Search NASA⌕ Search

SEARCH · Search NASA

Results for “UTILITY INTERCONNECTIONS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 217 records · Page 12

Interconnection Cost Analysis in ISO-New England

Electric transmission system operators (ISOs, RTOs, or utilities) require new large generators seeking to connect to the grid to undergo a series of impact studies before they can be built. This process establishes what new transmission equipment or upgrades may be needed before a project can connect to the system and assigns the costs of that equipment. Berkeley Lab has collected interconnection cost data for 194 projects in New England from interconnection studies performed between 2010 and 2021. Project-level cost summary data are available for download on this page. We find: -Interconnection costs have grown over time, especially for projects that withdraw. -Interconnection costs are highest for onshore wind, followed by solar and storage. Natural gas and offshore wind projects tend to cost less to interconnect, in comparison. -Economies of scale exist for solar and possibly storage projects, but not for other resource types. -Wind and solar projects requesting capacity network resource interconnection service have higher interconnection costs, despite being evaluated using the same interconnection standard in the analyzed studies. -Low and high interconnection costs can be found throughout the ISO-NE footprint. -Costs are split fairly evenly between investments at the point of interconnection and within the broader network for active and withdrawn projects, while complete projects incur most costs at the point of interconnection.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Development & Validation of Low-Cost, Highly-Durable, Spinel-Based Materials for SOFC Cathode-Side Contact (Final Report)

A cathode-side contact layer is required to provide and maintain stable electrical conduction paths between the interconnect and cathode in a solid oxide fuel cell (SOFC) stack assembly and thus minimize the ohmic resistance and stack power loss. Current cathode-interconnect contact materials are based on noble metals, electrically-conductive perovskites, their composite materials, etc. These materials are either too expensive or do not possess the overall balanced performance required for the cathode-side contact application. To achieve the DOE SOFC system cost and performance stability goals, a new generation of low-cost, high-performance contact materials needs to be developed. In this project, spinel-based materials thermally converted from the Fe-Ni and Co-Mn based alloy precursors were developed and validated for the cathode-side contact application. The precursor alloy compositions were optimized via a combination of composition screening in the (Ni,Fe) 3 O 4 and (Mn,Co) 3 O 4 spinel system, alloy design using physical metallurgy principles, and cost considerations. The alloy powders with the desired composition and particle size were manufactured via gas atomization. The optimal process parameters for thermal conversion of these alloy precursor layers to a spinel-based layer were identified, i.e., 900°C x 2h in air, which is close to the initial stack firing condition. The area-specific resistances (ASRs) of the interconnect/contact/cathode test assemblies with the developed contact layer were determined for various durations (up to 5000 h) under simulated cathodic operation conditions. Some of the alloy-derived spinel contacts exhibited the lowest ASR and ASR degradation rate. The in-stack performance of the most promising alloy-derived contact layer is currently being evaluated via stack testing. To reduce the stack cost, the Co-Mn based alloy powders were utilized as the precursor for synthesis of dense spinel-based interconnect coating. By optimizing both the initial powder size/distribution and the alloy powder composition, a dense (Mn,Co) 3 O 4 -based spinel coating was achieved. Furthermore, co-sintering of the coating/contact dual-layer structure under the initial stack firing condition was realized by utilizing the tailored Co-Mn alloy precursors. Cost analysis of the developed technology indicated a total stack cost reduction of around 10.6% with the implementation of co-sintering of the interconnect coating and the contact layer during initial stack firing. Since low-cost processes such as screen printing is utilized in the precursor application and no reduction heat treatment is needed for the coating formation, the developed technology can be readily implemented at the industrial partner’s manufacturing facilities with no additional capital investment needed.

08 HYDROGEN↗

Queued Up: 2024 Edition, Characteristics of Power Plants Seeking Transmission Interconnection As of the End of 2023 [Slides]

Electric transmission system operators (ISOs, RTOs, or utilities) require projects seeking to connect to the grid to undergo a series of impact studies before they can be built. This process establishes what new transmission equipment or upgrades may be needed before a project can connect to the system and assigns the costs of that equipment. The lists of projects in this process are known as “interconnection queues”. The amount of new electric capacity in these queues is growing dramatically, with nearly 2,600 gigawatts (GW) of total generation and storage capacity now seeking connection to the grid (over 95% of which is for zero-carbon resources like solar, wind, and battery storage). However, most projects that apply for interconnection are ultimately withdrawn, and those that are built are taking longer on average to complete the required studies and become operational. Data from these queues nonetheless provide a general indicator for mid-term trends in developer interest.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Queued Up: 2025 Edition – Characteristics of Power Plants Seeking Transmission Interconnection As of the End of 2024 [Slides]

Electric transmission system operators (ISOs, RTOs, or utilities) require proposed power plants seeking to connect to the transmission grid to undergo a series of impact studies before they can be built. This process establishes what new transmission equipment or upgrades may be needed before a project can connect to the system and assigns the costs of that equipment. The lists of projects in this process are known as “interconnection queues”. In collaboration with interconnection.fyi, Berkeley Lab compiled, aggregated, and cleaned interconnection queue data from >50 transmission grid operators (7 ISO/RTOs and 49 non-ISO balancing areas), which collectively represent ~97% of currently installed U.S. electric generating capacity. The dataset includes requests submitted to queues through the end of 2024, and only includes requests seeking to connect to the transmission grid (not distribution-connected or behind-the-meter projects). The files below include both a PDF report and an Excel data file. The PDF report analyzes interconnection data and metrics through the end of 2024. The Excel data file includes (a) the full project-level interconnection queue dataset through 2024, (b) a codebook (data dictionary) describing each data field, and (c) 35 additional tabs featuring tables summarizing a range of interconnection metrics. Key highlights from the Queued Up: 2025 Edition (featuring data through 2024) include: • As of the end of 2024, there were ~10,300 projects actively seeking grid interconnection in the U.S., representing 1,400 GW of generation and approximately 890 GW of storage. • Historic withdrawal rates alongside relatively fewer new requests resulted in a 12% decrease in total active queue volume compared to the prior year. • Active natural gas capacity (136 GW, +72% year-over-year) increased in 2024, while solar (956 GW, -12%), storage (890 GW, -13%), and wind (271 GW, -26%) capacity decreased. • 408 GW of capacity already has a draft or executed interconnection agreement (IA) but has not yet reached commercial operations. • The time projects spend in queues before reaching COD is increasing. For the regions with available data, the median duration from IR to COD has doubled from <2 years for projects built in 2000-2007 to over 4 years for those built in 2018-2024. • Ultimately, most of this proposed capacity will not be built. Only 13% of capacity that submitted interconnection requests from 2000-2019 had reached commercial operations by the end of 2024; 77% of that capacity had been withdrawn and 10% was still active. • FERC Order 2023 and various other reforms are being implemented. These are important measures to reduce interconnection bottlenecks and enhance grid system reliability, but it is too early to measure and assess their full impact. • New additions for the 2025 edition include: (a) additional detail on data processing and gaps; (b) updates on interconnection reforms; (c) new analysis on interconnection agreements, and more.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Queued Up: 2026 Edition, Characteristics of Power Plants Seeking Transmission Interconnection As of the End of 2025 [Slides]

Electric transmission system operators (ISOs, RTOs, or utilities) require proposed power plants seeking to connect to the transmission grid to undergo a series of impact studies before they can be built. This process establishes what new transmission equipment or upgrades may be needed before a project can connect to the system and assigns the costs of that equipment. The lists of projects in this process are known as “interconnection queues”. In collaboration with https://www.interconnection.fyi. Berkeley Lab compiled, aggregated, and cleaned interconnection queue data from >50 transmission grid operators (7 ISO/RTOs and 50 non-ISO balancing areas), which collectively represent ~98% of currently installed U.S. electric generating capacity.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Challenges in reducing the computational time of QSTS simulations for distribution system analysis.

The rapid increase in penetration of distributed energy resources on the electric power distribution system has created a need for more comprehensive interconnection modelling and impact analysis. Unlike conventional scenario - based studies , quasi - static time - series (QSTS) simulation s can realistically model time - dependent voltage controllers and the diversity of potential impacts that can occur at different times of year . However, to accurately model a distribution system with all its controllable devices, a yearlong simulation at 1 - second resolution is often required , which could take conventional computers a computational time of 10 to 120 hours when an actual unbalanced distribution feeder is modeled . This computational burden is a clear l imitation to the adoption of QSTS simulation s in interconnection studies and for determining optimal control solutions for utility operations . Our ongoing research to improve the speed of QSTS simulation has revealed many unique aspects of distribution system modelling and sequential power flow analysis that make fast QSTS a very difficult problem to solve. In this report , the most relevant challenges in reducing the computational time of QSTS simulations are presented: number of power flows to solve, circuit complexity, time dependence between time steps, multiple valid power flow solutions, controllable element interactions, and extensive accurate simulation analysis.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Demonstration of μCHP in Light Commercial Hot Water Applications

Internal combustion engine driven combined heat and power (CHP) systems produce power while the waste heat is recovered and used for another purpose. For µCHP systems (less than 50kWe output) overall efficiencies can reach over 90% for products currently on the market throughout the world. On a fuel basis this offers an advantage over using grid-based power and another fuel for heat. Additionally, the cost of natural gas on an energy unit basis is significantly less expensive than electric power. This difference can lead to substantial savings for the end user of a CHP system. In some parts of the world, particularly Germany and Japan, µCHP has become a common part of the heat and distributed generation equipment mix. Market analysis conducted in 2012 showed that in North America there is potential of a 5,300 units per year market for µCHP, resulting in an annual energy savings of approximately 13.5 TBtu and more than $84 million in annual customer savings. However, µCHP still has not seen much market penetration in North America. This study helps to identify some of the reasons why, address roadblocks that still need to be overcome and provide experience to established best practices. Nine commercial sites were initially identified (fitness club, surgical center, senior community, resort and spa, commercial laundry, two multi-family housing, restaurant and manufacturing facility). Systems from two different manufacturers were installed at five sites total, but due to unforeseen circumstances, only three of those sites were finally commissioned: test data were collected by Oak Ridge National Laboratory. While not all systems were installed as intended, the project resulted in the following key findings: Micro combined heat and power is an unfamiliar technology for building owners and plumbing and electrical contractors that serve the buildings most suited for µCHP. Manufacturers will need to be aggressive in providing training and providing broad support to successfully bring the technology to market.; The proper integration of µCHP into other building systems is the most critical part of a successful installation. Manufacturers will need to be able to provide the expertise to train, advise and support the mechanical contractors during the design and installation of the heat integration system.; Regulations governing µCHP varies across the country. There are a few UL standards (UL 2200 and UL 1741) that apply nationally. Emissions are governed by EPA except in California where the California Air Resources Board (CARB) has established their own standard. Requirements that dictate installation and interconnection are dependent on local building codes and local utility processes and requirements. Some out of date building codes do not offer clear guidance for these requirements, leading to confusion. This makes developing training and determining broadly applicable best practices difficult.; Installation costs of µCHP are a key factor in making an installation successful. It is critical that these costs and all national, state and local regulations be understood and accounted for by all parties involved in the installation before a project is undertaken.; A robust customer service organization is important to meet the needs of the customers. These systems require annual maintenance and service and local capability is needed to keep costs inline.

03 NATURAL GAS↗

Rapid QSTS Simulations for High-Resolution Comprehensive Assessment of Distributed PV

The rapid increase in penetration of distributed energy resources on the electric power distribution system has created a need for more comprehensive interconnection modeling and impact analysis. Unlike conventional scenario-based studies, quasi-static time-series (QSTS) simulations can realistically model time-dependent voltage controllers and the diversity of potential impacts that can occur at different times of year. However, to accurately model a distribution system with all its controllable devices, a yearlong simulation at 1-second resolution is often required, which could take conventional computers a computational time of 10 to 120 hours when an actual unbalanced distribution feeder is modeled. This computational burden is a clear limitation to the adoption of QSTS simulations in interconnection studies and for determining optimal control solutions for utility operations. The solutions we developed include accurate and computationally efficient QSTS methods that could be implemented in existing open-source and commercial software used by utilities and the development of methods to create high-resolution proxy data sets. This project demonstrated multiple pathways for speeding up the QSTS computation using new and innovative methods for advanced time-series analysis, faster power flow solvers, parallel processing of power flow solutions and circuit reduction. The target performance level for this project was achieved with year-long high-resolution time series solutions run in less than 5 minutes within an acceptable error.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Hybrid Power Plants: Status of Operating and Proposed Plants, 2022 Edition [Slides]

Falling battery prices and the growth of variable renewable generation are driving a surge of interest in “hybrid” power plants that combine, for example, wind or solar generating capacity with co-located batteries. While most of the current interest involves pairing photovoltaic (PV) plants with batteries, other types of hybrid or co-located plants with wide-ranging configurations have been part of the U.S. electricity mix for decades. This annually updated briefing tracks and maps existing hybrid or co-located plants across the United States while also synthesizing data mined from power purchase agreements (PPAs) and generation interconnection queues to shed light on near- and long-term development pipelines. The scope includes co-located hybrid plants that pair two or more generators and/or that pair generation with storage at a single point of interconnection, and full hybrids that feature co-location and co-control. The focus is on plants with one megawatt (MW) or more of capacity; smaller (often behind-the-meter) projects are also increasingly common, but are not included in this data synthesis. Key findings from the latest briefing include: -At the end of 2021, there were nearly 300 hybrid plants (>1 MW) operating across the United States, totaling nearly 36 gigawatts (GW) of generating capacity and 3.2 GW/8.1 GWh of energy storage. PV+storage plants are by far the most common, dominating in terms of plant number (140), storage capacity (2.2 GW/7.0 GWh), storage:generator ratio (53%), and storage duration (3.2 hours). But there are nearly twenty other hybrid plant configurations as well, including several different fossil hybrid categories (each dominated by the fossil component) as well as wind+storage, wind+PV, wind+PV+storage, geothermal+PV, and others. -Last year was a breakout year for PV+storage hybrids in particular: 67 of the 74 hybrids added in 2021 were PV+storage. By the end of 2021, there were more GW of battery capacity installed in PV+storage hybrids (2.2 GW) than as standalone storage plants (1.8 GW). The difference is even starker in energy terms, with PV+storage plants hosting twice as much battery capacity as standalone storage plants (7 GWh vs. 3.5 GWh, respectively). Much of the battery capacity added in hybrid form in 2021 was a battery retrofit to a pre-existing PV plant. -Data on plants under development from the interconnection queues of all seven ISOs/RTOs plus 35 individual utilities suggest that these hybridization trends are likely to continue. At the close of 2021, there were more than 670 GW of solar plants in the nation’s queues; 285 GW (~42%) of this capacity was proposed as a hybrid, most typically pairing PV with battery storage (PV+storage represented nearly 90% of all hybrid capacity in the queues). For wind, 247 GW of capacity sat in the queues, with 19 GW (~8%) proposed as a hybrid, again most-often pairing wind with storage (wind+storage represented ~4% of all hybrid capacity in the queues). Meanwhile, nearly half of all storage in the queues is estimated to be part of a hybrid plant. While many of these proposed plants will not ultimately reach commercial operations, the depth of interest in hybrid plants—especially PV+storage—is notable.

24 POWER TRANSMISSION AND DISTRIBUTION↗

A Methodology to Evaluate the Grid Reliability Impact of Oscillations Induced by Large Loads

The rapid growth of hyperscale AI data centers is bringing renewed attention to the reliability risk that sustained forced oscillations pose to bulk power systems, with cyclic computational workloads emerging as a new forcing source. Unlike the broadband, stochastic disturbances from traditional industrial loads such as arc furnaces, AI training and inference facilities can inject large active power swings concentrated at specific frequencies over extended durations - characteristics that existing grid planning practices do not account for. While the North American Electric Reliability Corporation (NERC) has recognized this gap and called for system-level studies of large load interconnections, no standardized methodology exists to screen, simulate, and quantify these risks at the planning stage. This report presents the Risk Assessment Tool for Large Load-induced Events (RATLLE), a Python-based, publicly available script suite developed at the Pacific Northwest National Laboratory to evaluate bulk power system reliability risks from data center-induced oscillations. RATLLE implements a three-module workflow: a screening module that identifies vulnerable interconnection locations and excitable system modes; a simulation module that models cyclic data center load behavior using a commercial positive sequence simulation platform; and an analysis module that computes risk metrics and generates interactive visualization dashboards. The risk metrics, formulated around simulation observables, map oscillation impacts to a three-stage severity scale spanning latent equipment fatigue through imminent cascading failure. The methodology is demonstrated on two Western Electricity Coordinating Council (WECC) system models: a publicly available 240-bus reduced representation and a detailed 2031 Heavy Winter planning case. Case studies illustrate that even modest 50 MW forced oscillations at resonant frequencies can produce wide-area power swings, N-1 security constraint violations, and cascading generator trips through protection actions - outcomes that would not occur under normal operating conditions without oscillations present. The results underscore the need for standardized oscillation impact assessment in large load interconnection studies and provide a reproducible, extensible framework for utilities to adopt or customize within their existing planning workflows.

Biswas, Shuchismita↗

The Sorghum (Sorghum bicolor) Brown Midrib 30 Gene Encodes a Chalcone Isomerase Required for Cell Wall Lignification

In sorghum ( Sorghum bicolor ) and other C 4 grasses, brown midrib ( bmr ) mutants have long been associated with plants impaired in their ability to synthesize lignin. The brown midrib 30 ( Bmr30 ) gene, identified using a bulk segregant analysis and next-generation sequencing, was determined to encode a chalcone isomerase (CHI). Two independent mutations within this gene confirmed that loss of its function was responsible for the brown leaf midrib phenotype and reduced lignin concentration. Loss of the Bmr30 gene function, as shown by histochemical staining of leaf midrib and stalk sections, resulted in altered cell wall composition. In the bmr30 mutants, CHI activity was drastically reduced, and the accumulation of total flavonoids and total anthocyanins was impaired, which is consistent with its function in flavonoid biosynthesis. The level of the flavone lignin monomer tricin was reduced 20-fold in the stem relative to wild type, and to undetectable levels in the leaf tissue of the mutants. The bmr30 mutant, therefore, harbors a mutation in a phenylpropanoid biosynthetic gene that is key to the interconnection between flavonoids and monolignols, both of which are utilized for lignin synthesis in the grasses.

59 BASIC BIOLOGICAL SCIENCES↗

Enhancing Distribution System Resiliency Using Grid-Forming Fuel Cell Inverter: Preprint

Legacy inverters interfacing distributed energy re-sources are traditionally grid-following (GFL) in nature. GFL assets typically follow real power and reactive power set points. Recently, inverters with grid-forming (GFM) capability are gaining attention as GFM assets can increase the resiliency of the distribution system under stressed conditions. These GFM inverters can use photovoltaics, batteries, or fuel cells as their energy source. In this paper, we present information on inverters interfacing fuel cell assets, specifically with GFM capability. By introducing a fuel cell powered GFM coupled with hydrogen production and storage, the GFM can continuously provide GFM activities during periods of low renewable resource availability, and/or during power outages exceeding typical electric battery duration. Finally, we present information on the need for updates on interconnection and interoperability standards that can be leveraged by utilities for including fuel cell inverters in their asset mix.

fuel cell inverters↗

Catalysts and Electrodes for Affordable Hydrogen Generation and Utilization [Slides]

Hydrogen enables energy pathways across applications and sectors in an increasingly interconnected energy system, helping deep decarbonization, economic growth, and jobs creation. Electrochemical Energy Conversion Devices produce "green" H 2 from water: electrolyzers. H 2 is used to produce "green" electricity through fuel cells. There is a need of catalysts to enhance reactions kinetics at the electrodes.

08 HYDROGEN↗

Enhancing Cloud Cybersecurity: Prescriptive Controls for Operational Technology

This whitepaper provides strategic insights and recommendations into security cloud-based solutions for electric utilities, encompassing operational technology (OT), virtual power plants (VPP), distributed energy resources (DERs), applications, networks, and data storage as they transition to and leverage cloud infrastructure through managed service providers (MSPs) and cloud service providers (CSPs). Principles derived from established frameworks serve as a foundation for best practices across cybersecurity projects and remove the constraints of settling on a single framework. For organizations that prefer not to integrate a specific framework altogether, elements of the proposed approach could be adopted or tailored to best fit defined requirements and expected functionalities. The Cirrus assessment, a utility cloud feasibility tool, and the roadmap it provides serve as a precursor to this paper, which seeks to be a valuable resource for defining next steps following cloud technology integration feasibility appraisal. With its comprehensive approach to adoption, the Cirrus framework offers strategic guidance on responsibly preparing for or deploying a utility cloud solution. The previously published whitepaper, “Use Case-Informed Framework for Utility Cloud Migration,” details the guiding strategy, research, and deployment of cloud solutions within electric and interconnected grid systems. Before implementing the controls suggested in this document, it is recommended that stakeholders complete Cirrus's cloud integration assessment and pair the results with their unique cybersecurity controls to form a comprehensive cloud-based utility cybersecurity plan. The Cirrus outcome will consider a series of future architectures for the grid before and after the energy transition and evaluate the arguments for and against cloud applications for each electric and interconnected grid layer. This document is a companion to the original whitepaper, "Use Case-Informed Framework for Utility Cloud Migration" to further identify and recommend security controls based on Cirrus’s cloud integration assessment output. The following whitepaper outlines the cybersecurity controls that secure cloud-service models pertinent to the electric sector using the predefined categories identify, protect, detect, and respond and recover. The objective is to outline prescriptive security controls based on the type of architecture and data stored in the cloud. The focus includes dissecting the shared responsibility model and elucidating what on-premises Infrastructure as a Service (IaaS), Platform as a Service (PaaS), and Software as a Service (SaaS) entail. A pivotal consideration in this context is allocating responsibility for foundational cybersecurity aspects—having used Cirrus for the cloud integration assessment. The ensuing controls detailed herein also represent a checklist of controls necessary for a secure cloud transition, equipping utilities with the knowledge to navigate this digital transformation with confidence and strategic foresight in a safe and responsible manner.

42 ENGINEERING↗

Inertia Estimation and Trend Analysis of the United States Power Grid Interconnections

The transition from conventional to modern power systems is causing an increase in integration of inverter-based resources (IBRs). This generally leads to a decrease in total system inertia, which in-turn increases the system’s rate-of-change-of-frequency (RoCoF) during disturbances. This poses a threat to the frequency stability of the system and may falsely trigger protective devices. To monitor system status and plan for integrating renewable energy sources like photovoltaic, wind, and energy storage systems, a realistic study of inertia estimation and analysis in the United States (US) over the past decade is needed. This paper uses field-measured phasor measurement unit (PMU) data collected throughout the US from 2013 to 2023 via the Frequency Monitoring Network (FNET/GridEye) operated by the University of Tennessee, Knoxville (UTK) and Oak Ridge National Laboratory (ORNL). The collected PMU frequency data is utilized to estimate the system inertia of the three US interconnections: Eastern, Western, and Texas. Various RoCoF time windows are investigated for estimating the inertia of each interconnection by maximizing the correlation coefficient between the measured RoCoF and power mismatch. The resulting inertia trends over the past decade show approximately a 6% decline in inertia in the Eastern interconnection, a 15% decline in inertia in the Western interconnection, and a 16% increase in inertia in Texas. Key insights into how inertia is changing amidst the complex energy landscape are extracted using the fuel mix trend data. This provides valuable information for future energy strategies and planning.

30 DIRECT ENERGY CONVERSION↗

Integrated Energy-Water Planning in the Western and Texas Interconnections

While long-term regional electricity transmission planning has traditionally focused on cost, infrastructure utilization, environmental impact, and reliability, the availability of water is an emerging issue. Toward this growing need, thermoelectric expansion should consider competing demands from other water use sectors balanced with fresh and non-traditional water supplies subject to climate variability. To address this need the Department of Energy's Office of Electricity Delivery and Energy Reliability supported an integrated planning project with funding through the American Reinvestment and Recovery Act (2009). Specifically, an integrated energy-water analysis was performed to support transmission system planners in the Western and Texas Interconnections to explore the potential implications of water availability and cost for long-term transmission planning. The project brought together electric transmission planners (e.g., Western Electricity Coordinating Council (WECC) and the Electric Reliability Council of Texas (ERCOT)) with western water planners (e.g., Western Governors' Association and the Western States Water Council). Efforts were organized into ten specific tasks: (1) project coordination and outreach; (2) thermoelectric water use; (3) non-thermoelectric water use; (4) water availability; (5) water cost; (6) environmental risk; (7) climate variability; (8) energy for water; (9) decision support system interface; and, (10) transmission planning support. Major accomplishments associated with this effort include: For the first time water availability was used to inform generation expansion planning by WECC and ERCOT. For the first time, projections of intensifying drought and its effect on reservoir levels, and thermal effluent discharge permitting were used to inform operational and expansion planning by ERCOT. Water withdrawal and consumption were characterized for each power plant in the WECC and ERCOT service areas/regions. Water use factors were also developed for a range of unit processes that allowed projection of future water demands related to electric generation expansion planning. Working with state water managers current and future water use (withdrawal and consumption) were projected throughout the Western United States at an 8-digit Hydraulic Unit Code (HUC-8) level (over 1200 watersheds). In a similar fashion water availability and cost were mapped across the Western United States. Considered were five different sources of water: unappropriated surface water, unappropriated groundwater, appropriated water, municipal wastewater and brackish groundwater. Water basins (at the HUC-8 level) were mapped across the Western United States with regard to their potential for conflicts between aquatic and riparian species and habitats listed under the Endangered Species Act and water availability for future energy development. Water planners were engaged through the Western States Water Council and thus reflects their membership of the 17 contiguous western states (i.e., Texas up through the Dakotas and West). Power plants at greatest risk to the impacts of drought were identified. The analysis considered the hazards of low flows, insufficient reservoir storage, and elevated water temperatures under intensifying drought conditions projected for the future. The electricity used to provide water-related services was mapped at a county level throughout the Western U.S. Considered was the electricity required for interbasin conveyance, agricultural pumping, drinking water and wastewater services. To communicate our results the project has produced 6 journal articles, 1 book chapter, 11 reports, and 47 presentations at related conferences.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Integrated Energy-Water Planning in the Western and Texas Interconnections

While long-term regional electricity transmission planning has traditionally focused on cost, infrastructure utilization, and reliability, issues concerning the availability of water represent an emerging issue. Thermoelectric expansion must be considered in the context of competing demands from other water use sectors balanced with fresh and non-fresh water supplies subject to climate variability. An integrated Energy-Water Decision Support System (DSS) is being developed that will enable planners in the Western and Texas Interconnections to analyze the potential implications of water availability and cost for long-range transmission planning. The project brings together electric transmission planners (Western Electricity Coordinating Council and Electric Reliability Council of Texas) with western water planners (Western Governors’ Association and the Western States Water Council). This paper lays out the basic framework for this integrated Energy-Water DSS.

electricity↗

Local control of reactive power by distributed photovoltaic generators

High penetration levels of distributed photovoltaic (PV) generation on an electrical distribution circuit may severely degrade power quality due to voltage sags and swells caused by rapidly varying PV generation during cloud transients coupled with the slow response of existing utility compensation and regulation equipment. Although not permitted under current standards for interconnection of distributed generation, fast-reacting, VAR-capable PV inverters may provide the necessary reactive power injection or consumption to maintain voltage regulation under difficult transient conditions. As side benefit, the control of reactive power injection at each PV inverter provides an opportunity and a new tool for distribution utilities to optimize the performance of distribution circuits, e.g. by minimizing thermal losses. We suggest a local control scheme that dispatches reactive power from each PV inverter based on local instantaneous measurements of the real and reactive components of the consumed power and the real power generated by the PVs. Using one adjustable parameter per circuit, we balance the requirements on power quality and desire to minimize thermal losses. Numerical analysis of two exemplary systems, with comparable total PV generation albeit a different spatial distribution, show how to adjust the optimization parameter depending on the goal. Overall, this local scheme shows excellent performance; it's capable of guaranteeing acceptable power quality and achieving significant saving in thermal losses in various situations even when the renewable generation in excess of the circuit own load, i.e. feeding power back to the higher-level system.

14 SOLAR ENERGY↗