Search NASA⌕ Search

SEARCH · Search NASA

Results for “approach navigation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 217 records · Page 12

Navigation and EDL for the Mars Exploration Rovers

A viewgraph presentation on Deep Space Navigation, and Entry, Decent, and Landing (EDL) for Mars Exploration Rovers is shown. The contents include: 1) JPL Spacecraft Operating across the Solar System; 2) 2003 - 2004: The Busiest Period in JPL's History; 3) Deep Space Navigation Will Enable Many of the New NASA Missions; 4) What Exactly is Navigation vs. GNC for Deep Space?; 5) Cruise and Approach: Why is Deep Space Navigation So Difficult?; 6) Project Importance of GNC: Landing Site Selection; 7) Planetary Communications and Tracking; 8) Tracking Data Types; 9) Delta Differential One-Way Range (deltaDOR); 10) All Solutions Leading up to TCM-4 Design; 11) Entry Flight Path Sensitivities; 12) MER Navigation Results; 13) Atmospheric Entry Targeting and Delivery; 14) Landing Ellipse Orientation; 15) MER Landing Site Trade Example; 16) Entry, Descent and Landing: Entry Guidance or What Things Do We NOT do for MER Landings (but we will later...); 17) Entering Martian Space 8:29 p.m. PST (ERT); 18) Entry, Descent and Landing; 19) Entry, Descent and Landing: Terminal Guidance; 20) The Challenge Going from 12,000 mph to Zero in Less Than Six Minutes; 21) Spirit Landing Location; 22) Entry, Descent and Landing: The Future; 23) Powered Descent Time-Line; and 24) Updated Sky Crane Maneuver Description. A short summary is also given on planetary guidance, navigation and control as it pertains to EDL systems

Mars Exploration Rover (MER)↗

Cracking the Code: An Integrated Approach to Meeting Client Needs at NASA’s Langley Research Center

Organizational development (OD) is an interdisciplinary field that encourages the integration of many different concepts and theories in meeting client requirements. However, OD practitioners often maintain a significant amount of knowledge and lack specific guidance on how to combine concepts into a unified approach to drive change, thus making the selection and integration of disparate approaches challenging. To assist OD practitioners in navigating these challenges, a theory synthesizing approach is used to demonstrate the incremental insights that can be gained through the innovative integration of concepts, rather than being restricted to one perspective. More specifically, a novel Integrated Approach Decision-Making Tool is presented that offers specific steps to take to reach an effective, innovative solution. To further illustrate how this tool can be used in practice, an example is provided that details how this tool was used to achieve project success at NASA’s Langley Research Center through integrating three common OD models. Taken together, this paper will inform change agents operating in a similar capacity at any organization by providing a roadmap for how to meet client requirements and achieve increased project success through creating integrated, novel OD interventions.

Interdisciplinary↗

Evolution and Impact of Saturn V on Space Launch System from a Guidance, Navigation, and Mission Analysis Perspective

The Saturn V launch vehicle represented a jump in capability for heavy lift launch vehicles, enabling the Lunar Orbit Rendezvous approach to planetary exploration employed by the Apollo program 50 years ago. Following Apollo, and the development of the Space Transportation System, the NASA space exploration program shifted focus from lunar exploration to long-term, sustained, re-usable access to Low Earth Orbit. With the recent focus of NASA on the Artemis program and continued exploration of cislunar space as a precursor to Martian exploration, the shift has swung back to heavy lift capability. To meet this need, NASA has developed the Space Launch System. While the vehicle is a new design, it is heavily influenced by the engineering solutions and approach used on the Saturn V while taking advantage of the state of the art of launch vehicle design. The approach to abort, for example, shares many familiarities with the triggers and concept of operations used on Saturn V. Analysis approaches to dispersed trajectory performance are also very similar, but advances in computing technology have enabled a much more expanded set of inputs that can be modelled and assessed in a rapid manner. Additionally, guided flight algorithms share similar first principles but have expanded to include day of launch wind information. Trajectory optimization has also advanced significantly due to the availability of computing resources, but similar maneuvers and profiles are flown across both vehicles. Also, while the approach of onboard inertial navigation has been maintained between the two programs, the shift from platform to strapdown systems enables reduced complexity in the system design while maintaining required performance. As described, the Space Launch System is the evolution of NASA launch vehicle designs, owing a large heritage to the Saturn vehicle program and incorporating advances in propulsion systems, avionics, computing, and sensor technology over the past 50 years.

Ahmad, Naeem↗

Fully autonomous navigation for the NASA cargo transfer vehicle

A great deal of attention has been paid to navigation during the close approach (less than or equal to 1 km) phase of spacecraft rendezvous. However, most spacecraft also require a navigation system which provides the necessary accuracy for placing both satellites within the range of the docking sensors. The Microcosm Autonomous Navigation System (MANS) is an on-board system which uses Earth-referenced attitude sensing hardware to provide precision orbit and attitude determination. The system is capable of functioning from LEO to GEO and beyond. Performance depends on the number of available sensors as well as mission geometry; however, extensive simulations have shown that MANS will provide 100 m to 400 m (3(sigma)) position accuracy and 0.03 to 0.07 deg (3(sigma)) attitude accuracy in low Earth orbit. The system is independent of any external source, including GPS. MANS is expected to have a significant impact on ground operations costs, mission definition and design, survivability, and the potential development of very low-cost, fully autonomous spacecraft.

Wertz, James R.↗

Maneuver design for Galileo Jupiter approach and orbital operations

Following the successful release of the Galileo probe, the navigation efforts were focused on the implementation of the critical Io approach and the Jupiter orbit insertion strategy. The actual in-flight events on the approach phase affected the strategy. The most significant event was the onboard tape recorder anomaly, and it is shown that this anomaly affected the plans and assumptions of the navigation strategy for the approach and orbit insertion. The analysis, constraints, contingency planning and design evolution of trajectory correction maneuvers which enabled the continuation of the mission, are reported on. The Jupiter approach and initial orbit navigation strategy is presented in order to verify the viability of the strategy under nominal circumstances, and future mission operations plans are described.

Wilson, Michael G.↗

Securing the Modern Grid: Federal Investments, Digitization, and Supply Chain Strategy

Across the United States (U.S.) grid expansion and modernization is underway, paving the way for accelerated load growth and intelligent resource management. Digitization of the grid is supported by several state and federal programs, providing support for utilities installing advanced metering infrastructure (AMI), AI-powered analytics systems, battery energy storage systems (BESS), and distributed energy resource management systems (DERMS) to transform the grid from a one-way power delivery system into an intelligent, responsive network that will enable faster load growth and power expansion of data centers for advanced artificial intelligence (AI) applications. The digital transformation of America's grid presents opportunity for increased efficiency and resiliency but also introduces new digital risks that require careful management. Digital equipment often contains several vulnerabilities such as unencrypted communication protocols, and persistent remote access capabilities that could be exploited to manipulate device settings, coordinate service disruptions, or inject false data into grid operations. These digital risks become particularly important as the grid must rapidly scale to support AI-driven data centers, which the administration has identified as essential for maintaining U.S. technological leadership and economic competitiveness. These vulnerabilities are compounded by supply chain realities: Chinese manufacturers currently produce 70-90% of essential grid components including inverters, batteries, and control systems, with the U.S. lacking domestic manufacturing capacity for critical assets like extra-high voltage transformers. Recent federal legislation has established Foreign Entity of Concern (FEOC) restrictions to address these risks, requiring projects to achieve escalating thresholds of non-FEOC content to receive tax credits while utilities work to expand sourcing channels for their supply chains and strengthen security measures. These restrictions arrive precisely when utilities face unprecedented electricity demand growth driven by the rapid growth in data centers, creating a considerable challenge: rapidly expanding infrastructure while navigating complex compliance requirements while lacking viable alternatives for many critical components. Idaho National Laboratory (INL) and its partners have developed practical approaches to help utilities navigate these intersecting challenges as they leverage federal investment to strengthen and grow the grid. These solutions include Cyber-Informed Engineering (CIE) principles that build resilience directly into systems, the Cirrus tool for secure cloud migration, and enhanced procurement guidance that embeds security requirements throughout equipment lifecycles. Federal initiatives, such as the Technical Assistance for Digital Assurance (TADA) project, provide direct support to utilities implementing these approaches while facilitating knowledge sharing across the industry. While these tools and frameworks cannot eliminate all risks inherent in foreign supply chain dependencies, they offer pragmatic pathways for strengthening security posture without sacrificing the deployment momentum essential to meeting surging electricity demand. Ultimately, securing America's digital energy infrastructure demands dedicated coordination across multiple fronts: building domestic supply chains, implementing robust digital assurance practices, and maintaining the aggressive modernization timeline necessary for reliability, resilience, and energy independence.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Flight test of an automatic approach and landing concept for a simulated space shuttle represented by the NASA Convair 990 aircraft

Unpowered automatic approaches and landings were conducted to study navigation, guidance, and control problems associated with terminal area, approach, and landing operation for the space shuttle. A Convair 990 aircraft was equipped with a digital flight-control computer connected to the aircraft control systems and displays. The flight tests evaluated, from 11,300 m to touchdown, the performance of a navigation and guidance concept that utilized blended radio/inertial navigation with VOR, DME, and ILS as the ground radio navigation aids. The results from 36 automatic approaches and landings are analyzed. Preliminary results indicate that this concept may provide sufficient accuracy that automatic landing of the unpowered shuttle orbiter can be accomplished on a conventional size runway.

Smith, D. W.↗

Development and flight test of a weather radar precision approach concept

In order to make full use of the helicopter's unique capability of remote-site, off-airport landings, it would be desirable to employ a self-contained navigation system requiring minimum groundable-based equipment. For this reason, research is being conducted with the aim to develop the use of airborne weather radar as a primary navigation aid for helicopter approach and landing in instrument flight rules (IFR) conditions. Anderson et al. (1982) have reported about the first phase of this effort, taking into account the detection of passive ground-based corner reflectors with the aid of an 'echo processor'. The technology of passive-reflector detection in the overland environment provides the pilot with the range and bearing to the landing site. The present investigation is concerned with a second research phase, which was undertaken with the objective to develop and demonstrate the feasibility of a weather radar-based precision approach concept. Preliminary flight test results are considered.

Clary, G. R.↗

Post-test navigation data analysis techniques for the shuttle ALT

Postflight test analysis data processing techniques for shuttle approach and landing tests (ALT) navigation data are defined. Postfight test processor requirements are described along with operational and design requirements, data input requirements, and software test requirements. The postflight test data processing is described based on the natural test sequence: quick-look analysis, postflight navigation processing, and error isolation processing. Emphasis is placed on the tradeoffs that must remain open and subject to analysis until final definition is achieved in the shuttle data processing system and the overall ALT plan. A development plan for the implementation of the ALT postflight test navigation data processing system is presented. Conclusions are presented.

Source record↗

Aerocapture: An Enabling Technology for Flagship-Class Uranus Orbiter and Probe Mission

Introduction: The current decadal survey published by the National Academies of Sciences has informed National Aeronautics and Space Administration (NASA) to prioritize the study of the Ice Giants, especially Uranus. To gather the required data that addresses the science questions raised in this survey, a mission to Uranus with an orbiter and atmospheric probe must be designed. The Uranus Orbiter and Probe (UOP) study, which the survey identified as the flagship mission of this decade, proposes a 2031 launch to take advantage of a Jupiter fly-by and utilizes a fully propulsive orbit insertion design with an Earth-to-Uranus transit times ranging from 13 to 15 years. This fully propulsive orbit insertion at Uranus will be very fuel expensive (wet mass percentages of around 60-70\%) thereby leaving less mass for the scientific payload and additional planetary probes. In addition, scientists are more interested in visiting Uranus before 2049, when the Spring Equinox will occur, as it allows studying Uranus seasons not seen during Voyager 2's flyby in 1987. A NASA Flagship-Class mission would require at least 10 years of lead time prior to launch thereby making the 2031 launch to take advantage of the Jupiter fly-by extremely challenging. The consequence of missing the Jupiter fly-by and launching in the late 2030s is the challenge of a fully-propulsive mission like UOP to have a feasible alternative interplanetary trajectory that reaches Uranus before 2050. As an alternative, to address the shortcomings of the fully propulsive mission, one can design a mission to Uranus using aerocapture. What is aerocapture: Aerocapture is an atmospheric maneuver that uses aerodynamic forces generated by flight within a planetary atmosphere to decelerate and achieve orbit insertion. Using aerocapture allows one to provide the change in velocity (Delta V) needed to slow down from the approach hyperbolic trajectory to achieve the desired captured orbit around the target planet using aerodynamic forces of the vehicle (lift and drag). Using aerodynamic forces instead of fully-propulsive maneuvers results in significant savings in the fuel. Furthermore, aerocapture can also allow one to consider interplanetary trajectories with higher approach hyperbolic velocities, thus reducing the mission transit times. Aerocapture as an enabling technology: To use aerocapture as an enabling technology for the Uranus exploration mission, one would require an integrated system-level design, including a Thermal Protection System (TPS), hardware needed for aerodynamic modulation, and autonomous Guidance, Navigation, and Control (GNC) systems. Aerocapture has yet to be demonstrated, despite considering it for several past missions. Recent advancements in TPS and GNC capabilities show the potential for using rigid, heritage entry vehicle configurations already flown at other planetary bodies for Uranus aerocapture. Aerocapture can be a robust technology that can deliver spacecraft to Uranus science orbits while substantially increasing on-orbit payload mass (more than 40\%) that can enable robust atmospheric entry probes. Additionally, the aerocapture maneuver would reduce the interplanetary transit time by 2–5 years (15-30\%) relative to fully-propulsive orbit insertion. Recent work has shown that one can conduct a flagship-class mission in a shorter period than fully-propulsive missions if using aerocapture. What does aerocapture bring in for a Uranus Mission: Using aerocapture for a Uranus orbiter and atmospheric probe mission can provide one with considerable propellant savings. Spacecraft in interplanetary trajectories to Uranus typically need an Delta V in orders of kilometers per second to insert into science orbit. One would require thousands of kilograms of fuel to achieve such a Delta V using a traditional fully propulsive maneuver, leaving less mass for payload during the mission launch. Aerocapture can reduce the propulsion needs by dissipating energy in the sizable atmosphere of Uranus without a significant mass increase due to the need for an aeroshell. One can use the mass savings achieved using the aerocapture to reduce the launch vehicle requirements. In addition, one can also have additional science instruments on the orbiter or create a robust instrumentation suite on an atmospheric probe that can significantly increase the science outcome of the Uranus exploration mission. Furthermore, since aerocapture performance is relatively insensitive to increases in hyperbolic excess velocity, one can design the interplanetary trajectory to arrive at Uranus faster, reducing the interplanetary transit time and operations cost. All these savings, achieved using aerocapture, could help fit a larger class mission, such as the Uranus mission within a smaller capital, e.g., a Flagship-class orbiter mission in a New Frontiers class capital. Summary: This talk will provide an overview of how aerocapture can enable the Uranus exploration mission. Specifically, this talk will discuss the latest advancements made in the Uranus aerocapture study, such as investigating interplanetary trajectories with higher hyperbolic approach velocities and their implications on the aero heating and the TPS design, incorporating FNPAG (an advanced numerical-predictor guidance) and comparison of multiple navigation approaches. In addition, this talk will focus on mechanical design that can house more than one atmospheric probe and the six degrees of freedom simulation of aerocapture at Uranus. Findings from a recent NASA Space Technology Mission Directorate (STMD)-funded activity studying the aerocapture as an enabling technology for a Uranus orbiter will be presented. Using the science payload recommended by the Decadal Survey for Uranus exploration, this work shows many improvements over the baseline fully-propulsive mission. These improvements include a shorter cruise phase, flexibility in launch opportunities late into the 2030s while reaching Uranus before the 2050 equinox for the desired science opportunities, and lower propellant mass needs. This talk will highlight how aerocapture can be utilized for Uranus science orbit insertion using a lower-risk, heritage entry vehicle configuration used extensively as a Mars entry, descent, and landing vehicle. Furthermore, this talk will explore how the demonstration of aerocapture at Earth can benefit the aerocapture-enabled Uranus mission.

Aerocapture↗

Lunar Node 1 and Beyond

Lunar Node 1 (LN-1) is an S-band Navigation beacon for lunar applications that was recently designed and built at MSFC. As part of NASA's Commercial Lunar Payload Services initiative, this beacon will be delivered to the moon's surface on Intuitive Machine's NOVA-C lunar lander in November 2021. During this mission, LN-1’s goal will be to demonstrate navigation technologies that can support local surface and orbital operations around the moon, enabling autonomy which would decrease dependency on heavily utilized Earth based assets like the Deep Space Network. To do this, LN-1’s design leverages Cubesat components as well as the Multi-spacecraft Autonomous Positioning System (MAPS) algorithms, which enable the autonomous spacecraft positioning through communication-integrated navigation measurements. In addition to demonstrating the MAPS payload, the radio will also be used in standard tone-based non-coherent ranging and Doppler tracking to provide an alternate approaches and comparisons for navigation performance. LN-1 will represent a single node in a potential greater MAPS network of assets. While LN-1 awaits launch to demonstrate this initial use of one-way navigation, designs are already under way for proposed subsequent missions like LN-2 to enable expanded capability. The next steps in these missions seek to include a receive capability to allow two-way ranging support with other operational spacecraft in the lunar vicinity, and to provide some component upgrades related to the radio, power, and thermal systems that will improve the longevity of the payload in the harsh lunar environment. The LN-1 design details, status, and potential forward work with mission like LN-2 will be outlined in this presentation.

Evan John Anzalone↗

An approach for targeting landers and penetrators using orbital optical navigation

Onboard orbital optical navigation data is analyzed with the purpose of generating topographic maps for selecting a landing site. It is suggested that a near-real time orbit-determination process be used for solving a large set of parameters including the spacecraft orbit and primary-body gravity field, the rotational properties of the planetary body, the coordinates of surface features, and the camera-pointing and orientation angles of each picture. A batch-sequential formulation of the standard least-squares problem is employed, along with backward smoothing and a square-root formation filter. An experiment in which over 100 images of Phobos are processed to estimate about 2000 parameters is presented, with emphasis on coordinate systems, transforming points on the reference surface to images in the picture, parameter estimation, and cartographic accuracy.

Wang, Tseng-Chan↗

Lucy: Navigating a Jupiter Trojan Tour

In January 2017, NASA selected the Lucy mission to explore six Jupiter Trojan asteroids. These six bodies, remnants of the primordial material that formed the outer planets, were captured in the Sun-Jupiter L4 and L5 Lagrangian regions early in the solar system formation. These particular bodies were chosen because of their diverse spectral properties and the chance to observe up close for the first time two orbiting approximately equal mass binaries, Patroclus and Menoetius. KinetX, Inc. is the primary navigation supplier for the Lucy mission. This paper describes preliminary navigation analyses of the approach phase for each Trojan encounter.

trajectory design↗

Optical Navigation for Dawn at Vesta

The Dawn S/C, launched in September 2007, towards Vesta and Ceres, will enter into orbit about asteroid Vesta in July 2011 and will conduct science remote sensing operations for approximately one year at various orbital altitudes. Vesta navigation operations begin with early approach in May 2011 until departure to Ceres in July 2012. A key navigation aspect is optical navigation, which will be conducted at all mission phases. Here we review the optical navigation plan, imaging, methodology, data types, as well as expected performance in the context of the overall mission navigation. A key aspect of optical navigation at Dawn that will receive particular attention is the extensive use of landmark navigation during most of mission phases. In addition to supporting real-time navigation operations, optical navigation will be used to determine some key physical characteristics of Vesta, such as the asteroid's pole & shape, to assist mission design & science operations.

Vesta↗

Navigation and Mission Design for Low-Thrust Insertion into Near Rectilinear Halo Orbits

Near Rectilinear Halo Orbits, the target of NASA’s Gateway, are slightly unstable and therefore require minimal insertion delta-V. This makes insertion using highly efficient low-thrust systems a viable and attractive option; however, it also may require the spacecraft to approach the insertion on a dynamically sensitive trajectory with multiple perilune passes. This study focuses on a low-thrust NRHO insertion from a spiral-out, Earth-to-Moon transfer that involves this type of dynamically sensitive approach. Correction maneuver and navigation strategies are found that are robust to initial state, navigation, and maneuver execution errors prior to and through insertion. Further, it is demonstrated that these maneuver and navigation strategies allow the spacecraft to transition to nominal NRHO stationkeeping after insertion, without the need for specially designed clean-up maneuvers or a significant amount of additional delta-V.

Ethan W Kayser↗

Assessment and Verification of SLS Block 1-B Exploration Upper Stage State and Stage Disposal Performance

One of the SLS Navigation System's key performance requirements is a constraint on the payload system's delta-v allocation to correct for insertion errors due to vehicle state uncertainty at payload separation. The SLS navigation team has developed a Delta-Delta-V analysis approach to assess the effect on trajectory correction maneuver (TCM) design needed to correct for navigation errors. This approach differs from traditional covariance analysis based methods and makes no assumptions with regard to the propagation of the state dynamics. This allows for consideration of non-linearity in the propagation of state uncertainties. The Delta-Delta-V analysis approach re-optimizes perturbed SLS mission trajectories by varying key mission states in accordance with an assumed state error. The state error is developed from detailed vehicle 6-DOF Monte Carlo analysis or generated using covariance analysis. These perturbed trajectories are compared to a nominal trajectory to determine necessary TCM design. To implement this analysis approach, a tool set was developed which combines the functionality of a 3-DOF trajectory optimization tool, Copernicus, and a detailed 6-DOF vehicle simulation tool, Marshall Aerospace Vehicle Representation in C (MAVERIC). In addition to delta-v allocation constraints on SLS navigation performance, SLS mission requirement dictate successful upper stage disposal. Due to engine and propellant constraints, the SLS Exploration Upper Stage (EUS) must dispose into heliocentric space by means of a lunar fly-by maneuver. As with payload delta-v allocation, upper stage disposal maneuvers must place the EUS on a trajectory that maximizes the probability of achieving a heliocentric orbit post Lunar fly-by considering all sources of vehicle state uncertainty prior to the maneuver. To ensure disposal, the SLS navigation team has developed an analysis approach to derive optimal disposal guidance targets. This approach maximizes the state error covariance prior to the maneuver to develop and re-optimize a nominal disposal maneuver (DM) target that, if achieved, would maximize the potential for successful upper stage disposal. For EUS disposal analysis, a set of two tools was developed. The first considers only the nominal pre-disposal maneuver state, vehicle constraints, and an a priori estimate of the state error covariance. In the analysis, the optimal nominal disposal target is determined. This is performed by re-formulating the trajectory optimization to consider constraints on the eigenvectors of the error ellipse applied to the nominal trajectory. A bisection search methodology is implemented in the tool to refine these dispersions resulting in the maximum dispersion feasible for successful disposal via lunar fly-by. Success is defined based on the probability that the vehicle will not impact the lunar surface and will achieve a characteristic energy (C3) relative to the Earth such that it is no longer in the Earth-Moon system. The second tool propagates post-disposal maneuver states to determine the success of disposal for provided trajectory achieved states. This is performed using the optimized nominal target within the 6-DOF vehicle simulation. This paper will discuss the application of the Delta-Delta-V analysis approach for performance evaluation as well as trajectory re-optimization so as to demonstrate the system's capability in meeting performance constraints. Additionally, further discussion of the implementation of assessing disposal analysis will be provided.

Patrick, Sean↗