Search NASA⌕ Search

SEARCH · Search NASA

Results for “Well Installation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 217 records · Page 12

Mark-18A Cold Runs

The Savannah River National Laboratory (SRNL) is tasked by the National Nuclear Security Administration (NNSA) to recover highly valued isotopes from irradiated Mark-18A (Mk-18A) targets. The Savannah River Site (SRS) has sixty-five Mk-18A targets available for the recovery of the high valued materials. The sixty-five Mk-18A targets are currently stored in the L-Area Basin and will be removed one at a time and individually transported to SRNL. Upon receipt at SRNL, the Mk-18A target material will be removed from the confinement, dissolved, chemically separated, and calcined to a stable oxide. The flowsheet is designed to recover the plutonium as well as the trivalent actinides. The remaining unrecovered material will be discarded to the high activity drain (HAD) system in SRNL. A specially designed cask was procured for transport of the targets from L-Area to SRNL. Once received at SRNL, the targets will be loaded into the back of Cell 7 and resized as they enter the cell. The resized targets (1/4 lengths) will then be processed one at a time through the following processes: caustic dissolution and filtration; acidic dissolution and filtration, Reillex anion exchange, diglycolamide (DGA) cation exchange; and DGA calcination. This processing will result in two product streams. The first is an aqueous plutonium solution which will be removed from the shielded cells and taken to a glovebox for further purification and conversion to an oxide. The second is a calcined oxide containing the Am and Cm as well as other lanthanide fission products which will be removed from the shielded cells using a bagless transfer system. Both materials will be packaged for shipment to Oak Ridge National Laboratory (ORNL). All equipment to carry out this process was designed, procured or fabricated, and installed in a mock-up facility (716-4A) at SRS to allow for simulation testing in a non-radioactive area. This equipment was then dismantled and transferred from 716-4A to 773-A and installed in the SRNL Shielded Cells. After installation in the shielded cells facility testing was performed using water followed by surrogates and cold chemicals. Issues were identified during these evaluations, including equipment issues as well as technical challenges. Many of the issues were rectified during performance of the cold runs, and the remaining have a resolution identified. Table ES-1 provides a summary of all issues identified during the cold run operations, as well as the status and identified resolutions to outstanding issues.

07 ISOTOPE AND RADIATION SOURCES↗

Low-Flow Marine Hydrokinetic Turbine for Small Autonomous Unmanned Mobile Recharge Stations

A prototype low-flow marine current turbine for deployment from a small unmanned mobile floating platform has been developed for autonomously seeking and harnessing tidal/coastal currents. The support platform is an unmanned surface vehicle (USV), in the form of a catamaran with two electric outboard motors and with capabilities for autonomous navigation. The USV utilized is a WAM-V 16 vehicle that has been developed separately with support from the Office of Naval Research (ONR) [1]. The marine current turbine is based on a freestream waterwheel (FSWW), also known as an undershot waterwheel (FSWW), mounted on the stern of the USV. The concept of operation involves the USV autonomously navigating to a designated marine current resource. Upon arrival, the USV anchors itself, aligns with the current, and deploys the FSWW turbine using a custom cable-lift mechanism. The turbine harnesses the local current, and an onboard power-take-off (PTO) device converts the mechanical energy into electricity, which is stored in an onboard battery bank. When energy harvesting is completed, the turbine and the anchor are retrieved and the USV navigates to a selected location. These unmanned at-sea platforms can provide power to other unmanned maritime systems. Specifically, in this project, the power generated onboard can be used to charge aerial drones via a custom flight deck that has been developed for the USV. The recharging capabilities offered by a fleet of such strategically placed recharging stations can significantly benefit aerial drones operating in the maritime domain by eliminating the need to travel back and forth to land or ship based charging stations. The project has resulted in the development of subcomponents, including the FSWW turbine, a novel PTO, an automated anchoring system for the USV, an automated turbine deployment system, and a flight deck with capabilities onboard the USV for landing, direct-contact charging and takeoff of aerial drones. The design and development of these subsystems have culminated in the overall prototype marine hydrokinetic platform (MHK Platform, Fig. 1). Comprehensive lab and field testing have been conducted to validate the functionality and performance of the platform and its components. The project demonstrates the potential for autonomous, unmanned systems to harness renewable energy from marine currents, and provide sustainable power solutions for maritime applications such as coastal surveillance and environmental monitoring; shoreline mapping; search and rescue; oceanographic research; inspection and maintenance of offshore energy installations like wind turbines and oil rigs; oil spill response; maritime disaster response; and aerial surveys, as well as facilitation of data transfer drones and shore stations.

16 TIDAL AND WAVE POWER↗

Experimental Investigation of a Phase Change Material Charged Serpentine Heat Exchanger with Louvered Fins

Phase change material heat exchangers (PCM-HX) can be used as a latent heat thermal energy storage (LHTES) component in heat pump applications to further enhance the efficiency of a heat pump as well as to yield financial savings by peak-load shifting. In this paper, a low-cost commercially available aluminum serpentine heat exchanger with louvered fins was experimentally investigated to check its thermal performance as a PCM-HX. A transparent rectangular box fabricated from acrylic plates served as a PCM container. Two cameras were used to capture the phase change process of the PCM on the front and top sides of the container during the experiment. A total of 88 installed temperature sensors throughout the test setup and a mass flow meter enabled a quantitative analysis of the PCM-HX as well. The energy balance deviation between the estimated theoretical and experimentally calculated PCM storage was ±14% considering the often-neglected heat loss and thermal mass of the PCM-HX. PCM temperature profiles, charge and discharge rates, and energy densities under different test conditions were also investigated.

42 ENGINEERING↗

HPC Molecular Simulation Tries Out a New GPU: Experiences on Early AMD Test Systems for the Frontier Supercomputer

Molecular simulation is an important tool for nu- merous efforts in physics, chemistry, and the biological sciences. Simulating molecular dynamics requires extremely rapid cal- culations to enable sufficient sampling of simulated temporal molecular processes. The Hewlett Packard Enterprise (HPE) Cray EX Frontier supercomputer installed at the Oak Ridge Leadership Computing Facility (OLCF) will provide an exascale resource for open science, and will feature graphics processing units (GPUs) from Advanced Micro Devices (AMD). The future LUMI supercomputer in Finland will be based on an HPE Cray EX platform as well. Here we test the ports of several widely used molecular dynamics packages that have each made substantial use of acceleration with NVIDIA GPUs, on Spock, the early Cray pre-Frontier testbed system at the OLCF which employs AMD GPUs. These programs are used extensively in industry for pharmaceutical and materials research, as well as academia, and are also frequently deployed on high-performance computing (HPC) systems, including national leadership HPC resources. We find that in general, performance is competitive and installation is straightforward, even at these early stages in a new GPU ecosystem. Our experiences point to an expanding arena for GPU vendors in HPC for molecular simulation.

Sedova, Ada↗

Analysis of Microseismicity and Reactivated Fault Size to Assess the Potential for Felt Events by CO 2 Injection in the Illinois Basin

The results of monitoring of carbon dioxide (CO 2 ) injection at the Illinois Basin—Decatur Project (IBDP) and the companion Illinois Industrial Carbon Capture and Sequestration Sources (IL-ICCS) project—have shown that reservoir response to fluid pressure changes can vary significantly at different injection locations within the same reservoir. Predrill reservoir characterization is important to identify potentially seismogenic faults. However, interpretations of newly reprocessed 3D seismic reflection data illustrate the challenges related to their identification in a region dominated by faulting with small vertical offsets. Faults interpreted in the 3D seismic volume range from ~300 to 1200 m wide and are in the same size range as faults that could have been the source of historical events up to Mw 2.7 in central Illinois. The array of monitoring sensors that was installed for the IBDP continues to collect data, as injection operates in IL-ICCS, the second injection well. CO 2 injection rates for the IL-ICCS well are on average 1.7 times the rates injected in the IBDP well, but a significantly reduced rate of induced seismicity is observed. This article presents results of passive seismic monitoring for the duration of the project to date, integrating active and passive seismic data to develop a new interpretation of the subsurface structure at the Decatur site that explicitly identifies pathways for fluid flow into the basement leading to induced seismicity, and provides a geological explanation for the sharp reduction of induced seismicity during injection at higher rates into the second well. The use of seismic moment to estimate the length of seismogenic slip planes in the local subsurface suggests that faults large enough to produce felt seismicity are unlikely to be present at or near the Decatur site.

Geochemistry & Geophysics↗

Sumner County Field Validation: An Assessment of Thermal Energy Storage in Municipal Buildings in Mixed-Humid Climates

The overall aim of the project was to conduct a full-scale implementation of TES in an operational administrative building in Sumner County, Kansas with a special focus of phase change material (PCM) passive implementation in the ceiling envelope. PCM was used with the intention of increasing the ability of public buildings to shift the peak HVAC energy demand and consumption. The study was conducted during the span of three years in 3 phases, (i) phase I: energy audit (pre-retrofit) (ii) phase II: ceiling tile installation (PCM retrofit), and (iii) phase III: energy evaluation (post-retrofit). Temperature and HVAC energy measurements as well as weather data collected is used for an extensive validation study and further parametric assessment to find (a) annual HVAC energy savings (b) peak period electricity and load savings focusing on cooling dominant months of the year.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

An automated system for continuous monitoring of CO 2 geosequestration using multi-well offset VSP with permanent seismic sources and receivers: Stage 3 of the CO2CRC Otway Project

Time-lapse seismic is an essential tool for monitoring CO 2 injection into the subsurface but suffers from high cost and long intervals between surveys. An alternative approach is continuous monitoring using permanent sources and receivers capable of mapping CO 2 plume evolution on an almost daily basis and drastically reduce human effort, cost and survey turnaround. As part of the CO2CRC Otway project, a continuous monitoring system is employed to monitor a small (15,000 tonnes) CO 2 injection within the CO2CRC Otway Project. The permanent monitoring system employs distributed acoustic sensors (DAS) installed in boreholes as seismic receivers and seismic orbital vibrators (SOV) as seismic sources. The monitoring approach is based on vertical seismic profiling using five wells equipped with DAS cemented behind the casing and nine SOVs and is acquiring the data continuously in an autonomous manner. The data is then automatically processed on-site producing a seismic image every 2.5 days, which is then transmitted to a remote office. The data has good repeatability with NRMS of about ~10-15%.

58 GEOSCIENCES↗

CONSTAX2: improved taxonomic classification of environmental DNA markers

Abstract Summary CONSTAX—the CONSensus TAXonomy classifier—was developed for accurate and reproducible taxonomic annotation of fungal rDNA amplicon sequences and is based upon a consensus approach of RDP, SINTAX and UTAX algorithms. CONSTAX2 extends these features to classify prokaryotes as well as eukaryotes and incorporates BLAST-based classifiers to reduce classification errors. Additionally, CONSTAX2 implements a conda-installable command-line tool with improved classification metrics, faster training, multithreading support, capacity to incorporate external taxonomic databases and new isolate matching and high-level taxonomy tools, replete with documentation and example tutorials. Availability and implementation CONSTAX2 is available at https://github.com/liberjul/CONSTAXv2, and is packaged for Linux and MacOS from Bioconda with use under the MIT License. A tutorial and documentation are available at https://constax.readthedocs.io/en/latest/. Data and scripts associated with the manuscript are available at https://github.com/liberjul/CONSTAXv2_ms_code. Supplementary information Supplementary data are available at Bioinformatics online.

59 BASIC BIOLOGICAL SCIENCES↗

Aluminum Electrolytic Capacitor Vulnerability Evaluation in DC Power Supplies at the Spallation Neutron Source

The service life of electrolytic capacitors is a concern for long-term reliable operation of power supplies. The Power Conversion Group at the Spallation Neutron Source (SNS) facility of Oak Ridge National Laboratory is responsible for more than 500 power supplies with over 1000 electrolytic capacitors installed in these power supplies. Most of the electrolytic capacitors have been in operation since 2007 and are either well over or close to the manufacturer provided lifetime. This paper addresses this vulnerability to ensure continued reliable operation of the SNS. The power supply circuit is simulated in a MATLAB/Simulink environment to quantify the capacitor ripple current and operating voltage. Combined with manufacturer data, this information is used to estimate capacitor lifetime. Utilizing the simulation results and lifetime projections of the capacitors, capacitor replacements for the power supplies is prioritized. To assess end-of-life, the ambient temperature and ripple current of the capacitor is used. Based on the manufacturer's data and scientific literature review, capacitor end-of-life is established. The results of the simulations and analysis is presented. Data on the highest priority supplies will also be presented, and statistics on the capacitor performance, reliability and remaining lifetime will be shown.

Harave, Sudarshan↗

New Improved Horizontal Electropolishing System for SRF Cavities

The best performance of niobium SRF accelerating cavities is obtained with surfaces smoothed with electropolishing chemical finishing. Jefferson Lab has recently specified, procured, installed, and commissioned a new versatile production electropolishing (EP) tool. Experience with EP research and operations at JLab as well as vendor interactions and experience guided development of the system specification. Detailed design and fabrication was awarded by contract to Semiconductor Process Equipment Corporation (SPEC). The delivered system was integrated into the JLab chemroom infrastructure and commissioned in 2020. The new EP tool provides much improved heat exchange from the circulating H₂SO₄/HF electrolyte and also the cavity via variable temperature external cooling water flow, resulting in quite uniform cavity wall temperature control and thus improved removal uniformity. With the JLab infrastructure, stabilized process temperature as low as 5 C is available. We describe the system and illustrate operational modes in this contribution.

Reece, C. E.↗

Combustion Performance and Emissions Optimization through Integration of Miniaturized High Temperature Multi Process Monitoring System

The main objective of this research program is to design, manufacture, and demonstrate a miniaturized, multi-process, monitoring system (mMPMS) for boiler condition management and easy system deployment to obtain a higher spatial resolution. This system will facilitate a Condition-Based Maintenance (CBM) philosophy that actively monitors the health of assets to predict and prevent failures and maximize availability and generating capacity at a reduced cost. CBM systems can provide boiler data that the advanced process control (APC) system can utilize for plant performance optimization, which is increasingly relevant as coal power plants shift from predominantly base-load operation to predominantly transient operation involving large load swings. The mMPMS is based on an electrochemical sensor that provides a real-time indication of the risk of damage to key locations in the radiant or convective section of a coal-fired boiler such as metal loss rates, heat flux, metal surface temperature, and deposit thickness. These indications can be utilized to optimize boiler performance as well as improve boiler availability in conjunction with corresponding operating conditions. This monitoring system was developed and tested in the high-temperature regions of coal-fired utility boilers in this project but can be applied to many other industries and applications as well. The new sensor design, leveraging the existing electrochemical noise-based monitoring system, is small enough to be installed through the webbing of the waterwalls without the need for long shut-downs to bend tubes and to make it feasible to obtain high spatial resolution in the boiler. Data can be transferred to the plant distributed control system (DCS) and any other control system. The sensor body that houses the sensor assembly was designed to ensure good conductive contact with boiler tubes to ensure the sensor is held at an identical temperature to the tube surface temperature. The data acquisition and signal conditioning modules were redesigned into a small footprint with optimized cooling of the module. System software was developed specifically for the new signal conditioning module and is compatible with plant PLCs. After the preliminary testing at a pilot-scale facility, five mMPMS were installed at a full-scale pulverized coal-fired plant, Basin Electric Power Cooperative’s Leland Olds Unit 1. The systems were demonstrated over a 6-week period during typical operation. Sensor measurements of deposit thickness were validated during the demonstration and subsequently leveraged to determine sensor-based boiler cleaning strategies. These strategies have the benefit of reduced thermal stresses on boiler tubes from over-cleaning and improved boiler water management. At the end of the project, continued development of the sensor technology was carried out at PacifiCorp’s Hunter Station. REI leveraged the permanent installation of the mMPMS in Unit 3 made possible by DOE funding on a separate program. The work at Hunter Plant focused on application of machine learning and artificial intelligence-based models for integration of sensor signals into control and optimization of Hunter Unit 3 processes.

Advanced Sensors, Corrosion, Ash Deposition, Optim↗

Combustion Performance and Emissions Optimization Through Integration of a Miniaturized High-Temperature Multi Process Monitoring System

The main objective of this research program is to design, manufacture, and demonstrate a miniaturized, multi-process, monitoring system (mMPMS) for boiler condition management and easy system deployment to obtain a higher spatial resolution. This system will facilitate a Condition-Based Maintenance (CBM) philosophy that actively monitors the health of assets to predict and prevent failures and maximize availability and generating capacity at a reduced cost. CBM systems can provide boiler data that the advanced process control (APC) system can utilize for plant performance optimization, which is increasingly relevant as coal power plants shift from predominantly base-load operation to predominantly transient operation involving large load swings. The mMPMS is based on an electrochemical sensor that provides a real-time indication of the risk of damage to key locations in the radiant or convective section of a coal-fired boiler such as metal loss rates, heat flux, metal surface temperature, and deposit thickness. These indications can be utilized to optimize boiler performance as well as improve boiler availability in conjunction with corresponding operating conditions. This monitoring system was developed and tested in the high-temperature regions of coal-fired utility boilers in this project but can be applied to many other industries and applications as well. The new sensor design, leveraging the existing electrochemical noise-based monitoring system, is small enough to be installed through the webbing of the waterwalls without the need for long shut-downs to bend tubes and to make it feasible to obtain high spatial resolution in the boiler. Data can be transferred to the plant distributed control system (DCS) and any other control system. The sensor body that houses the sensor assembly was designed to ensure good conductive contact with boiler tubes to ensure the sensor is held at an identical temperature to the tube surface temperature. The data acquisition and signal conditioning modules were redesigned into a small footprint with optimized cooling of the module. System software was developed specifically for the new signal conditioning module and is compatible with plant PLCs. After the preliminary testing at a pilot-scale facility, five mMPMS were installed at a full-scale pulverized coal-fired plant, Basin Electric Power Cooperative’s Leland Olds Unit 1. The systems were demonstrated over a 6-week period during typical operation. Sensor measurements of deposit thickness were validated during the demonstration and subsequently leveraged to determine sensor-based boiler cleaning strategies. These strategies have the benefit of reduced thermal stresses on boiler tubes from over-cleaning and improved boiler water management. At the end of the project, continued development of the sensor technology was carried out at PacifiCorp’s Hunter Station. REI leveraged the permanent installation of the mMPMS in Unit 3 made possible by DOE funding on a separate program. The work at Hunter Plant focused on application of machine learning and artificial intelligence-based models for integration of sensor signals into control and optimization of Hunter Unit 3 processes.

Advanced Sensors, Corrosion, Ash Deposition, Optim↗

Combustion Performance and Emissions Optimization Through Integration of a Miniaturized High-Temperature Multi Process Monitoring System

The main objective of this research program is to design, manufacture, and demonstrate a miniaturized, multi-process, monitoring system (mMPMS) for boiler condition management and easy system deployment to obtain a higher spatial resolution of wall conditions in utility boilers. This system will facilitate a Condition-Based Maintenance (CBM) philosophy that actively monitors the health of assets to predict and prevent failures and maximize availability and generating capacity at a reduced cost. CBM systems can provide boiler data that the advanced process control (APC) system can utilize for plant performance optimization, which is increasingly relevant as coal power plants shift from predominantly base-load operation to predominantly transient operation involving large load swings. The mMPMS is based on an electrochemical sensor that provides a real-time indication of the risk of damage to key locations in the radiant or convective section of a coal-fired boiler such as metal loss rates, heat flux, metal surface temperature, and deposit thickness. These indications can be utilized to optimize boiler performance as well as improve boiler availability in conjunction with corresponding operating conditions. This monitoring system was developed and tested in the high-temperature regions of a coal-fired utility boiler in this project but can be applied to many other industries and applications as well. The new sensor design, leveraging the existing electrochemical noise-based monitoring system, is small enough to be installed through the webbing of the waterwalls without the need for long shut-downs to bend tubes and to make it feasible to obtain high spatial resolution in the boiler. Data can be transferred to the plant distributed control system (DCS) and any other control system. The sensor body that houses the sensor assembly was designed to ensure good conductive contact with boiler tubes to ensure the sensor is held at an identical temperature to the tube surface temperature. The data acquisition and signal conditioning modules were redesigned into a small footprint with optimized cooling of the module. System software was developed specifically for the new signal conditioning module and is compatible with plant PLCs. After the preliminary testing at a pilot-scale facility, five mMPMS were installed at a full-scale pulverized coal-fired plant, Basin Electric Power Cooperative’s Leland Olds Unit 1. The systems were demonstrated over a 6-week period during typical operation. Sensor measurements of deposit thickness were validated during the demonstration and subsequently leveraged to determine sensor-based boiler cleaning strategies. These strategies have the benefit of reduced thermal stresses on boiler tubes from over-cleaning and improved boiler water management. At the end of the project, continued development of the sensor technology was carried out at PacifiCorp’s Hunter Station. REI leveraged the permanent installation of the mMPMS in Unit 3 made possible by DOE funding on a separate program. The work at Hunter Plant focused on application of machine learning and artificial intelligence-based models for integration of sensor signals into control and optimization of Hunter Unit 3 processes.

42 ENGINEERING↗

High-Temperature Multi-Process Sensor Development and Demonstration at a Full-scale PC Combustion System

The main objective of this research program is to design, manufacture, and demonstrate a miniaturized, multi-process, monitoring system (mMPMS) for boiler condition management and easy system deployment to obtain a higher spatial resolution of wall conditions in utility boilers. This system will facilitate a Condition-Based Maintenance (CBM) philosophy that actively monitors the health of assets to predict and prevent failures and maximize availability and generating capacity at a reduced cost. CBM systems can provide boiler data that the advanced process control (APC) system can utilize for plant performance optimization, which is increasingly relevant as coal power plants shift from predominantly base-load operation to predominantly transient operation involving large load swings. The mMPMS is based on an electrochemical sensor that provides a real-time indication of the risk of damage to key locations in the radiant or convective section of a coal-fired boiler such as metal loss rates, heat flux, metal surface temperature, and deposit thickness. These indications can be utilized to optimize boiler performance as well as improve boiler availability in conjunction with corresponding operating conditions. This monitoring system was developed and tested in the high-temperature regions of a coal-fired utility boiler in this project but can be applied to many other industries and applications as well. The new sensor design, leveraging the existing electrochemical noise-based monitoring system, is small enough to be installed through the webbing of the waterwalls without the need for long shut-downs to bend tubes and to make it feasible to obtain high spatial resolution in the boiler. Data can be transferred to the plant distributed control system (DCS) and any other control system. The sensor body that houses the sensor assembly was designed to ensure good conductive contact with boiler tubes to ensure the sensor is held at an identical temperature to the tube surface temperature. The data acquisition and signal conditioning modules were redesigned into a small footprint with optimized cooling of the module. System software was developed specifically for the new signal conditioning module and is compatible with plant PLCs. After the preliminary testing at a pilot-scale facility, five mMPMS were installed at a full-scale pulverized coal-fired plant, Basin Electric Power Cooperative’s Leland Olds Unit 1. The systems were demonstrated over a 6-week period during typical operation. Sensor measurements of deposit thickness were validated during the demonstration and subsequently leveraged to determine sensor-based boiler cleaning strategies. These strategies have the benefit of reduced thermal stresses on boiler tubes from over-cleaning and improved boiler water management. At the end of the project, continued development of the sensor technology was carried out at PacifiCorp’s Hunter Station. REI leveraged the permanent installation of the mMPMS in Unit 3 made possible by DOE funding on a separate program. The work at Hunter Plant focused on application of machine learning and artificial intelligence-based models for integration of sensor signals into control and optimization of Hunter Unit 3 processes.

Advanced Sensors, Corrosion, Ash Deposition, Optim↗

AI and ML Applications for PV Reliability and System Performance

This poster discusses AI and ML topics in PV reliability and system performance. In particular, automated metadata extraction and QA for fielded solar installations is covered for the PV Fleets Project. Additionally, statistical learning topics for the PVInsight Project are addressed, as well as development of the PV Validation Hub.

algorithm↗

Uplifting winds: The surprisingly positive community-wide impact of wind energy installations on property values

A primary concern of stakeholders when considering a new wind project is the potential negative effects wind turbines may have on home values. Yet, what has been surprisingly overlooked in the literature and general discourse around wind energy is that the well-researched positive economic development and fiscal and amenity benefits of wind energy (e.g., increased tax base, tax revenue, better public services and employment gains) might positively affect jurisdiction-wide housing values. With a focus on school districts in the United States, we compare home values in school districts with wind energy installations, before and after a wind energy installation becomes operational, to home values in other school districts located in the same county but without a wind energy installation to provide some of the first causal evidence on the relationship between wind energy projects and district-wide property values. We find that wind projects lead to economically meaningful increases in district-wide housing values of approximately 3 %, when those values are compared to similar homes located in school districts in same-county without wind energy. The effect is strongly correlated with wind project size. The mechanisms, our research suggests, are likely related to relatively large increases in school district per-pupil revenues and expenditures, which are also correlated with wind project size. We suggest other possible mechanisms for the increased values as well.

Attitudes↗

Performance of the Fermilab Linac Injector

The Fermilab Linac injection line consists of a 35 keV magnetron-type H- ion source, two-solenoid Low Energy Beam Transport (LEBT), 201 MHz 4-rod 750 keV Radio Frequency Quadrupole (RFQ), and a Medium Energy Transport (MEBT) containing 4 quadrupoles and a bunching cavity. The injector delivers 25 mA, 48 s pulses to drift-tube Linac at a repetition rate of 15Hz. The transmission efficiency has been lower than expected since commissioning. Recent beam current measurements suggest that the beam is primarily lost upstream of the RFQ exit. Numerical simulations indicate that ions passing through the non-linear field region of the solenoids could produce a beam with an increased emittance resulting in up to 50 % of the LEBT beam current failing to meet the RFQ acceptance. An aperture restriction was installed upstream of the first solenoid to remove these ions. This report describes the results of measurements and simulations as well as the LEBT tuning.

Jones, Daniel C.↗

Cold Climate Field Study of the Effect of Defrost Controls on the Integrated Performance of a Ductless Air-Source Heat Pump

Residential heat pumps have advanced over the past decade to allow for operation at colder temperatures. However, the challenges of frost accumulation and defrosting the outdoor coil remain. The goal of this study was to evaluate the impact of the control algorithms that determine when a heat pump needs to defrost and when the base pan heater runs on the overall heating efficiency of the heat pump. In this study, which occurred during the 2023–2024 heating season, we measured the performance of a ductless air-source heat pump installed in Fairbanks, Alaska, USA. The heat pump was instrumented to measure the electrical input and the thermal output, as well as selected internal variables and indoor and outdoor environmental conditions. The heat pump was first operated with factory default control algorithms associated with the initiation of defrost and control of the base pan heater. These factory default algorithms focused on aggressively defrosting the outdoor coil and keeping the base pan ice-free. In the middle of the winter, these algorithms were changed to focus on reducing defrost cycles and increasing efficiency, while the heat pump continued to be operated and monitored. The results showed that significant increases in efficiency are possible by improving the defrost and base pan heater control algorithms.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗