Search NASA⌕ Search

SEARCH · Search NASA

Results for “Test Plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 217 records · Page 12

Fracture Toughness Properties of Tritium Charged and Aged Stainless Steels: SRNL and SNL Collaboration Test Plan and 2018 Results

Forged stainless steels are used as the materials of construction for tritium reservoirs. During service, tritium diffuses into the reservoir walls and radioactively decays to helium-3. Tritium and decay helium cause a higher propensity for cracking which could lead to a tritium leak or failure of a tritium reservoir. Fracture toughness properties are needed for designing tritium reservoirs and evaluating the long-term effects of tritium on their structural properties. A key result of prior studies is that the long-term cracking resistance of stainless steels in tritium service depends greatly on the interaction between decay helium and the steels’ forged microstructure. Designers and modelers at Sandia National Laboratories (SNL) have identified key gaps in the data available on material performance in tritium. Thus, a collaborative plan and schedule of tests have been developed with SRNL and SNL to fill these gaps using a range of tensile test and fracture mechanics test geometries, at stockpile relevant temperatures. These studies target the fundamental deformation mechanisms and the influence of tritium-decay-helium on their behavior. This report outlines the goals of each program and describes the sample test matrices and experimental conditions. This report fulfills the requirements for a portion of the Enhanced Surveillance Campaign (ESC) FY19 Level 2 milestone 6725 to deliver an annual report on the aging studies of reservoir materials.

36 MATERIALS SCIENCE↗

Analysis and Optimization of Test Plans for Advanced Exploration Systems Reliability and Supportability

Future crewed exploration missions beyond Low Earth Orbit (LEO) will operate farther from Earth and be logistically isolated for longer than any previous human spaceflight mission. Under these conditions, supportability and reliability willbestronger drivers of mission mass and risk than they have been in the past. Items with high failure rates, or uncertain failure rates, can result in high spares mass requirements and/or high risk on deep space missions. Testing is a critical element of system development which provides the opportunity to identify and resolve design issues, defects, or other failure modes before they cause problems during a mission. Reliability growth programs can reduce failure rates by identifying and remove failure modes via design changes, and long-duration life testing can provide valuable data to reduce failure rate estimate uncertainty and verify (to some level of confidence) that components are as reliable as expected. Testing activities take time and resources, however, and must be incorporated into program plans in order to be fully effective. This paper presents an integrated reliability test plan analysis and optimization methodology, which has been used to inform Advanced Exploration Systems (AES) Life Support Systems (LSS) ground test planning for future missions. The methodology determines the optimal number of test units to purchase and allocation of test time –split between reliability growth and uncertainty reduction testing –across a given set of items in order to minimize spares mass for a given mission under constraints on total test cost and schedule. Model outputs also include expected spares mass after testing and the expected number of modifications or refurbishments during testing, both of which can inform program planning. Discussion of the model, conclusions, and future work are also presented.

Testing↗

Analysis and Optimization of Test Plans for Advanced Exploration Systems Reliability and Supportability

Future crewed exploration missions beyond Low Earth Orbit (LEO) will operate farther from Earth and be logistically isolated for longer than any previous human spaceflight mission. Under these conditions, supportability and reliability willbestronger drivers of mission mass and risk than they have been in the past. Items with high failure rates, or uncertain failure rates, can result in high spares mass requirements and/or high risk on deep space missions. Testing is a critical element of system development which provides the opportunity to identify and resolve design issues, defects, or other failure modes before they cause problems during a mission. Reliability growth programs can reduce failure rates by identifying and remove failure modes via design changes, and long-duration life testing can provide valuable data to reduce failure rate estimate uncertainty and verify (to some level of confidence) that components are as reliable as expected. Testing activities take time and resources, however, and must be incorporated into program plans in order to be fully effective. This paper presents an integrated reliability test plan analysis and optimization methodology, which has been used to inform Advanced Exploration Systems (AES) Life Support Systems (LSS) ground test planning for future missions. The methodology determines the optimal number of test units to purchase and allocation of test time –split between reliability growth and uncertainty reduction testing –across a given set of items in order to minimize spares mass for a given mission under constraints on total test cost and schedule. Model outputs also include expected spares mass after testing and the expected number of modifications or refurbishments during testing, both of which can inform program planning. Discussion of the model, conclusions, and future work are also presented.

Testing↗

Test plan. Task 5, subtask 5.2: Early on-orbit TPSdebris impact tests

The limitation of damage to, and survival of, the cryogenic tankage during the on-orbit stay despite potential impact of orbital debris, may be a significant discriminator in the RHCTS trade studies described in the TA-1 trade study plan (ref. RHCTS-TSP-1) dated July 29, 1994. The objective of this early phase of an overall debris impact test program is to provide the data to support assessment of the relative suitability of integral and non integral tanks.

Greenberg, H. S.↗

Aboveground Injection Sytem Construction and Mecahnical Integrity Test Plan

An In-Situ Bioremediation (ISB) Pilot Test Treatability Study is planned at Sandia National Laboratories, New Mexico (SNL/NM) Technical Area-V (TA-V) Groundwater Area of Concern. The Treatability Study is designed to gravity inject an electron-donor substrate and bioaugmentation bacteria into groundwater using an injection well. The constituents of concern (COCs) are nitrate and trichloroethene (TCE). The Pilot Test Treatability Study will evaluate the effectiveness of bioremediation and COC treatment over a prescribed period of time. Results of the pilot test will provide data that will be used to evaluate the cost and effectiveness of a fullscale system.

54 ENVIRONMENTAL SCIENCES↗

Manned remote work station development article. Volume 3: Development test plan. Appendix A: Manufacturing requirements/schedule

The tests and procedures for the manned remote work station (MRWS) open cherry picker (OCP) development test article (DTA) are described to validate systems requirements and performance specifications. A development test program is outlined to evaluate key design issues and man/machine interfaces when the MRWS OCP is used in a shuttle support role of satellite servicing and in orbit construction of large structures.

Source record↗

Firefighters' communication transceiver test plan

The requirements for the operational testing of the firefighters communication transceiver were identified. The major concerns centered around the integrity and reliability of the firefighter/microphone interface. The major concern about the radio hardware was that it be intrinsically safe in hazardous atmospheres and that the system not interfere with the fit or facial seal of self-contained breathing apparatus (SCBA). The greatest concern for operational testing purposes as the reliability and clarity of the line of communication between the firefighter and those on the fireground with whom he must maintain contact. A desire to test any units developed in both training exercises and in real responses to hazardous material incidents was expressed. It is felt that a VOX-microphone built into the SCBA facemask gives the best performance. A voice-pickup product device which combines a bone conduction microphone and a speaker into a single ear mounted unit is examined.

Wallace, R. J.↗

ROSA and Solar Cell Module Combined Environments Test Plan

Roll-out solar array (ROSA) technology is an emerging component of the future of spacecraft photovoltaic power subsystems. Qualification and risk reduction testing are necessary to demonstrate design worthiness for spaceflight implementation of the array and solar cell modules. Maxar Space LLC and NASA have undertaken a rigorous combined environment (CE) test campaign for a ROSA design expected to be a part of the Power and Propulsion Element (PPE) for the NASA Gateway which will be an outpost orbiting the Moon. The CE tests consist of several simulated space environment exposures associated with the planned mission: UV radiation, electron/proton radiation, xenon ion plume exposures, and vacuum thermal cycling and electrostatic discharge (ESD). These tests are conducted on small coupons consisting of the planned ROSA flight elements, and all tests are performed at the NASA Marshall Space Flight Center. This paper discusses the test plan, requirements for each environment, and the functional testing performed. Of note is a new approach for the induced primary arc used in the ESD testing, which better simulates the plasma expansion during the ESD event. Progress on executing the test plan is presented.

Space Environments Effects Testing↗

Fuel and core testing plan for a target fueled isotope production reactor.

In recent years there has been an unstable supply of the critical diagnostic medical isotope 99Tc. Several concepts and designs have been proposed to produce 99Mo the parent nuclide of 99Tc, at a commercial scale sufficient to stabilize the world supply. This work lays out a testing and experiment plan for a proposed 2 MW open pool reactor fueled by Low Enriched Uranium (LEU) 99Mo targets. The experiments and tests necessary to support licensing of the reactor design are described and how these experiments and tests will help establish the safe operating envelop for a medical isotope production reactor is discussed. The experiments and tests will facilitate a focused and efficient licensing process in order to bring on line a needed production reactor dedicated to supplying medical isotopes. The Target Fuel Isotope Reactor (TFIR) design calls for an active core region that is approximately 40 cm in diameter and 40 cm in fuel height. It contains up to 150 cylindrical, 1-cm diameter, LEU oxide fuel pins clad with Zircaloy (zirconium alloy), in an annular hexagonal array on a {approx}2.0 cm pitch surrounded, radially, by a graphite or a Be reflector. The reactor is similar to U.S. university reactors in power, hardware, and safety/control systems. Fuel/target pin fabrication is based on existing light water reactor fuel fabrication processes. However, as part of licensing process, experiments must be conducted to confirm analytical predictions of steady-state power and accident conditions. The experiment and test plan will be conducted in phases and will utilize existing facilities at the U.S. Department of Energy's Sandia National Laboratories. The first phase is to validate the predicted reactor core neutronics at delayed critical, zero power and very low power. This will be accomplished by using the Sandia Critical Experiment (CX) platform. A full scale TFIR core will be built in the CX and delayed critical measurements will be taken. For low power experiments, fuel pins can be removed after the experiment and using Sandia's metrology lab, relative power profiles (radially and axially) can be determined. In addition to validating neutronic analyses, confirming heat transfer properties of the target/fuel pins and core will be conducted. Fuel/target pin power limits can be verified with out-of-pile (electrical heating) thermal-hydraulic experiments. This will yield data on the heat flux across the Zircaloy clad and establish safety margin and operating limits. Using Sandia's Annular Core Research Reactor (ACRR) a 4 MW TRIGA type research reactor, target/fuel pins can be driven to desired fission power levels for long durations. Post experiment inspection of the pins can be conducted in the Auxiliary Hot Cell Facility to observe changes in the mechanical properties of the LEU matrix and burn-up effects. Transient tests can also be conducted at the ACRR to observe target/fuel pin performance during accident conditions. Target/fuel pins will be placed in double experiment containment and driven by pulsing the ACRR until target/fuel failure is observed. This will allow for extrapolation of analytical work to confirm safety margins.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Transmission Expansion Planning Test System for AC/DC Hybrid Grid With High Variable Renewable Energy Penetration

Test systems are important tools and benchmark for power system research. Currently, there is a lack of standard test systems for modern transmission expansion planning (TEP) research, especially under high variable renewable energy (VRE) penetrations. This article describes a 38-bus test system named the HRP-38 system dedicated to TEP. “HRP” stands for high renewable penetration. The objective of establishing such a system is to provide a consistent platform for different TEP methods to be tested and compared. The test system considers high VRE penetration of more than 30% energy share, which will be an important feature in many power systems in the future. Both AC and DC candidate lines are given to provide sufficient transmission planning alternatives. The complexity of the test system is well balanced considering calculation tractability and the ability to test the performance of the TEP planning model. The network topology, generation mix and load characteristics are described in detail. Year-round time series of VRE (wind power and PV) output and load curves for each bus are provided to facilitate a detailed evaluation of the transmission grid configuration under high VRE penetration. Finally, four benchmark results with different optimization settings are provided for the HRP-38 system.

AC/DC hybrid↗

Task 4 supporting technology. Part 1: Detailed test plan for leading edge tile development. Leading edge material development and testing

This task develops two alternative candidate tile materials for leading edge applications: coated alumina enhanced thermal barrier (AETB) tile and silicone impregnated reusable ceramic ablator (SIRCA) tile. Upon reentry of the X-33/RLV space vehicle, the leading edges experience the highest heating rates and temperatures. The wing leading edge and nose cap experience peak temperatures in the range 2000 to 2700 F. Replacing reinforced carbon-carbon (RCC) with tile-based thermal protection system (TPS) materials is the primary objective. Weight, complexity, coating impact damage, and repairability are among the problems that this tile technology development addresses. The following subtasks will be performed in this development effort: tile coating development; SIRCA tile development; robustness testing of tiles; tile repair development; tile operations/processing; tile leading edge configuration; and life cycle testing.

Hogenson, P. A.↗