for optimal sensor set selection and its implementation on a computational cluster. This new and innovative capability was developed to facilitate a reduction in operations staffing levels to improve plant economics. By automating surveillance and maintenance tasks through early detection of degrading sensors and equipment, staff can be more efficiently deployed. The method uses automated reasoning and domain knowledge in the form of the conservation equations to infer from plant measurements the state of equipment health. Inclusion of domain knowledge addresses the problem that exists with pure data-driven methods that there are no rigorous guidelines for determining what constitutes an adequate sensor set. Formalizing the procedure for sensor set selection as we have done results in a more reliable and explainable diagnosis of plant equipment health. Importantly, from the standpoint of the plant owner, personnel are provided with an early and explicit diagnosis of an equipment problem. That in principle automates the process and eliminates having to send personnel into the plant to find the cause as typically occurs when a data-driven method detects an anomaly. In this report we describe first results obtained using a computational cluster to solve the sensor set selection problem as framed above. The case described addresses the problem of equipment health monitoring in the high-pressure (HP) feedwater system of a pressurized light water reactor as seen through the eyes of our collaborating utility partner. Maintenance of this system can amount to millions of dollars per year if equipment health issues go undiagnosed and lead to loss of function. On examining the potential that is inherent in the installed sensor set for diagnosing equipment health degradation, it was found that greater fault resolution capability can be achieved using a sensor set that is 20 percent fewer in number. The take-away is that compared to the installed sensor set there exists a more strategic assignment of sensors that will furnish better health monitoring capability and with fewer sensors. Where the problem defies solution by manual inspection, as is the case here, one can be found by an algorithm. The solution was obtained in four hours using 30 computational cores. The HP feedwater problem as posed above illustrates the added value of approaching the sensor selection problem as one amenable to algorithmic solution. This problem is of interest to advanced reactor designers and to utilities that are setting up remote monitoring and diagnostic centers.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

The Fast-spectrum Transmutation Experimental Facility FASTEF: Main design achievements (part 2: Reactor building design and plant layout) within the FP7-CDT collaborative project of the European Commission

MYRRHA (Multi-purpose hybrid Research Reactor for High-tech Applications) is the flexible experimental accelerator-driven system (ADS) in development at SCK-CEN in replacement of its material testing reactor BR2. SCK-CEN in association with 17 European partners from industry, research centres and academia, responded to the FP7 (Seventh Framework Programme) call from the European Commission to establish a Central Design Team (CDT) for the design of a Fast Spectrum Transmutation Experimental Facility (FASTEF) able to demonstrate efficient transmutation and associated technology through a system working in subcritical and/or critical mode. The project has started on April 01, 2009 for a period of three years. In this paper, we present the latest concept of the reactor building and the plant layout. The FASTEF facility has evolved quite a lot since the intermediate reporting done at the ICAPP'10 and ICAPP'11 conferences 1,2. Many iterations have been performed to take into account the safety requirements. The present configuration enables an easy operation and maintenance of the facility, including the possibility to change large components of the reactor. In a companion paper 3, we present the latest configuration of the reactor core and primary system. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Preliminary Failure Modes and Effects Analysis of the US DCLL Test Blanket Module

This report presents the results of a preliminary failure modes and effects analysis (FMEA) of a small tritium-breeding test blanket module design for the International Thermonuclear Experimental Reactor. The FMEA was quantified with “generic” component failure rate data, and the failure events are binned into postulated initiating event families and frequency categories for safety assessment. An appendix to this report contains repair time data to support an occupational radiation exposure assessment for test blanket module maintenance.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Decommissioning of the high flux beam reactor at Brookhaven Lab

The high-flux beam reactor (HFBR) at the Brookhaven National Laboratory was a heavy water cooled and moderated reactor that achieved criticality on Oct. 31, 1965. It operated at a power level of 40 megawatts. An equipment upgrade in 1982 allowed operations at 60 megawatts. After a 1989 reactor shutdown to reanalyze safety impact of a hypothetical loss of coolant accident, the reactor was restarted in 1991 at 30 megawatts. The HFBR was shut down in December 1996 for routine maintenance and refueling. At that time, a leak of tritiated water was identified by routine sampling of groundwater from wells located adjacent to the reactor's spent fuel pool. The reactor remained shut down for almost three years for safety and environmental reviews. In November 1999 the United States Dept. of Energy decided to permanently shut down the HFBR. The decontamination and decommissioning of the HFBR complex, consisting of multiple structures and systems to operate and maintain the reactor, were complete in 2009 after removing and shipping off all the control rod blades. The emptied and cleaned HFBR dome, which still contains the irradiated reactor vessel, is presently under 24/7 surveillance for safety. Detailed dosimetry performed for the HFBR decommissioning during 1996-2009 is described in the paper. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Application and development of technologies for engine-condition-based maintenance of emergency diesel generators

The emergency diesel generator (EDG) of a nuclear power plant has the role of supplying emergency electric power to protect the reactor core system in the event of the loss of offsite power supply. Therefore, EDGs should be subject to periodic surveillance testing to verify their ability to supply specified frequencies and voltages at design power levels within a limited time. To maintain optimal reliability of EDGs, condition monitoring/diagnosis technologies must be developed. Changing from periodic disassemble maintenance to condition-based maintenance (CBM) according to predictions of equipment condition is recommended. In this paper, the development of diagnosis technology for CBM and the application of a diesel engine condition-analysis system are described. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗