Search NASA⌕ Search

SEARCH · Search NASA

Results for “Transmission System Operation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 217 records · Page 12

Survey of timing/synchronization of operating wideband digital communications networks

In order to benefit from experience gained from the synchronization of operational wideband digital networks, a survey was made of three such systems: Data Transmission Company, Western Union Telegraph Company, and the Computer Communications Group of the Trans-Canada Telephone System. The focus of the survey was on deployment and operational experience from a practical (as opposed to theoretical) viewpoint. The objective was to provide a report on the results of deployment how the systems performed, and wherein the performance differed from that predicted or intended in the design. It also attempted to determine how the various system designers would use the benefit of hindsight if they could design those same systems today.

Mitchell, R. L.↗

Emergency Asset Positioning for Resilient Transmission Grid Operation

In this paper we study a problem of hurricane emergency preparedness via placement of emergency generation assets prior to its strike. We present a two-stage stochastic model for choosing locations and quantities of emergency storage to help support the power grid through a hurricane event. The expectation of losses in our two-stage model is estimated using the sample average approximation. We construct damage scenarios for sample average approximation using WIND Toolkit meteorological data and fragility curves of various electric grid components. We demonstrate the efficacy of our two-stage planning model by simulating operations during Hurricane Dolly on the 2000-bus transmission test system. Our model, coupled with our scenario selection strategy, is effective at mitigating loss of load when compared to a model without emergency generation assets placed prior to an extreme event.

emergency preparedness↗

Emergency Asset Positioning for Resilient Transmission Grid Operation

In this paper we study a problem of hurricane emergency preparedness via placement of emergency storage assets prior to its strike. We present a two-stage stochastic model for choosing locations and quantities of emergency storage to help support the power grid through a hurricane event. The expectation of losses in our two-stage model is estimated using the sample average approximation. We construct damage scenarios for sample average approximation using WIND Toolkit meteorological data and fragility curves of various electric grid components. We demonstrate the efficacy of our two-stage planning model by simulating operations during Hurricane Dolly on the 2000-bus transmission test system. Our model, coupled with our scenario selection strategy, is effective at mitigating loss of load when compared to a model without emergency storage assets placed prior to an extreme event.

emergency preparedness↗

Emergency Generation Asset Positioning for Resilient Transmission Grid Operation: Preprint

In this paper we study a problem of hurricane emergency preparedness via placement of emergency generation assets prior to its strike. We present a two-stage stochastic model for choosing locations and quantities of emergency storage to help support the power grid through a hurricane event. The expectation of losses in our two-stage model is estimated using the sample average approximation. We construct damage scenarios for sample average approximation using WIND Toolkit meteorological data and fragility curves of various electric grid components. We demonstrate the efficacy of our two-stage planning model by simulating operations during Hurricane Dolly on the 2000-bus transmission test system. Our model, coupled with our scenario selection strategy, is effective at mitigating loss of load when compared to a model without emergency generation assets placed prior to an extreme event.

emergency preparedness↗

Transmission Data-Driven User-Defined Model for Inverter-based and Conventional Power Plants

Recent events in Odessa [1], [2] have shed light on the complexities of integrating large Inverter-Based Resource (IBR) plants with the transmission system, prompting NERC to stress continuous performance monitoring by transmission operators. Challenges such as plant control updates, IBR model revisions, Phase-locked loop loss of synchronism, and protection events have been identified, underscoring the need for enhanced monitoring protocols by regulatory bodies. The recent FERC 901 order underscores the importance of accurate data exchange regarding IBRs for reliability studies. However, limited access to IBR plant-related data hampers effective decision-making for transmission operators (TOP). This paper proposes a method for constructing data-driven User-Defined dynamic Models (UDM) for power plants for validating multiple-event data using field measurements from interconnection bus locations. The problem is formulated as a power plant model identification problem and a multi-task learning approach under partial input observability assumptions is proposed in this work. This approach aims to predict aggregated responses of conventional and IBR power plants during various dynamic physical events which is useful for planning studies under diverse disturbance conditions. Ultimately, this methodology emphasizes the importance of plant visibility to operators in addressing power system challenges, facilitating improved planning and operational studies.

Mahapatra, Kaveri [BATTELLE (PACIFIC NW LAB)]↗

Digital modulation schemes for high speed transmission through low bandwidth lowpass analog links

Existing NTSC (National Television System Committee) standard will be phased out and replaced with HDTV (High Definition Television) standard within the next 10 years. Accordingly, the existing video network system operated by NASA will become obsolete and requires either replacement or modification to accommodate digital transmission. Network replacement is extremely expensive, hence, several digital modulation schemes are investigated in this report to accomplish digital transmission over existing analog links saving NASA from the cost of network replacement. There are two competing transmission systems available for HDTV transmission over limited bandwidth channels. The cost and performance of the two competing schemes are remarkably similar. However, the input data rate in such a case is limited to 40 Mbit/s. Transmission of higher data rates is possible using simple signal processing techniques. On the other hand, a third transmission system, multilevel pulse amplitude modulation (M-PAM) is proposed. M-PAM is the first stage of the well known M-VSB. This M-PAM scheme is much simpler and uses the channel more efficiently. The three schemes are compared and preliminary conclusions were made. Despite of several similarities, each modulation scheme has it unique merits. To determine the suitability of each scheme, more investigations and laboratory tests for all schemes are needed.

Andrawis, Alfred S.↗

A Multistage Stochastic Transmission Expansion Algorithm for Wide-Area Planning under Uncertainty

The overall objective for this project was to develop and demonstrate a set of methods for solving the transmission investment problem for a large network considering many possible scenarios of future conditions and multiple decision points when investments can be made. Project sub-objectives achieved this goal through a succession of extending the methods to apply to problems with increasing complexity or additional features, including the number of decision points, whether generation and transmission are co-optimized, and whether AC or DC power flow is used. A transmission model was developed for the Western Electric Coordinating Council (WECC) region, the high-voltage transmission system that serves the western third of the continental U.S. Using a dataset provided by WECC and by researchers from John Hopkins University, we have validated and demonstrated the model and used it to compare the new method for solving multi-stage stochastic transmission planning to several state-of-the-art techniques. The project has resulted in several key outcomes and achievements: The covariance-based method for choosing a small set of hours to represent short-term variability has superior performance in terms of accuracy to existing methods, including K-means clustering and Importance Sampling; The combined partitioning method for long-term uncertainty with the nested clustering approach for choosing representative hours for each long-term group has superior accuracy for equivalent computational effort compared with existing methods; Using the partitioning/clustering method combined with Sample Average Approximation provides both statistical bounds on the quality of the solution and at the same time, a complete investment plan for all contingencies in the full uncertainty set; no existing methods can provide both at the same time; The method is demonstrated to work well for choosing both transmission and generation investments; A variant on the method allows for both scenario selection and simultaneous correction for the error from the DC power flow approximation to provide a tractable method for AC power flow-based transmission planning under uncertainty; The method applied to the WECC case study demonstrates the additional value to the system operator and the consumer of identifying flexible investment options in the near-term decisions. In particular, the case study exhibits significant option value in postponing some transmission additions that appear useful but in some long-term system states create new congestion problems.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Demonstrating Distribution System Resiliency through Grid-Edge Microgrids, on a Multi-Site Networked Hardware-in-Loop Platform

With the increasing penetration of Distributed Energy Resources (DERs) at the grid-edge, power systems include more energy storage, remote switches, relays, voltage regulators, and other intelligent electronic devices (IED). Effective control of these grid-edge devices by using Advanced Distribution Management Systems (ADMS) can yield substantial improvements to the resiliency and power quality of distribution systems. In this paper, improvements to the resiliency of a distribution system are demonstrated using a multi-site evaluation environment consisting of a real-time Hardware-in-Loop (HIL) setup in which DERs and other IEDs are modeled; and an ADMS which monitors and is able to control the distribution system assets. The HIL model and the ADMS are located 2400 km away, with communication between the sites enabled by a data manager using Distributed Network Protocol 3 (DNP3), demonstrating the system's capabilities even over long distances. After a simulated transmission system failure in the HIL demonstration setup, DERs and other devices are operated to restore critical loads and node voltage profile (to within the 'nominal +/-5%' band) in the distribution system.

ADMS↗

Analog optical signal transmission for HEP experiments

A critical element in all high-energy physics experiments is the signal transmission from the active elements to the data acquisition system. It is especially challenging in large volume detectors based on noble liquids that are extensively being used for dark matter and neutrino detection.The topic of this contribution is the optical signal transmission of the signals acquired with silicon photomultipliers, which is able to satisfy many stringent experimental requirements. It is RF-noise immune and operates in cryogenic liquids and in high-electric fields.This transmission system is based on commercially available electronics components and customized Fabry-Perot laser diodes.I will talk about encountered challenges, breakthrough, and advances from the original concept of this system up to final validation tests, demonstrating progressive developments.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

CalTestBed - Delphire - Testing and Evaluation of Delphire Sentinel System (CRADA Final Report)

The Delphire Sentinel is a modular fire detection and communications system operating as a mobile field unit, with low voltage DC power supplied by onboard photovoltaics (PV) and batteries. The Sentinel addresses several aspects of fire detection, communications and data analysis. The Sentinel's mobility enables it to be rapidly deployed and operate independently of existing power and communications networks. The duration of independent operation depends critically on the energy consumption of the systems and performance of the onboard PV and battery. The purpose of this testing is to ascertain the power draw and energy consumption of the Delphire Sentinel prototype system under several operational states, including various data transfer packet sizes, transmission time and frequencies, and communication pathways (Wi-Fi, cellular, satellite) expected to be encountered in field deployments. It will also include procedures to test the ability of the Sentinel to operate for extended periods without loss of functionality. Based on results from energy and power measurements, and anticipated duty cycles in field deployments, we will model annual system autonomy (e.g. loss of load probability) for off-grid operation in representative locations.

47 OTHER INSTRUMENTATION↗

Grid Resiliency using Hydro-based Microgrids During Wildfires

The primary objective of this project is to assess the techno-economic viability of hydropower resources with supplementary investments, including microgrid controllers, storage solutions, load banks, additional generation like diesel generators, communication links, and transmission infrastructure. The aim is to enable these systems to operate autonomously (in islanded mode) and ensure grid resiliency during and after wildfire events. The project seeks to establish a comprehensive framework for setting up hydropower-based microgrids, from risk estimation to final investment decisions. These microgrids can provide critical support during emergencies and offer additional grid stability and revenue opportunities during regular operations and other system contingencies.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Tracking and data system support for the Mariner Mars 1971 mission. Prelaunch phase through first trajectory correction maneuver, volume 1

The DSN command system provided the capability to enter commands in a computer at the deep space stations for transmission to the spacecraft. The high-rate telemetry system operated at 16,200 bits/sec. This system will permit return to DSS 14 of full-resolution television pictures from the spacecraft tape recorder, plus the other science experiment data, during the two playback periods of each Goldstone pass planned for each corresponding orbit. Other features included 4800 bits/sec modem high-speed data lines from all deep space stations to Space Flight Operations Facility (SFOF) and the Goddard Space Flight Center, as well as 50,000 bits/sec wideband data lines from DSS 14 to the SFOF, thus providing the capability for data flow of two 16,200 bits/sec high-rate telemetry data streams in real time. The TDS performed prelaunch training and testing and provided support for the Mariner Mars 1971/Mission Operations System training and testing. The facilities of the ETR, DSS 71, and stations of the MSFN provided flight support coverage at launch and during the near-earth phase. The DSSs 12, 14, 41, and 51 of the DSN provided the deep space phase support from 30 May 1971 through 4 June 1971.

Laeser, R. P.↗

An operational video data compression system for ATS and ITOS

An operational data compression system has been developed and implemented for transmission of digitized ATS and ITOS-VHRR satellite video data over the wideband communication link between the Wallops Island, Va. Command and Data Acquisition Station and the National Environmental Satellite Service at Suitland, Md. This system uses minicomputers for the coding and decoding of the data to achieve maximum flexibility together with specially designed interface equipment for greater efficiency. No loss in data quality occurs due to the compression, and, in certain cases, data is transmitted which would be otherwise unavailable due to the limited channel capacity. This paper describes the method of compression, the equipment used, and the compression results attained.

Kutz, R. L.↗

A transportronic solution to the problem of interorbital transportation

An all-electronic transportation system described by the term 'transportronics' is examined as a means of solving the current problem of the high cost of transporting material from low-Earth orbit (LEO) to geostationary orbit (GEO). In this transportation system, low cost electric energy at the surface of the Earth is efficiently converted into microwave power which is then efficiently formed into a narrow beam which is kept incident upon the orbital transfer vehicles (OTV's) by electronic tracking. The incident beam is efficiently captured and converted into DC power by a device which has a very high ratio of DC power output to its mass. Because the mass of the electric thruster is also low, the resulting acceleration is unprecedented for electric-propelled vehicles. However, the performance of the system in terms of transit times from LEO to GEO is penalized by the short time of contact between the beam and the vehicle in low-Earth orbits. This makes it necessary to place the Earth based transmitters and the vehicles in the equatorial plane thus introducing many geopolitical factors. Technically, however, such a system as described in the report may out-perform any other approach to transportation in the LEO to GEO regime. The report describes and analyzes all portions of the beamed microwave power transmission system in considerable detail. An economic analysis of the operating and capital costs is made with the aid of a reference system capable of placing about 130,000 kilograms of payload into GEO each year. More mature states of the system are then examined, to a level in which 60,000 metric tons per year could be placed into GEO.

Brown, William C.↗

Data Communications Performance of AOCDL and AUTOMET Over a VDL Mode 2 Link

Airline Operational Control Data Link (AOCDL) is a service that allows for downlink of in-flight data to help an airline operate efficiently. Automated Meteorological Transmission (AUTOMET) is a weather reporting system that provides forecasts and atmospheric conditions to pilots during flight. These are two examples of new or extended services that will be enabled by implementation of the ATN and its digital air/ground communications data links. One of the possible data links identified for these services is VDL Mode 2. This research focuses on the data link performance of AOCDL and AUTOMET services in a 2015 scenario using VDL Mode 2 as the data link. In the near term, it is expected that the Controller-Pilot Data Link Communication (CPDLC) and Decision Support System Data Link (DSSDL) services will also use the VDL Mode 2 link. CPDLC and DSSDL are high-priority services that communicate aircraft control information and require low end-to-end delays for safety. VDL Mode 3, which is the preferred link for these services because it provides priority-based link access, will not be deployed in time for earlier implementations of these services to use. As such, the research also investigates the impact of CPDLC and DSSDL services on the same VDL link as AOCDL and AUTOMET. Performance of these services over the data link will be separately examined for the airport, terminal, and en route domains. OPNET simulations are performed for each domain. The number of aircraft for each domain is representative of the expected peak aircraft in 2015. Results are collected during a steady-state condition, with aircraft neither entering nor exiting the domain. The study explores the services in terms of the traffic load they present to the VDL Mode 2 radio. The amount of load each service contributes to the data link will be shown for each domain. The end-to-end delays for each service will be discussed. Data link metrics such as subnetwork and queuing delays, channel utilization, and protocol overhead will be used to show the impact of these services on VDL Mode 2. All results will be presented both with and without the inclusion of CPDLC and DSSDL services.

Bretmersky, Steven↗

Comparison of an Inductance In-Line Oil Debris Sensor and Magnetic Plug Oil Debris Sensor

The objective of this research was to compare the performance of an inductance in-line oil debris sensor and magnetic plug oil debris sensor when detecting transmission component health in the same system under the same operating conditions. Both sensors were installed in series in the NASA Glenn Spiral Bevel Gear Fatigue Rig during tests performed on 5 gear sets (pinion/gear) when different levels of damage occurred on the gear teeth. Results of this analysis found both the inductance in-line oil debris sensor and magnetic plug oil debris sensor have benefits and limitations when detecting gearbox component damage.

Dempsey, Paula J.↗