Search NASA⌕ Search

SEARCH · Search NASA

Results for “RISK ASSESSMENT”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 217 records · Page 12

Expansion of Hazards and Probabilistic Risk Assessments of a Light-Water Reactor Coupled with Electrolysis Hydrogen Production Plants

This report builds upon the body of work sponsored by the Department of Energy (DOE) Light-Water Reactor Sustainability (LWRS) Flexible Power Operation and Generation (FPOG) program that presented generic probabilistic risk assessments (PRAs) for the addition of a heat extraction system (HES) to light-water reactors to support the co-location of a high temperature hydrogen electrolysis facility (HTEF). Probabilistic and deterministic hazards assessments and risk analyses are leveraged throughout this report. Several improvements and new analyses are included in this report. First, higher amounts of detail in the specifications of the generic HTEFs are used to produce scaled results for a 100, 500, and 1000 MW nominal hydrogen production facility. An additional hazard assessment of 1000 kg of hydrogen storage is performed. The facility hazards and footprint are assessed to determine the safe distance required for placement near the nuclear power plant (NPP). Second, specific designs for corresponding HESs for the different levels of support required by the HTEFs are analyzed in the PRA model. Third, a hazards analysis of the specified HTEFs leads not only to effects of the quantified risk assessment for the NPP, but also qualitative hazards assessment for the community. Finally, a seismic analysis and a high winds analysis have each been added to the PRA. The results investigate the applicability of the potential licensing approaches which do not require a full United States (U.S.) Nuclear Regulatory Commission (NRC) licensing review. The PRAs are generic and include listed assumptions. The HTEF design built for this project has further eliminated many conservative assumptions from the prior PRAs in this series. The PRA results indicate that the 10 CFR 50.59 licensing approach is justified due to the minimal increase in initiating event frequencies for all design basis accidents, with none exceeding 7.7%. The PRA results for core damage frequency and large early release frequency support the use of NRC Regulation Guide 1.174 as further risk information that supports a change without a full licensing amendment review. The hazard analyses and PRA confirm the need for engineered blast barriers of storage tanks and the common production header leaving the HTEF. The hazards analyses and PRA also confirm with high confidence that using the assumptions of design in this report that the safety case for licensing an HES addition and an HTEF sited with its unprotected high-pressure stage components 187 meters from the NPP’s transmission towers (the most fragile structure, system, and component) is strong.

08 HYDROGEN↗

Simulation Assisted Risk Assessment: Blast Overpressure Modeling

A probabilistic risk assessment (PRA) approach has been developed and applied to the risk analysis of capsule abort during ascent. The PRA is used to assist in the identification of modeling and simulation applications that can significantly impact the understanding of crew risk during this potentially dangerous maneuver. The PRA approach is also being used to identify the appropriate level of fidelity for the modeling of those critical failure modes. The Apollo launch escape system (LES) was chosen as a test problem for application of this approach. Failure modes that have been modeled and/or simulated to date include explosive overpressure-based failure, explosive fragment-based failure, land landing failures (range limits exceeded either near launch or Mode III trajectories ending on the African continent), capsule-booster re-contact during separation, and failure due to plume-induced instability. These failure modes have been investigated using analysis tools in a variety of technical disciplines at various levels of fidelity. The current paper focuses on the development and application of a blast overpressure model for the prediction of structural failure due to overpressure, including the application of high-fidelity analysis to predict near-field and headwinds effects.

Lawrence, Scott L.↗

Development and Demonstration of a Risk Assessment Approach for Approval of a Transportation Package of a Transportable Nuclear Power Plant for Domestic Highway Shipment

The U.S. Department of Defense (DoD) Strategic Capabilities Office (SCO) has tasked PNNL to address the regulatory challenges associated with confirming the safe transport of Transportable Nuclear Power Plants (TNPPs) containing irradiated nuclear fuel. A previous report—Proposed Risk-Informed Regulatory Framework for Approval of Microreactor Transportation Packages (PNNL-31867)—determined that the expected radioactive inventory in the irradiated fuel of a TNPP would likely require shipment in an NRC-approved Type B package (or spent nuclear fuel cask) but that a TNPP “package” is unlikely to meet the entire suite of NRC requirements set forth in Part 71 of Title 10 of the Code of Federal Regulations (CFR) for a Type B package. It was therefore concluded that shipment of this initial TNPP transportation package, as well as possibly others, under existing regulations would likely require NRC approval using the 10 CFR 71.12 (“Specific exemptions”) process that relies on risk-informed decision making supported by quantitative risk assessment (i.e., Probabilistic Risk Assessment).

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

HyRAM+ (Hydrogen Plus Other Alternative Fuels Risk Assessment Models) v.6.1

SAND2025-11565O HyRAM+ (Hydrogen Plus Other Alternative Fuels Risk Assessment Models) is a tool for conducting quantitative risk assessment (QRA) in transportation systems. HyRAM+ contains validated, simplified release behavior models, engineering models, and generic data relevant to hydrogen installations. HyRAM+’s platform integrates models and data to conduct QRA on user-defined hydrogen or other alternative fuel systems. The software will enable the international safety research community to add validated models to the HyRAM+ platform for use in QRAs. HyRAM (hydrogen-only) versions 1.0 to 3.1 were developed by Sandia for the Department of Energy (DOE) Hydrogen and Fuel Cell Technologies Office. The following agencies contributed to the development of HyRAM+ version 4.0 regarding the addition of methane (natural gas) and propane models: the DOE Vehicle Technologies Office and the Department of Transportation Pipeline and Hazardous Material Safety Administration. Sandia National Laboratories is a multimission laboratory managed and operated by National Technology & Engineering Solutions of Sandia, LLC, a wholly owned subsidiary of Honeywell International Inc., for the U.S. Department of Energy’s National Nuclear Security Administration under contract DE-NA0003525.

Groth, Katrina [Sandia National Lab. (SNL-NM), Alb↗

Qualitative Decision and Risk Assessment Approaches for Managing Nuclear Materials - 19061

Qualitative approaches to performing decision analyses and risk assessments have recently been developed at ORNL with the goal of providing simple tools to help manage complex projects that have a variety of drivers, constraints, or both. Many of the DoE's nuclear materials management projects involve making 'keep-or-dispose' decisions for nuclear materials and then developing projects to manage or dispose of the materials. ORNL uses decision analysis tools to identify and rank options for accomplishing nuclear materials management projects, and risk assessment tools to evaluate the preferred option(s) to identify risks and prioritize mitigation actions to reduce risks during implementation. This paper focuses on application of the decision analysis and risk-based planning tool(s) to guide management of projects during the planning and start-up phases when only preliminary project information is likely to be available. Such an analysis seeks to reduce risks, lower costs, and improve chances of project success. Examples showing the use of the tools in nuclear waste management scenarios are provided. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Concentrations, Sources, and Risk Assessment of Organohalogen Compounds in Soils from Kiambu to Mombasa, Kenya

Concentrations, sources, and risk assessment of 16 organochlorinated pesticides (OCPs), seven polychlorinated biphenyls (PCBs) and seven polybrominated diphenyl ethers (PBDEs) were determined in soils from Kiambu to Mombasa in Kenya. The total concentrations of OCPs ranged between 7.62 and 76.09 ng/g, dominated by HCHs. Source identification displayed recent inputs and historical use of DDTs and lindane. The total concentrations of PCBs ranged from 9.90 to 20.8 ng/g with an average of 14.40 ng/g dominated by penta-PCBs from old transformers leakages. The total PBDEs concentrations were in the range of 1.89–38.36 ng/g and with a mean of 11.38 ng/g. Electric and electronic equipment waste and PBDE containing materials as sources of PBDE. The risk assessment of OCPs and PCBs showed low potential human health risk from OCPs, while PCBs indicated to pose a high risk.

54 ENVIRONMENTAL SCIENCES↗

Rapid Response Risk Assessment in New Project Development

A capability for rapidly performing quantitative risk assessments has been developed by JSC Safety and Mission Assurance for use on project design trade studies early in the project life cycle, i.e., concept development through preliminary design phases. A risk assessment tool set has been developed consisting of interactive and integrated software modules that allow a user/project designer to assess the impact of alternative design or programmatic options on the probability of mission success or other risk metrics. The risk and design trade space includes interactive options for selecting parameters and/or metrics for numerous design characteristics including component reliability characteristics, functional redundancy levels, item or system technology readiness levels, and mission event characteristics. This capability is intended for use on any project or system development with a defined mission, and an example project will used for demonstration and descriptive purposes, e.g., landing a robot on the moon. The effects of various alternative design considerations and their impact of these decisions on mission success (or failure) can be measured in real time on a personal computer. This capability provides a high degree of efficiency for quickly providing information in NASA s evolving risk-based decision environment

Graber, Robert R.↗

Framework for Shared Drinking Water Risk Assessment.

Central to protecting our nation's critical infrastructure is the development of methodologies for prioritizing action and supporting resource allocation decisions associated with risk-reduction initiatives. Toward this need a web-based risk assessment framework that promotes the anonymous sharing of results among water utilities is demonstrated. Anonymous sharing of results offers a number of potential advantages such as assistance in recognizing and correcting bias, identification of 'unknown, unknowns', self-assessment and benchmarking for the local utility, treatment of shared assets and/or threats across multiple utilities, and prioritization of actions beyond the scale of a single utility. The constructed framework was demonstrated for three water utilities. Demonstration results were then compared to risk assessment results developed using a different risk assessment application by a different set of analysts.

99 GENERAL AND MISCELLANEOUS↗

Threatened southern African soils: A need for appropriate ecotoxicological risk assessment

In southern Africa arable soils are limited due to low rainfall and are threatened by anthropogenic activities like agriculture and mining making it susceptible to degradation. The aim of this study is to review the existing information available with regards to soil contamination and its possible threats towards biodiversity and quality of southern African soils. Some of the issues being addressed in this paper include the focus areas of ecotoxicological research in southern African countries, levels of contaminants in soils, the impacts of climate on soil animals and the representativity of standardised test species. In order to address this, we report on a literature search, which was done to determine the main focus areas of soil ecotoxicological research, highlighting strengths and research needs in comparison to approaches elsewhere in the world. Further, to address if the risk assessment approaches of Europe and the USA are valid for southern African environmental conditions; this in the light of differences in temperature, rainfall and fauna. It is concluded that risk assessment procedures for Europe and the USA were based on non-southern African conditions making it necessary to rethink risk assessment studies; although limited, in southern Africa. We recommend future research that has to be undertaken to address these issues. This research should include investigating species sensitivities in responses to contamination and including insects likes ants and termites in ecological risk assessment studies.

54 ENVIRONMENTAL SCIENCES↗

US EPA superfund radiation risk assessment update: new, revised, and upcoming tools - 15350

The U.S. EPA Superfund remedial program is finishing up a significant number of revisions to its guidance for the risk assessment process at radioactively contaminated Superfund sites. The six Preliminary Remediation Goal (PRG) and Dose Compliance Concentration (DCC) internet based calculators for risk and dose assessment at Superfund sites are being revised to reflect better science, revisions to existing exposure scenarios and new scenarios, and changes to match up more closely with the EPA chemical regional screening level calculator. A comprehensive set of revisions to the PRG calculator will be finished in November 2014. A revised version of the 1999 guidance document that provides an overview for the Superfund risk assessment process at radioactively contaminated sites, 'Radiation Risk Assessment At CERCLA Sites: Q and A' was issued on June 13, 2014 reflects Superfund recommended guidance and other technical documents issued over the past 15 years. Also on June 13, 2014 EPA issued a new tool-kit comprised of 22 fact sheets that was developed to help the general public understand more about EPA's risk assessment process used at radioactively contaminated Superfund sites. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A Single Conjunction Risk Assessment Metric: the F-Value

The Conjunction Assessment Team at NASA Goddard Space Flight Center provides conjunction risk assessment for many NASA robotic missions. These risk assessments are based on several figures of merit, such as miss distance, probability of collision, and orbit determination solution quality. However, these individual metrics do not singly capture the overall risk associated with a conjunction, making it difficult for someone without this complete understanding to take action, such as an avoidance maneuver. The goal of this analysis is to introduce a single risk index metric that can easily convey the level of risk without all of the technical details. The proposed index is called the conjunction "F-value." This paper presents the concept of the F-value and the tuning of the metric for use in routine Conjunction Assessment operations.

Frigm, Ryan Clayton↗

Development of Simplified Probabilistic Risk Assessment Model for Seismic Initiating Event

ABSTRACT This paper discusses a simplified method to evaluate seismic risk using a methodology built on dividing the seismic intensity spectrum into multiple discrete bins. The seismic probabilistic risk assessment model uses Nuclear Regulatory Commission’s (NRC’s) full power Standardized Plant Analysis Risk (SPAR) model as the starting point for development. The seismic PRA models are integrated with their respective internal events at-power SPAR model. This is accomplished by combining the modified system fault trees from the full power SPAR model with seismic event tree logic. The peak ground acceleration is divided into five bins. The g-value for each bin is estimated using the geometric mean of lower and upper values of that particular bin and the associated frequency for each bin is estimated by taking the difference between upper and lower values of that bin. The component’s fragilities are calculated for each bin using the plant data, if available, or generic values of median peak ground acceleration and uncertainty values for the components. For human reliability analysis (HRA), the SPAR HRA (SPAR-H) method is used which requires the analysts to complete relatively straight forward worksheets that include the performance shaping factors (PSFs). The results are then used to estimate human error probabilities (HEPs) of interest. This work is expected to improve the NRC’s ability to include seismic hazards in risk assessments for operational events in support of the reactor oversight program (e.g., significance determination process).

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Early-stage quantitative risk assessment to support development of codes and standard requirements for indoor fueling of hydrogen vehicles

Sandia National Laboratories is developing the technical basis for assessing the risk of hydro gen infrastructure for use in the development of relevant codes and standards. The development of codes and standards is an important step in ensuring the safe design and operation of the hydrogen fuel cell infrastructure. Codes and standards organizations are increasingly using risk-informed processes to establish code requirements.

Groth, Katrina M.↗

V-INT: Automated Vulnerability Intelligence and Risk Assessment

The project team, including the University of Arkansas (UA) as the lead, the University of Arkansas at Little Rock (UALR), Network Perception (NP), and Bastazo, has successfully researched, developed, and demonstrated the V-INT toolset, and also integrated it into the commercial products of NP (i.e., NP-View) and Bastazo (i.e., Spartan). The end product is a cybersecurity software tool for energy utilities that can automatically assess the risks of software vulnerabilities in an organization’s assets considering the organization’s firewall policies. It allows security operators to identify the small portion of vulnerabilities that poses true threats to their system (i.e., those that are not protected by firewall policies) and prioritize the mitigation of these vulnerabilities to minimize risks. It also allows security operators to identify the vulnerability-induced attack paths under their organization’s firewall policy, providing effective decision supports for mitigating potential attacks.

97 MATHEMATICS AND COMPUTING↗

Design definition study of a NASA/Navy lift/cruise fan technology V/STOL airplane: Risk assessment addendum to the final report

An assessment of risk, in terms of delivery delays, cost overrun, and performance achievement, associated with the V/STOL technology airplane is presented. The risk is discussed in terms of weight, structure, aerodynamics, propulsion, mechanical drive, and flight controls. The analysis ensures that risks associated with the design and development of the airplane will be eliminated in the course of the program and a useful technology airplane that meets the predicted cost, schedule, and performance can be produced.

Zabinsky, J. M.↗

Engine non-containment: UK risk assessment methods

More realistic guideline data must be developed for use in aircraft design in order to comply with recent changes in British civil airworthiness requirements. Unrealistically pessimistic results were obtained when the methodology developed during the Concorde SST certification program was extended to assess catastrophic risks resulting from uncontained engine rotors.

Wallin, J. C.↗

Probability of Failure and Risk Assessment of Propulsion Structural Components

Due to increasing need to account for the uncertainties in material properties, loading conditions, or geometries, a methodology was developed to determine structural reliability and the assess the risk associated with it. The methodology consists of a probabilistic structural analysis by a probabilistic finite element computer code Nonlinear Evaluation of Stochastic Structures Under Stress (NESSUS) and a generic probabilistic material properties model. The methodology is versatile and is equally applicable to high and cryogenic temperature structures. Results obtained demonstrate that the whole issue of structural reliability and risk can be formally evaluated using the methodology developed which is inclusive of uncertainties in material properties, structural parameters and loading conditions. The methodology is described in some detail with illustrative examples.

Shiao, Michael C.↗

Case Studies in NASA High-Technology Risk Assessment and Management

This study discusses the approach of NASA managers in the assessment of risk in three critical decisions: the Apollo 8 decision to orbit the Moon in 1968, the servicing of the Hubble Space Telescope in 1993, and the privitization of the Space Shuttle in the latter 1990s.

Lambright, W. Henry↗