Search NASA⌕ Search

SEARCH · Search NASA

Results for “Scheduled arrival operations”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 217 records · Page 12

Benefit Assessment of the Integrated Demand Management Concept for Multiple New York Metroplex Airports

Benefits of the Integrated Demand Management (IDM) concept were assessed utilizing a newly developed automated simulation capability called ‘Traffic Management Initiative Automated Simulation (TMIAutoSim).’ The IDM concept focuses on improving traffic flow management (TFM) by coordinating the FAA’s strategic Traffic Flow Management System (TFMS) with its more tactical Time-Based Flow Management (TBFM) system. The IDM concept leverages a new TFMS capability called Collaborative Trajectory Options Program (CTOP) to strategically pre-condition traffic demand flowing into a TBFM-managed arrival environment, where TBFM is responsible for tactically managing traffic by generating precise arrival schedules. The IDM concept was developed over a multi-year effort, focusing on solving New York metroplex airport arrival problems. TMIAutoSim closely mimics NASA’s high-fidelity simulation capabilities while enabling more data to be collected at higher speed. Using this new capability, the IDM concept was evaluated using realistic traffic across various weather scenarios. Six representative weather days were selected after clustering three months of historical data. For those selected six days, Newark Liberty International Airport (EWR) and LaGuardia Airport (LGA) arrival traffic scenarios were developed. For each selected day, the historical data were analyzed to accurately simulate actual operations and the weather impact of the day. The current day operations and the IDM concept operations were simulated for the same weather scenarios and the results were compared. The selected six days were categorized into two groups: ‘clear weather’ for days without Ground Delay Programs (GDP) and ‘convective weather’ for days with GDP and significant weather around New York metroplex airports. For the clear weather scenarios, IDM operations reduced last minute, unanticipated departure delays for short-haul flights within TBFM control boundaries with minimal to no impact on throughput and total delay. For the convective weather scenarios, IDM significantly reduced delays and increased throughput to the destination airports.

Traffic Management Initiative Automated Simulation↗

Concept and implementation of the Globalstar mobile satellite system

Globalstar is a satellite-based mobile communications system which provides quality wireless communications (voice and/or data) anywhere in the world except the polar regions. The Globalstar system concept is based upon technological advancements in Low Earth Orbit (LEO) satellite technology and in cellular telephone technology, including the commercial application of Code Division Multiple Access (CDMA) technologies. The Globalstar system uses elements of CDMA and Frequency Division Multiple Access (FDMA), combined with satellite Multiple Beam Antenna (MBA) technology and advanced variable-rate vocoder technology to arrive at one of the most efficient modulation and multiple access systems ever proposed for a satellite communications system. The technology used in Globalstar includes the following techniques in obtaining high spectral efficiency and affordable cost per channel: (1) CDMA modulation with efficient power control; (2) high efficiency vocoder with voice activity factor; (3) spot beam antenna for increased gain and frequency reuse; (4) weighted satellite antenna gain for broad geographic coverage; (5) multisatellite user links (diversity) to enhance communications reliability; and (6) soft hand-off between beams and satellites. Initial launch is scheduled in 1997 and the system is scheduled to be operational in 1998. The Globalstar system utilizes frequencies in L-, S- and C-bands which have the potential to offer worldwide availability with authorization by the appropriate regulatory agencies.

Schindall, Joel↗

A Mixed Integer Linear Program for Airport Departure Scheduling

Aircraft departing from an airport are subject to numerous constraints while scheduling departure times. These constraints include wake-separation constraints for successive departures, miles-in-trail separation for aircraft bound for the same departure fixes, and time-window or prioritization constraints for individual flights. Besides these, emissions as well as increased fuel consumption due to inefficient scheduling need to be included. Addressing all the above constraints in a single framework while allowing for resequencing of the aircraft using runway queues is critical to the implementation of the Next Generation Air Transport System (NextGen) concepts. Prior work on airport departure scheduling has addressed some of the above. However, existing methods use pre-determined runway queues, and schedule aircraft from these departure queues. The source of such pre-determined queues is not explicit, and could potentially be a subjective controller input. Determining runway queues and scheduling within the same framework would potentially result in better scheduling. This paper presents a mixed integer linear program (MILP) for the departure-scheduling problem. The program takes as input the incoming sequence of aircraft for departure from a runway, along with their earliest departure times and an optional prioritization scheme based on time-window of departure for each aircraft. The program then assigns these aircraft to the available departure queues and schedules departure times, explicitly considering wake separation and departure fix restrictions to minimize total delay for all aircraft. The approach is generalized and can be used in a variety of situations, and allows for aircraft prioritization based on operational as well as environmental considerations. We present the MILP in the paper, along with benefits over the first-come-first-serve (FCFS) scheme for numerous randomized problems based on real-world settings. The MILP results in substantially reduced delays as compared to FCFS, and the magnitude of the savings depends on the queue and departure fix structure. The MILP assumes deterministic aircraft arrival times at the runway queues. However, due to taxi time uncertainty, aircraft might arrive either earlier or later than these deterministic times. Thus, to incorporate this uncertainty, we present a method for using the MILP with "overlap discounted rolling planning horizon". The approach is based on valuing near-term decision results more than future ones. We develop a model of taxitime uncertainty based on real-world data, and then compare the baseline FCFS delays with delays using the above MILP in a simple rolling-horizon method and in the overlap discounted scheme.

Gupta, Gautam↗

Efficiency Benefits Using the Terminal Area Precision Scheduling and Spacing System

NASA has developed a capability for terminal area precision scheduling and spacing (TAPSS) to increase the use of fuel-efficient arrival procedures during periods of traffic congestion at a high-density airport. Sustained use of fuel-efficient procedures throughout the entire arrival phase of flight reduces overall fuel burn, greenhouse gas emissions and noise pollution. The TAPSS system is a 4D trajectory-based strategic planning and control tool that computes schedules and sequences for arrivals to facilitate optimal profile descents. This paper focuses on quantifying the efficiency benefits associated with using the TAPSS system, measured by reduction of level segments during aircraft descent and flight distance and time savings. The TAPSS system was tested in a series of human-in-the-loop simulations and compared to current procedures. Compared to the current use of the TMA system, simulation results indicate a reduction of total level segment distance by 50% and flight distance and time savings by 7% in the arrival portion of flight (~200 nm from the airport). The TAPSS system resulted in aircraft maintaining continuous descent operations longer and with more precision, both achieved under heavy traffic demand levels.

Thipphavong, Jane↗

Prediction of Pushback Times and Ramp Taxi Times for Departures at Charlotte Airport

When optimizing the takeoff sequence and schedule for departures at busy airports, it is important to accurately predict the taxi times from gate to runway because those are used to calculate the earliest possible takeoff times. Several airports like Charlotte Douglas International Airport show relatively long taxi times inside the ramp area with large variations, with respect to the travel times in the airport movement area. Also, the pushback process times have not been accurately modeled so far mainly due to the lack of accurate data. The recent deployment of the integrated arrival, departure, and surface traffic management system at Charlotte airport by NASA enables more accurate flight data in the airport surface operations to be obtained. Taking advantage of this system, actual pushback times and ramp taxi times from historical flight data at this airport are analyzed. Based on the analysis, a simple, data-driven prediction model is introduced for estimating pushback times and ramp transit times of individual departure flights. To evaluate the performance of this prediction model, several machine learning techniques are also applied to the same dataset. The prediction results show that the data-driven prediction model is as good as the machine learning algorithms when comparing various prediction performance metrics.

Lee, Hanbong↗

Prediction of Pushback Times and Ramp Taxi Times for Departures at Charlotte Airport

When optimizing the takeoff sequence and schedule for departures at busy airports, it is important to accurately predict the taxi times from gate to runway because those are used to calculate the earliest possible takeoff times. Several airports like Charlotte Douglas International Airport show relatively long taxi times inside the ramp area with large variations, with respect to the travel times in the airport movement area. Also, the pushback process times have not been accurately modeled so far mainly due to the lack of accurate data. The recent deployment of the integrated arrival, departure, and surface traffic management system at Charlotte airport by NASA enables more accurate flight data in the airport surface operations to be obtained. Taking advantage of this system, actual pushback times and ramp taxi times from historical flight data at this airport are analyzed. Based on the analysis, a simple, data-driven prediction model is introduced for estimating pushback times and ramp transit times of individual departure flights. To evaluate the performance of this prediction model, several machine learning techniques are also applied to the same dataset. The prediction results show that the data-driven prediction model is as good as the machine learning algorithms when comparing various prediction performance metrics.

airport surface operations↗

Simulation studies of time-control procedures for the advanced air traffic control system

The problem of mixing aircraft equipped with time-controlled guidance systems and unequipped aircraft in the terminal area has been investigated via a real-time air traffic control simulation. These four-dimensional (4D) guidance systems can predict and control the touchdown time of an aircraft to an accuracy of a few seconds throughout the descent. The objectives of this investigation were to (1) develop scheduling algorithms and operational procedures for various traffic mixes that ranged from 25% to 75% 4D-equipped aircraft; (2) examine the effect of time errors at 120 n. mi. from touchdown on touchdown time scheduling of the various mix conditions; and (3) develop efficient algorithms and procedures to null the initial time errors prior to reaching the final control sector, 30 n. mi. from touchdown. Results indicate substantial reduction in controller workload and an increase in orderliness when more than 25% of the aircraft are equipped with 4D guidance systems; initial random errors of up to + or - 2 min can be handled via a single speed advisory issued in the arrival control sector, thus avoiding disruption of the time schedule.

Tobias, L.↗

Modeling Weather Impact on Ground Delay Programs

Scheduled arriving aircraft demand may exceed airport arrival capacity when there is abnormal weather at an airport. In such situations, Federal Aviation Administration (FAA) institutes ground-delay programs (GDP) to delay flights before they depart from their originating airports. Efficient GDP planning depends on the accuracy of prediction of airport capacity and demand in the presence of uncertainties in weather forecast. This paper presents a study of the impact of dynamic airport surface weather on GDPs. Using the National Traffic Management Log, effect of weather conditions on the characteristics of GDP events at selected busy airports is investigated. Two machine learning methods are used to generate models that map the airport operational conditions and weather information to issued GDP parameters and results of validation tests are described.

Wang, Yao↗

Encealdus Orbilander: A Flagship Mission Concept for Astrobiology

"Whether life exists beyond Earth remains a fundamental question driving our exploration of the Solar System. At Saturn’s moon Enceladus, plumes of oceanic material vented into space allow the investigation of the astrobiological potential of an ocean world, hinted at by Cassini, without the necessity of drilling through kilometers of ice crust. The Enceladus Orbilander is a flagship ($2.56B in fiscal year 2025 dollars) mission concept created for the 2023–2033 Planetary Science Decadal Survey. Orbilander takes full advantage of the opportunity provided by Enceladus’ plumes to search for signs of life. A single spacecraft both orbits and lands, capturing samples from four distinct reservoirs offered by the plumes. These samples, both particulate and vapor, are then analyzed by the Life Detection Suite (LDS), a set of five instruments conducting complementary and orthogonal biosignature-seeking measurements. To provide the context that specifically enhances interpretation of LDS measurements, geochemical and geophysical investigations are conducted both in orbit and on the surface. These reveal the physio-chemical state of the ocean and core as well as the processes involved in ejection of plume material and how these affect the ocean material analyzed by the LDS. The Orbilander can be delivered to the Saturn system via several launch vehicle and trajectory options, including a direct trajectory (7-year cruise), a ∆V-EGA trajectory (9-year cruise) and several options using an inner cruise with Venus and Earth flybys (10-year cruise). Upon Saturn Orbit Insertion, a 4-year moon tour pumps down the Orbilander’s orbit to intercept Enceladus. The most optimal arrival times balance the Jupiter flyby opportunities of the late 2030s and solar illumination at the Enceladus high southern latitudes where plume material is most abundant. This mission concept therefore targets project start in 2030. Upon Enceladus Orbit Insertion, the Orbilander begins a 1.5-year-long campaign of landing site reconnaissance, remote sensing science, and collecting sufficient plume sample to run all but one of the LDS measurements. After successful landing, the Orbilander spends 2 years on the surface conducting multiple LDS measurements with all five instruments on actively and passively collected plume material, as well as seismic investigations. The schedule laid out here is well-defined, but the mission also has operational and resource flexibility should additional reconnaissance be needed. As part of the design study, mission and development risks were identified and mitigation strategies proposed. Technologies key to achieving the life detection science objectives include instrumentation matured under programs like COLDTech and ICEE-2, such as aspects of the sampling system and microfluidic devices, as well as well-known techniques like high-resolution and separation-capable mass spectrometers. Autonomous onboard navigation is planned to maintain a halo orbit around Enceladus to enable passive sampling from orbit as well as reconnaissance measurements for use in site selection and landing. Terrain relative navigation is included to ensure safe landing, given that targeted areas may contain landing hazards. Continued development of radioisotope thermoelectric generator (RTG) technology and long-life batteries is essential for this long duration mission. The Enceladus Orbilander represents an optimal point in the trade space of science value versus cost, taking advantage of the extensive knowledge of Enceladus provided by Cassini, how well Enceladus lends itself to a search for life in material from its ocean, and the flexibility afforded by the innovative design developed by the APL team. By taking full advantage of Enceladus’ plumes both in orbit and on the surface, Orbilander represents a robust search for life with complementary and orthogonal biosignatures as well as contextual geophysical and geochemical measurements, determining not only whether Enceladus is inhabited (at levels up to 500,000× scarcer than in Earth’s oceans) but also why. "

Exobiology↗

ADS-B within a Multi-Aircraft Simulation for Distributed Air-Ground Traffic Management

Automatic Dependent Surveillance Broadcast (ADS-B) is an enabling technology for NASA s Distributed Air-Ground Traffic Management (DAG-TM) concept. DAG-TM has the goal of significantly increasing capacity within the National Airspace System, while maintaining or improving safety. Under DAG-TM, aircraft exchange state and intent information over ADS-B with other aircraft and ground stations. This information supports various surveillance functions including conflict detection and resolution, scheduling, and conformance monitoring. To conduct more rigorous concept feasibility studies, NASA Langley Research Center s PC-based Air Traffic Operations Simulation models a 1090 MHz ADS-B communication structure, based on industry standards for message content, range, and reception probability. The current ADS-B model reflects a mature operating environment and message interference effects are limited to Mode S transponder replies and ADS-B squitters. This model was recently evaluated in a Joint DAG-TM Air/Ground Coordination Experiment with NASA Ames Research Center. Message probability of reception vs. range was lower at higher traffic levels. The highest message collision probability occurred near the meter fix serving as the confluence for two arrival streams. Even the highest traffic level encountered in the experiment was significantly less than the industry standard "LA Basin 2020" scenario. Future studies will account for Mode A and C message interference (a major effect in several industry studies) and will include Mode A and C aircraft in the simulation, thereby increasing the total traffic level. These changes will support ongoing enhancements to separation assurance functions that focus on accommodating longer ADS-B information update intervals.

Barhydt, Richard↗

Operational Concept for Flight Crews to Participate in Merging and Spacing of Aircraft

The predicted tripling of air traffic within the next 15 years is expected to cause significant aircraft delays and create a major financial burden for the airline industry unless the capacity of the National Airspace System can be increased. One approach to improve throughput and reduce delay is to develop new ground tools, airborne tools, and procedures to reduce the variance of aircraft delivery to the airport, thereby providing an increase in runway throughput capacity and a reduction in arrival aircraft delay. The first phase of the Merging and Spacing Concept employs a ground based tool used by Air Traffic Control that creates an arrival time to the runway threshold based on the aircraft s current position and speed, then makes minor adjustments to that schedule to accommodate runway throughput constraints such as weather and wake vortex separation criteria. The Merging and Spacing Concept also employs arrival routing that begins at an en route metering fix at altitude and continues to the runway threshold with defined lateral, vertical, and velocity criteria. This allows the desired spacing interval between aircraft at the runway to be translated back in time and space to the metering fix. The tool then calculates a specific speed for each aircraft to fly while enroute to the metering fix based on the adjusted land timing for that aircraft. This speed is data-linked to the crew who fly this speed, causing the aircraft to arrive at the metering fix with the assigned spacing interval behind the previous aircraft in the landing sequence. The second phase of the Merging and Spacing Concept increases the timing precision of the aircraft delivery to the runway threshold by having flight crews using an airborne system make minor speed changes during enroute, descent, and arrival phases of flight. These speed changes are based on broadcast aircraft state data to determine the difference between the actual and assigned time interval between the aircraft pair. The airborne software then calculates a speed adjustment to null that difference over the remaining flight trajectory. Follow-on phases still under development will expand the concept to all types of aircraft, arriving from any direction, merging at different fixes and altitudes, and to any airport. This paper describes the implementation phases of the Merging and Spacing Concept, and provides high-level results of research conducted to date.

Baxley, Brian T.↗

Benefits Assessment for Single-Airport Tactical Runway Configuration Management Tool (TRCM)

The System-Oriented Runway Management (SORM) concept was developed as part of the Airspace Systems Program (ASP) Concepts and Technology Development (CTD) Project, and is composed of two basic capabilities: Runway Configuration Management (RCM), and Combined Arrival/Departure Runway Scheduling (CADRS). RCM is the process of designating active runways, monitoring the active runway configuration for suitability given existing factors, and predicting future configuration changes; CADRS is the process of distributing arrivals and departures across active runways based on local airport and National Airspace System (NAS) goals. The central component in the SORM concept is a tool for taking into account all the various factors and producing a recommendation for what would be the optimal runway configuration, runway use strategy, and aircraft sequence, considering as many of the relevant factors required in making this type of decision, and user preferences, if feasible. Three separate tools were initially envisioned for this research area, corresponding to the time scale in which they would operate: Strategic RCM (SRCM), with a planning horizon on the order of several hours, Tactical RCM (TRCM), with a planning horizon on the order of 90 minutes, and CADRS, with a planning horizon on the order of 15-30 minutes[1]. Algorithm development was initiated in all three of these areas, but the most fully developed to date is the TRCM algorithm. Earlier studies took a high-level approach to benefits, estimating aggregate benefits across most of the major airports in the National Airspace Systems (NAS), for both RCM and CADRS [2]. Other studies estimated the benefit of RCM and CADRS using various methods of re-sequencing arrivals to reduce delays3,4, or better balancing of arrival fixes5,6. Additional studies looked at different methods for performing the optimization involved in selecting the best Runway Configuration Plan (RCP) to use7-10. Most of these previous studies were high-level or generic in nature (not focusing on specific airports), and benefits were aggregated for the entire NAS, with relatively low fidelity simulation of SORM functions and aircraft trajectories. For SORM research, a more detailed benefits assessment of RCM and CADRS for specific airports or metroplexes is needed.

Oseguera-Lohr, Rosa↗

Mission Planning for Trident: Discovery proposal to Neptune’s moon, Triton

Trident was one of the four Discovery-class Step-1 mission proposals selected by NASA in 2020 for further development and study; however, in 2021, the Step-2 proposal was not down-selected to transition into the next phase of mission development, i.e., a mission for flight.Neptune’s largest moon, Triton, was the primary focus of study for Trident. Triton’s physical and orbital characteristics make it a unique planetary target for scientific exploration, providing opportunities for investigations in a wide variety of scientific fields, including geomorphological, atmospheric, geophysical, magnetospheric, and ionospheric studies. The science objectives of the Trident mission encompassed an in-depth interior-to-exterior set of objectives, focused on multiple outstanding questions resulting from the 1989 encounter of Voyager 2, and subsequent analysis.Ball Aerospace Corp. was tasked with building the Trident spacecraft, with JPL responsible for providing Engineering Support (Mission Design & Navigation, Mission Planning, Flight Operations, Ground Data Systems, Systems Engineering) and leading Project Management. The observatory would carry a wide-ranging suite of scientific instruments onboard, including an Infrared Spectrometer (IRS) and Narrow Angle Camera (NAC) to be provided by Ball Aerospace Corp., a Wide Angle Camera (WAC) from JPL, a Magnetometer from UCLA, a contributed Plasma Science Suite from IRF (Sweden), and a contributed Radio Science instrument from ASI (Italy). All of these instruments would be used to collect unique datasets during the Triton encounter. Trident would have taken advantage of an ~13-yr, nearly-ballistic trajectory to Triton, utilizing a timely Jupiter Gravity Assist, to execute a 10-day long encounter in the Neptunian system. Launch was planned for October 2025, with Triton arrival scheduled for December 2038. The timeline for this mission would have been sub-divided into seven major phases: Launch, Commissioning, Inner Planet Cruise, Outer Planet Cruise, Approach, Encounter, and Science Data Return. Multiple planetary flybys were planned to be performed during the cruise, including three Earth flybys and one Venus flyby in the Inner Planet Cruise phase, and one Jupiter flyby in the Outer Planet Cruise phase. Along with conventional (Range and Doppler) tracking data, Delta-DOR and Optical Navigation data were also to be acquired to assist with spacecraft navigation during the Approach and Encounter phases. A 3 meter X-Band High Gain Antenna would allow playback of all science data at 1 kbps within 1 year after the Triton Encounter. The Mission Planning element on Trident encompassed and informed multiple aspects of this proposal, ranging from science observation planning during the Triton Encounter phase, to generation of activity timelines for all mission phases; performing ground coverage analysis for science observations to be acquired by all instruments and tracing them to science requirements; evaluation of spacecraft resources including data volume stored onboard, power/energy consumption, telecom (commanding/telemetry) requirements, and overall, working at the interface of science and engineering teams on the mission. All of these functions that were performed by the Mission Planning team on this proposal are discussed in this paper.

Prockter, Louise↗

Scheduling and Separating Departures Crossing Arrival Flows in Shared Airspace

Flight efficiency and reduction of flight delays are among the primary goals of NextGen. In this paper, we propose a concept of shared airspace where departures fly across arrival flows, provided gaps are available in these flows. We have explored solutions to separate departures temporally from arrival traffic and pre-arranged procedures to support controllers' decisions. We conducted a Human-in-the-Loop simulation and assessed the efficiency and safety of 96 departures from the San Jose airport (SJC) climbing across the arrival airspace of the Oakland and San Francisco arrival flows. In our simulation, the SJC tower had a tool to schedule departures to fly across predicted gaps in the arrival flow. When departures were mistimed and separation could not be ensured, a safe but less efficient route was provided to the departures to fly under the arrival flows. A coordination using a point-out procedure allowed the arrival controller to control the SJC departures right after takeoff. We manipulated the accuracy of departure time (accurate vs. inaccurate) as well as which sector took control of the departures after takeoff (departure vs. arrival sector) in a 2x2 full factorial plan. Results show that coordination time decreased and climb efficiency increased when the arrival sector controlled the aircraft right after takeoff. Also, climb efficiency increased when the departure times were more accurate. Coordination was shown to be a critical component of tactical operations in shared airspace. Although workload, coordination, and safety were judged by controllers as acceptable in the simulation, it appears that in the field, controllers would need improved tools and coordination procedures to support this procedure.

shared airspace↗

Charlotte - EDC Evaluation and Demonstration (CEED) Human-in-the-Loop Results Briefing to ATD-2 FAA Partners

The Charlotte EDC Evaluation and Demonstration (CEED) was the first Human-In-The-Loop experiment under the Air Traffic Management Technology Demonstration-2 (ATD-2) project. The purpose of the study was fourfold: 1) to establish a simulation environment (Charlotte) for airspace operations for ATD-2 technology, 2) to simulate current-day departures and arrival operations, 3) to assess the impact of current Traffic Management Initiatives (TMI) on Charlotte (CLT) departure flows and en route operations in Washington (ZDC) and Atlanta Centers (ZTL), and 4) to assess the impact of departure takeoff time compliance on airspace operations. The experimental design compared 3 TMIs and 2 compliance levels. Fourteen FAA retired controllers participated in the simulation. In addition, two Traffic Management Coordinators from ZTL and ZDC managed traffic flows. Surface and airborne delays, control efficiency, throughput, realism, workload, and acceptability were assessed and will be compared across the experimental conditions. Participants rated the simulation as very realistic. Results indicate that different TMIs have different impacts on surface and airspace delay. Departure compliance indicates partial benefits to sector complexity and controller workload. This simulation will provide an initial assessment of the tactical scheduling problems that the ATD-2 technology will address in the near term.

airspace technology demonstration 2↗

Fatigue in U.S. Astronauts Onboard the International Space Station: Environmental Factors, Operational Impacts, and Implementation of Countermeasures

Since 2000, US astronauts have been supporting missions up to a six month duration on the International Space Station (ISS). Crewmembers have experienced fatigue for reasons similar to military deployments. Astronauts experience psychological stressors such as heavy workloads, extended duty periods, circadian misalignment, inadequate/ineffective sleep, and loss of the environmental cues of a gravity environment. Complicating the psychological stressors are environmental factors; distracting background noise, unexpected and variable mission schedules, unfavorable thermal control, elevated CO2 levels, and an unusual sleep environment with schedules that impinge on pre‐sleep periods. Physiological contributors to poor sleep and fatigue include a cephalad fluid shift and back pain. Restful sleep is further challenged due to a lack of gravity‐related proprioceptive cues and need for restraints. The term "space fog" has been used by astronauts to describe a phenomenon of forgetfulness, slowed reaction time and transient confusion while trying to complete tasks. There is a distinct temporal correlation with arrival on the Space Station and the onset of slowed cognitive skills and a spontaneous resolution that may take up to 6 weeks. The Genesis of this phenomenon may be chronic fatigue secondary to transitioning from a planar environment to a 360deg microgravity perspective. Recently, countermeasures to improve sleep duration and quality in astronauts on the ISS have been instituted with moderate degrees of success as measured by self‐reaction time (psychomotor vigilance task testing), actigraphy, and subjective reports. Judicious use of stimulants and hypnotics, light therapy, controlled sleep periods and sleep shifting and reducing ambient CO2 levels are a few of the most promising countermeasures being used in space to improve sleep and reduce fatigue.

Scheuring, R. A.↗

Exact and Heuristic Algorithms for Runway Scheduling

This paper explores the Single Runway Scheduling (SRS) problem with arrivals, departures, and crossing aircraft on the airport surface. Constraints for wake vortex separations, departure area navigation separations and departure time window restrictions are explicitly considered. The main objective of this research is to develop exact and heuristic based algorithms that can be used in real-time decision support tools for Air Traffic Control Tower (ATCT) controllers. The paper provides a multi-objective dynamic programming (DP) based algorithm that finds the exact solution to the SRS problem, but may prove unusable for application in real-time environment due to large computation times for moderate sized problems. We next propose a second algorithm that uses heuristics to restrict the search space for the DP based algorithm. A third algorithm based on a combination of insertion and local search (ILS) heuristics is then presented. Simulation conducted for the east side of Dallas/Fort Worth International Airport allows comparison of the three proposed algorithms and indicates that the ILS algorithm performs favorably in its ability to find efficient solutions and its computation times.

safe & surface operations↗

Advanced Communication and Networking Technologies for Mars Exploration

Next-generation Mars communications networks will provide communications and navigation services to a wide variety of Mars science vehicles including: spacecraft that are arriving at Mars, spacecraft that are entering and descending in the Mars atmosphere, scientific orbiter spacecraft, spacecraft that return Mars samples to Earth, landers, rovers, aerobots, airplanes, and sensing pods. In the current architecture plans, the communication services will be provided using capabilities deployed on the science vehicles as well as dedicated communication satellites that will together make up the Mars network. This network will evolve as additional vehicles arrive, depart or end their useful missions. Cost savings and increased reliability will result from the ability to share communication services between missions. This paper discusses the basic architecture that is needed to support the Mars Communications Network part of NASA's Space Science Enterprise (SSE) communications architecture. The network may use various networking technologies such as those employed in the terrestrial Internet, as well as special purpose deep-space protocols to move data and commands autonomously between vehicles, at disparate Mars vicinity sites (on the surface or in near-Mars space) and between Mars vehicles and earthbound users. The architecture of the spacecraft on-board local communications is being reconsidered in light of these new networking requirements. The trend towards increasingly autonomous operation of the spacecraft is aimed at reducing the dependence on resource scheduling provided by Earth-based operators and increasing system fault tolerance. However, these benefits will result in increased communication and software development requirements. As a result, the envisioned Mars communications infrastructure requires both hardware and protocol technology advancements. This paper will describe a number of the critical technology needs and some of the ongoing research activities.

Bhasin, Kul↗