Search NASA⌕ Search

SEARCH · Search NASA

Results for “Scheduling Service”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 217 records · Page 12

Providing Reliability Services through Demand Response: A Prelimnary Evaluation of the Demand Response Capabilities of Alcoa Inc.

Demand response is the largest underutilized reliability resource in North America. Historic demand response programs have focused on reducing overall electricity consumption (increasing efficiency) and shaving peaks but have not typically been used for immediate reliability response. Many of these programs have been successful but demand response remains a limited resource. The Federal Energy Regulatory Commission (FERC) report, 'Assessment of Demand Response and Advanced Metering' (FERC 2006) found that only five percent of customers are on some form of demand response program. Collectively they represent an estimated 37,000 MW of response potential. These programs reduce overall energy consumption, lower green house gas emissions by allowing fossil fuel generators to operate at increased efficiency and reduce stress on the power system during periods of peak loading. As the country continues to restructure energy markets with sophisticated marginal cost models that attempt to minimize total energy costs, the ability of demand response to create meaningful shifts in the supply and demand equations is critical to creating a sustainable and balanced economic response to energy issues. Restructured energy market prices are set by the cost of the next incremental unit of energy, so that as additional generation is brought into the market, the cost for the entire market increases. The benefit of demand response is that it reduces overall demand and shifts the entire market to a lower pricing level. This can be very effective in mitigating price volatility or scarcity pricing as the power system responds to changing demand schedules, loss of large generators, or loss of transmission. As a global producer of alumina, primary aluminum, and fabricated aluminum products, Alcoa Inc., has the capability to provide demand response services through its manufacturing facilities and uniquely through its aluminum smelting facilities. For a typical aluminum smelter, electric power accounts for 30% to 40% of the factory cost of producing primary aluminum. In the continental United States, Alcoa Inc. currently owns and/or operates ten aluminum smelters and many associated fabricating facilities with a combined average load of over 2,600 MW. This presents Alcoa Inc. with a significant opportunity to respond in areas where economic opportunities exist to help mitigate rising energy costs by supplying demand response services into the energy system. This report is organized into seven chapters. The first chapter is the introduction and discusses the intention of this report. The second chapter contains the background. In this chapter, topics include: the motivation for Alcoa to provide demand response; ancillary service definitions; the basics behind aluminum smelting; and a discussion of suggested ancillary services that would be particularly useful for Alcoa to supply. Chapter 3 is concerned with the independent system operator, the Midwest ISO. Here the discussion examines the evolving Midwest ISO market structure including specific definitions, requirements, and necessary components to provide ancillary services. This section is followed by information concerning the Midwest ISO's classifications of demand response parties. Chapter 4 investigates the available opportunities at Alcoa's Warrick facility. Chapter 5 involves an in-depth discussion of the regulation service that Alcoa's Warrick facility can provide and the current interactions with Midwest ISO. Chapter 6 reviews future plans and expectations for Alcoa providing ancillary services into the market. Last, chapter 7, details the conclusion and recommendations of this paper.

24 POWER TRANSMISSION AND DISTRIBUTION↗

AsyncStageOut: Distributed User Data Management for CMS Analysis

AsyncStageOut (ASO) is a new component of the distributed data analysis system of CMS, CRAB, designed for managing users' data. It addresses a major weakness of the previous model, namely that mass storage of output data was part of the job execution resulting in inefficient use of job slots and an unacceptable failure rate at the end of the jobs. ASO foresees the management of up to 400k files per day of various sizes, spread worldwide across more than 60 sites. It must handle up to 1000 individual users per month, and work with minimal delay. This creates challenging requirements for system scalability, performance and monitoring. ASO uses FTS to schedule and execute the transfers between the storage elements of the source and destination sites. It has evolved from a limited prototype to a highly adaptable service, which manages and monitors the user file placement and bookkeeping. To ensure system scalability and data monitoring, it employs new technologies such as a NoSQL database and re-uses existing components of PhEDEx and the FTS Dashboard. We present the asynchronous stage-out strategy and the architecture of the solution we implemented to deal with those issues and challenges. The deployment model for the high availability and scalability of the service is discussed. The performance of the system during the commissioning and the first phase of production are also shown, along with results from simulations designed to explore the limits of scalability.

Riahi, H.↗

Analyzing the Impact of System Reliability Events on Applications in the Titan Supercomputer

Extreme-scale computing systems employ Reliability, Availability and Serviceability (RAS) mechanisms and infrastructure to log events from multiple system components. In this paper, we analyze RAS logs in conjunction with the application placement and scheduling database, in order to understand the impact of common RAS events on application performance. This study conducted on the records of about 2 million applications executed on Titan supercomputer provides important insights for system users, operators and computer science researchers. Specifically, we investigate the impact of RAS events on application performance and its variability by comparing cases where events are recorded with corresponding cases where no events are recorded. Such a statistical investigation is possible since we observed that system users tend to execute their applications multiple times. Our analysis reveals that most RAS events do impact application performance, although not always. We also find that different system components affect application performance differently. In particular, our investigation includes the following components: parallel file system processor, memory, graphics processing units, system and user software issues. Our work establishes the importance of providing feedback to system users for increasing operational efficiency of extreme-scale systems.

Ashraf, Rizwan↗

Quality assurance and independent dosimetry for an intraoperative x-ray device

Purpose: Quality assurance is an essential component of accurate and safe radiotherapy delivery, and should include measurements which are independent of manufacturer-provided calibration. However, the physical and dosimetric properties of the INTRABEAM compact mobile 50 kV x-ray source are different from conventional kilovoltage therapy units and few reports describe methods for independent checks, frequencies, or tolerances for quality assurance tests. Methods: Based on the available evidence and local experience, methods are described for determination of the key dosimetric parameters: beam quality, output, isotropy, and depth doses. Internal system checks are also described, along with measurements of long-term stability. Results: A small volume parallel plate ionization chamber in a liquid water tank is the gold standard for measurements with this unit, but solid water-equivalent materials, thermoluminescent dosimeters and radiochromic film can all be used as practical alternatives with an accuracy of 5%-10%. The main cause of measurement uncertainty is positioning of the detector in the steep dose gradient, but energy dependence should also be considered. Conclusions: A quality assurance schedule with suggested tolerances is proposed, which includes both internal tests, before each treatment and on a monthly basis, and independent tests every year or after servicing or recalibration.

60 APPLIED LIFE SCIENCES↗

Demonstration of Utility Managed Smart Charging for Multiple Benefit Streams (Final Report)

In the summer of 2020, the U.S. Department of Energy (DOE) awarded funding to Exelon’s Maryland utilities—Baltimore Gas and Electric (BGE), Delmarva Power & Light (DPL), and Potomac Electric Power Company (Pepco)—to implement the Smart Charge Management (SCM) pilot. This initiative aimed to design and implement managed electric vehicle (EV) charging strategies, evaluate the grid impacts of EV charging, and assess the utilities' ability to control EV load based on real-time grid conditions. The SCM pilot explored four aspects for continued improvement: (1) cybersecurity and managed charging functionality testing of two vendor platforms—WeaveGrid (telematics-based) and Shell Recharge Solutions (network-based)—which pursued charge scheduling and optimization through distinct approaches; (2) an analysis by Argonne National Laboratory (ANL) modeling team of three potential SCM enrollment scenarios within BGE and Pepco service territories over the next decade to assess future scalability; (3) employing customer engagement strategies, including surveys and a responsive pricing approach; and (4) the launch and implementation of pilots in Exelon’s Maryland territories in collaboration with WeaveGrid.

24 POWER TRANSMISSION AND DISTRIBUTION↗

QoS support for end users of I/O-intensive applications using shared storage systems

I/O-intensive applications are becoming increasingly common on today's high-performance computing systems. While performance of compute-bound applications can be effectively guaranteed with techniques such as space sharing or QoS-aware process scheduling, it remains a challenge to meet QoS requirements for end users of I/O-intensive applications using shared storage systems because it is difficult to differentiate I/O services for different applications with individual quality requirements. Furthermore, it is difficult for end users to accurately specify performance goals to the storage system using I/O-related metrics such as request latency or throughput. As access patterns, request rates, and the system workload change in time, a fixed I/O performance goal, such as bounds on throughput or latency, can be expensive to achieve and may not lead to a meaningful performance guarantees such as bounded program execution time. We propose a scheme supporting end-users QoS goals, specified in terms of program execution time, in shared storage environments. We automatically translate the users performance goals into instantaneous I/O throughput bounds using a machine learning technique, and use dynamically determined service time windows to efficiently meet the throughput bounds. We have implemented this scheme in the PVFS2 parallel file system and have conducted an extensive evaluation. Our results show that this scheme can satisfy realistic end-user QoS requirements by making highly efficient use of the I/O resources. The scheme seeks to balance programs attainment of QoS requirements, and saves as much of the remaining I/O capacity as possible for best-effort programs.

97 MATHEMATICS AND COMPUTING↗

A Distributed Middleware Architecture for Attack-Resilient Communications in Smart Grids

Distributed Energy Resources (DERs) are being increasingly accepted as an excellent complement to traditional energy sources in smart grids. As most of these generators are geographically dispersed, dedicated communications investments for every generator are capital cost prohibitive. Real-time distributed communications middleware, which supervises, organizes and schedules tremendous amounts of data traffic in smart grids with high penetrations of DERs, allows for the use of existing network infrastructure. In this paper, we propose a distributed attack-resilient middleware architecture that detects and mitigates the congestion attacks by exploiting the Quality of Experience (QoE) measures to complement the conventional Quality of Service (QoS) information to detect and mitigate the congestion attacks effectively. The simulation results illustrate the efficiency of our proposed communications middleware architecture.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Quantifying the value of hydropower in the electric grid : role of hydropower in existing markets.

The electrical power industry is facing the prospect of integrating a significant addition of variable generation technologies in the next several decades, primarily from wind and solar facilities. Overall, transmission and generation reserve levels are decreasing and power system infrastructure in general is aging. To maintain grid reliability modernization and expansion of the power system as well as more optimized use of existing resources will be required. Conventional and pumped storage hydroelectric facilities can provide an increasingly significant contribution to power system reliability by providing energy, capacity and other ancillary services. However, the potential role of hydroelectric power will be affected by another transition that the industry currently experiences - the evolution and expansion of electricity markets. This evolution to market-based acquisition of generation resources and grid management is taking place in a heterogeneous manner. Some North American regions are moving toward full-featured markets while other regions operate without formal markets. Yet other U.S. regions are partially evolved. This report examines the current structure of electric industry acquisition of energy and ancillary services in different regions organized along different structures, reports on the current role of hydroelectric facilities in various regions, and attempts to identify features of market and scheduling areas that either promote or thwart the increased role that hydroelectric power can play in the future. This report is part of a larger effort led by the Electric Power Research Institute with purpose of examining the potential for hydroelectric facilities to play a greater role in balancing the grid in an era of greater penetration of variable renewable energy technologies. Other topics that will be addressed in this larger effort include industry case studies of specific conventional and hydro-electric facilities, systemic operating constraints on hydro-electric resources, and production cost simulations aimed at quantifying the increased role of hydro.

13 HYDRO ENERGY↗

The CPAT 2.0.2 Domain Model - How CPAT 2.0.2 "Thinks" From an Analyst Perspective.

To help effectively plan the management and modernization of their large and diverse fleets of vehicles, the Program Executive Office Ground Combat Systems (PEO GCS) and the Program Executive Office Combat Support and Combat Service Support (PEO CS &CSS) commissioned the development of a large - scale portfolio planning optimization tool. This software, the Capability Portfolio Analysis Tool (CPAT), creates a detailed schedule that optimally prioritizes the modernization or replacement of vehicles within the fleet - respecting numerous business rules associated with fleet structure, budgets, industrial base, research and testing, etc., while maximizing overall fleet performance through time. This report contains a description of the organizational fleet structure and a thorough explanation of the business rules that the CPAT formulation follows involving performance, scheduling, production, and budgets. This report, which is an update to the original CPAT domain model published in 2015 (SAND2015 - 4009), covers important new CPAT features. This page intentionally left blank

97 MATHEMATICS AND COMPUTING↗

Hualapai Tribal Utility Development Project

The first phase of the Hualapai Tribal Utility Development Project (Project) studied the feasibility of establishing a tribally operated utility to provide electric service to tribal customers at Grand Canyon West (see objective 1 below). The project was successful in completing the analysis of the energy production from the solar power systems at Grand Canyon West and developing a financial model, based on rates to be charged to Grand Canyon West customers connected to the solar systems, that would provide sufficient revenue for a Tribal Utility Authority to operate and maintain those systems. The objective to establish a central power grid over which the TUA would have authority and responsibility had to be modified because the construction schedule of GCW facilities, specifically the new air terminal, did not match up with the construction schedule for the solar power system. Therefore, two distributed systems were constructed instead of one central system with a high voltage distribution network. The Hualapai Tribal Council has not taken the action necessary to establish the Tribal Utility Authority that could be responsible for the electric service at GCW. The creation of a Tribal Utility Authority (TUA) was the subject of the second objective of the project. The second phase of the project examined the feasibility and strategy for establishing a tribal utility to serve the remainder of the Hualapai Reservation and the feasibility of including wind energy from a tribal wind generator in the energy resource portfolio of the tribal utility (see objective 2 below). It is currently unknown when the Tribal Council will consider the implementation of the results of the study. Objective 1 - Develop the basic organizational structure and operational strategy for a tribally controlled utility to operate at the Tribe’s tourism enterprise district, Grand Canyon West. Coordinate the development of the Tribal Utility structure with the development of the Grand Canyon West Power Project construction of the power infrastructure at Grand Canyon West. Develop the maintenance and operations capacity necessary to support utility operations. Develop rates for customers on the Grand Canyon West “mini-grid” sufficient for the tribal utility to be self-sustaining. Establish an implementation strategy for tribal utility service at Grand Canyon West Objective 2 - Develop a strategy for tribal utility takeover of electric service on the Reservation. Perform a cost analysis of Reservation electrical service. Develop an implementation strategy for tribal takeover of Reservation electrical service. Examine options and costs associated with integration of the Tribe’s wind resources.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Simultaneous personnel and vehicle shift scheduling in the waste management sector

Highlights: • We consider the problem of simultaneously schedule personnel and vehicle shifts in the waste management sector. • We propose both an optimization model and a heuristic approach. • Important monetary savings can be achieved in the waste collection operations. - Abstract: Urban waste management is becoming an increasingly complex task, absorbing a huge amount of resources, and having a major environmental impact. The design of a waste management system consists in various activities, and one of these is related to the definition of shift schedules for both personnel and vehicles. This activity has a great incidence on the tactical and operational cost for companies. In this paper, we propose an integer programming model to find an optimal solution to the integrated problem. The aim is to determine optimal schedules at minimum cost. Moreover, we design a fast and effective heuristic to face large-size problems. Both approaches are tested on data from a real-world case in Southern Italy and compared to the current practice utilized by the company managing the service, showing that simultaneously solving these problems can lead to significant monetary savings.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Optimizing workplace charging facility deployment and smart charging strategies

This study introduces a workplace charging (WPC) optimization model that maximizes the total satisfied electric miles of employees’ plug-in electric vehicles, subject to a given annual budget. The model optimizes both planning decisions of charger number and power levels and operation decisions of charging spot assignment and charging schedule for the given temporal distribution of charging demands and varied electricity prices. Results of experiments based on national average travel data indicate that the actual WPC strategy varies by budget level. Through optimization, the strategy could reduce impacts of the varied electricity price by shifting charging schedules to periods when electricity prices are low. Also, the model is expanded to study the trade-off between providing WPC and addressing consequence of degraded charging service by including the per-mile shadow cost of unsatisfied charging demand. Finally, we observe that their relative competitiveness mainly depends on the actual shadow cost of WPC.

33 ADVANCED PROPULSION SYSTEMS↗

Projecting Future Colorado River Basin Water and Hydropower Operations

Drought, variable renewable energy (VRE) resources (primarily wind and photovoltaic technologies), and power markets can all impact hydropower plant operations. We analyze how these three factors collectively may potentially change the future operation and economics of federal dams and hydropower plants located in the Colorado River Basin (CRB). Federal CRB energy and capacity resources, including 4,200 MW of hydropower capacity, are marketed by Western Area Power Administration (WAPA) and sold through long-term Firm Electric Service (FES) contracts to entities located in 15 western and central States that serve millions of electricity consumers. The parameters of FES contracts allow a wide range of scheduling flexibility for FES customers. The FES customers will adjust the timing of energy delivery according to the changing water, power market, and VRE contribution level to the power grid. We simulate and project water and hydropower operations with two models: 1) reservoir operation and 2) power system operation (production cost) with various temporal granularity. We consider two sets of grid scenarios (one representing today's infrastructure, and one representing higher VRE contributions in 2036) and two sets of water scenarios (drought and normal hydrology). We modeled scenarios to understand the power market-energy price levels and patterns, FES customer scheduling, hydropower economics, WAPA finances and hydropower operation for various hydrologic conditions, and VRE contribution level to the power grid. The detailed modeling framework includes: (1) creating ensembles of CRB hydrologic and hydropower futures, (2) selecting representative futures, (3) simulation of FES customer contracts, (4) simulating western U.S. power grid economic scheduling and dispatch under two VRE contribution levels, utilizing information from modeling steps (1)-(4), (5) assessment of reservoir water and hydropower operation, and (6) comparing scenario operations and economics. Our study team comprising WAPA, and an interdisciplinary team of national labs will gain insight into how WAPA can prepare for and adapt its practices in response to an evolving U.S. power grid.

Colorado River↗

Impact of Hydrological Data on Power System Operational Studies: Preprint

Hydropower is expected to play an important role in maintaining grid reliability and flexibility as the share of of variable renewable energy increases. While the current hydropower operational models have been studied and used widely, they haven't been updated for decades to meet new performance standards. For example, current steady state and dynamic models often neglect hydrological conditions, which may lead to unrealistic expectations when relying on hydropower for energy and ancillary services. To study this impact, a multi-timescale hydrological model was created by leveraging the National Renewable Energy Laboratory-developed Multi-timescale Integrated Dynamics and Scheduling (MIDAS) tool. Using MIDAS, we compare the impact of considering hydrological conditions in a day-ahead unit commitment (DAUC) schedule on the reduced 240-bus Western Interconnect (WI) test system under winter and summer case studies. We show that neglecting current hydrological conditions of hydropower plants in power system models can lead to an overestimation of hydropower capabilities, which could lead to power balancing issues. For example, power system DAUC simulation results of our reduced test system show that in the case where hydrological conditions are not considered in the model, an approximate 31% overestimation of hydropower capabilities occurs in the summer case and approximately 60% occurs in the winter case compared to what is available. Additionally, results show an underestimation of WI day-ahead power system generation costs by approximately $54M - $80M in the weekly summer scenario and $116M - $126M in the weekly winter scenario. This analysis helps to underscore the importance of considering hydrological data in power system operational studies.

ENERGY PLANNING, POLICY, AND ECONOMY,HYDRO ENERGY↗

Optimized Hypervisor Scheduler for Parallel Discrete Event Simulations on Virtual Machine Platforms

With the advent of virtual machine (VM)-based platforms for parallel computing, it is now possible to execute parallel discrete event simulations (PDES) over multiple virtual machines, in contrast to executing in native mode directly over hardware as is traditionally done over the past decades. While mature VM-based parallel systems now offer new, compelling benefits such as serviceability, dynamic reconfigurability and overall cost effectiveness, the runtime performance of parallel applications can be significantly affected. In particular, most VM-based platforms are optimized for general workloads, but PDES execution exhibits unique dynamics significantly different from other workloads. Here we first present results from experiments that highlight the gross deterioration of the runtime performance of VM-based PDES simulations when executed using traditional VM schedulers, quantitatively showing the bad scaling properties of the scheduler as the number of VMs is increased. The mismatch is fundamental in nature in the sense that any fairness-based VM scheduler implementation would exhibit this mismatch with PDES runs. We also present a new scheduler optimized specifically for PDES applications, and describe its design and implementation. Experimental results obtained from running PDES benchmarks (PHOLD and vehicular traffic simulations) over VMs show over an order of magnitude improvement in the run time of the PDES-optimized scheduler relative to the regular VM scheduler, with over 20 reduction in run time of simulations using up to 64 VMs. The observations and results are timely in the context of emerging systems such as cloud platforms and VM-based high performance computing installations, highlighting to the community the need for PDES-specific support, and the feasibility of significantly reducing the runtime overhead for scalable PDES on VM platforms.

Yoginath, Srikanth B↗

Coordinated Control Strategy of a Battery Energy Storage System to Support a Wind Power Plant Providing Multi-Timescale Frequency Ancillary Services

With increasing penetrations of wind generation on electric grids, wind power plants (WPPs) are encouraged to provide frequency ancillary services (FAS); however, it is a challenge to ensure that variable wind generation can reliably provide these ancillary services. This paper proposes using a battery energy storage system (BESS) to ensure the WPPs' commitment to FAS. This method also focuses on reducing the BESS's size and extending its lifetime. In this paper, a state-machine-based coordinated control strategy is developed to utilize a BESS to support the obliged FAS of a WPP (including both primary and secondary frequency control). This method takes into account the operational constraints of the WPP (e.g., real-time reserve) and the BESS (e.g., state of charge [SOC], charge and discharge rate) to provide reliable FAS. Meanwhile, an adaptive SOC-feedback control is designed to maintain SOC at the optimal value as much as possible and thus reduce the size and extend the lifetime of the BESS. In conclusion, the effectiveness of the control strategy is validated with an innovative, multi-area, interconnected power system simulation platform that can mimic realistic power systems operation and control by simulating real-time economic dispatch, regulating reserve scheduling, multi-area automatic generation control, and generators' dynamic response.

25 ENERGY STORAGE↗

From Cell to System: Accelerated hpc Simulations of BESS Aging under Frequency Regulation and Arbitrage use cases

Lithium-ion battery energy storage systems (BESS) packs have emerged as a leading solution for grid-scale energy storage, enhancing resiliency and balancing load fluctuations. Yet, experimental characterization of large-format LIB packs-particularly to assess performance and degradation over hundreds of cycles - demands substantial hardware investment and multi-year testing campaigns. In this work, we couple a hierarchical, physics-based modeling framework agnostic to electrode chemistries with high-performance computing to accelerate systems level evaluation by upto two orders of magnitude. Building on the open-source liionpack platform, we implement cell, module, and pack-scale electrochemical models enriched with mechanistic aging mechanisms and deploy them on an HPC cluster to simulate 150−200kWh systems over 500 - 1,000 cycles with in days. We subject these virtual B ESS to both constant-current cycling and realistic grid service profiles spanning frequency regulation, ramp-rate support, and energy arbitrage-and quantify the resulting degradation patterns. Our results reveal that localized cell aging can induce substantial nonuniformity at module and pack levels, with service-specific cycling protocols driving distinct aging modes. This rapid, multiscale modeling approach provides a powerful design-space exploration tool for optimizing electrical architecture, control strategies, and operational schedules to prolong pack lifetime and lower total cost of ownership.

Ayalasomayajula, Surya [ORNL] (ORCID:0009000860788↗

CWS4DB: A Customizable Web Service for Efficient Access to Distributed Nuclear Physics Relational Databases

Tech-X proposes to develop a system providing an efficient access for the High-Energy and Nuclear Physics data stored in distributed heterogeneous relational databases. The system will consist of a generic Web Service, customized client APIs, and tools that facilitate generation of custom client APIs. The access to the data will be mediated by mechanisms that provide data caching and adaptive scheduling of the query plans.

99 GENERAL AND MISCELLANEOUS↗