Search NASA⌕ Search

SEARCH · Search NASA

Results for “Vehicle assignment”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 217 records · Page 12

Parallel-Processing Software for Creating Mosaic Images

A computer program implements parallel processing for nearly real-time creation of panoramic mosaics of images of terrain acquired by video cameras on an exploratory robotic vehicle (e.g., a Mars rover). Because the original images are typically acquired at various camera positions and orientations, it is necessary to warp the images into the reference frame of the mosaic before stitching them together to create the mosaic. [Also see "Parallel-Processing Software for Correlating Stereo Images," Software Supplement to NASA Tech Briefs, Vol. 31, No. 9 (September 2007) page 26.] The warping algorithm in this computer program reflects the considerations that (1) for every pixel in the desired final mosaic, a good corresponding point must be found in one or more of the original images and (2) for this purpose, one needs a good mathematical model of the cameras and a good correlation of individual pixels with respect to their positions in three dimensions. The desired mosaic is divided into slices, each of which is assigned to one of a number of central processing units (CPUs) operating simultaneously. The results from the CPUs are gathered and placed into the final mosaic. The time taken to create the mosaic depends upon the number of CPUs, the speed of each CPU, and whether a local or a remote data-staging mechanism is used.

Klimeck, Gerhard↗

Design of Safe Separation Bounds for Temporally Deconflicted Trajectories Under Bounded Uncertainties

This paper explores the derivation of safe separation bounds for a heterogeneous group of~$n$ Uncrewed Aerial Systems (UAS) that are assigned temporally deconflicted trajectories. Compared to spatially deconflicted trajectories, temporal deconfliction can lead to higher traffic capacities and a more efficient use of the available airspace. One challenge with this type of deconfliction is that collisions can occur if some cooperating UAS are behind or ahead of schedule. To overcome this risk, this paper derives a lower bound on the safety distance between two heterogeneous UAS in the presence of bounded uncertainties. This safety distance can be leveraged to inform trajectory generation algorithms. The proposed bound establishes a rigorous safety margin when the fleet deviates from the planned trajectories, both temporally and spatially. For its derivation the paper assumes the UAS implement a distributed coordination algorithm that allows the fleet to maintain their schedules synchronized within a bounded temporal error, and a path-following algorithm that lets the vehicles track a target that moves along the planned trajectory with a bounded spatial error.

autonomy↗

Operations Analysis of the 2nd Generation Reusable Launch Vehicle

The Space Launch Initiative (SLI) program is developing a second-generation reusable launch vehicle. The program goals include lowering the risk of loss of crew to 1 in 10,000 and reducing annual operations cost to one third of the cost of the Space Shuttle. The SLI missions include NASA, military and commercial satellite launches and crew and cargo launches to the space station. The SLI operations analyses provide an assessment of the operational support and infrastructure needed to operate candidate system architectures. Measures of the operability are estimated (i.e. system dependability, responsiveness, and efficiency). Operations analysis is used to determine the impact of specific technologies on operations. A conceptual path to reducing annual operations costs by two thirds is based on key design characteristics, such as reusability, and improved processes lowering labor costs. New operations risks can be expected to emerge. They can be mitigated with effective risk management with careful identification, assignment, tracking, and closure. SLI design characteristics such as nearly full reusability, high reliability, advanced automation, and lowered maintenance and servicing coupled with improved processes are contributors to operability and large operating cost reductions.

Noneman, Steven R.↗

Ares I-X Range Safety Simulation Verification and Analysis IV and V

NASA s ARES I-X vehicle launched on a suborbital test flight from the Eastern Range in Florida on October 28, 2009. NASA generated a Range Safety (RS) flight data package to meet the RS trajectory data requirements defined in the Air Force Space Command Manual 91-710. Some products included in the flight data package were a nominal ascent trajectory, ascent flight envelope trajectories, and malfunction turn trajectories. These data are used by the Air Force s 45th Space Wing (45SW) to ensure Eastern Range public safety and to make flight termination decisions on launch day. Due to the criticality of the RS data in regards to public safety and mission success, an independent validation and verification (IV&V) effort was undertaken to accompany the data generation analyses to ensure utmost data quality and correct adherence to requirements. Multiple NASA centers and contractor organizations were assigned specific products to IV&V. The data generation and IV&V work was coordinated through the Launch Constellation Range Safety Panel s Trajectory Working Group, which included members from the prime and IV&V organizations as well as the 45SW. As a result of the IV&V efforts, the RS product package was delivered with confidence that two independent organizations using separate simulation software generated data to meet the range requirements and yielded similar results. This document captures ARES I-X RS product IV&V analysis, including the methodology used to verify inputs, simulation, and output data for an RS product. Additionally a discussion of lessons learned is presented to capture advantages and disadvantages to the IV&V processes used.

Tarpley, Ashley↗

Cost Analysis In A Multi-Mission Operations Environment

Spacecraft control centers have evolved from dedicated, single-mission or single missiontype support to multi-mission, service-oriented support for operating a variety of mission types. At the same time, available money for projects is shrinking and competition for new missions is increasing. These factors drive the need for an accurate and flexible model to support estimating service costs for new or extended missions; the cost model in turn drives the need for an accurate and efficient approach to service cost analysis. The National Aeronautics and Space Administration (NASA) Huntsville Operations Support Center (HOSC) at Marshall Space Flight Center (MSFC) provides operations services to a variety of customers around the world. HOSC customers range from launch vehicle test flights; to International Space Station (ISS) payloads; to small, short duration missions; and has included long duration flagship missions. The HOSC recently completed a detailed analysis of service costs as part of the development of a complete service cost model. The cost analysis process required the team to address a number of issues. One of the primary issues involves the difficulty of reverse engineering individual mission costs in a highly efficient multimission environment, along with a related issue of the value of detailed metrics or data to the cost model versus the cost of obtaining accurate data. Another concern is the difficulty of balancing costs between missions of different types and size and extrapolating costs to different mission types. The cost analysis also had to address issues relating to providing shared, cloud-like services in a government environment, and then assigning an uncertainty or risk factor to cost estimates that are based on current technology, but will be executed using future technology. Finally the cost analysis needed to consider how to validate the resulting cost models taking into account the non-homogeneous nature of the available cost data and the decreasing flight rate. This paper presents the issues encountered during the HOSC cost analysis process, and the associated lessons learned. These lessons can be used when planning for a new multi-mission operations center or in the transformation from a dedicated control center to multi-center operations, as an aid in defining processes that support future cost analysis and estimation. The lessons can also be used by mature serviceoriented, multi-mission control centers to streamline or refine their cost analysis process.

Newhouse, M.↗

Cost Analysis in a Multi-Mission Operations Environment

Spacecraft control centers have evolved from dedicated, single-mission or single mission-type support to multi-mission, service-oriented support for operating a variety of mission types. At the same time, available money for projects is shrinking and competition for new missions is increasing. These factors drive the need for an accurate and flexible model to support estimating service costs for new or extended missions; the cost model in turn drives the need for an accurate and efficient approach to service cost analysis. The National Aeronautics and Space Administration (NASA) Huntsville Operations Support Center (HOSC) at Marshall Space Flight Center (MSFC) provides operations services to a variety of customers around the world. HOSC customers range from launch vehicle test flights; to International Space Station (ISS) payloads; to small, short duration missions; and has included long duration flagship missions. The HOSC recently completed a detailed analysis of service costs as part of the development of a complete service cost model. The cost analysis process required the team to address a number of issues. One of the primary issues involves the difficulty of reverse engineering individual mission costs in a highly efficient multi-mission environment, along with a related issue of the value of detailed metrics or data to the cost model versus the cost of obtaining accurate data. Another concern is the difficulty of balancing costs between missions of different types and size and extrapolating costs to different mission types. The cost analysis also had to address issues relating to providing shared, cloud-like services in a government environment, and then assigning an uncertainty or risk factor to cost estimates that are based on current technology, but will be executed using future technology. Finally the cost analysis needed to consider how to validate the resulting cost models taking into account the non-homogeneous nature of the available cost data and the decreasing flight rate. This paper presents the issues encountered during the HOSC cost analysis process, and the associated lessons learned. These lessons can be used when planning for a new multi-mission operations center or in the transformation from a dedicated control center to multi-center operations, as an aid in defining processes that support future cost analysis and estimation. The lessons can also be used by mature service-oriented, multi-mission control centers to streamline or refine their cost analysis process.

Felton, Larry↗

Nuclear Lunar Logistics Study

This document has been prepared to incorporate all presentation aid material, together with some explanatory text, used during an oral briefing on the Nuclear Lunar Logistics System given at the George C. Marshall Space Flight Center, National Aeronautics and Space Administration, on 18 July 1963. The briefing and this document are intended to present the general status of the NERVA (Nuclear Engine for Rocket Vehicle Application) nuclear rocket development, the characteristics of certain operational NERVA-class engines, and appropriate technical and schedule information. Some of the information presented herein is preliminary in nature and will be subject to further verification, checking and analysis during the remainder of the study program. In addition, more detailed information will be prepared in many areas for inclusion in a final summary report. This work has been performed by REON, a division of Aerojet-General Corporation under Subcontract 74-10039 from the Lockheed Missiles and Space Company. The presentation and this document have been prepared in partial fulfillment of the provisions of the subcontract. From the inception of the NERVA program in July 1961, the stated emphasis has centered around the demonstration of the ability of a nuclear rocket to perform safely and reliably in the space environment, with the understanding that the assignment of a mission (or missions) would place undue emphasis on performance and operational flexibility. However, all were aware that the ultimate justification for the development program must lie in the application of the nuclear propulsion system to the national space objectives.

Source record↗

Advanced Launch System Multi-Path Redundant Avionics Architecture Analysis and Characterization

The objective of the Multi-Path Redundant Avionics Suite (MPRAS) program is the development of a set of avionic architectural modules which will be applicable to the family of launch vehicles required to support the Advanced Launch System (ALS). To enable ALS cost/performance requirements to be met, the MPRAS must support autonomy, maintenance, and testability capabilities which exceed those present in conventional launch vehicles. The multi-path redundant or fault tolerance characteristics of the MPRAS are necessary to offset a reduction in avionics reliability due to the increased complexity needed to support these new cost reduction and performance capabilities and to meet avionics reliability requirements which will provide cost-effective reductions in overall ALS recurring costs. A complex, real-time distributed computing system is needed to meet the ALS avionics system requirements. General Dynamics, Boeing Aerospace, and C.S. Draper Laboratory have proposed system architectures as candidates for the ALS MPRAS. The purpose of this document is to report the results of independent performance and reliability characterization and assessment analyses of each proposed candidate architecture and qualitative assessments of testability, maintainability, and fault tolerance mechanisms. These independent analyses were conducted as part of the MPRAS Part 2 program and were carried under NASA Langley Research Contract NAS1-17964, Task Assignment 28.

Baker, Robert L.↗

Internship Abstract - Aerosciences and Flight Mechanics Intern

Mars is a hard place to land on, but my internship with NASA's Aerosciences & Flight Mechanics branch has shown me the ways in which men and women will one day land safely. I work on Mars Aerocapture, an aeroassist maneuver that reduces the fuel necessary to "capture" into Martian orbit before a descent. The spacecraft flies through the Martian atmosphere to lose energy through heating before it exits back into space, this time at a slower velocity and in orbit around Mars. Spacecraft will need to maneuver through the Martian atmosphere to accurately hit their orbit, and they will need to survive the generated heat. Engineering teams need simulation data to continue their designs, and the guidance algorithm that ensures a proper orbit insertion needs to be refined - two jobs that fell to me at the summer's start. Engineers within my branch have developed two concept aerocapture vehicles, and I run simulations on their behavior during the maneuver. I also test and refine the guidance algorithm. I spent the first few weeks familiarizing myself with the simulation software, troubleshooting various guidance bugs and writing code. Everything runs smoothly now, and I recently sent my first set of trajectory data to a Thermal Protection System group so they can incorporate it into their heat-bearing material designs. I hope to generate plenty of data in the next few weeks for various engineering groups before my internship ends mid-August. My major accomplishment so far is improving the guidance algorithm. It is a relatively new algorithm that promises higher accuracy and fuel efficiency, but it hasn't undergone extensive testing yet. I've had the opportunity to work with the principal developer - a professor at Iowa State University - to find and fix several issues. I was also assigned the task of expanding the branch's aerodynamic heating simulation software. I am excited to do this because engineers in the future will use my work to generate meaningful data and make design decisions. My internship has taught me to how to teach myself. There are no tutors, study sessions or professor office hours. When I am given an assignment I am expected to figure out how to accomplish it, and I have grown in my problem solving abilities. My summer experience has reinforced my drive to work at NASA, and I can definitely see myself working full time on the aerocapture project, or something similar.

Rangel, John↗

The Autonomous Precision Landing and Hazard Detection and Avoidance Technology (ALHAT)

As NASA plans to send humans back to the Moon and develop a lunar outpost, technologies must be developed to place humans and cargo safely, precisely, repeatedly, on the lunar surface with the capability to avoid surface hazards. Exploration Space Architecture Study requirements include the need for global lunar surface access with safe, precise landing without lighting constraints on terrain that may have landing hazards for human scale landing vehicles. Landing accuracies of perhaps 1,000 meters for sortie crew missions to 10 s of meters for Outpost class missions are required. The Autonomous precision Landing Hazard Avoidance Technology (ALHAT) project will develop the new and unique descent and landing Guidance, Navigation and Control (GNC) hardware and software technologies necessary for these capabilities. The ALHAT project will qualify a lunar descent and landing GNC system to a Technology Readiness Level (TRL) of 6 capable of supporting lunar crewed, cargo, and robotic missions. The (ALHAT) development project was chartered by NASA Headquarters in October 2006. The initial effort to write a project plan and define an ALHAT Team was followed by a fairly aggressive research and analysis effort to determine what technologies existed that could be developed and applied to the lunar landing problems indicated above. This paper describes the project development, research, analysis and concept evolution that has occurred since the assignment of the project. This includes the areas of systems engineering, GNC, sensors, sensor algorithms, simulations, fielding testing, laboratory testing, Hardware-In-The-Loop testing, system avionics and system certification concepts.

Epp, Chirold D.↗

Evaluation of Gear Condition Indicator Performance on Rotorcraft Fleet

The U.S. Army is currently expanding its fleet of Health Usage Monitoring Systems (HUMS) equipped aircraft at significant rates, to now include over 1,000 rotorcraft. Two different on-board HUMS, the Honeywell Modern Signal Processing Unit (MSPU) and the Goodrich Integrated Vehicle Health Management System (IVHMS), are collecting vibration health data on aircraft that include the Apache, Blackhawk, Chinook, and Kiowa Warrior. The objective of this paper is to recommend the most effective gear condition indicators for fleet use based on both a theoretical foundation and field data. Gear diagnostics with better performance will be recommended based on both a theoretical foundation and results of in-fleet use. In order to evaluate the gear condition indicator performance on rotorcraft fleets, results of more than five years of health monitoring for gear faults in the entire HUMS equipped Army helicopter fleet will be presented. More than ten examples of gear faults indicated by the gear CI have been compiled and each reviewed for accuracy. False alarms indications will also be discussed. Performance data from test rigs and seeded fault tests will also be presented. The results of the fleet analysis will be discussed, and a performance metric assigned to each of the competing algorithms. Gear fault diagnostic algorithms that are compliant with ADS-79A will be recommended for future use and development. The performance of gear algorithms used in the commercial units and the effectiveness of the gear CI as a fault identifier will be assessed using the criteria outlined in the standards in ADS-79A-HDBK, an Army handbook that outlines the conversion from Reliability Centered Maintenance to the On-Condition status of Condition Based Maintenance.

Antolick, Lance J.↗

Automated and Adaptive Mission Planning for Orbital Express

The Orbital Express space mission was a Defense Advanced Research Projects Agency (DARPA) lead demonstration of on-orbit satellite servicing scenarios, autonomous rendezvous, fluid transfers of hydrazine propellant, and robotic arm transfers of Orbital Replacement Unit (ORU) components. Boeing's Autonomous Space Transport Robotic Operations (ASTRO) vehicle provided the servicing to the Ball Aerospace's Next Generation Serviceable Satellite (NextSat) client. For communication opportunities, operations used the high-bandwidth ground-based Air Force Satellite Control Network (AFSCN) along with the relatively low-bandwidth GEO-Synchronous space-borne Tracking and Data Relay Satellite System (TDRSS) network. Mission operations were conducted out of the RDT&E Support Complex (RSC) at the Kirtland Air Force Base in New Mexico. All mission objectives were met successfully: The first of several autonomous rendezvous was demonstrated on May 5, 2007; autonomous free-flyer capture was demonstrated on June 22, 2007; the fluid and ORU transfers throughout the mission were successful. Planning operations for the mission were conducted by a team of personnel including Flight Directors, who were responsible for verifying the steps and contacts within the procedures, the Rendezvous Planners who would compute the locations and visibilities of the spacecraft, the Scenario Resource Planners (SRPs), who were concerned with assignment of communications windows, monitoring of resources, and sending commands to the ASTRO spacecraft, and the Mission planners who would interface with the real-time operations environment, process planning products and coordinate activities with the SRP. The SRP position was staffed by JPL personnel who used the Automated Scheduling and Planning ENvironment (ASPEN) to model and enforce mission and satellite constraints. The lifecycle of a plan began three weeks outside its execution on-board. During the planning timeframe, many aspects could change the plan, causing the need for re-planning. These variable factors, ranging from shifting contact times to ground-station closures and required maintenance times, are discussed along with the flexibility of the ASPEN tool to accommodate changes to procedures and the daily or long-range plan, which contributed to the success of the mission. This paper will present an introduction to ASPEN, a more in-depth discussion on its use on the Orbital Express mission, and other relative work. A description of ground operations after the SRP deliveries were made is included, and we briefly discuss lessons learned from the planning perspective and future work.

scheduling↗

CloudSat Anomaly Recovery and Operational Lessons Learned

In April 2011, NASA's pioneering cloud profiling radar satellite, CloudSat, experienced a battery anomaly that placed it into emergency mode and rendered it operations incapable. All initial attempts to recover the spacecraft failed as the resultant power limitations could not support even the lowest power mode. Originally part of a six-satellite constellation known as the "A-Train", CloudSat was unable to stay within its assigned control box, posing a threat to other A-Train satellites. CloudSat needed to exit the constellation, but with the tenuous power profile, conducting maneuvers was very risky. The team was able to execute a complex sequence of operations which recovered control, conducted an orbit lower maneuver, and returned the satellite to safe mode, within one 65 minute sunlit period. During the course of the anomaly recovery, the team developed several bold, innovative operational strategies. Details of the investigation into the root-cause and the multiple approaches to revive CloudSat are examined. Satellite communication and commanding during the anomaly are presented. A radical new system of "Daylight Only Operations" (DO-OP) was developed, which cycles the payload and subsystem components off in tune with earth eclipse entry and exit in order to maintain positive power and thermal profiles. The scientific methodology and operational results behind the graduated testing and ramp-up to DO-OP are analyzed. In November 2011, the CloudSat team successfully restored the vehicle to consistent operational collection of cloud radar data during sunlit portions of the orbit. Lessons learned throughout the six-month return-to-operations recovery effort are discussed and offered for application to other R&D satellites, in the context of on-orbit anomaly resolution efforts.

cloud profiling radar satellite↗

Kiloton Class ISRU Systems for LO2/LCH4 Propellant Production on the Mars Surface

As part of the 2023 strategic analysis cycle to explore the trade space, the NASA Mars Architecture Team wanted to explore what it takes to produce in situ on Mars many hundreds of tons of propellants for a large all-chemical transportation system. The conceptual operations and design of the LO 2 /LCH 4 in situ resource utilization (ISRU) water acquisition, propellant production and liquification system was assigned to the NASA Compass concurrent engineering team with support from various NASA ISRU, cryogenic fluid management, and surface power experts. The conceptual point design examined one case producing 300 t of LO 2 /LCH 4 from the Mars atmosphere and delivered water in 20 months and storing the liquified propellants in a to-be-reused lander. Several of these large single-stage, all-chemical class large vertical landers would deliver the required ISRU equipment. The required 150 t of water stock for the ISRU system was traded between three options: delivered, pumped from subsurface ice deposits or extracted from surface soils. The large propellant production systems consist of atmospheric CO 2 collection scroll pumps, a combined solid oxide electrolysis and methanation system to convert the CO 2 and water into gaseous O 2 and CH 4 , and various dryers, scrubbers, and separators to remove the excess water, CO 2 and H 2 . The liquefaction system consisted of 90 K cryocoolers to provide cold Ne to the launch vehicle tanks to liquify these CH 4 and O 2 gases and store them as rocket propellants. The systems are deployed using a 6 t (payload) capable chassis derived from conceptual pressurized rover designs. In total, the propellant production and liquefaction systems required three propellant production pallets, two liquefaction pallets, two water tankers, and six 40 kW-fission surface power systems (FSPS) with cabling. All this equipment was found to notionally fit inside two- 75 metric ton payload capacity Mars ascent and landing vehicles (MALV). For the case where 150 t of water delivered from Earth, four cargo MALVs are required for the full system. The same is true when the 150 t of water is extracted through surface mining. For the borehole system, only 3 cargo MALVs are necessary. A comparison of approaches in terms of number of landers, number and type of elements, power and time is made.

ISRU↗

International Solar Terrestrial Physics (ISTP) geotail mission

The Geotail spacecraft will be provided by the Institute of Space and Astronautical Science (ISAS) and will provide a Delta Launch Vehicle, tracking support by the Deep Space Network (DSN), and data processing support by GSFC. In exchange, ISAS will reserve part of the payload for NASA instruments together with a certain number of investigators from the United States. As the solar wind flows toward the Earth, some of the energy is modified by the Earth's magnetosphere, ionosphere, and upper atmosphere. This interaction causes the flow to be altered, creating a plasmasphere, plasma sheet, and ring currents in the Earth's Geomagnetic Tail region. The result is a series of distinct regions which affect processes on the Earth. By traversing the tail region to a variety of depths, Geotail will be able to determine the size, position, and other properties of these regions. When correlated with information obtained from the other ISAS spacecraft, Geotail data should help to provide a more complete understanding of how the solar processes affect the Earth's environment. The flight profile is given, and information is presented in tabular form on the following topics: DSN support, frequency assignments, telemetry, command, and tracking support responsibility.

Sanford, R.↗

Centralized Planning for Multiple Exploratory Robots

A computer program automatically generates plans for a group of robotic vehicles (rovers) engaged in geological exploration of terrain. The program rapidly generates multiple command sequences that can be executed simultaneously by the rovers. Starting from a set of high-level goals, the program creates a sequence of commands for each rover while respecting hardware constraints and limitations on resources of each rover and of hardware (e.g., a radio communication terminal) shared by all the rovers. First, a separate model of each rover is loaded into a centralized planning subprogram. The centralized planning software uses the models of the rovers plus an iterative repair algorithm to resolve conflicts posed by demands for resources and by constraints associated with the all the rovers and the shared hardware. During repair, heuristics are used to make planning decisions that will result in solutions that will be better and will be found faster than would otherwise be possible. In particular, techniques from prior solutions of the multiple-traveling- salesmen problem are used as heuristics to generate plans in which the paths taken by the rovers to assigned scientific targets are shorter than they would otherwise be.

Estlin, Tara↗

Hierarchical Mixture of Experts for Advanced Air Mobility Flight Phase Classification

Advanced Air Mobility (AAM) and Urban Air Mobility (UAM) operations will have numerous vehicles and aircraft flying in the airspace, which poses safety and security concerns. Commercial airlines utilize Air Traffic Management (ATM) and Air Traffic Control (ATC) for real-time monitoring, surveillance, traffic coordination, and rerouting to maintain safe and efficient flight patterns. Transferring ATM and ATC architectures to AAM/UAM will be difficult to implement since AAM/UAM aircraft fly at lower altitudes, have more static and dynamic obstacles, operate in highly dense environments, and have several more aircraft to monitor for a given volume of the national airspace (NAS). Automatic flight phase classification will enhance efficiencies of ATM/ATC-like architectures for AAM/UAM. Classifying the main flight phases (takeoff, climb, cruise, descent, and landing) provides insight to ensure safe operations, provide situational awareness of the NAS, and monitor flights in case there are any emergencies. Typical flight phase classification methods are all-or-nothing, which will not capture or accurately classify the transitions between flight phases. Utilizing hierarchical mixture of experts (HME) provides a flight phase classification solution that includes transitions between the flight phases by assigning weights based on ground-based distributed sensor readings from cameras and radar. Adding the transitions between flight phases increases the fidelity of flight phase classification and provides deeper insight for flight phase classification by leveraging distributed sensing concepts.

distributed sensing↗

STS-54 Space Shuttle mission report

The STS-54 Space Shuttle Program Mission Report is a summary of the Orbiter, External Tank (ET), Solid Rocket Booster/Redesigned Solid Rocket Motor (SRB/RSRM), and the Space Shuttle Main Engine (SSME) subsystems performance during this fifty-third flight of the Space Shuttle Program, and the third flight of the Orbiter vehicle Endeavour (OV-105). In addition to the Orbiter, the flight vehicle consisted of an ET, which was designated ET-51; three SSME's, which were serial numbers 2019, 2033, and 2018 in positions 1, 2, and 3, respectively; and two retrievable and reusable SRB's which were designated BI-056. The lightweight RSRM's that were installed in each SRB were designated 360L029A for the left SRB, and 360L029B for the right SRB. The primary objectives of this flight were to perform the operations to deploy the Tracking and Data Relay Satellite-F/Inertial Upper Stage payload and to fulfill the requirements of the Diffuse X-Ray Spectrometer (DXS) payload. The secondary objective was to fly the Chromosome and Plant Cell Division in Space (CHROMEX), Commercial Generic Bioprocessing Apparatus (CGBA), Physiological and Anatomical Rodent Experiment (PARE), and the Solid Surface Combustion Experiment (SSCE). In addition to presenting a summary of subsystem performance, this report also discusses each Orbiter, ET, SSME, SRB, and RSRM in-flight anomaly in the applicable section of the report. The official tracking number for each in-flight anomaly, assigned by the cognizant project, is also shown. All times are given in Greenwich mean time (G.m.t.) and mission elapsed time (MET).

Fricke, Robert W., Jr.↗