Search NASA⌕ Search

SEARCH · Search NASA

Results for “Return on Investment”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 217 records · Page 12

Lunar base - A stepping stone to Mars

Basic elements of technology and programmatic development are identified that appear relevant to the Case for Mars, starting from a base on the moon. The moon is a logical stepping stone toward human exploration of Mars because a lunar base can provide the first test of human ability to use the resources of another planetary body to provide basic materials for life support. A lunar base can provide the first long-term test of human capability to work and live in a reduced (but not zero) gravity field. A lunar base requires creation of the elements of a space transportation system that will be necessary to deliver large payloads to Mars and the space operations capability and experience necessary to carry out a Mars habitation program efficiently and with high reliability. A lunar base is feasible for the first decade of the 21st Century. Scenarios have been studied that provide advanced capability by 2015 within budget levels that are less than historical U.S. space expenditures (Apollo). Early return on the investment in terms of knowledge, practical experience and lunar products are important in gaining momentum for an expanded human exploration of the solar system and the eventual colonization of Mars.

Duke, M. B.↗

Advanced space communications architecture study. Volume 2: Technical report

The technical feasibility and economic viability of satellite system architectures that are suitable for customer premise service (CPS) communications are investigated. System evaluation is performed at 30/20 GHz (Ka-band); however, the system architectures examined are equally applicable to 14/11 GHz (Ku-band). Emphasis is placed on systems that permit low-cost user terminals. Frequency division multiple access (FDMA) is used on the uplink, with typically 10,000 simultaneous accesses per satellite, each of 64 kbps. Bulk demodulators onboard the satellite, in combination with a baseband multiplexer, convert the many narrowband uplink signals into a small number of wideband data streams for downlink transmission. Single-hop network interconnectivity is accomplished via downlink scanning beams. Each satellite is estimated to weigh 5600 lb and consume 6850W of power; the corresponding payload totals are 1000 lb and 5000 W. Nonrecurring satellite cost is estimated at $110 million, with the first-unit cost at $113 million. In large quantities, the user terminal cost estimate is $25,000. For an assumed traffic profile, the required system revenue has been computed as a function of the internal rate of return (IRR) on invested capital. The equivalent user charge per-minute of 64-kbps channel service has also been determined.

Horstein, Michael↗

Analysis of the financial factors governing the profitability of lunar helium-3

Financial factors influencing the profitability of the mining and utilization of lunar helium-3 are examined. The analysis addressed the following questions: (1) which financial factors have the greatest leverage on the profitability of He-3; (2) over what range can these factors be varied to keep the He-3 option profitable; and (3) what ultimate effect could this energy source have on the price of electricity for U.S. consumers. Two complementary methods of analysis were used in the assessment: rate of return on incremental investment required and reduction revenue requirements (total cost to customers) achieved. Some of the factors addressed include energy demand, power generation costs with and without fusion, profitability for D-He(3) fusion, annual capital and operating costs, launch mass and costs, He-3 price, and government funding. Specific conclusions are made with respect to each of the companies considered: utilities, lunar mining company, and integrated energy company.

Kulcinski, G. L.↗

Scheduling revisited workstations in integrated-circuit fabrication

The cost of building new semiconductor wafer fabrication factories has grown rapidly, and a state-of-the-art fab may cost 250 million dollars or more. Obtaining an acceptable return on this investment requires high productivity from the fabrication facilities. This paper describes the Photo Dispatcher system which was developed to make machine-loading recommendations on a set of key fab machines. Dispatching policies that generally perform well in job shops (e.g., Shortest Remaining Processing Time) perform poorly for workstations such as photolithography which are visited several times by the same lot of silicon wafers. The Photo Dispatcher evaluates the history of workloads throughout the fab and identifies bottleneck areas. The scheduler then assigns priorities to lots depending on where they are headed after photolithography. These priorities are designed to avoid starving bottleneck workstations and to give preference to lots that are headed to areas where they can be processed with minimal waiting. Other factors considered by the scheduler to establish priorities are the nearness of a lot to the end of its process flow and the time that the lot has already been waiting in queue. Simulations that model the equipment and products in one of Texas Instrument's wafer fabs show the Photo Dispatcher can produce a 10 percent improvement in the time required to fabricate integrated circuits.

Kline, Paul J.↗

Small scale sequence automation pays big dividends

Galileo sequence design and integration are supported by a suite of formal software tools. Sequence review, however, is largely a manual process with reviewers scanning hundreds of pages of cryptic computer printouts to verify sequence correctness. Beginning in 1990, a series of small, PC based sequence review tools evolved. Each tool performs a specific task but all have a common 'look and feel'. The narrow focus of each tool means simpler operation, and easier creation, testing, and maintenance. Benefits from these tools are (1) decreased review time by factors of 5 to 20 or more with a concomitant reduction in staffing, (2) increased review accuracy, and (3) excellent returns on time invested.

Nelson, Bill↗

Spacecraft Onboard Software Maintenance: An Effective Approach which Reduces Costs and Increases Science Return

Flight software (FSW) is a mission critical element of spacecraft functionality and performance. When ground operations personnel interface to a spacecraft, they are dealing almost entirely with onboard software. This software, even more than ground/flight communications systems, is expected to perform perfectly at all times during all phases of on-orbit mission life. Due to the fact that FSW can be reconfigured and reprogrammed to accommodate new spacecraft conditions, the on-orbit FSW maintenance team is usually significantly responsible for the long-term success of a science mission. Failure of FSW can result in very expensive operations work-around costs and lost science opportunities. There are three basic approaches to staffing on-orbit software maintenance, namely: (1) using the original developers, (2) using mission operations personnel, or (3) assembling a Center of Excellence for multi-spacecraft on-orbit FSW support. This paper explains a National Aeronautics and Space Administration, Goddard Space Flight Center (NASA/GSFC) experience related to the roles of on-orbit FSW maintenance personnel. It identifies the advantages and disadvantages of each of the three approaches to staffing the FSW roles, and demonstrates how a cost efficient on-orbit FSW Maintenance Center of Excellence can be established and maintained with significant return on the investment.

Shell, Elaine M.↗

Geospace Multiprobes

The foregoing science discussions, the required measurements and the detailed implementation plans should provide ample evidence in support of the contention that geospace multiprobes are the next logical step forward in exploration of our environment. The advancement of technology in areas such as mechanical engineering, power systems, circuit miniaturization, high-capacity data storage, and innovative propulsion systems all allow the implementation of multiple satellite configurations within a constrained budget. The problems that have plagued our interpretation of previous data and the advancements that could not be made without the availability of multiple platforms can now be overcome. New multiprobe missions promise to produce a real leap forward in our understanding of the geospace environment for they will allow all the required measurements to be made in all the right places. The most efficient use of resources, and application of experience and knowledge, will be achieved from a series of missions such as envisioned by Solar Terrestrial Probes. The return for our investment in a multiprobe mission sequence is the organized advancement of our understanding in two key areas. First, we will understand the geospace environment to a level that will allow real quantitative assessment of the impacts of humans and the vulnerability of human space systems. Second, this advancement will allow us to more fully evaluate present and future data from other planetary environments to assess differences important to habitability.

Source record↗

The Future of the Deep Space Network: Technology Development for K2-Band Deep Space Communications

Projections indicate that in the future the number of NASA's robotic deep space missions is likely to increase significantly. A launch rate of up to 4-6 launches per year is projected with up to 25 simultaneous missions active [I]. Future high resolution mapping missions to other planetary bodies as well as other experiments are likely to require increased downlink capacity. These future deep space communications requirements will, according to baseline loading analysis, exceed the capacity of NASA's Deep Space Network in its present form. There are essentially two approaches for increasing the channel capacity of the Deep Space Network. Given the near-optimum performance of the network at the two deep space communications bands, S-Band (uplink 2.025-2.120 GHz, downlink 2.2-2.3 GHz), and X-Band (uplink 7.145-7.19 GHz, downlink 8.48.5 GHz), additional improvements bring only marginal return for the investment. Thus the only way to increase channel capacity is simply to construct more antennas, receivers, transmitters and other hardware. This approach is relatively low-risk but involves increasing both the number of assets in the network and operational costs.

Bhanji, Alaudin M.↗

Analysis of System-Wide Investment in the National Airspace System: A Portfolio Analytical Framework and an Example

In this paper, the authors review the FAA s current program investments and lay out a preliminary analytical framework to undertake projects that may address some of the noted deficiencies. By drawing upon the well developed theories from corporate finance, an analytical framework is offered that can be used for choosing FAA s investments taking into account risk, expected returns and inherent dependencies across NAS programs. The framework can be expanded into taking multiple assets and realistic values for parameters in drawing an efficient risk-return frontier for the entire FAA investment programs.

Bhadra, Dipasis↗

Habitat Size Optimization of the O'Neill - Glaser Economic Model for Space Solar Satellite Production

Creating large space habitats by launching all materials from Earth is prohibitively expensive. Using space resources and space based labor to build space solar power satellites can yield extraordinary profits after a few decades. The economic viability of this program depends on the use of space resources and space labor. To maximize the return on the investment, the early use of high density bolo habitats is required. Other shapes do not allow for the small initial scale required for a quick population increase in space. This study found that 5 Man Year, or 384 person bolo high density habitats will be the most economically feasible for a program started at year 2010 and will cause a profit by year 24 of the program, put over 45,000 people into space, and create a large system of space infrastructure for the further exploration and development of space.

Curreri, Peter A.↗

Shuttle Repair Tools Automate Vehicle Maintenance

Successfully building, flying, and maintaining the space shuttles was an immensely complex job that required a high level of detailed, precise engineering. After each shuttle landed, it entered a maintenance, repair, and overhaul (MRO) phase. Each system was thoroughly checked and tested, and worn or damaged parts replaced, before the shuttle was rolled out for its next mission. During the MRO period, workers needed to record exactly what needed replacing and why, as well as follow precise guidelines and procedures in making their repairs. That meant traceability, and with it lots of paperwork. In 2007, the number of reports generated during electrical system repairs was getting out of hand-placing among the top three systems in terms of paperwork volume. Repair specialists at Kennedy Space Center were unhappy spending so much time at a desk and so little time actually working on the shuttle. "Engineers weren't spending their time doing technical work," says Joseph Schuh, an electrical engineer at Kennedy. "Instead, they were busy with repetitive, time-consuming processes that, while important in their own right, provided a low return on time invested." The strain of such inefficiency was bad enough that slow electrical repairs jeopardized rollout on several occasions. Knowing there had to be a way to streamline operations, Kennedy asked Martin Belson, a project manager with 30 years experience as an aerospace contractor, to co-lead a team in developing software that would reduce the effort required to document shuttle repairs. The result was System Maintenance Automated Repair Tasks (SMART) software. SMART is a tool for aggregating and applying information on every aspect of repairs, from procedures and instructions to a vehicle s troubleshooting history. Drawing on that data, SMART largely automates the processes of generating repair instructions and post-repair paperwork. In the case of the space shuttle, this meant that SMART had 30 years worth of operations that it could apply to ongoing maintenance work. According to Schuh, "SMART standardized and streamlined many shuttle repair processes, saving time and money while increasing safety and the quality of repairs." Maintenance technicians and engineers now had a tool that kept them in the field, and because SMART is capable of continually evolving, each time an engineer put it to use, it would enrich the Agency-wide knowledge base. "If an engineer sees something in the work environment that they could improve, a repair process or a procedure, SMART can incorporate that data for use in future operations," says Belson.

Source record↗

Service Life Extension of the Propulsion System of Long-Term Manned Orbital Stations

One of the critical non-replaceable systems of a long-term manned orbital station is the propulsion system. Since the propulsion system operates beginning with the launch of station elements into orbit, its service life determines the service life of the station overall. Weighing almost a million pounds, the International Space Station (ISS) is about four times as large as the Russian space station Mir and about five times as large as the U.S. Skylab. Constructed over a span of more than a decade with the help of over 100 space flights, elements and modules of the ISS provide more research space than any spacecraft ever built. Originally envisaged for a service life of fifteen years, this Earth orbiting laboratory has been in orbit since 1998. Some elements that have been launched later in the assembly sequence were not yet built when the first elements were placed in orbit. Hence, some of the early modules that were launched at the inception of the program were already nearing the end of their design life when the ISS was finally ready and operational. To maximize the return on global investments on ISS, it is essential for the valuable research on ISS to continue as long as the station can be sustained safely in orbit. This paper describes the work performed to extend the service life of the ISS propulsion system. A system comprises of many components with varying failure rates. Reliability of a system is the probability that it will perform its intended function under encountered operating conditions, for a specified period of time. As we are interested in finding out how reliable a system would be in the future, reliability expressed as a function of time provides valuable insight. In a hypothetical bathtub shaped failure rate curve, the failure rate, defined as the number of failures per unit time that a currently healthy component will suffer in a given future time interval, decreases during infant-mortality period, stays nearly constant during the service life and increases at the end when the design service life ends and wear-out phase begins. However, the component failure rates do not remain constant over the entire cycle life. The failure rate depends on various factors such as design complexity, current age of the component, operating conditions, severity of environmental stress factors, etc. Development, qualification and acceptance test processes provide rigorous screening of components to weed out imperfections that might otherwise cause infant mortality failures. If sufficient samples are tested to failure, the failure time versus failure quantity can be analyzed statistically to develop a failure probability distribution function (PDF), a statistical model of the probability of failure versus time. Driven by cost and schedule constraints however, spacecraft components are generally not tested in large numbers. Uncertainties in failure rate and remaining life estimates increase when fewer units are tested. To account for this, spacecraft operators prefer to limit useful operations to a period shorter than the maximum demonstrated service life of the weakest component. Running each component to its failure to determine the maximum possible service life of a system can become overly expensive and impractical. Spacecraft operators therefore, specify the required service life and an acceptable factor of safety (FOS). The designers use these requirements to limit the life test duration. Midway through the design life, when benefits justify additional investments, supplementary life test may be performed to demonstrate the capability to safely extend the service life of the system. An innovative approach is required to evaluate the entire system, without having to go through an elaborate test program of propulsion system elements. Evaluating every component through a brute force test program would be a cost prohibitive and time consuming endeavor. ISS propulsion system components were designed and built decades ago. There are no representative ground test articles for some of the components. A 'test everything' approach would require manufacturing new test articles. The paper outlines some of the techniques used for selective testing, by way of cherry picking candidate components based on failure mode effects analysis, system level impacts, hazard analysis, etc. The type of testing required for extending the service life depends on the design and criticality of the component, failure modes and failure mechanisms, life cycle margin provided by the original certification, operational and environmental stresses encountered, etc. When specific failure mechanism being considered and the underlying relationship of that mode to the stresses provided in the test can be correlated by supporting analysis, time and effort required for conducting life extension testing can be significantly reduced. Exposure to corrosive propellants over long periods of time, for instance, lead to specific failure mechanisms in several components used in the propulsion system. Using Arrhenius model, which is tied to chemically dependent failure mechanisms such as corrosion or chemical reactions, it is possible to subject carefully selected test articles to accelerated life test. Arrhenius model reflects the proportional relationship between time to failure of a component and the exponential of the inverse of absolute temperature acting on the component. The acceleration factor is used to perform tests at higher stresses that allow direct correlation between the times to failure at a high test temperature to the temperatures to be expected in actual use. As long as the temperatures are such that new failure mechanisms are not introduced, this becomes a very useful method for testing to failure a relatively small sample of items for a much shorter amount of time. In this article, based on the example of the propulsion system of the first ISS module Zarya, theoretical approaches and practical activities of extending the service life of the propulsion system are reviewed with the goal of determining the maximum duration of its safe operation.

Kamath, Ulhas↗

Mission Control Operations: Employing a New High Performance Design for Communications Links Supporting Exploration Programs

The planetary exploration programs demand a totally new examination of data multiplexing, digital communications protocols and data transmission principles for both ground and spacecraft operations. Highly adaptive communications devices on‐board and on the ground must provide the greatest possible transmitted data density between deployed crew personnel, spacecraft and ground control teams. Regarding these requirements, this proposal borrows from research into quantum mechanical computing by applying the concept of a qubit, a single bit that represents 16 states, to radio frequency (RF) communications link design for exploration programs. This concept of placing multiple character values into a single data bit can easily make the evolutionary steps needed to meet exploration mission demands. To move the qubit from the quantum mechanical research laboratory into long distance RF data transmission, this proposal utilizes polarization modulation of the RF carrier signal to represent numbers from zero to fifteen. It introduces the concept of a binary‐to‐hexadecimal converter that quickly chops any data stream into 16‐bit words and connects variously polarized feedhorns to a single‐frequency radio transmitter. Further, the concept relies on development of a receiver that uses low‐noise amplifiers and an antenna array to quickly assess carrier polarity and perform hexadecimal to binary conversion. Early testbed experiments using the International Space Station (ISS) as an operations laboratory can be implemented to provide the most cost‐effective return for research investment. The improvement in signal‐to‐noise ratio while supporting greater baseband data rates that could be achieved through this concept justifies its consideration for long‐distance exploration programs.

Jackson, Dan E., Jr.↗

Service Life Extension of the ISS Propulsion System Elements

The International Space Station (ISS) is a result of international collaboration in building a sophisticated laboratory of an unprecedented scale in Low Earth Orbit. After a complex assembly sequence spanning over a decade, some of the early modules launched at the beginning of the program would reach the end of their certified lives, while the newer modules were just being commissioned into operation. To maximize the return on global investments in this one-of-a-kind orbiting platform that was initially conceived for a service life until 2016, it is essential for the cutting edge research on ISS to continue as long as the station can be sustained safely in orbit. ISS Program is assessing individual modules in detail to extend the service life of the ISS to 2024, and possibly to 2028. Without life extension, Functional Cargo Block (known by its Russian acronym as FGB) and the Service Module (SM), two of the early modules on the Russian Segment, would reach the end of their certified lives in 2013 and 2015 respectively. Both FGB and SM are critical for the propulsive function of the ISS. This paper describes the approach used for the service life extension of the FGB propulsion system. Also presented is an overview of the system description along with the process adopted for developing the life test plans based on considerations of system failure modes, fault tolerance and safety provisions. Tests and analyses performed, important findings and life estimates are summarized. Based on the life extension data, FGB propulsion system, in general, is considered ready for a service life until 2028.

Kamath, Ulhas↗

Leveraging Terrestrial Industry for Utilization of Space Resources

NASA's Journey to Mars: Pioneering Next Steps in Space Exploration released in October of 2015 states that NASA is working toward the capability to work, operate, and sustainably live safely beyond Earth. To progress from our current "Earth-Reliant" approach to exploration and eventually become "Earth Independent", we need to first identify resources in space and then learn to use and harvest them to minimize logistics from Earth, reduce costs, and enable sustainable and affordable space transportation and surface operations. Known as In Situ Resource Utilization (ISRU), the collection and conversion of space resources into products such as propellants, fuel cell reactants, and life support consumables can greatly reduce the mass, cost, and risk of space exploration. Also, the ability to perform civil engineering, construction, and manufacturing at sites of exploration can also allow for increased crew safety and sustainable growth in critical infrastructure. Much of what NASA wants to do on the Moon and Mars with respect to harnessing and utilizing space resources has been performed and perfected on Earth over the centuries. While minimizing mass and operating in the vacuum of space may be unique challenges to NASA, both terrestrial industry and NASA face many of the same challenges associated with operating in severe environments, minimizing maintenance and logistics, maximizing performance per unit mass and volume, performing remote and autonomous operations, and integrating hardware from many vendors and countries. In the end, both NASA and terrestrial industry need to obtain a return on the investment for the development and deployment of these capabilities. This paper will first examine what is ISRU and what are the space resources of interest. The paper will than discuss what are NASA's approach, life cycle, and economic considerations for implementing ISRU. The paper will outline the site and infrastructure needs associated with a phased implementation of ISRU into human missions to the Moon and Mars. The paper will than assess what technologies and operations from terrestrial industries are relevant and synergistic with ISRU (from prospecting to product storage), and what challenges and similarities between the two can be exploited. Lastly, the paper will end with a discussion on where do we go from here for industry and NASA to collaborate.

Sanders, Gerald B.↗

Reduced Cost and Increased Capability Through Technology in the New Millennium

The National Aeronautics and Space Administration's (NASA's) New Millennium Program (NMP) is designed to reduce the cost of spacecraft in the 21 st century while simultaneously increasing spacecraft capabilities, thereby increasing the return on our investment in space exploration. The NMP process ins being enacted in the following manner: We are developing a science vision for the 21 st century and identifying the attendant missions of this vision. These missions, in turn, will specify the capabilities that future spacecraft require.

New↗

Developing a Vision for Heliophysics Infrastructure: The LIKED Resource and the DIARieS Ecosystem

Heliophysics data and computational infrastracture are not equipped for 21st science, suffering from holes in the know-how to build better systems. Without a clear vision, efforts to improve the infrastructure have been incremental and incoherent. This poster presents both the vision and the technology required: an online LIbrary KnowledgE and Discovery (LIKED) resource for discovering and implementing knowledge, data, and infrastructure resources; and an online analysis ecosystem to simplify Discovery, Implementation, Analysis, Reproducibility, and Sharing (DIARieS) of scientific results and environments. The LIKED and DIARieS solutions adopt FAIR data principles and the best practices from the budding field of open science. The proposed new infrastructure components will close many of the current gaps in heliophysics’ infrastructure, such as the ability to search for data and knowledge by phenomenon across domains, and to find software and examples relevant to the desired data set (including model data). Further, these components will enable community members to more efficiently use the resources already present and improve upon the content via a community-curated and trusted library. Combining these solutions lowers the barriers to heliophysics resources for all, increasing the return on our investments. Finally, the structure behind these ideas are topic-agnostic, so they are fully extensible to other fields, leading to invaluable connections to other disciplines. Just as with the development and construction of a long-term satellite mission, we must work together as a community to build a vision of the infrastructure that will most benefit the community, and then collaborate to construct, assemble, and test all the necessary pieces individually and as a unit. Our purpose in presenting this work is to not only describe the proposed vision, but also to gather feedback from the community on this topic.

infrastructure↗

High Value Risk Targets in Human System Risk

The Human System Risk Board (HSRB) has the overall responsibility for tracking the evolution of the top ~30 human system risks that it has identified to be associated with human spaceflight. The Board is also charged with maintaining a consistent, integrated process to mitigate those risks, and developing evidence-based risk posture recommendations. Each Risk Custodian Team (RCT) identifies High Value Risk Mitigation Targets (HVRMT) that have the highest likelihood or greatest impact in reducing their risk. These typically include areas where there are major gaps in knowledge or capability; or other targets that promise to yield returns worthy of investments in time, money and other resources by stakeholders interested in reducing Human System Risk. As part of the review of each risk the Board members consider and discuss the HVRMT statements, which are then approved by the Board Chair. High Value Risk Mitigation Targets can include research activities funded by the Human Research Program, but often involve recommending standards, monitoring, or other operational goals to reduce risk. This presentation will discuss common themes and highlights of the approved HVRTs to inform IWS attendees and the wider research community.

D M Buckland↗