Publisher's Note: Identifying Neutrino Mass Hierarchy at Extremely Small {theta}{sub 13} through Earth Matter Effects in a Supernova Signal [Phys. Rev. Lett. 101, 171801 (2008)]
No abstract prepared.
SEARCH · Search NASA
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
No abstract prepared.
Not Available
High-current cables using REBCO tapes can be used to develop high-field dipole magnets. However, the strain accumulated during cable fabrication and coil winding may reduce the critical current of the conductor. Therefore, it is important to properly consider the strain when designing high-field magnets. We used structural finite-element analysis (FEA) to predict the strain experienced by a REBCO tape during bending in configurations relevant to the fabrication of high-field accelerator magnets, in particular, the mechanical strain generated during cable fabrication and winding in a canted-cosθ dipole configuration. We considered two different cable options: (A) Flat tape that lay in the mandrel channel and (B) a REBCO tape helically wound around a circular copper core, the typical configuration of the conductor in round core cable (CORC). Strain accumulated during tape winding is studied for different core diameters and winding tilt angles. FEA longitudinal strain results were compared with the simulations for configuration A, where higher strain was observed experimentally. Configuration B was verified indirectly by comparing experimentally measured I c with the one predicted (based on the longitudinal strain) as a function of the bending diameter. Good agreement was found up to a bending diameter of 30 mm. The presented results will help to understand the impact of bending on REBCO tapes and CORC wires to develop high-field magnets.
The cross-section design of cos (θ) superconducting magnets is historically developed in a two-step process: initially, the coil geometry is defined on the basis of magnetic optimizations; then, the structure is designed around the coil. The first step searches for the best coil cross-section maximizing the magnetic field, margin, field quality and conductor efficiency. The latter step aims at limiting the coil stresses and deformations. However, the coil design, defined with the initial magnetic optimization, can influence the mechanical behaviour of the magnet, altering, for example, the peak stress during operation. As the critical current is a function of the applied strain, the mechanical implications of the coil cross-section design can limit the achievable performance. In this paper we propose an integrated optimization process that targets the peak stress on the conductor in addition to the magnetic objectives. Here the results are presented for a sample high-field Nb 3 Sn dipole: a 4-layer design aiming at ultimate conductor performance.
The U.S. Magnet Development Program (US-MDP) is developing high-field accelerator magnets with magnetic fields beyond the limits of Nb3Sn technology based on high temperature superconductor Bi 2 Sr 2 CaCu 2 O 8-x (Bi2212). However, Bi2212 wires and cables are sensitive to transverse stresses and strains, which are substantial in high-field accelerator magnets. To prevent large degradation of the Bi2212 coils and achieve the required field quality, an innovative design which provides turn positioning during coil fabrication and operation and manage azimuthal and radial strains/stresses in the coil has been proposed at FNAL. This paper describes the development of a small-aperture two-layer Bi2212 dipole coil with stress management. The main parameters of the Bi2212 wire and Rutherford cable, the design of coil stress management structure and its plastic model, the coil mechanical analysis in the dipole mirror configuration are presented and discussed.
High energy physics research will need more and more powerful circular accelerators in the next decades. It is therefore desirable to have dipole magnets able to produce the largest possible magnetic field, in order to keep the machine diameter within a reasonable size. A 20 T dipole is considered a desired achievement since it would allow the construction of an 80 km machine, able to circulate 100 TeV proton beams. In order to reach 20 T, a hybrid Low-Temperature Superconductor (LTS) - High-Temperature Superconductor (HTS) magnet is needed, since LTS technology is presently limited to ~16 T for accelerator magnet applications. In this paper, we present the design of a 6 layers 20 T hybrid dipole magnet using Nb 3 Sn (LTS) and Bi2212 (HTS). Here we show that it is possible to achieve this magnetic field with accelerator field quality, with sufficient margin on a realistic conductor, keeping the stresses within safe limit, avoiding conductor degradation.
The design concept of the Electron Ion Collider (EIC), which is under construction at BNL, considers adding a 2nd Interaction Region (IR) and detector to the machine after completion of the present EIC project. Recent progress with development and fabrication of large-aperture high-field magnets based on the Nb3Sn technology for the HL-LHC makes this technology interesting for the 2nd EIC IR. This paper summarizes the results of feasibility studies of large-aperture high-field Nb3Sn dipoles and quadrupoles for the 2nd EIC IR.
REBCO coated conductors have a strong potential for high-field magnet applications. The REBCO technology, however, is still in its infancy for accelerator magnet applications. As part of the U.S. Magnet Development Program (MDP), we developed a six-layer canted cos θ dipole magnet, C3a, using CORC® wires developed by Advanced Conductor Technologies LLC. All the layers were wound using a semi-automated winding machine. Three layers of the magnet used CORC® wires containing the SuperPower “AP” REBCO tapes and the remaining layers used the wires containing the “HM” tapes. At 77 K, both kinds of CORC® wires showed 5% to 10% degradation, after bending to a minimum bend radius of 30 or 35 mm, with respect to the self-field critical current measured before winding. At 4.2 K, the magnet reached 9.5 kA at a ramp rate of 9 A s -1 and generated a dipole field of 1.4 T. Further, the critical current of one layer degraded by 4% after a current transient up to 10.5 kA ramped in an averaged rate of 175 kA s -1 or 20 T s -1 . We confirmed the HM CORC® wire can carry a higher current than the AP CORC® wire at 4.2 K. The test results of the C3a magnet showed that the fabrication and assembly procedure can be used for the upcoming full-scale C3 magnet.
Not Available
Abstract not provided
No abstract prepared.
There were two major goals to this proposal: the study of the discrepancy between data and MC in the NuMI Medium Energy neutrino beam and the incorporation of the MINOS and NOVA neutrino oscillation datasets. The first topic was approached via development of a simulation of the NuMI beam monitoring instrumentation suite. Initially, the Horn-Off current data sets were used to measure a set of hadron production parameters which improved the data/MC agreement in a way which was independent of the focusing parameters. The peak position discrepancy was only explained by a large (10kA) reduction in the horn current. A full simulation of the muon monitors was developed to attempt to make an independent measurement of the horn current by means of differential data taken by those monitors. While only at the 5kA level, the result corroborated the former findings. The second goal has not yet been completed but progress has focused on understanding how to modify the MINOS MC to take into account the MEC contribution which is missing from the underlying NEUGEN MC. A number of improvements to the MINOS reconstruction have been necessary. The framework to run the fits on the combined data has been completed.
Explore the source record for details and available documents.
Thermal stratification and transition to natural circulation pose two of the largest sources of uncertainty in systems-level modeling of liquid metal-cooled fast reactors. As these phenomena typically develop during transient event sequences, licensing-basis events analyzed using systemslevel models may have considerable uncertainties associated with thermal-hydraulic parameters of the system to account for these phenomena. As a result, the validation basis for these phenomena for systems-level codes is insufficient to fully support the wide range of liquid metal fast reactors being developed in the US. Currently, the most viable path for licensing a design is to take significant conservatisms and maintain sufficiently large safety margins to account for this uncertainty.
This presentation discusses the first campaign on the Deimos platform. There was planned for 3 configurations and got 6. In process of writing ICSBEP evaluation with Section 1: to external review end of FY25 and the Full evaluation to TRG: FY27.
First hydrostatic stellar contraction phase for cases without full convection and adiabatic temperature stratification
Explore the source record for details and available documents.
Electroencephalographic responses of subjects performing vigilance task of detecting digits presented auditorally