Search NASA⌕ Search

SEARCH · Search NASA

Results for “Work Planning”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 217 records · Page 12

Trajectory Simulation Using Multi Model Monte Carlo with Python (MXMCPy)

EDL (Entry, Descent and Landing) is the process from a vehicle approaching a surface to landing on it, such as a Mars rover approaching the planet before landing. POST2 (Program to Optimize Simulated Trajectories 2) is Langley’s primary EDL simulation tool and is used NASA-wide for simulations. POST2 can generate highly accurate results by running a precise, but time consuming, Monte Carlo (MC) simulation hundreds or thousands of times. Though POST2 can produce highly accurate results, it can take unrealistic time spans to generate these results, which has created a need to speed up the simulations. The new NASA software MXMCPy offers various ways to speed up the simulations while getting just as precise results. Instead of running high-precision POST2 simulations many times for traditional MC, MXMCPy can run fewer high-precision POST2 simulations and many less precise POST2 simulations and merge the results. MXMCPy contains 30+ different methods which will each suggest different allocations between model precision levels, which result in results of varying precision based on the POST2 simulation. I created Python and Bash code to automate the 5 steps of MXMCPy’s application to POST2. I also tested the precision of traditional Monte Carlo simulations to MXMCPy aided simulations and found that MXMCPy can achieve substantially more precise solutions at the same computer runtime. I learned Test Driven Development (TDD), a software programming workflow which involves writing computer-automated tests before writing the code which is being tested. These tests are ran every time the code is changed and they can find glitches in the code much quicker than a human can. This programming workflow saved me a lot of time because the automated tests could tell me exactly where the code had stopped working. I plan on using this software development method for future academic and professional software projects. I have greatly enjoyed my work at NASA, so I have been applying to NASA internships and Pathways positions. In addition, I plan on applying what I have learned about Test Driven Development to my computer science courses next semester

James Warner↗

Controls and Automation Research in Space Life Support

A highly controlled and automated life support system has long been a NASA goal. It is usually assumed that life support for future long duration missions will use physical/chemical recycling systems that substantially close the oxygen and water circulation loops. Such a tightly coupled life support system has been thought to require an overall supervisory control system to minimize crew operation and maintenance activities. The International Space Station (ISS) Environmental Control and Life Support System (ECLSS) was at first expected to have supervisory control and automation. After this was found infeasible during the design of the ISS ECLSS in the early 1990's, it was then expected that the ISS or future mission systems would be upgraded to meet the original expectations. Since then NASA has extensively researched life support system controls and automation. Automation and Artificial Intelligence (AI) have gone through several cycles of enthusiasm and neglect before their recent great achievements, and NASA life support interest has similarly varied. Since the ISS ECLSS was launched, its on-board operational problems have led NASA to deemphasize system level controls and automation in favor of improving subsystem reliability and maintainability. Recent work has investigated supervisory control for a system similar to the ISS ECLSS. This paper reviews past planning and work on the supervisory control of closed, integrated physical/chemical life support systems similar to the ISS ECLSS and its precursors dating back to the 1960's.

life support↗

Planning and managing future space facility projects

To learn how ground-based personnel of a space project plan and organize their work and how such planning and organizing relate to work outcomes, longitudinal study of the management and execution of the Space Lab Mission Development Test 3 (SMD 3) was performed at NASA Ames Research Center. A view of the problems likely to arise in organizations and some methods of coping with these problems are presented as well as the conclusions and recommendations that pertain strictly to SMD 3 management. Emphasis is placed on the broader context of future space facility projects and additional problems that may be anticipated. A model of management that may be used to facilitate problem solving and communication - management by objectives (MBO) is presented. Some problems of communication and emotion management that MBO does not address directly are considered. Models for promoting mature, constructive and satisfying emotional relationships among group members are discussed.

Sieber, J. E.↗

Motion-based carriage simulation of extra-vehicular activity (EVA) rescue

A research program was outlined for a series of Extra-Vehicular Activity (EVA) rescue studies. The general purpose is to get a better appreciation of the characteristics describing an EVA rescue scenario. Several studies have been completed in the Virtual Interactive Environment Workstation (VIEW) at NASA Ames Research Center. Similar studies are planned for a variety of simulators both to get more reliable results for the EVA rescue problem and to baseline the simulators against one another. Work is planned for a motion-based carriage to expand the validity of the previously obtained results.

Brody, Adam R.↗

T-38 Primary Flight Display Prototyping and HIVE Support Abstract & Summary

This fall I worked in EV3 within NASA's Johnson Space Center in The HIVE (Human Integrated Vehicles & Environments). The HIVE is responsible for human in the loop testing, getting new technologies in front of astronauts, operators, and users early in the development cycle to make the interfaces more human friendly. Some projects the HIVE is working on includes user interfaces for future spacecraft, wearables to alert astronauts about important information, and test beds to simulate mock missions. During my internship I created a prototype for T-38 aircraft displays using LabVIEW, learned how to use microcontrollers, and helped out with other small tasks in the HIVE. The purpose of developing a prototype for T-38 Displays in LabVIEW is to analyze functions of the display such as navigation in a cost and time effective manner. The LabVIEW prototypes allow Ellington Field AOD to easily make adjustments to the display before hardcoding the final product. LabVIEW was used to create a user interface for simulation almost identical to the real aircraft display. Goals to begin the T-38 PFD (Primary Flight Display) prototype included creating a T-38 PFD hardware display in a software environment, designing navigation for the menu's, incorporating vertical and horizontal navigation bars, and to add a heading bug for compass controls connected to the HSI (Horizontal Situation Indicator). To get started with the project, measurements of the entire display were taken. This enabled an accurate model of the hardware display to be created. Navigation of menu's required some exploration of different buttons on the display. The T-38 simulator and aircraft were used for examining the display. After one piece of the prototype was finished, another trip of to the simulator took place. This was done until all goals for the prototype were complete. Some possible integration ideas for displays in the near future are autopilot selection, touch screen displays, and crew member preferences. Complete navigation, control, and function customization will be achievable once a display is fully developed. Other than the T-38 prototyping, I spent time learning how to design small circuits and write code for them to function. This was done by adding electronic circuit components to breadboard and microcontroller then writing code to speak to those components through the microcontroller. I went through an Arduino starter kit to build circuits and code software that allowed the hardware to act. This work was planned to assist in a lighting project this fall but another solution was discovered for the lighting project. Other tasks that I assisted with, included hands on work such as mock-up construction/removal, logic analyzer repairs, and soldering with circuits. The unique opportunity to be involved work with NASA has significantly changed my educational and career goals. This opportunity has only opened the door to my career with engineering. I have learned over the span of this internship that I am fascinated by the type of work that NASA does. My desire to work in the aerospace industry has increased immensely. I hope to return to NASA to be more involved in the advancement of science, engineering, and spaceflight. My interests for my future education and career lie in NASA’s work - pioneering the future in space exploration, scientific discovery and aeronautics research.

Boniface, Andrew↗

Distribution automation and control support; Analysis and interpretation of DAC working group results for use in project planning

The Executive Summary and Proceedings of the Working Group Meeting was analyzed to identify specific projects appropriate for Distribution Automation and Control DAC RD&D. Specific projects that should be undertaken in the DAC RD&D program were recommended. The projects are presented under broad categories of work selected based on ESC's interpretation of the results of the Working Group Meeting. Some of the projects are noted as utility industry projects. The ESC recommendations regarding program management are presented. Utility versus Government management responsibilities are noted.

Klock, P.↗

Manned Mars Landing

Following the first Apollo lunar landing mission in 1969, then Vice-President Spiro Agnew called upon NASA to prepare a plan in 30 days. The action was assigned to the newly formed Program Development Organization. A team was formed to prepare a plan which was completed on time and on August 4, 1969, the plan was presented to The Space Task Group (STG) at NASA HQ by Dr. Wernher Von Braun accompanied by Dr. William Lucas, Ron Harris and Gene Austin. The STG was headed by Dr. George Moeller, then AA in the Office of Manned Space Flight, and composed of other senior NASA officials. The charts in this book are copies of those used in the August 4, 1969 briefing. After this briefing, the MSFC attendees met privately with Dr. Moeller and received further comments/actions. The plan was worked further over the next few weeks and subsequently discussions were held with the Vice President and other White House staff members. While no blanket approval was given to the plan, the need for a reusable Space Shuttle was clearly indicated ass a first step ;in achieving the capability to assemble a Mars ship in Earth orbit. Dr. Moeller hence used this as a strong justification in his successful efforts to sell the Space Shuttle Program.

Mars↗

Update on Development of SiC Multi-Chip Power Modules

Progress has been made in a continuing effort to develop multi-chip power modules (SiC MCPMs). This effort at an earlier stage was reported in 'SiC Multi-Chip Power Modules as Power-System Building Blocks' (LEW-18008-1), NASA Tech Briefs, Vol. 31, No. 2 (February 2007), page 28. The following recapitulation of information from the cited prior article is prerequisite to a meaningful summary of the progress made since then: 1) SiC MCPMs are, more specifically, electronic power-supply modules containing multiple silicon carbide power integrated-circuit chips and silicon-on-insulator (SOI) control integrated-circuit chips. SiC MCPMs are being developed as building blocks of advanced expandable, reconfigurable, fault-tolerant power-supply systems. Exploiting the ability of SiC semiconductor devices to operate at temperatures, breakdown voltages, and current densities significantly greater than those of conventional Si devices, the designs of SiC MCPMs and of systems comprising multiple SiC MCPMs are expected to afford a greater degree of miniaturization through stacking of modules with reduced requirements for heat sinking; 2) The stacked SiC MCPMs in a given system can be electrically connected in series, parallel, or a series/parallel combination to increase the overall power-handling capability of the system. In addition to power connections, the modules have communication connections. The SOI controllers in the modules communicate with each other as nodes of a decentralized control network, in which no single controller exerts overall command of the system. Control functions effected via the network include synchronization of switching of power devices and rapid reconfiguration of power connections to enable the power system to continue to supply power to a load in the event of failure of one of the modules; and, 3) In addition to serving as building blocks of reliable power-supply systems, SiC MCPMs could be augmented with external control circuitry to make them perform additional power-handling functions as needed for specific applications. Because identical SiC MCPM building blocks could be utilized in such a variety of ways, the cost and difficulty of designing new, highly reliable power systems would be reduced considerably. This concludes the information from the cited prior article. The main activity since the previously reported stage of development was the design, fabrication, and testing a 120- VDC-to-28-VDC modular power-converter system composed of eight SiC MCPMs in a 4 (parallel)-by-2 (series) matrix configuration, with normally-off controllable power switches. The SiC MCPM power modules include closed-loop control subsystems and are capable of operating at high power density or high temperature. The system was tested under various configurations, load conditions, load-transient conditions, and failure-recovery conditions. Planned future work includes refinement of the demonstrated modular system concept and development of a new converter hardware topology that would enable sharing of currents without the need for communication among modules. Toward these ends, it is also planned to develop a new converter control algorithm that would provide for improved sharing of current and power under all conditions, and to implement advanced packaging concepts that would enable operation at higher power density.

Lostetter, Alexander↗

NASA's Space Launch System Moves into Testing and Integration

NASA's Space Launch System (SLS) has moved from design and manufacturing into testing and integration for its first flight as early as December 2019. In 2017, the NASA/industry team completed manufacturing of all major structural elements for the launch vehicle for Exploration Mission-I (EM-1 ). That work included shipping the first major flight hardware element to the launch site. The team processed all four RS-25 engines for stage integration, cast all 10 booster flight motor segments, and manufactured all five major sections of the core stage. The program also completed major structural work on the B-2 test stand at Stennis Space Center, which will be used for the core stage "green run" test; delivered the core stage and engine simulators used for training; and much of the transportation equipment for the core stage. Engineers completed structural testing on the upper stage/payload section of the vehicle as well as the engine section test article. In 2018, the program will deliver the Orion Stage Adapter (OSA) to Exploration Ground Systems (EGS) at KSC and send the test articles for the core stage liquid hydrogen tank, liquid oxygen tank, and intertank to NASA's Marshall Space Flight center for structural testing. Additionally, workers will begin the challenging process of integrating the major sections of the 212-foot EM-1 core stage. This work is focused on the initial Block 1 variant of SLS, capable of launching more than 70 metric tons (t) to low Earth orbit (LEO). However, work concurrently is underway on the Block lB variant, which will enable 105 t to LEO and more than 37t to trans-lunar injection (TLI). Block lB will be the workhorse vehicle of NASA's lunar exploration plans. As the needs of the nation's deep space exploration program grow, SLS performance is designed to evolve to a payload mass of 130 t to LEO and up to 45t to TLI. The advantages of this mass - as well as volume- are critical to the entire exploration architecture for deep space exploration. They translate to greater capability, greater infrastructure and operational simplicity, less overall mission risk, and opportunities to accomplish unprecedented exploration and discovery. This paper will discuss SLS progress to date and planned future work.

Honeycutt, John↗

Shallow Soil Polychlorinated Biphenyl Site Assessment Report

This report presents a summary of the shallow soil polychlorinated biphenyl (PCB) site assessment activities that occurred from December 2020 through July 2022 at General Services Administration Reclamation Yard, Solid Waste Management Unit (SWMU) 010, located at the John F. Kennedy Space Center (KSC), Florida. The site is monitored under KSC’s Resource Conservation and Recovery Act Corrective Action Program, which also meets the requirements of Chapter 62-780, Florida Administrative Code. For the purposes of this report, three separate shallow soil plumes, known as the Northeast Shallow Soil PCB Plume, Southeast Shallow Soil PCB Plume, and West Shallow Soil PCB Plume, were identified for this site. The activities presented in this report include seven field events conducted between December 2020 and July 2022, which include shallow soil sample collection in the Northeast, Southeast, and West Shallow Soil PCB Plumes. AECOM Technical Services, Inc., personnel collected 330 soil samples from 118 boring locations. The samples were collected at 0.5-foot depth intervals to various depths based on analytical results and depth to groundwater. The soil samples were submitted to a fixed-based laboratory for analysis by United States Environmental Protection Agency Method 8082A for total PCBs. Several soil samples had PCB concentrations above the State of Florida Direct Exposure Residential and Industrial Soil Cleanup Target Levels (SCTLs), and two soil samples had PCB concentrations above the State of Florida Leachability for Groundwater. No soil borings were located beneath impervious surfaces, such as concrete or asphalt. The current Land Use Control Implementation Plan (LUCIP) covers PCBs in soils above the residential SCTL, which includes the paved areas.

PCBs↗

Use of satellite imagery for wildland resource evaluation in the Great Basin

The author has identified the following significant results. Most major vegetation types of Nevada have been mapped with success. The completed set of mosaic overlays will be more accurate and detailed than previous maps compiled by various State and Federal agencies due to the excellent vantage point that ERTS-1 data affords. This new vegetation type map will greatly aid resource agencies in their daily work. Such information as suitable grazing areas, wildlife habitat, forage production, and approximate wildland production potentials can be inferred from such a map. There has been some success in detecting vegetational changes with the use of ERTS-1 MSS imagery, but exposure differences have somewhat confounded the results. Future plans include work to solve this problem.

Tueller, P. T.↗

Multi-Configuration and Aeroelastic Shape Design

This presentation describes the advances being made with the Aerodynamic Shape Optimization (ASO) and high-fidelity Multidisciplinary Optimization (MDO) software used in the High Speed Research Program at NASA Ames Research Center. The description starts with the motivation for continued ASO/MDO development. Objectives of the current work are then presented. A list of ingredients deemed necessary for a flexible design environment is discussed, and the HSR requirement for different geometries at different design points is explained. Multiple design disciplines within a high-fidelity design environment are demonstrated. Finally, progress so far is summarized and planned future work is outlined.

Reuther, James↗

Overview of environmental test plans for Space Station Freedom work package 4

The generation and distribution of electric power for Space Station Freedom (SSF) is critical to the station's success. Work Package 4 (WP-04) has the responsibility for the design, development, test, and delivery of the Electric Power System (EPS) for the SSF. During launch, assembly, and operation, the EPS will be subjected to various environments. A test and verification approach has been developed to assure that the EPS will function in these environments. An overview of that test program is presented with emphasis on environmental testing of hardware. Two key areas of the test program are highlighted in the overview. One area is the verification of the Solar Power Module (SPM) and associated cargo element hardware. This area includes detailing the plans for development and qualification testing of the SPM hardware. One series of tests, including modal and acoustic, has been completed on a development cargo element. Another area highlighted is the acceptance testing of high-power Orbital Replacement Units (ORU). The environmental test equipment plans are presented and reviewed in light of an aggressive production rate, which delivers ORU's to the WP-04 and other Space Station Work Packages. Through implementing the test program as outlined, the EPS hardware will be certified for flight and operation on the Space Station Freedom.

Peterson, Tom J.↗

Booster aerodynamic heating: Test support

Several technical areas were encompassed in providing support for booster thermal environment test work. These areas included: (1) cavity flow heating, (2) rarefied flow heating, and (3) impulse operated model research and testing. Cavity flow heating problems were studied with respect to the proposed altitude control motors for the space shuttle. Available literature on this subject was reviewed and analytical predictive methods were summarized for use in planning testing work. Rarefied flow heating data was reviewed and correlated. The study showed the importance of considering rarefied flow conditions in launch thermal environment prediction. Impulse operated model research and testing was conducted to provide a basis for understanding and designing such models for booster thermal environment testing.

Engel, C. D.↗

Fundamental Aeronautics Program: Overview of Project Work in Supersonic Cruise Efficiency

The Supersonics Project, part of NASA?s Fundamental Aeronautics Program, contains a number of technical challenge areas which include sonic boom community response, airport noise, high altitude emissions, cruise efficiency, light weight durable engines/airframes, and integrated multi-discipline system design. This presentation provides an overview of the current (2011) activities in the supersonic cruise efficiency technical challenge, and is focused specifically on propulsion technologies. The intent is to develop and validate high-performance supersonic inlet and nozzle technologies. Additional work is planned for design and analysis tools for highly-integrated low-noise, low-boom applications. If successful, the payoffs include improved technologies and tools for optimized propulsion systems, propulsion technologies for a minimized sonic boom signature, and a balanced approach to meeting efficiency and community noise goals. In this propulsion area, the work is divided into advanced supersonic inlet concepts, advanced supersonic nozzle concepts, low fidelity computational tool development, high fidelity computational tools, and improved sensors and measurement capability. The current work in each area is summarized.

Castner, Raymond↗

Fundamental Aeronautics Program: Overview of Propulsion Work in the Supersonic Cruise Efficiency Technical Challenge

The Supersonics Project, part of NASA's Fundamental Aeronautics Program, contains a number of technical challenge areas which include sonic boom community response, airport noise, high altitude emissions, cruise efficiency, light weight durable engines/airframes, and integrated multi-discipline system design. This presentation provides an overview of the current (2012) activities in the supersonic cruise efficiency technical challenge, and is focused specifically on propulsion technologies. The intent is to develop and validate high-performance supersonic inlet and nozzle technologies. Additional work is planned for design and analysis tools for highly-integrated low-noise, low-boom applications. If successful, the payoffs include improved technologies and tools for optimized propulsion systems, propulsion technologies for a minimized sonic boom signature, and a balanced approach to meeting efficiency and community noise goals. In this propulsion area, the work is divided into advanced supersonic inlet concepts, advanced supersonic nozzle concepts, low fidelity computational tool development, high fidelity computational tools, and improved sensors and measurement capability. The current work in each area is summarized.

Castner, Ray↗

NASA's Space Lidar Measurements of Earth and Planetary Surfaces

A lidar instrument on a spacecraft was first used to measure planetary surface height and topography on the Apollo 15 mission to the Moon in 1971, The lidar was based around a flashlamp-pumped ruby laser, and the Apollo 15-17 missions used them to make a few thousand measurements of lunar surface height from orbit. With the advent of diode pumped lasers in the late 1980s, the lifetime, efficiency, resolution and mass of lasers and space lidar all improved dramatically. These advances were utilized in NASA space missions to map the shape and surface topography of Mars with > 600 million measurements, demonstrate initial space measurements of the Earth's topography, and measured the detailed shape of asteroid. NASA's ICESat mission in Earth orbit just completed its polar ice measurement mission with almost 2 billion measurements of the Earth's surface and atmosphere, and demonstrated measurements to Antarctica and Greenland with a height resolution of a few em. Space missions presently in cruise phase and in operation include those to Mercury and a topographic mapping mission of the Moon. Orbital lidar also have been used in experiments to demonstrate laser ranging over planetary distances, including laser pulse transmission from Earth to Mars orbit. Based on the demonstrated value of the measurements, lidar is now the preferred measurement approach for many new scientific space missions. Some missions planned by NASA include a planetary mission to measure the shape and dynamics of Europa, and several Earth orbiting missions to continue monitoring ice sheet heights, measure vegetation heights, assess atmospheric CO2 concentrations, and to map the Earth surface topographic heights with 5 m spatial resolution. This presentation will give an overview of history, ongoing work, and plans for using space lidar for measurements of the surfaces of the Earth and planets.

Abshire, James B.↗

Formulation of consumables management models. Volume 1: Mission planning

Development of an STS (Space Transportation System) interactive computer program MPP (Mission Planning Processor) working model was conducted. A summary of the computer program development and those supporting tasks conducted is presented. Development of the MPP Computer Program is discussed. This development was supported by several parallel tasks. These tasks either directly supported the program development, or provided information for future application and/or modification to the program in relation to the flight planning and flight operations of the STS and advanced spacecraft. The supporting tasks also included development of a Space Station MPP to demonstrate the applicability of the analytical methods developed under this RTOP to more advanced spacecraft than the STS.

Torian, J. G.↗