Search NASA⌕ Search

SEARCH · Search NASA

Results for “building technologies program”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 217 records · Page 12

Satellite and Ground System Solutions at Your Fingertips

In the summer of 1998, the blockbuster action movie Armageddon captivated audiences with a thrilling doomsday plot about a meteor the size of Texas that was racing towards the Earth. Though the premise of the movie was purely fictional, the unfortunate reality is that near-Earth asteroids such as the one portrayed in the film do exist. On December 23, 2004, NASA announced that an asteroid it anticipated to pass near the Earth on April 13, 2029, had been assigned the highest score to date on the universally used Torino Impact Hazard Scale. At first, the flyby distance for the asteroid, dubbed MN4, was uncertain and an Earth impact could not be ruled out. The odds of impact were initially believed to be 1 in 300, high enough to merit special monitoring by astronomers around the world, but were then escalated to 1 in 37 on December 27. NASA officials noted, however, that these odds should not be of public concern, since they were likely to change on a day-to-day basis as new data were received. The officials were correct in their assertion, as any chances of an impact with Earth in 2029 were completely ruled out later that same day. Integral Systems, Inc., a leading provider of satellite ground systems and the first company to offer an integrated suite of commercial-off-the-shelf software products for satellite command and control, is helping NASA keep a careful watch for any close-encountering asteroids with its tracking technology. The company supported the first NASA Discovery mission, the Near Earth Asteroid Rendezvous (NEAR) program, back in 1996, and has expanded its business by building more ground systems for a greater variety of satellites than any other company in the world. (NASA has since launched seven more Discovery missions, with the eighth lifting off earlier this year.) The experience gained from the company s participation in developing satellite command and control ground systems for the NEAR program has bolstered its flagship product line, the EPOCH Integrated Product Suite (IPS), first featured in Spinoff 1997, and led to the creation of its latest product, the Skylight Direct Broadcast Ground Terminal.

Source record↗

Analysis and Optimization of Baseline Single Aisle Aircraft for Future Electrified Powertrain Flight Demonstrator Comparisons

The purpose of this study is to provide baseline single-aisle vehicles for future comparisons NASA’s Electrified Powertrain Flight Demonstrator (EPFD) turbofan powered Vision Systems. Both a large single-aisle (≈150 passenger) and a small single-aisle (≈100 passenger) vehicle will be analyzed using NASA’s General Aviation Synthesis Program and a modernized Python-based version of this program that enables efficient gradient-based optimization of both the airframe and propulsion that currently is being referred to as GASPy. A technology build-up will be conducted to bring the current State-of-the-art vehicles to a projected 2035 technology level by incorporating estimations for improvements in aerodynamics, structures, and propulsions. These vehicles can be used in NASA’s future EPFD project as baselines to measure the benefits of future hybrid and fully electric aircraft against. The advanced, large single-aisle will then be used to demonstrate the benefits of a coupled engine-airframe optimization for fuel burn reduction.

Carl J Recine↗

Bridging the Gap from Networking Technologies to Applications: Workshop Report

The objective of the Next Generation Internet (NGI) Federal program is threefold, encompassing development of networking technologies, high-performance network testbeds, and revolutionary applications. There have been notable advances in emerging network technologies and several nationwide testbeds have been established, but the integration of emerging technologies into applications is lagging. To help bridge this gap between developers of NGI networking technologies and developers of NGI applications, the NASA Research and Education Network (NREN) project hosted a two-day workshop at NASA Ames Research Center in August 1999. This paper presents a summary of the results of this workshop and also describes some of the challenges NREN is facing while incorporating new technologies into HPCC and other NASA applications. The workshop focused on three technologies - Quality of Service (QoS), advanced multicast, and security-and five major NGI application areas - telemedicine, digital earth, digital video, distributed data-intensive applications, and computational infrastructure applications. Network technology experts, application developers, and NGI testbed representatives came together at the workshop to promote cross-fertilization between the groups. Presentations on the first day, including an overview of the three technologies, application case studies and testbed status reports, laid the foundation for discussions on the second day. The objective of these latter discussions, held within smaller breakout groups, was to establish a coherent picture of the current status of the various pieces of each of the three technologies, to create a roadmap outlining future technology development, and to offer technological guidance to application developers. In this paper we first present a brief overview of the NGI applications that were represented at the workshop, focusing on the identification of technological advances that have successfully been incorporated in each application and technological challenges that remain. Next we present the technology roadmaps that were created at the workshop, summarizing the status of various mechanisms that are currently under development and forecasting when various advances are likely to occur within the next one-to-three-year time span. Then we identify issues that were raised at the workshop that might hinder technology development or that might impede integration into NGI applications. We also report some specific guidelines that were offered at the workshop to enable application developers to integrate and effectively use emerging NGI technology building blocks. Finally, we describe NREN activities to incorporate emerging technologies into NASA applications. These activities include support for other NASA High-Performance Computing and Communications Program areas such as IPG (Information Power Grid), support for NASA science enterprises such as Earth science and Mars program prototyping activities, support for satellite/terrestrial networking applications such as the TransAtlantic and TransPacific demonstrations and the Interplanetary Internet, support for NASA telemedicine applications such as the Virtual Collaborative Clinic, and participation in NGI advanced technology testbed initiatives such as the QBone and the NTON/Supernet. For each activity we highlight the primary technological challenge that is associated with it.

Johnson, Marjory J.↗

Evaluation of cryogenic system test options for the OTV on-orbit propellant depot

Future space missions to geosynchronous, lunar, and planetary orbits will require an orbital depot for stockpiling propellants. This depot will provide long-term storage of cryogens, requiring new technologies for fluid management in microgravity and further development of thermal management technologies for minimization of cryogen boiloff. Preliminary evaluations have been made to define a test program approach for reducing technical risk through verifying performance models and building a base of engineering data for depot design. A number of testing options were defined and evaluated, leading to selection of ground testing combined with an orbital systems test. Ground testing is inadequate because of critical microgravity concerns; extending testing aboard the Space Station was eliminated because the data would not be available soon enough to benefit the propellant depot design. The orbital test would either be a short-term test carried out in the cargo bay of the Space Shuttle Orbiter using a nonhazardous cryogen or a longer term test carried out with hydrogen aboard a free-flying experiment orbited with an expendable launch vehicle.

Schuster, John R.↗

Programs Automate Complex Operations Monitoring

Kennedy Space Center, just off the east coast of Florida on Merritt Island, has been the starting place of every human space flight in NASA s history. It is where the first Americans left Earth during Project Mercury, the terrestrial departure point of the lunar-bound Apollo astronauts, as well as the last solid ground many astronauts step foot on before beginning their long stays aboard the International Space Station. It will also be the starting point for future NASA missions to the Moon and Mars and temporary host of the new Ares series rockets designed to take us there. Since the first days of the early NASA missions, in order to keep up with the demands of the intricate and critical Space Program, the launch complex - host to the large Vehicle Assembly Building, two launch pads, and myriad support facilities - has grown increasingly complex to accommodate the sophisticated technologies needed to manage today s space missions. To handle the complicated launch coordination safely, NASA found ways to automate mission-critical applications, resulting in streamlined decision-making. One of these methods, management software called the Control Monitor Unit (CMU), created in conjunction with McDonnell Douglas Space & Defense Systems, has since left NASA, and is finding its way into additional applications.

Source record↗

The 1989 long-range program plan

The President's National Space Policy of 1988 reaffirms that space activities serve a variety of vital national goals and objectives, including the strengthening of U.S. scientific, technological, political, economic, and international leadership. The new policy stresses that civil space activities contribute significantly to enhancing America's world leadership. Goals and objectives must be defined and redefined, and each advance toward a given objective must be viewed as a potential building block for future programs. This important evolutionary process for research and development is reflected, describing NASA's program planning for FY89 and later years. This plan outlines the direction of NASA's future activities by discussing goals, objectives, current programs, and plans for the future. The 1989 plan is consistent with national policy for both space and aeronautics, and with the FY89 budget that the President submitted to Congress in February 1988.

Source record↗

Ares Launch Vehicles Overview

Since 2005, the Ares Projects have been building the nation s next generation of crew and cargo launch vehicles. As part of the Constellation Program, the Ares vehicles will enable astronauts in the Orion crew exploration vehicle and Altair lunar lander to reach the Moon and beyond. These vehicles draw upon hardware and experienced developed over 50 years of exploration, while also incorporating technology and management practices from today. Ares is concentrating on building the Ares I crew launch vehicle to ensure America s continued ability to send crews to the International Space Station. Progress has been made on design, fabrication, and testing for the first stage, upper stage, upper stage engine, and integrated vehicle. This presentation will provide an overview of the Ares launch vehicles architecture, milestone progress, and top project risks.

Vanhooser, Teresa↗

Intelligent Systems Technologies to Assist in Utilization of Earth Observation Data

With the launch of several Earth observing satellites over the last decade, we are now in a data rich environment. From NASA's Earth Observing System (EOS) satellites alone, we are accumulating more than 3 TB per day of raw data and derived geophysical parameters. The data products are being distributed to a large user community comprising scientific researchers, educators and operational government agencies. Notable progress has been made in the last decade in facilitating access to data. However, to realize the full potential of the growing archives of valuable scientific data, further progress is necessary in the transformation of data into information, and information into knowledge that can be used in particular applications. Sponsored by NASA s Intelligent Systems Project within the Computing, Information and Communication Technology (CICT) Program, a conceptual architecture study has been conducted to examine ideas to improve data utilization through the addition of intelligence into the archives in the context of an overall knowledge building system. Potential Intelligent Archive concepts include: 1) Mining archived data holdings using Intelligent Data Understanding algorithms to improve metadata to facilitate data access and usability; 2) Building intelligence about transformations on data, information, knowledge, and accompanying services involved in a scientific enterprise; 3) Recognizing the value of results, indexing and formatting them for easy access, and delivering them to concerned individuals; 4) Interacting as a cooperative node in a web of distributed systems to perform knowledge building (i.e., the transformations from data to information to knowledge) instead of just data pipelining; and 5) Being aware of other nodes in the knowledge building system, participating in open systems interfaces and protocols for virtualization, and collaborative interoperability. This paper presents some of these concepts and identifies issues to be addressed by research in future intelligent systems technology.

Ramapriyan, Hampapuram K.↗

Continuing Development of a Collaborative Plan to Further Engage South Dakota in NASA's Earth Science Enterprise

An ongoing set of research planning activities have occurred in South Dakota as a consequence of the past two years of NASA-EPSCoR Preparation Grants. During this time a group of approximately 60 scientists, engineers, and university administrators in South Dakota have been directly involved as "theme team" members in a series of five all-day meetings to identify the research and technological priorities that are consistent both with NASA-ESE's interests and the State's expertise. Institutions represented within the group's membership include: South Dakota School of Mines & Technology, South Dakota State University, Augustana College, University of South Dakota, USGS EROS Data Center, Si ranks College, Santa Gleska University, Sisseton Wahpeton Community College, USGS Water Resources Division, US National Weather Service, and the SD Department of Environment & Natural Resources. Many of these organizations are also members and affiliates of the SD Space Grant Consortium. The evolving plan has been guided by the following desirable actions: 1. To establish new contacts and strengthen existing linkages with NASA Centers, relevant NASA researchers, and key personnel at the USGS EROS Data Center. 2. To promote participation from the State's major research institutions, State agencies, and relevant businesses in South Dakota that are interested in strengthening our scientific and technological enterprises. 3. To develop the State's scientific talent and infrastructure for enhanced competitiveness in research, development, and technology-based economic development. 4. To encourage greater participation by under represented groups, especially Native Americans, in scientific education and research. 5. To build greater public and political support in South Dakota for the overall science, engineering, and technology enterprise. 6. To communicate the benefits of current and future NASA programs to the progress and development of South Dakota, the Northern Great Plains Region, and the Nation.

Farwell, Sherry O.↗

Integrated Requirements Analysis and Technology Roadmaps

In fiscal year 1997, Strategic Insight performed analytical studies for NASA's Highly Reusable Space Transportation (HRST) program, creating program documents which illuminated technical requirements and critical research opportunities. Studies were performed to structure and confirm HRST's evolving technical requirements, building on Marshall's Phase 1 work, which defined HRST system concepts, analytical tools and high-level issues for assessment in Phase 2. Specifically, Strategic Insight: (1) Performed a requirements analysis to update HRST: An Advanced Concepts Study, Study Guidelines, Version 2.0 of January 22, 1996; only minor changes were recommended for the given parameters of interest to concept designers; (2) Conducted mini-workshops during HRST Working Group meetings on April 14-15, 1997 and July 22-24, 1997; and (3) Created structures for technology road maps of candidate HRST concepts, both subsystem and end-to-end concepts, emerging from the 13 cooperative agreement projects.

Source record↗

Building the RS-25 Engine for NASA’s Next Generation of Exploration.

NASA is aggressively pursuing a human lunar return to the Moon with the Artemis Program. The Space Launch System (SLS) is critical to the transportation architecture, providing both crew and cargo capability. To accelerate SLS development, NASA settled on space shuttle heritage propulsion technologies. Early missions will use repurposed RS-25 engines from the Shuttle Program adapted to SLS requirements. For future missions, however, NASA and engine contractor Aerojet Rocketdyne are restarting RS-25 production with a goal of using the latest manufacturing technologies to produce an RS-25 variant that will cost at least 30 percent less than the shuttle-era engines developed and flown for almost 30 years. The prospect of restarting the production line on these engines after many years and modifying the engine to reduce cost and better match the needs of the SLS vehicle presented unique challenges and opportunities for NASA and Aerojet Rocketdyne. NASA and AR are now deep into the process of adapting 16 RS-25 engines for the first four SLS Artemis flights and building the first RS-25 “Restart” engines for future Artemis missions. In addition to navigating programmatic, technical, and logistical challenges with the current RS-25 production work, NASA and AR have partnered to pursue new methods of building this engine through advanced manufacturing techniques to further reduce the cost and schedule required to build each RS-25 engine to contribute to the long-term affordability of the SLS vehicle. This presentation will discuss the goals for the restart program, the challenges, and results to date.

Jessica Jean Wood↗

The Virtual Test Bed Project

This is a report of my activities as a NASA Fellow during the summer of 2002 at the NASA Kennedy Space Center (KSC). The core of these activities is the assigned project: the Virtual Test Bed (VTB) from the Spaceport Engineering and Technology Directorate. The VTB Project has its foundations in the NASA Ames Research Center (ARC) Intelligent Launch & Range Operations program. The objective of the VTB project is to develop a new and unique collaborative computing environment where simulation models can be hosted and integrated in a seamless fashion. This collaborative computing environment will be used to build a Virtual Range as well as a Virtual Spaceport. This project will work as a technology pipeline to research, develop, test and validate R&D efforts against real time operations without interfering with the actual operations or consuming the operational personnel s time. This report will also focus on the systems issues required to conceptualize and provide form to a systems architecture capable of handling the different demands.

Rabelo, Luis C.↗

Marshall Space Flight Center Research and Technology Report 2019

Today, our calling to explore is greater than ever before, and here at Marshall Space Flight Center—we make human deep space exploration possible. A key goal for Artemis is demonstrating and perfecting capabilities on the Moon for technologies needed for humans to get to Mars. This year’s report features 10 of the Agency’s 16 Technology Areas, and I am proud of Marshall’s role in creating solutions for so many of these daunting technical challenges. Many of these projects will lead to sustainable in-space architecture for human space exploration that will allow us to travel to the Moon, on to Mars, and beyond. Others are developing new scientific instruments capable of providing an unprecedented glimpse into our universe. NASA has led the charge in space exploration for more than six decades, and through the Artemis program we will help build on our work in low Earth orbit and pave the way to the Moon and Mars. At Marshall, we leverage the skills and interest of the international community to conduct scientific research, develop and demonstrate technology, and train international crews to operate further from Earth for longer periods of time than ever before— first at the lunar surface, then on to our next giant leap, human exploration of Mars. While each project in this report seeks to advance new technology and challenge conventions, it is important to recognize the diversity of activities and people supporting our mission. This report not only showcases the Center’s capabilities and our partnerships, it also highlights the progress our people have achieved in the past year. These scientists, researchers and innovators are why Marshall and NASA will continue to be a leader in innovation, exploration, and discovery for years to come.

Dankanich, John W.↗

Analytical Models

A system-level design and analysis model was developed. This model was conceived to have several key elements: a solar pond thermodynamic performance model, a power generation subsystem model, and an economic analysis element. The basic approach was to create these elements or modules and refine them on an individual basis yet retain the capability to easily couple them into a full system design model. This building block approach allows for maximum flexibility and substitution of refined descriptions as the technology develops. A general overview of interconnecting these subsystem models is presented. The primary program control element will perform the administrative functions of data input, data output, information storage and transfer, and sequential calling of the subsystem models. From the point of view of the requirements of a system design model, a power conversion subsystem model was developed. The goal of the effort was a preliminary subsystem model compatible with the solar pond subsystem model so that a first order system simulation analysis could be performed.

Source record↗

X-33/RLV Program Aerospike Engines

Substantial progress was made during the past year in support of the X-33/RLV program. X-33 activity was directed towards completing the remaining design work and building hardware to support test activities. RLV work focused on the nozzle ramp and powerpack technology tasks and on supporting vehicle configuration studies. On X-33, the design activity was completed to the detail level and the remainder of the drawings were released. Component fabrication and engine assembly activity was initiated, and the first two powerpacks and the GSE and STE needed to support powerpack testing were completed. Components fabrication is on track to support the first engine assembly schedule. Testing activity included powerpack testing and component development tests consisting of thrust cell single cell testing, CWI system spider testing, and EMA valve flow and vibration testing. Work performed for RLV was divided between engine system and technology development tasks. Engine system activity focused on developing the engine system configuration and supporting vehicle configuration studies. Also, engine requirements were developed, and engine performance analyses were conducted. In addition, processes were developed for implementing reliability, mass properties, and cost controls during design. Technology development efforts were divided between powerpack and nozzle ramp technology tasks. Powerpack technology activities were directed towards the development of a prototype powerpack and a ceramic turbine technology demonstrator (CTTD) test article which will allow testing of ceramic turbines and a close-coupled gas generator design. Nozzle technology efforts were focused on the selection of a composite nozzle supplier and on the fabrication and test of composite nozzle coupons.

Source record↗

Advanced Technology Lifecycle Analysis System (ATLAS) Technology Tool Box (TTB)

The Advanced Technology Lifecycle Analysis System (ATLAS) is a decision support tool designed to aid program managers and strategic planners in determining how to invest technology research and development dollars. It is an Excel-based modeling package that allows a user to build complex space architectures and evaluate the impact of various technology choices. ATLAS contains system models, cost and operations models, a campaign timeline and a centralized technology database. Technology data for all system models is drawn from a common database, the ATLAS Technology Tool Box (TTB). The TTB provides a comprehensive, architecture-independent technology database that is keyed to current and future timeframes.

Doyle, Monica↗

Commercial Cargo Derivative Study of the Advanced Hybrid Wing Body Configuration with Over-Wing Engine Nacelles

LM has leveraged our partnership with the Air Force Research Laboratory (AFRL) and NASA on the advanced hybrid wing body (HWB) concept to develop a commercial freighter which addresses the NASA Advanced Air Transport Technology (AATT) Project goals for improved efficiency beyond 2025. The current Air Force Research Laboratory (AFRL) Revolutionary Configurations for Energy Efficiency (RCEE) program established the HWB configuration and technologies needed for military transports to achieve aerodynamic and fuel efficiencies well beyond the commercial industry's most modern designs. This study builds upon that effort to develop a baseline commercial cargo aircraft and two HWB derivative commercial cargo aircraft to quanitify the benefit of the HWB and establish a technology roadmap for further development.

Hooker, John R.↗

Development of first generation aerospace NiMH cells

Gates Aerospace Batteries in conjunction with Gates Energy Products (GEP) has been developing NiMH technology for aerospace use since 1990. GEP undertook the development of NiMH technology for commercial cell applications in 1987. This program focused on wound cell technology for replacement of current NiCd technology. As an off shoot of this program small, wound cells were used to evaluate initial design options for aerospace prismatic cell designs. Early in 1991, the first aerospace prismatic cell designs were built in a 6 Ah cell configuration. These cells were used to initially characterize performance in prismatic configurations and begin early life cycle testing. Soon after the 6 Ah cells were on test, several 22 Ah cells were built to test other options. The results of testing of these cells were used to identify potential problem areas for long lived cells and develop solutions to those problems. Following these two cell builds, a set of 7 Ah cells was built to evaluate improvements to the technology. To date results from these tests are very promising. Cycle lives in excess of 2,200 LEO cycles at 50 percent DoD were achieved with cells continuing on test. Results from these cell tests are discussed and data presented to demonstrate feasibility of this technology for aerospace programs.

Tinker, Lawrence↗