Search NASA⌕ Search

SEARCH · Search NASA

Results for “REACTOR PROTECTION SYSTEMS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 217 records · Page 12

Development of Shielding Benchmarks Using the Godiva IV Assembly

The Nuclear Criticality Safety Program (NCSP) is developing a shielding benchmark using the Godiva IV assembly as a source. Its present status is reviewed herein. Even eight decades into the nuclear era, substantial work remains to develop a database of shielding benchmarks to support future nuclear development. A nuclear simulation is only as good as its supporting data, inputs, and validation basis. Uncertainty in these areas is addressed using conservatism, which adds margin and, occasionally, cost. In many shielding situations, high accuracy is not necessary because additional material is not particularly expensive. After all, 1–2 cm of lead often reduces the gamma ray dose substantially. However, in certain areas, conservatism can add unnecessary cost. These areas include mobile shielding applications such as casks, ships, microreactors, and spacecraft, where weight and, thus, margin is expensive. Although these characteristics are side benefits for NCSP shielding benchmark development, the main driver is enabling more reliable placement of criticality accident alarm systems (CAASs) in nuclear material facilities, such as those dedicated to the production of advanced reactor fuels. CAAS placement relies on more than accurate data and code validation. It also relies on sufficiently accurate materials specifications, geometry specifications, and a well-defined, alarm-producing baseline accident. All these things require tacit knowledge and understanding of the problem being evaluated. Benchmarks can help ensure this understanding.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Periodic Material-Based Seismic Base Isolators for Small Modular Reactors

Important structures such as nuclear power plants should experience very little vibrations in order to maintain the safety of the nuclear facilities during seismic events. Protection of these structures by seismic isolators requires the isolators to provide seismic isolation irrespective of the direction of excitations and to develop a stable response without rocking. Conventional seismic isolation systems, however, can only fulfill partial requirements for the seismic protection. This study adopts the principle of periodic materials for seismic isolation. These materials exhibit unique properties of frequency band gaps, where incoming waves with frequencies falling inside the frequency band gaps are forbidden. The new isolation systems, known as periodic foundations, function both as a structural foundation to support the gravitational weight of the superstructure and also as a seismic isolator. The isolation mechanism, hypothetically, can easily fulfill all the requirements for seismic protection of the critical facilities. This study focuses on the design of one-dimensional (1D) and three-dimensional (3D) periodic foundations for seismic isolation of small modular reactor (SMR) buildings. The theoretical study was first conducted to reveal the fundamental behavior of periodic foundations. Then global sensitivity analysis was utilized to study the effect of design parameters on the frequency band gaps. In addition, simple straight-forward design equations based on the sensitivity analysis are proposed for the design of periodic foundations. Utilizing the proposed equations, prototypes of 1D and 3D periodic foundations were designed to isolate an SMR building. Scaled models were fabricated and experimentally tested to validate the hypothesis and design. The periodic foundation structural systems were tested under various input waves, including seismic waves, in the horizontal and vertical directions and the torsional mode. The shake table test results show that the periodic foundations can reduce the acceleration response of the SMR building up to 90% in the horizontal direction and the torsional mode. As much as a 40% response reduction in the vertical direction is also observed. Moreover, the periodic foundation-isolated structure exhibited stable response with negligible rocking on the structure. This study proved the capability of periodic foundations to enhance the seismic safety of critical structures.

42 ENGINEERING↗

Implications for advanced safeguards derived from PR&PP case study results

The proliferation resistance and physical protection (PR and PP) working group produced a case study on the Example Sodium Fast Reactor (ESFR). The ESFR is a hypothetical nuclear energy system consisting of four sodium-cooled fast reactors of medium size collocated with an on-site dry fuel storage facility and a spent fuel reprocessing facility using pyroprocessing technology. This study revealed how safeguards would be applied at such site consisting of integrated multiple fuel cycle facilities and the implications of what safeguards technology and safeguards concepts would need to be adapted and developed to safeguard successfully this Generation IV nuclear energy system concept. The major safeguards concepts driving our safeguards analysis are timeliness goals and material quantity goals. Because the fresh transuranic (TRU) fuel to be produced in the ESFR fuel fabrication facility contains plutonium, the ESFR will be reprocessing, using in the reactor, and storing material on site that will have IAEA defined 'direct-use material' in it with stringent timeliness goals and material quantity goals that drive the safeguards implementation. Specifically, the TRU fresh fuel, pyroprocessing in process material, LWR spent fuel sent to the ESFR, and TRU spent fuel will contain plutonium. This material will need to be verified at interim intervals four times per year because the irradiated direct-use material, as defined previously, has three-month timeliness goals and 8 kg material quantity goals for plutonium. The TRU in-process material is, of course, irradiated direct-use material as defined by the IAEA. Keeping the plutonium and uranium together with TRu products should provide a radiation barrier. this radiation barrier slows down the ability to reprocess the fuel. Furthermore, the reprocessing technique, if it has some intrinsic proliferation resistance, will need major modifications to be able to separate plutonium from the uranium and TRU mixture. The ESFR design should have such features in it if it is seen to have intrinsic proliferation resistance. The technical difficulty in diverting material from the ESFR is at least as strongly impacted by the adversaries overall technical capabilities as it is by the effort required to overcome those barriers intrinsic to the nuclear fuel cycle. The intrinsic proliferation resistance of the ESFR will affect how extrinsic measures in the safeguards approach for the ESFR will provide overall proliferation resistance.

99 GENERAL AND MISCELLANEOUS↗

Fukushima Containment Dose Assessment

Dose calculations for a BWR Mark I containment are conducted to complement source term research on the meltdowns at Fukushima Daiichi. These efforts are a primary component of Phase II of the OECD/NEA's Benchmark Study on the Accident at Fukushima Daiichi Nuclear Power Station (BSAF). Phase II of BSAF aims to evaluate radionuclide source terms to the containment and to the environment, radionuclide transport behavior, and dose rates inside and near the plant. The radionuclide-focused goals of Phase II make use of thermal-hydraulic and severe accident insights from Phase I of BSAF, which concentrated on severe accident thermal-hydraulics, core degradation and fuel relocation, reactor pressure vessel (RPV) lower head failure, and containment response. The details and assumptions involved in the severe accident progression have first-order impacts on radionuclide transport and consequent dose rates. An MCNP6 model is created to support the BSAF Phase II investigations. The MCNP6 input represents a boiling water reactor (BWR) Mark I containment and pertinent surrounding structures such the reactor building. This paper examines photon dose rates inside and adjacent to the containment. The spatial distribution and energy spectrum of the source, as well as the overall source magnitude, are informed by MELCOR radionuclide transport calculations in conjunction with ORIGEN-S decay calculations. Initial mesh and ring tally calculations are discussed in relation to plant data. Despite the simplified geometry model and uncertainties of the severe accident source, the preliminary calculations yield impressive agreement with the measured data. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Tritium Room Air Monitor Operating Experience Review

Monitoring the breathing air in tritium facility rooms for airborne tritium is a radiological safety requirement and a best practice for personnel safety. Besides audible alarms for room evacuation, these monitors often send signals for process shutdown, ventilation isolation, and cleanup system actuation to mitigate releases and prevent tritium spread to the environment. Therefore, these monitors are important not only to personnel safety but also to public safety and environmental protection. This paper presents an operating experience review of tritium monitor performance on demand during small (1 mCi to 1 Ci) operational releases, and intentional airborne inroom tritium release tests. The tritium tests provide monitor operation data to allow calculation of a statistical estimate for the reliability of monitors annunciating in actual tritium gas airborne release situations. The data show a failure to operate rate of 3.5E-06/monitor-hr with an upper bound of 4.7E-06, a failure to alarm on demand rate of 1.4E-02/demand with an upper bound of 4.4E-02, and a spurious alarm rate of 0.1 to 0.2/monitor-yr.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Multifaceted Considerations for Fission Surface Power Radiation Shielding Design

The purpose of the Fission Surface Power (FSP) nuclear system is to provide energy on the Moon and Mars for supporting their exploration and colonization. The FSP design and deployment can leverage the past research and development work in areas, such as reactor design, but such crucial components as radiation shielding and instrumentation still need material and manufacturing studies, modeling, and testing. The shielding components are needed for the protection of humans, electronics, and sensitive components. They are essential system components, but they are often the heaviest components of the system for which each kilogram matters. Different material combinations and layouts are possible. The studies presented were focused on the evaluation of several options. The initial analysis included their performance assessment, initial temperature distribution evaluation and manufacturability considerations. Several feasible shield design options were identified and discussed in this paper, as well.

Fission Surface Power↗

Remote Dismantling and Packaging of the RPV and Thermal Shield at the Obrigheim NPP - 16073

The Obrigheim Nuclear Power Plant (KWO) is located in the Federal State of Baden- Wuerttemberg in Germany and was operated by the EnKK-KWO. The Nuclear Power Plant - a light water pressurized water reactor with 357 MW of electrical power - was operated from 1968 to 2005. In June 2009 the Energiewerke Nord GmbH (EWN) was charged with the dismantling planning and dismantling of the reactor. According to the German nuclear and radiation protection law, several licenses will be required for the realisation of this task. This also applies to the disposal of the waste produced by dismantling, which must finally be stored in the German final repository for low and medium-radioactive waste (underground repository 'Konrad'). In spring 2010 EWN completed all application documents for the dismantling of the reactor pressure vessel (RPV) and the RPV internals and EnKK-KWO delivered them to the responsible Environmental Ministry of Baden-Wuerttemberg. Since then it has been worked intensively on the design, construction and manufacturing of the facilities for dismantling. With a separate notification of amendment, it was applied for the license to install and commission the facilities for the dismantling of the RPV and the RPV internals at the Environmental Ministry of Baden-Wuerttemberg in October 2010. This notification of amendment was confirmed in summer 2012. In September 2011 the work process and test plan and the technical information about the campaign for the removal of the radioactive waste resulting from the RPV with internals, peripheral components and secondary waste with the aim of final disposal in the Federal Repository 'Konrad' was submitted to the Federal Office for Radiation Protection. The evaluation and assessment of the work process and test plan was concluded in August 2013, when it was audited by TUV Nord EnSys without any further measures and indications. On September 10 the work process and test plan was released by the Federal Office for radiation protection. The dismantling of the RPV internals upper core and lower core structure started in September 2013 in the wet cutting area in room 01.106/306 and were finished in October 2014. In the presentation 'Dismantling of the Obrigheim NPP Reactor and Waste Management' held on the WM Symposia in Phoenix, 2014, an overview about the remote cutting and packaging of the upper and lower core structure was given. In today's presentation the subsequent dismantling activities will be outlined and evaluated. The presentation will start with the short description of the basic frame conditions for the nuclear licensing procedure, important procedural principles, and necessary plant-specific conditions. After the remote cutting and packing of the reactor internals of the upper and lower core structure was completed, the wet cutting area 'reactor room 01.106/306' was cleaned and the reactor room rebuilt into a cutting area for peripheral components. After the peripheral components were dismantled, all preconditions were set to lift the RPV from its mounting position and to arrange it in the upper reactor room 01.306. After these activities were completed, the lifting of the RPV was prepared and the cutting area 'Dismantling of the RPV insulation in the reactor room 01.106/306' was set up. To carry out this task, a strand jack unit with connection block was installed on the bridge of the reactor building crane. The opening created by the dismantling of the pool plate was closed with a flap door. The manipulators used for the wet cutting of the RPV internals were also used for the remote dismantling of the RPV insulation and mounted in the cutting area. The remote facilities were handled from a control centre and/or control stand. The air-technical housing which has already been used for the remote dismantling of the RPV internals was designed for the dismantling of the RPV insulation and was extended for this dismantling scope with appropriate ventilation systems. A special feature is the fixation of the RPV insulation at the RPV corpus. The RPV insulation consists of insulation wool, wire mesh and metal-sheet insulation. This 'Sandwich Construction' is detached with a steel corset at the RPV corpus and partly tightened. The insulation of the RPV bottom dome is tightened at the supporting frame. Due to the activation of the material in the core area and the resulting high ambient dose rate the RPV insulation can only be dismantled remotely. Additionally, as asbestos fibers are expected to be found in the insulation the dismantling has to be performed according to the Technical Rules for hazardous substances. The demolition, restoration or maintenance works have to be performed remotely according to the Technical Rules for hazardous substances when the RPV is located in the cutting area. But in case of dismantling of a power reactor no such experience can be found. Beginning with the explanation of the technical, radiological and substantial boundary conditions this presentation will not only impart knowledge about the dismantling of the RPV insulation but also about the remote controlled packaging of the metal sheet insulation and the manual conditioning of the RPV insulation. Subsequently, reports on the remotely controlled cutting and packaging of the RDB are given. Here is particularly interesting that cutting methods have been used and how the activity determination of the segments was carried out. On the basis of the evaluation of the realisation the subsequent dismantling activities will be lined out. In parallel to the dismantling tasks, the waste package documentation for the final repository was issued, checked and confirmed for the containers loaded with parts of the RDB internals. The most important stages are exemplified in this presentation. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

OAST Space Theme Workshop. Volume 2: Theme summary. 4: Solar system exploration (no. 10). A: Statement of theme: B. 26 April 1976 Presentation. C. Summary. D. Initiative actions (form 5)

Major strategies for exploring the solar system focus on the return of information and the return of matter. Both the planetary exploration facility, and an orbiting automated space station, and the sample return and exploration facility have similar requirements. The single most essential need to enable intensive study of the outer solar system is nuclear propulsion and power capability. New initiatives in 1978 related to the reactor, data and sample acquisition and return, navigation, and environmental protection are examined.

Source record↗

Introduction of Diverse Manual Actuation Design for APR1400

APR1400 is an Advanced Light Water Reactor (ALWR) design with enhanced plant safety and advanced design features. One unit is in commercial operation and 11 are currently under construction, 4 abroad and 7 in Korea. APR1400 adopts full digitalized Man-Machine Interface System (MMIS) to perform the function of control, indication and alarming for safety and non-safety systems APR1400 MMIS is designed to operate the plant from the Main Control Room (MCR) under all anticipated operating conditions including design basis accidents. This advanced MMIS is designed to meet the latest codes, standards and regulatory requirements including the defense-in-depth and diversity requirements, which is intended to mitigate the consequence of a total failure of the digital safety system caused by a software Common Cause Failure (CCF) coupled with anyone of the Design Basis Events. The redundancy of the safety system could be defeated during this CCF condition and the protective function could be rendered inoperable.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

High bias machine learning for antineutrino-based safeguards for small reactors

The statistical methods used for antineutrino detection will need to be improved to effectively monitor the inventory of next-generation nuclear reactors. In this sensitivity study, we evaluate machine learning models compared to previously used statistical approaches to identify diversion scenarios in a simulated Advanced Fast Reactor (AFR)-100. A chi-square goodness-of-fit technique, which individually compares the simulated antineutrino yields to the expected antineutrino yield, resulted in precise but low diversion detection probability. Various support vector machine (SVM) models were applied with diverse training datasets to evaluate the robustness of the method towards unexpected or “unseen” diversion scenarios. Furthermore, our results indicate that while the SVM models significantly improved the detection probability of near-field antineutrino-based safeguards, up to a probability of ~0.04, for the simulated small reactor, the detection system still needs improvements to reach the 0.2 detection limit established by the International Atomic Energy Agency.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

Instrumentation Cables Test Plan

A fire at a nuclear power plant (NPP) has the potential to damage structures, systems, and components important to safety, if not promptly detected and suppressed. At Browns Ferry Nuclear Power Plant on March 22, 1975, a fire in the reactor building damaged electrical power and control systems. Damage to instrumentation cables impeded the function of both normal and standby reactor coolant systems, and degraded the operators’ plant monitoring capability. This event resulted in additional NRC involvement with utilities to ensure that NPPs are properly protected from fire as intended by the NRC principle design criteria (i.e., general design criteria 3, Fire Protection). Current guidance and methods for both deterministic and performance based approaches typically make conservative (bounding) assumptions regarding the fire-induced failure modes of instrumentation cables and those failure modes effects on component and system response. Numerous fire testing programs have been conducted in the past to evaluate the failure modes and effects of electrical cables exposed to severe thermal conditions. However, that testing has primarily focused on control circuits with only a limited number of tests performed on instrumentation circuits. In 2001, the Nuclear Energy Institute (NEI) and the Electric Power Research Institute (EPRI) conducted a series of cable fire tests designed to address specific aspects of the cable failure and circuit fault issues of concern1. The NRC was invited to observe and participate in that program. The NRC sponsored Sandia National Laboratories to support this participation, whom among other things, added a 4-20 mA instrumentation circuit and instrumentation cabling to six of the tests. Although limited, one insight drawn from those instrumentation circuits tests was that the failure characteristics appeared to depend on the cable insulation material. The results showed that for thermoset insulated cables, the instrument reading tended to drift and fluctuate, while the thermoplastic insulated cables, the instrument reading fell off-scale rapidly. From an operational point of view, the latter failure characteristics would likely be identified as a failure from the effects of fire, while the former may result in inaccurate readings.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Preliminary Assessment of the Dose near the Shield Plug at Fukushima Daiichi Unit 2 (1F2)

Since the accident at Fukushima Daiichi on March 11, 2011, caused by the Great East Japan earthquake and subsequent tsunami, there have been significant coordinated international efforts to better understand the accident progression, phenomenology and consequences. Of particular note is the Organisation for Economic Cooperation and Development Nuclear Energy Agency's (OECD/NEA) Benchmark Study of the Accident at the Fukushima Daiichi Nuclear Power Plant (BSAF Project). Phase 1 of this ongoing effort focused on modeling the modeling of the three beyond design basis accidents at the site for the first six days of the accident. Phase 2 of the effort is a forensic effort and focuses on extending the accident simulations out to 21 days and assessing the consequences of the accident. This effort aims to inform the government of Japan and The Tokyo Electric Power Company (TEPCO)'s ongoing effort to decommission and decontaminate the site. One of the key questions posed by TEPCO in its efforts to decommission the site is the location of released radionuclides (RNs) that result in anomalously high dose rate measurements on and near the shield plugs of all three units. In this summary, we provide insight into the possible location of the source resulting in this high dose. Previous MELCOR accident progression analyses have predicted leakage of the containment through the drywell head, directly below the shield plug. Using this plausible accident scenario, MELCOR is able to predict the radionuclide source to the region below the shield plug and possible deposition amounts within the gaps of the shield plug. Using this predicted source and the transport and shielding code MCNP6 the dose in and around the shield plug of 1F2 was assessed. Unit 2 was chosen since the refueling bay is still intact and therefore a simpler initial problem compared to Units 1 and 3. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Regulation of the Shutdown Defueling and Decommissioning Reactors in the United Kingdom - 16576

Nuclear policy, including for decommissioning, in the United Kingdom is set by the UK Government. The Nuclear Decommissioning Authority, NDA, is responsible for managing the clean-up of the UK's nuclear legacy which includes the first generation of Magnox power stations. Magnox Ltd (MXL), owned by Cavendish Fluor Partnership, is the licensee and the management and operations contractor responsible for ten Magnox reactor sites and two restoration sites in the UK, working for the sites' owner, NDA. The work of the company is diverse covering electricity generation at Wylfa (until December 2015), defueling, and preparation for an interim end state, known as Care and Maintenance (C and M) which will precede the final site clearance. The C and M phase is expected to last over 75 years during which the sites are maintained in a passively safe and secure state while radiation levels are left to decay naturally. Preparations for this phase include removing fuel from the reactors and storage ponds; retrieving intermediate level waste from current stores and treating it or converting it to forms suitable for long-term storage or disposal and making sure of the integrity of critical safety systems of the de-fuelled reactors. The Decommissioning, Fuel and Waste programme within the Office for Nuclear Regulation, ONR, regulates nuclear safety in the 12 Magnox nuclear licensed sites. ONR works with the environmental regulators who are responsible for environmental protection on nuclear sites. The focus of this paper is the regulation of nuclear safety by ONR across the Magnox sites and the interactions with nuclear security and the environmental aspects required to achieve effective, proportionate and efficient regulation of these sites in the UK. ONR's strategy for regulating the Magnox defueling and decommissioning sites is focused on enabling the licensee to complete the initial stages of decommissioning and reduce the nuclear and radioactive hazards on its sites. To this effect, ONR's revised inspection guidance is centred on inspecting the (remaining) important systems for safety identified in the safety cases. Other interventions focus on engaging with the licensee on safety significant decommissioning projects to gain evidence of the licensee's readiness prior to and during these activities rather than formal assessment of the associated safety cases. In light of reduced hazards and risks across the de-fueled and decommissioning Magnox reactors, ONR's revised regulatory expectation regarding evolution of emergency arrangements during decommissioning is based on key transition points that follow electricity generation. Implementation of these revised strategies as well as organisational restructuring within the team responsible for regulation of the Magnox fleet has resulted in improved efficiency and consistency in regulatory approach whilst securing the required safety standards in managing decommissioning activities. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A Dynamic Risk Framework for the Optimization of Physical Security Posture of Nuclear Power Plants

This paper describes an ongoing work within the Light Water Reactor Sustainability pathway at Idaho National Laboratory (INL) to optimize security and cost of nuclear power plants. It introduces the dynamic risk assessment tool developed at INL, Event Modeling Risk Assessment using Linked Diagrams (EMRALD). EMRALD was leveraged to optimize the security posture of a nuclear power plant by integrating force-on-force (FOF) simulations and operator mitigation actions including the dynamic and flexible coping strategies (FLEX). To illustrate the methodology, four attack scenarios were modeled in a commercially available FOF simulation tool using a hypothetical nuclear power plant facility. The simulation results provide valuable insights into possible attack outcomes, as well as the probabilistic risk of core damage event given these outcomes. Safety mitigation procedures were modeled in EMRALD dependent on the attack outcomes by considering human operator uncertainties. The results demonstrate that the number of armed responders can be optimized, while still maintaining the same protection level as the initial security posture. The proposed modeling and simulation framework of integrating FLEX equipment with FOF models enables the nuclear power plants to credit FLEX portable equipment in the plant security posture, resulting in an efficient and optimized physical security system.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

A Dynamic Risk Framework for the Physical Security of Nuclear Power Plants

This paper describes ongoing work within the Light Water Reactor Sustainability pathway at Idaho National Laboratory (INL) to optimize the security and cost of nuclear power plants. It introduces the dynamic risk assessment tool developed at INL, Event Modeling Risk Assessment using Linked Diagrams (EMRALD). EMRALD is leveraged to optimize the security posture of a nuclear power plant by integrating force-on-force (FOF) simulations and operator mitigation actions, including dynamic and flexible coping strategies (FLEX). To illustrate the methodology, four attack scenarios are modeled in a commercially available FOF simulation tool using a hypothetical nuclear power plant facility. The simulation results provide valuable insights into possible attack outcomes, as well as the probabilistic risk of a core damage event given these outcomes. Safety mitigation procedures are modeled in EMRALD dependent on the attack outcomes by considering human operator uncertainties. The results demonstrate that the number of armed responders can be optimized, while still maintaining the same protection level as the initial security posture. The proposed modeling and simulation framework of integrating FLEX equipment with FOF models enables the nuclear power plants to credit FLEX portable equipment in the plant security posture, resulting in an efficient and optimized physical security system.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗