Search NASA⌕ Search

SEARCH · Search NASA

Results for “aircraft scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 217 records · Page 12

Aircraft Exceedances Vary According to Time of Day and Workload

The Flight Operational Quality Assurance (FOQA) programs have been implemented in US and Europe to identify anomalous flights based on data recorded on board an aircraft in an effort to improve flight safety. Numerous methods have been developed to support the analysis of FOQA data. However, it is unclear how FOQA data relates to the performance of the pilot. We sought to characterize the frequency and type of flight exceedances extracted from FOQA data during a controlled pilot schedule in order to determine whether patterns of exceedances related to human control of the aircraft would change according to scheduling factors.

flight data↗

Rotor systems research aircraft predesign study. Volume 2: Conceptual study report

The overall feasibility of the technical requirements and concepts for a rotor system research aircraft (RSRA) was determined. The designs of two aircraft were then compared against the RSRA requirements. One of these is an all new aircraft specifically designed as an RSRA vehicle. A new main rotor, transmission, wings, and fuselage are included in this design. The second aircraft uses an existing Sikorsky S-61 main rotor, an S-61 roller gearbox, and a highly modified Sikorsky S-67 airframe. The wing for this aircraft is a new design. Both aircraft employ a fan-in-fin anti-torque/yaw control system, T58-GE-16 engines for rotor power, and TF34-GE-2 turbofans for auxiliary thrust. Each aircraft meets the basic requirements and goals of the program. The all new aircraft has inflight variable main rotor shaft tilt, a side-by-side cockpit seating arrangement, and is slightly faster in the compound mode. It is also somewhat lighter since it uses new dynamic components specifically designed for the RSRA. Preliminary development plans, including schedules and costs, were prepared for both of these aircraft.

Schmidt, S. A.↗

Effects of modeling errors on trajectory predictions in air traffic control automation

Air traffic control automation synthesizes aircraft trajectories for the generation of advisories. Trajectory computation employs models of aircraft performances and weather conditions. In contrast, actual trajectories are flown in real aircraft under actual conditions. Since synthetic trajectories are used in landing scheduling and conflict probing, it is very important to understand the differences between computed trajectories and actual trajectories. This paper examines the effects of aircraft modeling errors on the accuracy of trajectory predictions in air traffic control automation. Three-dimensional point-mass aircraft equations of motion are assumed to be able to generate actual aircraft flight paths. Modeling errors are described as uncertain parameters or uncertain input functions. Pilot or autopilot feedback actions are expressed as equality constraints to satisfy control objectives. A typical trajectory is defined by a series of flight segments with different control objectives for each flight segment and conditions that define segment transitions. A constrained linearization approach is used to analyze trajectory differences caused by various modeling errors by developing a linear time varying system that describes the trajectory errors, with expressions to transfer the trajectory errors across moving segment transitions. A numerical example is presented for a complete commercial aircraft descent trajectory consisting of several flight segments.

Jackson, Michael R. C.↗

Wind Information Uplink to Aircraft Performing Interval Management Operations

Interval Management (IM) is an ADS-B-enabled suite of applications that use ground and flight deck capabilities and procedures designed to support the relative spacing of aircraft (Barmore et al., 2004, Murdoch et al. 2009, Barmore 2009, Swieringa et al. 2011; Weitz et al. 2012). Relative spacing refers to managing the position of one aircraft to a time or distance relative to another aircraft, as opposed to a static reference point such as a point over the ground or clock time. This results in improved inter-aircraft spacing precision and is expected to allow aircraft to be spaced closer to the applicable separation standard than current operations. Consequently, if the reduced spacing is used in scheduling, IM can reduce the time interval between the first and last aircraft in an overall arrival flow, resulting in increased throughput. Because IM relies on speed changes to achieve precise spacing, it can reduce costly, low-altitude, vectoring, which increases both efficiency and throughput in capacity-constrained airspace without negatively impacting controller workload and task complexity. This is expected to increase overall system efficiency. The Flight Deck Interval Management (FIM) equipment provides speeds to the flight crew that will deliver them to the achieve-by point at the controller-specified time, i.e., assigned spacing goal, after the target aircraft crosses the achieve-by point (Figure 1.1). Since the IM and target aircraft may not be on the same arrival procedure, the FIM equipment predicts the estimated times of arrival (ETA) for both the IM and target aircraft to the achieve-by point. This involves generating an approximate four-dimensional trajectory for each aircraft. The accuracy of the wind data used to generate those trajectories is critical to the success of the IM operation. There are two main forms of uncertainty in the wind information used by the FIM equipment. The first is the accuracy of the forecast modeling done by the weather provider. This is generally a global environmental prediction obtained from a weather model such as the Rapid Refresh (RAP) from the National Centers for Environmental Prediction (NCEP). The weather forecast data will have errors relative to the actual, or truth, winds that the aircraft will encounter. The second source of uncertainty is that only a small subset of the forecast data can be uplinked to the aircraft for use by the FIM equipment. This results in loss of additional information. The Federal Aviation Administration (FAA) and RTCA are currently developing standards for the communication of wind and atmospheric data to the aircraft for use in NextGen operations. This study examines the impact of various wind forecast sampling methods on IM performance metrics to inform the standards development.

Ahmad, Nashat N.↗

VTOL as it applies to resource development in the Canadian north

It is pointed out that, for many of the natural resource development projects planned in Canada between now and the end of the century, it may be necessary for the work force to commute to the site by air. Examples of successful operations, including those involving VTOL, are given. A computer program developed for determining the least expensive type of aircraft for commuting to remote projects is described. It is noted that the program can select both fixed-wing and helicopter aircraft types for a specific project, employing such variables as the size and shift schedules of the work force and the commuting distance. Capital and operating costs of existing and proposed aircraft types, as well as groundside infrastructure operations and maintenance costs, are compared for competing aircraft.

Lightfoot, R. N.↗

An Examination of Selected Datacom Options for the Near-Term Implementation of Trajectory Based Operations

A primary feature of the Next Generation Air Transportation System (NextGen) is trajectory based operations (TBO). Under TBO, aircraft flight plans are known to computer systems on the ground that aid in scheduling and separation. The Future Air Navigation System (FANS) was developed to support TBO, but relatively few aircraft in the US are FANSequipped. Thus, any near-term implementation must provide TBO procedures for non-FANS aircraft. Previous research has explored controller clearances, but any implementation must also provide procedures for aircraft requests. The work presented here aims to surface issues surrounding TBO communication procedures for non-FANS aircraft and for aircraft requesting deviations around weather. Three types of communication were explored: Voice, FANS, and ACARS,(Aircraft Communications Addressing and Reporting System). ACARS and FANS are datacom systems that differ in that FANS allows uplinked flight plans to be loaded into the Flight Management System (FMS), while ACARS delivers flight plans as text that must be entered manually via the Control Display Unit (CDU). Sixteen pilots (eight two-person flight decks) and four controllers participated in 32 20-minute scenarios that required the flight decks to navigate through convective weather as they approached their top of descents (TODs). Findings: The rate of non-conformance was higher than anticipated, with aircraft off path more than 20% of the time. Controllers did not differentiate between the ACARS and FANS datacom, and were mixed in their preference for Voice vs. datacom (ACARS and FANS). Pilots uniformly preferred Voice to datacom, particularly ACARS. Much of their dislike appears to result from the slow response times in the datacom conditions. As a result, participants frequently resorted to voice communication. These results imply that, before implementing TBO in environments where pilots make weather deviation requests, further research is needed to develop communication procedures that integrate voice and datacom.

trajectory based operations↗

Approach and landing simulation

Computer program integrates avionics research in navigation, guidance, controls, and displays with realistic aircraft model. Program gives researchers capability of evaluating avionics area independently from other research areas and thus allows more flexibility in time schedules. Program comprises many independent modules that represent specific hardware onboard actual aircraft.

Ostroff, A. J.↗

Precision Arrival Scheduling for Tactical Reconfiguration

This research adapts the concept of precision arrival scheduling to accommodate reconfiguration operations between two sets of fixed arrival routes modeled for Chicago O'Hare International Airport (ORD). Integrated fixed path routing from en-route to runways was modeled for ORD's top two peak traffic configurations, as well as transition routing between the two configurations. A first-come-first-served multi-point scheduler was adapted to the reconfiguration problem by prioritizing the rescheduling of aircraft within the terminal airspace at the time of reconfiguration notification. Arrival rescheduling was then tested for a range of arrival rates and reconfiguration notification lead-times in fasttime simulation. Reconfigurations with lead-times as short as 10 minutes at a nominal static configuration arrival rate (~25 arrivals per quarter hour) could be accommodated with little impact to throughput. However, as lead-time shortened below 25 minutes, individual aircraft efficiency quickly degraded due to extra flight time at lower altitude and speed. In general, first-come-first-served arrival scheduling on fixed routing for this sample reconfiguration problem is promising if at least 10-15 minutes lead-time is given before the reconfiguration is in effect.

airport reconfiguration↗

Exact and Heuristic Algorithms for Runway Scheduling

This paper explores the Single Runway Scheduling (SRS) problem with arrivals, departures, and crossing aircraft on the airport surface. Constraints for wake vortex separations, departure area navigation separations and departure time window restrictions are explicitly considered. The main objective of this research is to develop exact and heuristic based algorithms that can be used in real-time decision support tools for Air Traffic Control Tower (ATCT) controllers. The paper provides a multi-objective dynamic programming (DP) based algorithm that finds the exact solution to the SRS problem, but may prove unusable for application in real-time environment due to large computation times for moderate sized problems. We next propose a second algorithm that uses heuristics to restrict the search space for the DP based algorithm. A third algorithm based on a combination of insertion and local search (ILS) heuristics is then presented. Simulation conducted for the east side of Dallas/Fort Worth International Airport allows comparison of the three proposed algorithms and indicates that the ILS algorithm performs favorably in its ability to find efficient solutions and its computation times.

safe & surface operations↗

Computational Approaches to Simulation and Optimization of Global Aircraft Trajectories

This study examines three possible approaches to improving the speed in generating wind-optimal routes for air traffic at the national or global level. They are: (a) using the resources of a supercomputer, (b) running the computations on multiple commercially available computers and (c) implementing those same algorithms into NASAs Future ATM Concepts Evaluation Tool (FACET) and compares those to a standard implementation run on a single CPU. Wind-optimal aircraft trajectories are computed using global air traffic schedules. The run time and wait time on the supercomputer for trajectory optimization using various numbers of CPUs ranging from 80 to 10,240 units are compared with the total computational time for running the same computation on a single desktop computer and on multiple commercially available computers for potential computational enhancement through parallel processing on the computer clusters. This study also re-implements the trajectory optimization algorithm for further reduction of computational time through algorithm modifications and integrates that with FACET to facilitate the use of the new features which calculate time-optimal routes between worldwide airport pairs in a wind field for use with existing FACET applications. The implementations of trajectory optimization algorithms use MATLAB, Python, and Java programming languages. The performance evaluations are done by comparing their computational efficiencies and based on the potential application of optimized trajectories. The paper shows that in the absence of special privileges on a supercomputer, a cluster of commercially available computers provides a feasible approach for national and global air traffic system studies.

global air traffic optimization↗

Simulation studies of time-control procedures for the advanced air traffic control system

The problem of mixing aircraft equipped with time-controlled guidance systems and unequipped aircraft in the terminal area has been investigated via a real-time air traffic control simulation. These four-dimensional (4D) guidance systems can predict and control the touchdown time of an aircraft to an accuracy of a few seconds throughout the descent. The objectives of this investigation were to (1) develop scheduling algorithms and operational procedures for various traffic mixes that ranged from 25% to 75% 4D-equipped aircraft; (2) examine the effect of time errors at 120 n. mi. from touchdown on touchdown time scheduling of the various mix conditions; and (3) develop efficient algorithms and procedures to null the initial time errors prior to reaching the final control sector, 30 n. mi. from touchdown. Results indicate substantial reduction in controller workload and an increase in orderliness when more than 25% of the aircraft are equipped with 4D guidance systems; initial random errors of up to + or - 2 min can be handled via a single speed advisory issued in the arrival control sector, thus avoiding disruption of the time schedule.

Tobias, L.↗

Analysis of Small Aircraft as a Transportation System

An analysis was conducted to examine the market viability of small aircraft as a transportation mode in competition with automobile and scheduled commercial air travel by estimating the pool of users that would potentially switch to on-demand air travel due to cost/time savings. The basis for the analysis model was the Integrated Air Transportation System Evaluation Tool (IATSET) which was developed under contract to NASA by the Logistics Management Institute. IATSET is a macroeconomic model that predicts at a National level the mode choice between automobile, scheduled air, and on-demand air travel based on the value of a travelers time and monetary cost of the trip. A number of modifications are detailed to the original IATSET to better model the changing small aircraft environment. The potential trip market was modeled for the Eclipse 500 operated as a corporate jet and as an air taxi for the business travel market. The Cirrus 20R and a $80K single engine piston aircraft (based on automobile manufacturing technology) are evaluated in the pleasure and personal business travel market.

Dollyhigh, Samuel M.↗

Ride quality evaluation. IV - Models of subjective reaction to aircraft motion

The paper examines models of human reaction to the motions typically experienced on short-haul aircraft flights. Data are taken on the regularly scheduled flights of four commercial airlines - three airplanes and one helicopter. The data base consists of: (1) a series of motion recordings distributed over each flight, each including all six degrees of freedom of motion; temperature, pressure, and noise are also recorded; (2) ratings of perceived comfort and satisfaction from the passengers on each flight; (3) moment-by-moment comfort ratings from a test subject assigned to each airplane; and (4) overall comfort ratings for each flight from the test subjects. Regression models are obtained for prediction of rated comfort from rms values for six degrees of freedom of motion. It is shown that the model C = 2.1 + 17.1 T + 17.2 V (T = transverse acceleration, V = vertical acceleration) gives a good fit to the airplane data but is less acceptable for the helicopter data.

Jacobson, I. D.↗

Commercial Aircraft Maintenance Experience Relating to Engine External Hardware

Airlines are extremely sensitive to the amount of dollars spent on maintaining the external engine hardware in the field. Analysis reveals that many problems revolve around a central issue, reliability. Fuel and oil leakage due to seal failure and electrical fault messages due to wire harness failures play a major role in aircraft delays and cancellations (D&C's) and scheduled maintenance. Correcting these items on the line requires a large investment of engineering resources and manpower after the fact. The smartest and most cost effective philosophy is to build the best hardware the first time. The only way to do that is to completely understand and model the operating environment, study the field experience of similar designs and to perform extensive testing.

Soditus, Sharon M.↗

Initial Investigations of Controller Tools and Procedures for Schedule-Based Arrival Operations with Mixed Flight-Deck Interval Management Equipage

NASA's Air Traffic Management Demonstration-1 (ATD-1) is a multi-year effort to demonstrate high-throughput, fuel-efficient arrivals at a major U.S. airport using NASA-developed scheduling automation, controller decision-support tools, and ADS-B-enabled Flight-Deck Interval Management (FIM) avionics. First-year accomplishments include the development of a concept of operations for managing scheduled arrivals flying Optimized Profile Descents with equipped aircraft conducting FIM operations, and the integration of laboratory prototypes of the core ATD-1 technologies. Following each integration phase, a human-in-the-loop simulation was conducted to evaluate and refine controller tools, procedures, and clearance phraseology. From a ground-side perspective, the results indicate the concept is viable and the operations are safe and acceptable. Additional training is required for smooth operations that yield notable benefits, particularly in the areas of FIM operations and clearance phraseology.

Callantine, Todd J.↗

System-Oriented Runway Management Concept of Operations

This document describes a concept for runway management that maximizes the overall efficiency of arrival and departure operations at an airport or group of airports. Specifically, by planning airport runway configurations/usage, it focuses on the efficiency with which arrival flights reach their parking gates from their arrival fixes and departure flights exit the terminal airspace from their parking gates. In the future, the concept could be expanded to include the management of other limited airport resources. While most easily described in the context of a single airport, the concept applies equally well to a group of airports that comprise a metroplex (i.e., airports in close proximity that share resources such that operations at the airports are at least partially dependent) by including the coordination of runway usage decisions between the airports. In fact, the potential benefit of the concept is expected to be larger in future metroplex environments due to the increasing need to coordinate the operations at proximate airports to more efficiently share limited airspace resources. This concept, called System-Oriented Runway Management (SORM), is further broken down into a set of airport traffic management functions that share the principle that operational performance must be measured over the complete surface and airborne trajectories of the airport's arrivals and departures. The "system-oriented" term derives from the belief that the traffic management objective must consider the efficiency of operations over a wide range of aircraft movements and National Airspace System (NAS) dynamics. The SORM concept is comprised of three primary elements: strategic airport capacity planning, airport configuration management, and combined arrival/departure runway planning. Some aspects of the SORM concept, such as using airport configuration management1 as a mechanism for improving aircraft efficiency, are novel. Other elements (e.g., runway scheduling, which is a part of combined arrival/departure runway scheduling) have been well studied, but are included in the concept for completeness and to allow the concept to define the necessary relationship among the elements. The goal of this document is to describe the overall SORM concept and how it would apply both within the NAS and potential future Next Generation Air Traffic System (NextGen) environments, including research conducted to date. Note that the concept is based on the belief that runways are the primary constraint and the decision point for controlling efficiency, but the efficiency of runway management must be measured over a wide range of space and time. Implementation of the SORM concept is envisioned through a collection of complementary, necessary capabilities collectively focused on ensuring efficient arrival and departure traffic management, where that efficiency is measured not only in terms of runway efficiency but in terms of the overall trajectories between parking gates and transition fixes. For the more original elements of the concept-airport configuration management-this document proposes specific air traffic management (ATM) decision-support automation for realizing the concept.

Lohr, Gary W.↗

Concept of Operations for Management by Trajectory

This document describes Management by Trajectory (MBT), a concept for future air traffic management (ATM) in which every flight operates in accordance with a four-dimensional trajectory (4DT) that is negotiated between the airspace user and the Federal Aviation Administration (FAA) to respect the airspace user's goals while complying with National Airspace System (NAS) constraints. In the present-day NAS, the ATM system attempts to predict the trajectory for each flight based on the approved flight plan and scheduled or controlled departure time. However, once the aircraft starts to move, controllers tactically manage the aircraft to implement traffic management restrictions, separate otherwise conflicting aircraft, and address arising NAS constraints. Tactical controller actions are not directly communicated to the automation systems or other stakeholders. Furthermore, the initial trajectory prediction does not anticipate these disruptions or how they will impact the flight. Consequently, and compounded by gaps in required data and models, trajectory predictions are less accurate than possible, which affects Traffic Flow Management (TFM) performance. A cornerstone of the MBT concept is that all air vehicles have, at all times, an assigned 4DT from their current state to their destination. These assigned trajectories consist of trajectory constraints and descriptions. Pilots and air traffic controllers, with the aid of automation, operate the aircraft to comply with the assigned trajectory, unless first negotiating a revision. Equipped aircraft have substantial responsibility for complying with the assigned trajectory without controller intervention. To maximize the operational flexibility available to the airspace user, the assigned trajectory only imposes trajectory constraints as required to achieve the ATM goals of NAS constraint compliance and aircraft separation. Trajectory descriptions are added to the assigned trajectory to ensure sufficient predictability. To further improve trajectory prediction accuracy, airspace users supplement the assigned trajectory by broadcasting intent information and updating it as necessary. Air vehicle intent is a more detailed description of the airspace user's plan for how the flight will fly the assigned trajectory. Air vehicle intent can change freely, without negotiation, as long as it remains in compliance with the assigned trajectory. Aircraft assigned trajectories, air vehicle intent, and predicted trajectories are shared, creating a common view among stakeholders. A NAS Constraint Service gathers and publishes information about all known NAS constraints, enabling airspace users to be informed participants in trajectory negotiation. Trajectory constraints in the assigned trajectory are mapped to NAS constraints to facilitate identifying which aircraft are affected when NAS constraints change. To support efficient trajectory negotiation, all aircraft provide current information about air vehicle capabilities. Assigned trajectories are constructed to satisfy all known NAS constraints, improving trajectory stability and predictability. Uncertainty and disruptions are handled by modifying the assigned trajectory as far in advance as possible. By proactively negotiating changes to the assigned trajectory, rather than relying on controller-selected tactical actions such as vectors to resolve traffic conflicts or implement miles-in-trail restrictions, MBT keeps aircraft on closed trajectories that are fully known to all stakeholders. Since reactive air traffic control actions cannot be predicted in advance, the downstream trajectory cannot be accurately predicted until they happen. Reliable trajectory predictions allow the system to identify needed modifications to trajectories further in advance, where they can be negotiated and communicated as amendments (i.e., additional or altered trajectory constraints) to the assigned trajectory. Decision Support Tools (DSTs) aid controllers in rapidly defining and communicating closed trajectories to the aircraft and support all stakeholders in trajectory negotiation. Anticipated MBT benefit mechanisms include more accurate trajectory predictions, improved ATM performance and robustness to off-nominal conditions, increased flexibility and operational efficiency, reduced impediments to emerging classes of airspace users accessing NAS resources, reduced environmental impacts, and enhanced safety.

ConOps↗