SPS High Bandwidth Transverse Feedback System MD (1/23/2012)
We continue to have problems remaining synchronized with the beam. At this point we are not sure what the cause is. Typical problems associated with the timing shift: loss of synchronization of back end timing with the bunch by as much at a fraction of a nanosecond to several nanoseconds. Sometimes the front end timing changes and sometimes not. We eventually were able to synchronize quickly, by simply looking at the kicker load signal. JC has begun to recognize waveform traces typical of proper synchronization. For these initial tests, this should be good enough. Used a 200 MHz non amplitude modulated signal, measured the sum of the 200 MHz signal out of excitation and feedback systems, file Jan-22-932. Typically, out of the H9, 320 mV pp corresponds to both system begin aligned, with set attenuation. We were able to take many measurements where we scanned the phase of the FIR filter and varied the gain to determine the phase that damps the beam motion. $\phi$ ~ 90°. Performed some drive and damp measurements, driving mode 0, see Table 2 for details. Had a chromaticity sweep implemented and monitored the bunch with feedback on and off, see Table 3 for details.