Search NASA⌕ Search

SEARCH · Search NASA

Results for “Risk Resource”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 217 records · Page 12

Overview of Crew Operations for Transit to Mars

Crewed Mars missions are estimated to be 700-1,200 days in length which is two to three times longer than any continuous human spaceflight mission to date. When architecting a Mars mission there are numerous resources that must be considered, evaluated, and planned for, including—but not limited to—mass, cost, performance, and risk. Crew time is a limited resource that will need to be appropriately allocated during future Mars missions. NASA’s “Moon to Mars Objectives” specifically recognizes as Recurring Tenets the need to return crews safely to Earth while mitigating adverse impacts to crew health and maximizing crew time available for science and engineering activities within planned mission durations. Crew operations and the crew time allocation for a Mars missions will likely be different than current operational planning aboard the ISS due to communication delays, crew health and performance needs, transportation system needs, potential vehicle dormancy, and mass ejection. Crew will need to operate much more Earth independently and potentially be responsible for more operations since traditional Earth ground support will be delayed. Incidents requiring immediate crew action will therefore either be the responsibility of the crew or an automated feature of the transit vehicle. This paper discusses the operational challenges of a Mars transit mission and the associated activities that will need to take place during each operational phase of transit to and from Mars.

Crew Time↗

Overview of Crew Operations for Transit to Mars

Crewed Mars missions are estimated to be 700-1,200 days in length which is two to three times longer than any continuous human spaceflight mission to date. When architecting a Mars mission there are numerous resources that must be considered, evaluated, and planned for, including—but not limited to—mass, cost, performance, and risk. Crew time is a limited resource that will need to be appropriately allocated during future Mars missions. NASA’s “Moon to Mars Objectives” specifically recognizes as Recurring Tenets the need to return crews safely to Earth while mitigating adverse impacts to crew health and maximizing crew time available for science and engineering activities within planned mission durations. Crew operations and the crew time allocation for a Mars missions will likely be different than current operational planning aboard the ISS due to communication delays, crew health and performance needs, transportation system needs, potential vehicle dormancy, and mass ejection. Crew will need to operate much more Earth independently and potentially be responsible for more operations since traditional Earth ground support will be delayed. Incidents requiring immediate crew action will therefore either be the responsibility of the crew or an automated feature of the transit vehicle. This paper discusses the operational challenges of a Mars transit mission and the associated activities that will need to take place during each operational phase of transit to and from Mars.

Crew Time↗

Evolving Metrics for Resource Adequacy Assessment

Resource adequacy analysis quantifies the likelihood of capacity shortfall on a power system in a probabilistic manner. Using a combination of statistical techniques and power system fundamentals, the analysis typically evaluates hundreds or thousands of stochastic random samples (replications) of varying load, generator outages, variable renewable energy availability, and other aspects of power system uncertainty. In this range of uncertainty, there are - at times - periods where the power system's available resources are insufficient to meet system demand, referred to as a shortfall event. Today's power systems' rapidly evolving generation mix is changing the types of data needed by system planners and regulators, which can often render traditional resource adequacy metrics insufficient for ensuring resource adequacy for tomorrow's grid. In this paper we provide a critical assessment of traditional measures of shortfall risk in power systems, discussing their shortcomings and how they compare to metrics used in other domains. From this analysis we propose four steps forward for improving power system resource adequacy risk metrics in the future.

ENERGY PLANNING, POLICY, AND ECONOMY,POWER TRANSMI↗

Carcass appearance does not influence scavenger avoidance of carnivore carrion

Abstract The selection or avoidance of certain carrion resources by vertebrate scavengers can alter the flow of nutrients in ecosystems. Evidence suggests higher trophic level carrion is scavenged by fewer vertebrate species and persists longer when compared to lower trophic level carrion, although it is unclear how scavengers distinguish between carcasses of varying species. To investigate carnivore carrion avoidance and explore sensory recognition mechanisms in scavenging species, we investigated scavenger use of intact and altered (i.e., skin, head, and feet removed) coyote— Canis latrans (carnivore) and wild pig— Sus scrofa (omnivore) carcasses experimentally placed at the Savannah River Site, SC, USA. We predicted carnivore carcasses would persist longer due to conspecific and intraguild scavenger avoidance. Further, we hypothesized visually modifying carcasses would not reduce avoidance of carnivore carrion, given scavengers likely depend largely on chemical cues when assessing carrion resources. As expected, mammalian carnivores largely avoided scavenging on coyote carcasses, resulting in carnivore carcasses having longer depletion times than wild pig carcasses at intact and altered trials. Therefore, nutrients derived from carnivore carcasses are not as readily incorporated into higher trophic levels and scavengers largely depend on olfactory cues when assessing benefits and risks associated with varying carrion resources.

60 APPLIED LIFE SCIENCES↗

The Role of Space Medicine in Management of Risk in Spaceflight

The purpose of Space Medicine is to ensure mission success by providing quality and comprehensive health care throughout all mission phases to optimize crew health and performance and to prevent negative long-term health consequences. Space flight presents additional hazards and associated risks to crew health, performance, and safety. With an extended human presence in space it is expected that illness and injury will occur on orbit, which may present a significant threat to crew health and performance and to mission success. Maintaining crew health, safety and performance and preventing illness and injury are high priorities necessary for mission success and agency goals. Space flight health care should meet the standards of practice of evidence based clinical medicine. The function of Space Medicine is expected to meet the agency goals as stated in the 1998 NASA Strategic Plan and the priorities established by the Critical Path Roadmap Project. The Critical Path Roadmap Project is an integrated NASA cross-disciplinary strategy to assess, understand, mitigate, and manage the risks associated with long-term exposure to the space flight environment. The evidence based approach to space medicine should be standardized, objective process yielding expected results and establishing clinical practice standards while balancing individual risk with mission (programmatic) risk. The ability to methodically apply available knowledge and expertise to individual and mission health issues will ensure appropriate priorities are assigned and resources are allocated. NASA Space Medicine risk management process is a combined clinical and engineering approach. Competition for weight, power, volume, cost, and crew time must be balanced in making decisions about the care of individual crew with competing agency resources.

Clark, Jonathan B.↗

Beyond Expected Values Evolving Metrics for Resource Adequacy Assessment

Resource adequacy analysis quantifies the likelihood of capacity shortfall on a power system in a probabilistic manner. Using a combination of statistical techniques and power system fundamentals, the analysis typically evaluates hundreds or thousands of stochastic random samples (replications) of varying load, generator outages, variable renewable energy availability, and other aspects of power system uncertainty. In this range of uncertainty, there are - at times - periods where the power system's available resources are insufficient to meet system demand, referred to as a shortfall event. Today's power systems' rapidly evolving generation mix is changing the types of data needed by system planners and regulators, which can often render traditional resource adequacy metrics insufficient for ensuring resource adequacy for tomorrow's grid. In this paper we provide a critical assessment of traditional measures of shortfall risk in power systems, discussing their shortcomings and how they compare to metrics used in other domains. From this analysis we propose four steps forward for improving power system resource adequacy risk metrics in the future.

ENERGY PLANNING, POLICY, AND ECONOMY↗

Texas Disasters II: Utilizing NASA Earth Observations to Assist the Texas Forest Service in Mapping and Analyzing Fuel Loads and Phenology in Texas Grasslands

The risk of severe wildfires in Texas has been related to weather phenomena such as climate change and recent urban expansion into wild land areas. During recent years, Texas wild land areas have experienced sequences of wet and dry years that have contributed to increased wildfire risk and frequency. To prevent and contain wildfires, the Texas Forest Service (TFS) is tasked with evaluating and reducing potential fire risk to better manage and distribute resources. This task is made more difficult due to the vast and varied landscape of Texas. The TFS assesses fire risk by understanding vegetative fuel types and fuel loads. To better assist the TFS, NASA Earth observations, including Landsat and Moderate Resolution Imaging Specrtoradiometer (MODIS) data, were analyzed to produce maps of vegetation type and specific vegetation phenology as it related to potential wildfire fuel loads. Fuel maps from 2010-2011 and 2014-2015 fire seasons, created by the Texas Disasters I project, were used and provided alternating, complementary map indicators of wildfire risk in Texas. The TFS will utilize the end products and capabilities to evaluate and better understand wildfire risk across Texas.

Brooke, Michael↗

Developing a Process for Collaboration-Based Siting of a Federal Consolidated Interim Storage Facility in the United States: Learning from Communities Living with Legacy Waste

In June of 2023, the U.S. Department of Energy (DOE), Office of Nuclear Energy (NE) announced the selection of its Collaboration-Based Siting (CBS) Consortia, a group of 12 awardees, including the Consortium for Risk Evaluation with Stakeholder Participation (CRESP) (led by Vanderbilt University) to assist DOE-NE with the development of its process for siting a federal consolidated interim storage facility (FCISF) for spent nuclear fuel (SNF) storage. At this time, DOE NE is not soliciting interested host communities, rather the CBS Consortia are tasked with in-depth engagement, mutual learning, and capacity building to provide DOE NE with feedback on the CBS process. CRESP’s objective is to engage communities in two regions (the Pacific Northwest and the Southeast) with sites currently storing defense- and research-related SNF to foster learning concerning the best and worst practices in community participation in risk-informed decision making. This includes learning from existing structures for public input in radioactive waste management decision making [e.g. citizen advisory boards (CABs)] and other local parties about how to build and sustain trust among the parties. CRESP has been working to engage stakeholders and Tribes surrounding two DOE sites historically differing in receptiveness to engaging with DOE and trusting in DOE to accomplish its missions. CRESP’s approach to date has consisted of (1) engaging voluntarily members and former members of the DOE Office of Environmental Management’s CABs to develop a mutual understanding of their perspectives, values, and experiences related to risk and participatory decision making; (2) engaging members of those communities that would likely be part of any radioactive waste management discussions and who may provide valuable feedback for the development of the CBS process; and in the longer term, (3) engaging communities to foster knowledge sharing on understanding and definitions of risk and how risk is factored into community decision making. Our emphasis is to identify opportunities for improving risk communication frameworks, strategies, and decision making. The selection of a future FCISF site is likely to result in the creation of a structure similar to a CAB composed of members of the local community. We anticipate that these insights can help DOE NE learn from existing participatory risk communication structures in place at sites storing defenseor research-related SNF to understand best practices for fostering enduring and participatory relationships with future CABs. Within this paper, we (1) describe CRESP’s overall approach to assisting DOE NE with maturing the CBS process; (2) present a summary of preliminary phase 1 project results, including the development of a body of knowledge (describing available resources to support community engagement, risk communica tion, and participatory decision making) and community ecosystem information (leveraging demographic, social, economic, and environmental attribute mapping and advanced sentiment analysis of social media data); and (3) based on these results, provide observations for future research opportunities to support the development of CBS processes for radioactive waste management facilities, generally.

collaboration-based siting↗

Bridging Equipment Reliability Data and Robust Decisions in a Plant Operation Context

In order to reduce operation and maintenance (O&M) costs, nuclear power plants (NPPs) are moving from corrective and periodic maintenance to predictive maintenance strategies. Such transition requires changes on the data that needs to be retrieved and on the type of decision processes to be employed. Advanced monitoring and data analysis technologies are essential to support predictive strategies. They can in fact provide precise information about health of a component, track its degradation trends, and provide information of its expected failure time. With such information, maintenance operations for a component can be performed right before its expected failure time. This dynamic context of O&M operations requires new methods to analyze data, propagate component health information from the component to the system level, and optimize plant resources. In this respect, the risk informed asset management (RIAM) project has been tasked to develop and test this new class of methods into a risk analytics toolset. This toolset consists of data analytics tools coupled with reliability methods designed to manage plant assets and performances in a predictive maintenance context. This report shows the latest improvements on such development and the initial testing of our methods on the three main research areas that the RIAM project is focusing on. These areas are the following: equipment reliability data analytics, system reliability modeling, and plant resources optimization methods. We show how the methods developed in these areas can support predictive maintenance strategies by: 1) analyzing equipment reliability data (either in numeric and textual form), 2) assessing component and system health through an innovative margin-based reliability approach, and 3) identifying the most critical components and set optimal maintenance schedule based on plant economic and operational constraints.

97 MATHEMATICS AND COMPUTING↗

Determining the Relative Criticality of Diverse Exploration Risks in NASA's Human Research Program

The mission of NASA s Human Research Program (HRP) is to understand and reduce the risk to crew health and performance in exploration missions. The HRP addresses 27 specific risks, primarily in the context of Continuous Risk Management. Each risk is evaluated in terms of two missions (a six month stay on the Moon and a thirty month round trip to Mars) and three types of consequences (in-mission crew health, post-mission crew health, and in-mission performance). The lack of a common metric between the three consequence scales, such as financial costs or quality adjusted life years lost, makes it difficult to compare the relative criticality of the risks. We are, therefore, exploring the use of a ternary scale of criticality based on the common metric of influencing an operational decision. The three levels correspond to the level of concern the risk generates for a "go/no-go" decision to launch a mission: 1) no-go; 2) go with significant reservations; 3) go. The criticality of each of the 27 risks is scored for the three types of consequence in both types of mission. The scores are combined to produce an overall criticality rating for each risk. The overall criticality rating can then be used to guide the prioritization of resources to affect the greatest amount of risk reduction.

Kundrot, Craig E.↗

Flexibility Options: A Proposed Product for Managing Imbalance Risk

The presence of variable renewable energy resources with uncertain outputs in day-ahead electricity markets results in additional balancing needs in real-time. Addressing those needs cost-effectively and reliably within a competitive market with unbundled products is challenging as both the demand for and the availability of flexibility depends on day-ahead energy schedules. Existing approaches for reserve procurement usually rely either on oversimplified demand curves that do not consider how system conditions that particular day affect the value of flexibility, or on bilateral trading of hedging instruments that are not co-optimized with day-ahead schedules. This article proposes a new product, ‘Flexibility Options', to address these two limitations. The demand for this product is endogenously determined in the day-ahead market and it is met cost-effectively by considering real-time supply curves for product providers, which are co-optimized with the energy supply. As we illustrate with numerical examples and mathematical analysis, the product addresses the hedging needs of participants with imbalances cost-effectively, provides a less intermittent revenue stream for participants with flexible outputs, promotes value-driven pricing of flexibility, and ensures that the system operator is revenue-neutral. This article provides a comprehensive design that can be further tested and applied in large-scale systems.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Integrated Medical Model (IMM) Optimization Version 4.0 Functional Improvements

The IMMs ability to assess mission outcome risk levels relative to available resources provides a unique capability to provide guidance on optimal operational medical kit and vehicle resources. Post-processing optimization allows IMM to optimize essential resources to improve a specific model outcome such as maximization of the Crew Health Index (CHI), or minimization of the probability of evacuation (EVAC) or the loss of crew life (LOCL). Mass and or volume constrain the optimized resource set. The IMMs probabilistic simulation uses input data on one hundred medical conditions to simulate medical events that may occur in spaceflight, the resources required to treat those events, and the resulting impact to the mission based on specific crew and mission characteristics. Because IMM version 4.0 provides for partial treatment for medical events, IMM Optimization 4.0 scores resources at the individual resource unit increment level as opposed to the full condition-specific treatment set level, as done in version 3.0. This allows the inclusion of as many resources as possible in the event that an entire set of resources called out for treatment cannot satisfy the constraints. IMM Optimization version 4.0 adds capabilities that increase efficiency by creating multiple resource sets based on differing constraints and priorities, CHI, EVAC, or LOCL. It also provides sets of resources that improve mission-related IMM v4.0 outputs with improved performance compared to the prior optimization. The new optimization represents much improved fidelity that will improve the utility of the IMM 4.0 for decision support.

risk assessment↗

Impact-Identified Medical Capabilities with Largest Effect on Medical Risk for an Extended Duration Artemis Mission

Historically, identifying resources to include in a medical system has been based on heuristically guided clinical subject matter expert assessment. Probabilistic risk assessment (PRA) and tradespace analysis have the power to simplify and increase the fidelity of this traditional approach by providing initial risk estimates and system design solutions that fit within the specified constraints. This will be especially important as the increased mission complexity, distance from Earth, and duration of LDEMs is likely to drive an increase in mission medical risk. NASA’s Informing Mission Planning via Analysis of Complex Tradespaces tool (IMPACT) is designed to do just that. IMPACT uses an evidence based medical database of conditions likely to affect LDEM outcomes and a PRA computational engine to estimate how medical conditions and included medical capabilities affect mission outcomes. We identified the 10 medical conditions with the largest effect on medical risks and determined what medical system capabilities affected risk reduction the greatest.

Anderson A↗

Cassini Information Management System in Distributed Operations Collaboration and Cassini Science Planning

Launched on October 15, 1997, the Cassini-Huygens spacecraft began its ambitious journey to the Saturnian system with a complex suite of 12 scientific instruments, and another 6 instruments aboard the European Space Agencies Huygens Probe. Over the next 6 1/2 years, Cassini would continue its relatively simplistic cruise phase operations, flying past Venus, Earth, and Jupiter. However, following Saturn Orbit Insertion (SOI), Cassini would become involved in a complex series of tasks that required detailed resource management, distributed operations collaboration, and a data base for capturing science objectives. Collectively, these needs were met through a web-based software tool designed to help with the Cassini uplink process and ultimately used to generate more robust sequences for spacecraft operations. In 2001, in conjunction with the Southwest Research Institute (SwRI) and later Venustar Software and Engineering Inc., the Cassini Information Management System (CIMS) was released which enabled the Cassini spacecraft and science planning teams to perform complex information management and team collaboration between scientists and engineers in 17 countries. Originally tailored to help manage the science planning uplink process, CIMS has been actively evolving since its inception to meet the changing and growing needs of the Cassini uplink team and effectively reduce mission risk through a series of resource management validation algorithms. These algorithms have been implemented in the web-based software tool to identify potential sequence conflicts early in the science planning process. CIMS mitigates these sequence conflicts through identification of timing incongruities, pointing inconsistencies, flight rule violations, data volume issues, and by assisting in Deep Space Network (DSN) coverage analysis. In preparation for extended mission operations, CIMS has also evolved further to assist in the planning and coordination of the dual playback redundancy of highvalue data from targets such as Titan and Enceladus. This paper will outline the critical role that CIMS has played for Cassini in the distributed ops paradigm throughout operations. This paper will also examine the evolution that CIMS has undergone in the face of new science discoveries and fluctuating operational needs. And finally, this paper will conclude with theoretical adaptation of CIMS for other projects and the potential savings in cost and risk reduction that could potentially be tapped into by future missions.

Equils, Douglas J.↗

Identifying University Chemicals That Pose Security Risks: A Simple Qualitative Approach

Various laboratory-focused tools and methodologies for completing a safety risk assessment have been published, yet few similar resources to address chemical security exist. Herein, we describe a chemical security risk assessment case study at a university in a developing country. In this case study, we demonstrate a chemical security risk assessment for a university chemistry department, using an original inventory of 645 entries which was condensed to 295 chemicals after removing duplicates and erroneous entries. We then prioritized to highlight 83 chemicals of interest based on hazardous or dual-use properties that could lead to unacceptable consequences. We further refined to a list of 34 high-risk chemicals that required action, 48 chemicals that may need further justification and consideration for additional protection, and 1 chemical that did not need further consideration for additional protection.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Oscillation Risks of Grid-Following and Grid-Forming Inverter-Based Resources in Series-Compensated Networks

Here, this paper investigates the dynamic behavior of a grid-connected inverter-based resource (IBR) when connected radially to a series compensated line. Potential interactions between the series compensation and the IBR have been identified for both types: grid-following (GFL) or grid-forming (GFM). The study begins with electromagnetic transient (EMT) simulations to demonstrate stability issues. Subsequently, nonlinear analytical models are formulated in the dq frame, validated against the EMT simulation, and leveraged to assess eigenvalues and participation factors. Influencing factors of the dominant oscillation modes have been identified. The analysis results show that series compensation may make a mode associated with the synchronization unit unstable. Furthermore, customized feedback systems are built for the synchronizing loop. Series compensation can increase the sensitivity of the voltage phase angle towards the synchronizing angle, and introduce phase lag in the real power response towards the synchronizing angle. These factors may cause interactions with the phase-locked loop in GFL-IBR systems and with power-based synchronization in GFM-IBR systems, potentially leading to instability.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Risk Informed Philosophy: Using What We Fear to Lose to Guide Us to Success

When an organization sets out on a new effort, program, or project, one of the first steps undertaken is to understand the related requirements. Most often, these requirements come in the form of standards, directives, or other organizational processes, and are derived to meet a broad range of efforts, programs, and projects. The net result is that organizations or teams are forced to start with a maximum set of requirements and expend time and energy tailoring the set of requirements down to what is more appropriate for the effort, program, or project at hand. This presentation will present an alternate method for the application of requirements or best practices that is based upon the actual risks to the safety, performance, or success of the effort. This additive route for applying best practices and requirements also encourages an early exploration of the risks, thus yielding a better understanding of where resources should be applied. This presentation also extends this concept of risk-based application of best practices and requirements to the selection of organization-wide improvement or standardization efforts, such as Lean, Six Sigma, and Quality Management Systems.

Darpel, Scott↗