Search NASA⌕ Search

SEARCH · Search NASA

Results for “Site Readiness”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 217 records · Page 12

NASA Robotic Neurosurgery Testbed

The detection of tissue interface (e.g., normal tissue, cancer, tumor) has been limited clinically to tactile feedback, temperature monitoring, and the use of a miniature ultrasound probe for tissue differentiation during surgical operations, In neurosurgery, the needle used in the standard stereotactic CT or MRI guided brain biopsy provides no information about the tissue being sampled. The tissue sampled depends entirely upon the accuracy with which the localization provided by the preoperative CT or MRI scan is translated to the intracranial biopsy site. In addition, no information about the tissue being traversed by the needle (e.g., a blood vessel) is provided. Hemorrhage due to the biopsy needle tearing a blood vessel within the brain is the most devastating complication of stereotactic CT/MRI guided brain biopsy. A robotic neurosurgery testbed has been developed at NASA Ames Research Center as a spin-off of technologies from space, aeronautics and medical programs. The invention entitled "Robotic Neurosurgery Leading to Multimodality Devices for Tissue Identification" is nearing a state ready for commercialization. The devices will: 1) improve diagnostic accuracy and precision of general surgery, with near term emphasis on stereotactic brain biopsy, 2) automate tissue identification, with near term emphasis on stereotactic brain biopsy, to permit remote control of the procedure, and 3) reduce morbidity for stereotactic brain biopsy. The commercial impact from this work is the potential development of a whole new generation of smart surgical tools to increase the safety, accuracy and efficiency of surgical procedures. Other potential markets include smart surgical tools for tumor ablation in neurosurgery, general exploratory surgery, prostate cancer surgery, and breast cancer surgery.

Mah, Robert↗

Development of Robotic Inspection Systems for In-situ Characterisation Prior to Decommissioning - 20306

The University of Bristol's South West Nuclear Hub is part of two large UK academic research collaborations aiming to reduce the costs of nuclear power by trialing innovative solutions to major decommissioning challenges. Robotics and Artificial Intelligence in Nuclear (RAIN) and the National Centre for Nuclear Robotics (NCNR) are the two collaborations tasked by the UK research councils to coordinate this activity, for the benefit of the nuclear industry. This paper presents a summary of Bristol's research aimed at generating and demonstrating a series of technologies ready for commercialization. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Considerations for Distributed Edge Data Centers and Use of Building Loads to Support Large Interconnections

The rapid expansion of artificial intelligence (AI) and machine learning is driving unprecedented electricity demand from data centers. It is predicted that by 2030, 90% of AI workloads will be inference-based, requiring interconnection of multiple low-latency edge data centers (<20 MW) sited closer to end users - often on already constrained distribution feeders. Although individually small, these loads can aggregate to large loads per feeder, straining infrastructure, creating multi-year interconnection delays, and driving up customer costs. This paper proposes a data center-focused grid-integration framework that combines feeder hosting capacity analysis with building energy efficiency, building load flexibility, and waste heat reuse to expand effective feeder and substation headroom. Such approaches can reduce interconnection delays, lower costs for ratepayers, and accelerate AI-ready infrastructure deployment.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Moon to Mars (M2M) Habitation Considerations: A Snap Shot As of January 2022

The following NASA Technical Memorandum (TM) is intended to provide a snapshot in time of NASA’s current considerations (ground rules and assumptions, functional allocations, logistics) for habitation systems for the lunar surface (non-roving) and Mars transits. As NASA continues to refine the reference designs to meet the needs of an evolving architecture, it is expected that this information will also be updated as a result. Where appropriate, relevant publicly released documents will be referenced to provide further detail. NASA’s human lunar exploration plan under the Artemis program calls for achieving the goal of sending the first woman and first person of color to the surface of the Moon in the mid- 2020s and working toward sustainable exploration by the end of the decade. Working with both commercial and international partners, NASA will establish a permanent human presence on the Moon to uncover new scientific discoveries and lay the foundation for private companies to build a lunar economy. Longer duration missions on the lunar surface and in lunar orbit will also serve as a test bed for technologies to support future Mars exploration campaigns. The agency will use what we learn on the Moon to prepare for humanity's next giant leap – sending astronauts to Mars. NASA intends to establish a sustained lunar presence with the development of the Artemis Base Camp to prove technologies and capabilities that will one day enable humans to live and work on Mars, beginning with core elements including the Lunar Terrain Vehicle (LTV), the Pressurized Rover (PR), the lunar Surface Habitat (SH), power systems, and in-situ resource utilization (ISRU) systems. For in space operations and eventual transport of humans to Mars, NASA will utilize a Mars Transit Habitat (TH). Following deployment, the TH will complete a series of longer duration missions and shakedown testing while docked at Gateway, leveraging Gateway’s habitation redundancy for safety measures. Proposed Gateway-TH missions will far exceed the longest duration cislunar human missions to date. They will be the first operational readiness tests of our long-duration deep space systems, and of the split crew (two crew on the surface, two crew in space) operations that are vital to the approach for the first human Mars mission. Both the SH and TH are major architectural elements of NASA’s Moon to Mars (M2M) approach, each with very different concepts of operation. The SH is intended for use on the lunar surface as a home for astronauts, surface operations base, science facility, hub for communications, extravehicular activity (EVA) equipment repair site, waste processing facility, and supply hub. It serves as an enabler for a sustained surface presence and preparation for partial gravity operations during Mars missions. The SH will be designed to be self-sufficient for operations on the lunar surface. The SH will independently provide several functions, including its own power generation, energy storage capability, sleep quarters, hygiene areas, work areas, and dining areas. It will be capable of communicating with surface assets, orbital assets, and directly with Earth ground stations. It is planned to operate with two crew in the habitat for ~28- day stays with crew swap-outs in which the PR crew of two trades places with the habitat crew. During the swap-out, the habitat will nominally support four crew for a short period of time. For contingency scenarios, the habitat must also be capable of supporting four crew for up to 7 days. The TH will be designed to be capable of up to ~1,200-day Mars missions with the ability to carry all food and supplies needed to support a crew of four for this duration. An assumed Mars mission profile for the TH is to carry crew and supplies for ~850-day roundtrips between Earth and Mars orbit that allows 30-day stays on the Martian surface. To test the systems for this long journey, the TH will be used to extend the duration of missions at Gateway, enabling the orbiting outpost to be used as a Mars analog. These analog missions will be accomplished by attaching the TH to Gateway and conducting lunar surface operations from the TH. The TH may also need to perform free-flying shakedown missions to test out all systems prior to leaving for Mars. The habitat provides many critical functions including: a contingency airlock, crew quarters, galley, hygiene areas, safe haven capability, and science equipment. It can receive docked items from either axial end or on a radial port.

Habitat↗

High Resolution Terrain Sensing Lidar for Precision Navigation and Safe Landing of Space and Aerial Vehicles

A 3-D imaging flash lidar sensor employing a resolution enhancement algorithm is being developed at NASA Langley Research Center for providing Terrain Relative Navigation and Hazard Avoidance capabilities onboard spacecraft landing on the Moon, Mars, and other planetary bodies. This lidar sensor, we refer to as Terrain Sensing Lidar (TSL), is a solution for future missions that require landing at pre-designated sites near high value resources or at areas of high scientific value, while avoiding hazardous terrain features, such as escarpments, craters, slopes, and rocks, or pre-deployed assets. TSL can also benefit terrestrial applications such as autonomous aerial vehicles without reliance on signals from Global Positioning System (GPS). The feasibility of the TSL concept has been shown through a series of drone, fixed-wing aircraft, and helicopter flight tests. A prototype version of the TSL has been recently assembled for conducting another set of flight tests to demonstrate its readiness for upcoming landing missions. This paper describes the TSL, provides its performance parameters, and explains its operational concepts for landing missions.

Precision Navigation↗

STS-1: Columbia Briefings

A video presentation on an update of the STS-1 Columbia Shuttle is shown. Hugh Harris is the moderator. He introduces Don Phillips, Chief STS Test OPS, who presents the status of the vehicle. Terry William, Chief of Mechanical Systems, discusses the debonding of the panels. A question and answer period from the news media is shown. The various topics of discussion from the news media include: 1) Repair of thermal tiles; 2) Launch dates; and 3) Landing and launch sites and 4) Low pressure/high pressure tanking tests. An audio presentation is given of questions from NASA Marshall Space Flight Center and NASA Washington. On March 12, 1981, another STS-1 Columbia update is shown. Bob Schick, Shuttle Test Director, and Bob Sieck, Flight Project Engineer answers questions about the actual repair time of the panels and a very detailed description of the three areas of debonding is presented. A brief launch date statement from Dr. Allen Lovelace, Acting NASA Administrator is given and John Lardley, Shuttle Associate Director, discusses the flight readiness review.

Source record↗

Contingency Support Simulation for the Tracking and Data Relay Satellite System (TDRSS)

In March 2006, the Tracking and Data Relay Satellite (TDRS)-3 experienced an unexpected thrusting event, which caused significant changes to its orbit. Recovery from this anomaly was protracted, raising concerns during the Independent Review Team (IRT) investigation of the anomaly regarding the contingency response readiness. The simulations and readiness exercises discussed in this paper were part of the response to the IRT concerns. This paper explains the various levels of simulation needed to enhance the proficiency of the Flight Dynamics Facility (FDF) and supporting elements in recovery from a TDRS contingency situation. The main emergency to address is when a TDRS has experienced uncommanded, unreported, or misreported thrusting, causing a ground station to lose the ability to acquire the spacecraft, as happened in 2006. The following levels of simulation are proposed: 1) Tests that would be performed by the individual support sites to verify that internal procedures and tools are in place and up to date; 2) Tabletop simulations that would involve all of the key support sites talking through their respective operating procedures to ensure that proper notifications are made and communications links are established; and 3) Comprehensive simulations that would be infrequent, but realistic, involving data exchanges between ground sites and voice and electronic communications among the supporting elements.

Dykes, Andy↗

UKy-CAER Heat Integrated Transformative CO 2 Capture Process in Pulverized Coal Power Plants

The goal of this Phase II Topical Report is to summarize the work for public domain conducted on project DE-FE0031583. Building upon the Design Basis completed during Phase I and in accordance with the Statement of Project Objectives (SOPO), the University of Kentucky (UK) Center for Applied Energy Research (CAER) (Recipient) along with team members has completed the Front End Engineering Design (FEED) for its advanced, versatile post-combustion CO 2 capture system (CCS) at the 10 MWe large pilot scale to be installed at the Wyoming (WY) Integrated Test Center (ITC), using a heat integrated process with split-rich fed, two-stage stripping and any advanced solvent to enhance the CO 2 absorber performance and lower the cost of CO 2 capture. The proposed project (Phases I-III) involves the design, fabrication, installation, testing and evaluation of a large pilot scale facility that will demonstrate the UK CAER transformative CCS integrated with an operating power plant. The work performed in Phase I, detailed in the Phase I Topical Report that was submitted in March 2019, included formation of a project team, securing the host site, and completing pre-FEED design basis, a cost estimation, a preliminary techno-economic analysis (TEA) and an environmental information volume (EIV). The work performed in Phase II, detailed in this Phase II Topical Report, includes completion of FEEDs, completion of a process risk analysis (PRA), obtaining necessary permits, updating the EIV and TEA, updating the cost and schedule estimate for the Phase III scope of work (SOW) and securing the necessary cost share. Updated information is provided on the current status of the UK CAER CCS technology and the project is ready to begin immediately detailed design, construction and operation of the proposed pilot.

20 FOSSIL-FUELED POWER PLANTS↗

Sand Thermal Energy Storage Pilot Design (Final Report)

This report summarizes work done on developing a 10-MWhe pilot of the sand-based thermal energy storage (SandTES) technology at Alabama Power’s Plant Gaston Unit 5, an operating, supercritical coal power unit. The system will be integrated to the unit, obtaining steam to heat the sand through an air-blown fluidized-bed heat exchanger, then storing the water to be reused during discharging to produce steam that will then be vented. An electrical particle heater will also be included to provide part of the heat to the sand to provide data and learnings for commercial systems that will be fully electrically heated. Hot sand is contained in one bunker, while cold sand is housed in the other bunker, and standard solids handling equipment moves the sand around. This pilot would advance the SandTES technology to Technology Readiness Level 6 and position it for commercial readiness by 2030. This work was done in two phases: Phase I performed a conceptual study that provided Association for the Advancement of Cost Engineering (AACE) Class 5 costs and estimated performance, and then Phase II, which also involved a design update, performed a more detailed pre-front-end engineering and design study that elicited AACE Class 4 costs. Work was also done to provide estimated costs for commercial applications of the technology, assess its gaps, create its technology maturation and commercialization plans, and finally perform an Environmental Information Volume for the pilot site as a first step in the National Environmental Policy Act process.

20 FOSSIL-FUELED POWER PLANTS↗

Evaluating SAR Radiometric Terrain Correction Solutions: Optimal products for applied users

Operational applications of Synthetic Aperture Radar (SAR) are under development around the world, driven by the regularly-acquired, free-and-open source C-band SAR observations provided by ESA’s Sentinel-1 sensor constellation since 2014. Groups like SERVIR, a joint NASA and USAID initiative, are at the forefront of remote sensing applications for societal benefit. A takeaway from SERVIR’s experience is the need for appropriately geocoded and fully calibrated SAR data that is ready to use for a range of ecosystems-related applications. Radiometric Terrain Corrected (RTC) data are key entry-level products for multiple applications that range from ecosystems to hazards. This work fills a gap in current research by evaluating several RTCs produced by open-source software solutions (SNAP-7 and ISCE-2), the gold standard commercial software (GAMMA), a Google Earth Engine (GEE) based workflow, and the uncorrected GRD products currently available in GEE. RTCs were analyzed for geolocation quality, absolute radiometric calibration, and fidelity of the radiometric terrain flattening over ten sites representing varied terrains. In addition, a time series analysis was conducted over two locations. Overall, no significant differences for radiometric calibration were found across RTC products. However, all RTCs performed better than uncorrected GRD products. The main differences between products were found in geolocation quality. These results not only demonstrate the need for the uptake and distribution of RTC products for ecosystems applications, but demonstrate the ability to do so with open source methods, adding value to developing affordable operational applications.

Helen Blue Parache↗

Hydrogen Education for a Decarbonized Global Economy (H 2 EDGE) (Final Technical Report)

The energy sector is undergoing rapid growth and transformation, creating urgent demand for a skilled workforce to support emerging technologies and resilient systems. Hydrogen is an emerging solution for “hard to abate” sectors, including heavy industry and transportation that also provides optionality for the electric system and enables long‑duration energy storage. As hydrogen scales from traditional industrial uses to new applications, success depends on knowledgeable engineers, technicians, planners, and operators safely deploying hydrogen technologies across the full value chain: production, delivery, storage, and end use. The H 2 EDGE initiative, funded by the U.S. Department of Energy’s Hydrogen and Fuel Cell Technologies Office from 2020 to 2025, was launched to prepare people for careers hydrogen and related technologies. Through its interactive approach, H 2 EDGE equipped stakeholders with knowledge and tools to build a reliable and sustainable energy future together. H 2 EDGE built a national network of academic and industry partners to deliver modular training, share open-access curricula, and engage diverse talent pipelines. The program leveraged EPRI’s extensive industry membership and expanded on the train-the-trainer model of the GridEd program to connect educators, employers, and community organizations across all regions of the U.S. New methods were introduced to more systematically map hydrogen competencies and assess curricula using traditional and AI-assisted approaches. Outcomes included delivery of professional short courses, developing university curriculum, sponsoring faculty and student projects, and engaging stakeholders through workshops, site tours, and webinars.

08 HYDROGEN↗

Plowing Through the Cost Barrier: Zero Energy K-12 Schools for Less: Preprint

There is a perception that zero energy K–12 schools cost more than conventional schools. Zero energy schools provide a number of unique benefits to school districts, students and staff, and communities. Among other things, a zero energy school requires far less energy to operate than a conventional school and uses on-site renewable energy systems to offset that reduced energy load. The money saved on energy can often be used to enhance educational programs. But does the extra value come at a premium? Research findings indicate that not only can zero energy schools be designed and built on conventional school budgets, they can cost less. In an integrated design and construction process, the cost of zero energy measures can be offset by, for example, downsizing heating, ventilating, and air-conditioning systems, reducing both life cycle and first costs. These findings are based on an examination of 88 zero energy or zero energy ready schools across the United States built during the last 15 years. The data collected on these schools include capital costs and the experiences of owners and design teams. The goal was to understand the perceived cost barrier, given that each building was built with a predetermined budget. The results will help future school stakeholders, program administrators, and design teams counter the perceived cost barriers. Successful strategies for achieving zero energy at no initial cost are presented. The lessons learned from existing zero energy schools can help transform the market such that all new schools can be zero energy.

30 DIRECT ENERGY CONVERSION↗

Optimizing Alabama’s CO 2 Storage in Shelby County (Project OASIS): Task 6.0 Deliverable – CarbonSAFE Phase III Readiness

The OASIS CarbonSAFE Phase II Project OASIS (Optimizing Alabama’s CO 2 Storage in Shelby County) is a geologic and reservoir characterization study designed to evaluate deep saline formations for potential long-term carbon dioxide (CO 2 ) storage in central Alabama near the National Carbon Capture Center (NCCC) and Alabama Power’s Plant Gaston. The project centers on understanding the potential of the Cambro-Ordovician Knox Group and underlying strata such as the Conasauga and Rome Formations for geologic storage of CO 2 . These formations were investigated as part of SECARB-USA (DE-FE0031830) and Project OASIS through the drilling of two stratigraphic test wells to obtain electronic well logs, core, and sidewall core plugs. These data provide direct measurements of porosity, permeability, and lithologic variability critical for reservoir characterization. Complementing the well program, a limited 2D seismic survey was conducted to help select the site for Westover #2 as part of SECARB-USA (DE-FE0031830), and a more regional Seismic Exchange (SEI) seismic survey was licensed and interpreted to define structural and stratigraphic frameworks in a new Static Earth Model (SEM), map reservoir continuity, and to identify potential sealing intervals. Integrated with geologic and reservoir modeling, these datasets form the basis for evaluating storage capacity, injectivity, and containment. While this document endeavors to provide readers with a high-level overview of Project OASIS activities and its suitability for subsequent CarbonSAFE Phases, such as a Phase III effort. Other project deliverables and milestones will provide more details on individual subjects.

20 FOSSIL-FUELED POWER PLANTS↗

Robots for Astrobiology!

The search for life and its study is known as astrobiology. Conducting that search on other planets in our Solar System is a major goal of NASA and other space agencies, and a driving passion of the community of scientists and engineers around the world. We practice for that search in many ways, from exploring and studying extreme environments on Earth, to developing robots to go to other planets and help us look for any possible life that may be there or may have been there in the past. The unique challenges of space exploration make collaborations between robots and humans essential. The products of those collaborations will be novel and driven by the features of wholly new environments. For space and planetary environments that are intolerable for humans or where humans present an unacceptable risk to possible biologically sensitive sites, autonomous robots or telepresence offer excellent choices. The search for life signs on Mars fits within this category, especially in advance of human landed missions there, but also as assistants and tools once humans reach the Red Planet. For planetary destinations where we do not envision humans ever going in person, like bitterly cold icy moons, or ocean worlds with thick ice roofs that essentially make them planetary-sized ice caves, we will rely on robots alone to visit those environments for us and enable us to explore and understand any life that we may find there. Current generation robots are not quite ready for some of the tasks that we need them to do, so there are many opportunities for roboticists of the future to advance novel types of mobility, autonomy, and bio-inspired robotic designs to help us accomplish our astrobiological goals. We see an exciting partnership between robotics and astrobiology continually strengthening as we jointly pursue the quest to find extraterrestrial life.

Robotics↗

Planetary and Lunar Environment Thermal Toolbox Elements (PALETTE) Project Year One Results

This paper summarizes the technology development progress made during year one of the three-year JPL PALETTE project, which is funded by the NASA STMD Game Changing Development (GCD) Program. The project goal is to ensure that a full “palette” of flight-ready (high TRL) thermal “toolbox” elements is available so that engineers can create passive, ultra-isolative thermal designs for science instruments on a variety of carriers in lunar/planetary extreme environments. PALETTE is structured to meet the need via four design/build/test tasks and four analysis/study tasks. This paper focuses on Tasks 1-4, the four design/build/test tasks. Task 1 involves the development of nested thermally-switched enclosures featuring a reverse-operation DTE thermal switch (ROD-TSW) in series with a propylene miniaturized loop heat pipe (mini-LHP). Task 2 involves the development of a parabolic reflector radiator (PRR) for low latitude lunar sites. Task 3 involves the development of a low effective emissivity (e*) multilayer insulation (MLI) known as “spacerless” MLI. Finally, Task 4 involves the development of low conductance (G) thermal isolators. Available test results for all four tasks will be summarized in the paper, as will the plans for the remainder of the PALETTE project.

Britton, Shawn R↗

Advanced Structured Adsorbent Architectures for Transformative Carbon Dioxide Capture Performance (Final Report)

Svante is a world leader at using solid sorbents for low-cost Carbon Dioxide (CO 2 ) capture, a technology which is recognized as critical in meeting the dual mandates of energy security/reliability and the mitigation of man-made CO 2 emissions. Svante has been developing proprietary adsorbent material compositions, forming them into structured laminates, developing and optimizing process cycles, and system design for efficient capture of CO 2 from post-combustion flue gases of thermal power plants and industrial facilities. The deployment of first-generation CO 2 capture technology has been significantly hampered by high costs and energy penalties, among other barriers. Second generation CO 2 capture technologies (including the Mark I variant of Svante’s Veloxotherm™ adsorption-based technology), utilizing single adsorbent architecture, show promise for reducing the barriers to deploying CO 2 capture plants in commercially meaningful numbers. The objective of this project was to evaluate the Recipient’s transformational (Mark-II) VeloxoTherm™ Technology via the development and bench-scale testing of an advanced structured adsorbent, including novel Bi-layer, laminated adsorbent structures and segmented beds. Svante selected, synthesized, and characterized tailored solid adsorbents for computational modeling, advanced structured adsorbent development, process simulations, and dynamic bench scale (~1-10 kg/day CO 2 captured) testing using an existing single-bed VeloxoTherm™ Station (VTS) coupled with a natural gas-fired boiler. Segmented beds used the in-house, multi-bed Process Demonstration Unit (PDU) to demonstrate key performance indicators (KPIs), such as recovery, product purity, regeneration energy, and the integrated system's productivity in lifetime analysis. Segmented beds were used at a 1 tonne per day (TPD) unit at an industrial site to provide bench-scale validation of performance in an industrial setting. Svante was developing and optimizing the post-combustion CO 2 adsorption technology architectures, including the Bi-layer and segmented laminated adsorbent structure design, integrated rapid cycle temperature swing adsorption (RC-TSA) cycle, flow path architecture, and adsorbent bed construction and packaging (including gas porting) to progress towards achievement of DOE’s Transformational CO 2 Capture goals of 95% CO 2 purity and a cost of electricity at least 30% lower than a supercritical Pulverized Coal (PC) power plant with CO 2 capture, or approximately $30 per tonne of CO 2 captured ready for demonstration by 2030. The main requirements to reach the DOE target cost of carbon capture below $30/MT using Rapid-Cycling Temperature Swing Adsorption (RC-TSA) are as follows: (1) Increased capacity at different CO 2 concentrations, (2) Increased sorbents cycle life, (3) Increased O 2 resistance, and (4) Decreased steam requirement to extract 1 kg of CO 2 .

20 FOSSIL-FUELED POWER PLANTS↗

Exploitation of ERTS-1 imagery utilizing snow enhancement techniques

Photogeological analysis of ERTS-simulation and ERTS-1 imagery of snowcovered terrain within the ERAP Feather River site and within the New England (ERTS) test area provided new fracture detail which does not appear on available geological maps. Comparative analysis of snowfree ERTS-1 images has demonstrated that MSS Bands 5 and 7 supply the greatest amount of geological fracture detail. Interpretation of the first snow-covered ERTS-1 images in correlation with ground snow depth data indicates that a heavy blanket of snow (more than 9 inches) accentuates major structural features while a light "dusting", (less than 1 inch) accentuates more subtle topographic expressions. An effective mail-based method for acquiring timely ground-truth (snowdepth) information was established and provides a ready correlation of fracture detail with snow depth so as to establish the working limits of the technique. The method is both efficient and inexpensive compared with the cost of similarly scaled direct field observations.

Wobber, F. J.↗

Aeronautical-Satellite-Assisted Process Being Developed for Information Exchange Through Network Technologies (Aero-SAPIENT)

Communications technologies are being developed to address safety issues during aviation travel. Some of these technologies enable the aircraft to be in constant bidirectional communications with necessary systems, people, and other aircraft that are not currently in place today. Networking technologies, wireless datalinks, and advanced avionics techniques are areas of particular importance that the NASA Glenn Research Center has contributed. Glenn, in conjunction with the NASA Ames Research Center, NASA Dryden Flight Research Center, and NASA Langley Research Center, is investigating methods and applications that would utilize these communications technologies. In mid-June 2000, the flight readiness of the network and communications technologies were demonstrated via a simulated aircraft. A van simulating an aircraft was equipped with advanced phased-array antennas (Advanced Communications/Air Traffic Management (AC/ATM) Advanced Air Transportation Technologies (AATT) project) that used commercial Ku-band satellite communications to connect Glenn, Dryden, and Ames in a combined system ground test. This test simulated air-ground bidirectional transport of real-time digital audio, text, and video data via a hybrid network configuration that demonstrated the flight readiness of the network and communications technologies. Specifically, a Controller Pilot Data Link Communications application was used with other applications to demonstrate a multiprotocol capability via Internet-protocol encapsulated ATN (Aeronautical Telecommunications Network) data packets. The significance of this combined ground test is its contribution to the Aero Information Technology Base Program Level I milestone (Software Technology investment area) of a real-time data link for the National Airspace System. The objective of this milestone was to address multiprotocol technology applicable for real-time data links between aircraft, a satellite, and the ground as well as the ability to distribute flight data with multilevel priorities among several sites.

Zernic, Michael J.↗