Search NASA⌕ Search

SEARCH · Search NASA

Results for “compliance reporting”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 217 records · Page 12

Annual Site Environmental Report: 2021 (ASER) for the SLAC National Accelerator Laboratory

This report, prepared by the SLAC National Accelerator Laboratory (SLAC) for the U.S. Department of Energy (DOE), SLAC Site Office (SSO), provides a comprehensive summary of the environmental program activities at SLAC for calendar year 2021. Annual Site Environmental Reports (ASERs) are prepared for all DOE sites with significant environmental activities and distributed to relevant external regulatory agencies and other interested organizations or individuals. To the best of my knowledge, this report accurately summarizes the results of the 2021 environmental monitoring, compliance, and restoration programs at SLAC. This assurance can be made based on SSO and SLAC review of the ASER, and quality assurance protocols applied to monitoring and data analyses at SLAC.

54 ENVIRONMENTAL SCIENCES↗

Characterization Results for the August 2025 Tank Farm 2H Evaporator Overhead Sample

On an annual basis, Savannah River Mission Completion (SRMC) provides 2H and 3H evaporator overhead samples to Savannah River National Lab (SRNL) to be analyzed per Section 5.2 of the Effluent Treatment Project (ETP) Waste Compliance Plan (WCP) and the Waste Acceptance Criteria (WAC). This report presents the average characterization results for the August 2025 2H evaporator overhead sample. The sample was clear and colorless with no visible solids. The results provide measurements for cesium-137 ( 137 Cs), strontium-90 ( 90 Sr), and iodine-129 ( 129 I) with the radionuclide concentration limits specified by the WAC. These analyses were performed in duplicate, and all three measured radionuclide concentrations were within ETP WAC limits. A summary of the analytical results for this 2H evaporator overhead sample includes the following: The measured cesium-137 activity in the 2H evaporator overhead sample averaged 3.02E+02 dpm/mL, which is below the ETP WAC limit of 1.30E+03 dpm/mL. The strontium-90 activity in the 2H evaporator overhead sample averaged 3.33E+00 dpm/mL, which is below the ETP WAC limit of 1.76E+02 dpm/mL. The iodine-129 activity in the 2H evaporator overhead sample averaged 1.20E-01 dpm/mL, which is below the ETP WAC limit of 1.00E+00 dpm/mL. Although the measurements for Cs-137 and Sr-90 are lower compared to previous years, the results remain within a similar range to past measurements and are well below the WAC limits. Iodine-129 indicates detectable results compared to previous years, which can be attributed to recent salt batch processing trending close to the WAC limit for saltstone production. However, these results are still below the ETP WAC limit.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Pacific Northwest National Laboratory Annual Site Environmental Report for Calendar Year 2024

The report provides a synopsis of ongoing environmental management performance and compliance activities for operations that occur at the PNNL-Richland campus in Richland, Washington, and at the PNNL-Sequim campus near Sequim, Washington. It describes the location of and background for each facility; addresses compliance with applicable DOE, federal, state, and local regulations, and site-specific permits; documents environmental monitoring efforts and their status; presents potential radiation doses to staff and the public in the surrounding areas; and describes DOE-required data quality assurance methods used for data verification.

54 ENVIRONMENTAL SCIENCES↗

Dynamics of cavitating cascades

Brief accounts of the theoretical research conducted on the unsteady cavitation characteristics of liquid rocket engine turbopumps are reported. The objective is to produce estimates of the cavitation compliance and other unsteady characteristics which could then be used in analysis of the pogo instability. Blade cavitation is the particular pheonomenon which is investigated and line arized free streamline methods were employed in both quasistatic and complete dynamic cascade analyses of the unsteady flow. The simpler quasistatic analysis was applied to particular turbopumps but yielded values of compliances significantly smaller than those indirectly obtained from experiments. Reasons for this discrepancy are discussed. The complete dynamic analysis presents a new problem in fundamental hydrodynamics and, though the basic solution is presented, numerical results have not as yet been obtained.

Acosta, A. J.↗

Wetland Re-Evaluation and Delineation Report for the Los Alamos National Laboratories Wetlands Project, Los Alamos County, New Mexico

In March of 2005, the Department of Energy (DOE), National Nuclear Security Administration (NNSA), Los Alamos Site office (LASO) requested the U.S. Army Corps of Engineers Albuquerque District (USACE) to identify and delineate wetlands at Los Alamos National Laboratory (LANL). The results of this study were intended to support the preparation of the Supplemental Site-Wide Environmental Impact Statement (EIS) and various mitigative measures that would become part of the National Environmental Policy Act (NEPA) compliance process for LANL. The term “wetland” will be used throughout the report to refer to the potential wetlands listed in Table 1. Many of these potential "wetlands” were not determined to be wetlands based on 2025 data.

60 APPLIED LIFE SCIENCES↗

MARSAME Release Report for Replacement Water Lines From TA-48 to TA-55, Revision 2

Environmental Protection and Compliance, Environmental Stewardship (EPC-ES) has determined that only a portion of the soil associated with Replacement Water Lines from Technical Area (TA)-48 to TA 55 (Figure 1) meets the criteria for unrestricted release to the public under Department of Energy (DOE) Order 458.1, Radiation Protection for the Public and the Environment (DOE, 2020). The remaining soil did not meet the criteria for unrestricted release and must be managed appropriately. These conclusions are based on the known history of the area combined with soil sample data collected in 2022; the findings are consistent with DOE Order 458.1 and Los Alamos National Laboratory (LANL) Functional Series Document EPC-ES-FSD-004, Environmental Radiation Protection (LANL, 2021). Sampling and data analysis, as described in this report, were sufficient to meet measurement quality objectives (MQOs) under the Multi-Agency Radiation Survey and Assessment of Materials and Equipment (MARSAME) manual (NUREG, 2009) and LANL procedures (LANL, 2020). Final approvals for waste disposition will come from LANL’s Waste Management Program.

54 ENVIRONMENTAL SCIENCES↗

Chemical Analysis Results for Potable Water from ISS Expeditions 21 to 25

The Johnson Space Center Water and Food Analytical Laboratory (WAFAL) performed detailed ground-based analyses of archival water samples for verification of the chemical quality of the International Space Station (ISS) potable water supplies for Expeditions 21 to 25. Over a 14-month period, the Space Shuttle visited the ISS on five occasions to complete construction and deliver supplies. The onboard supplies of potable water available for consumption by the Expeditions 21 to 25 crews consisted of Russian ground-supplied potable water, Russian potable water regenerated from humidity condensate, and US potable water recovered from urine distillate and condensate. Chemical archival water samples that were collected with U.S. hardware during Expeditions 21 to 25 were returned on Shuttle flights STS-129 (ULF3), STS-130 (20A), STS-131 (19A), STS-132 (ULF4) and STS-133 (ULF5), as well as on Soyuz flights 19-22. This paper reports the analytical results for the returned archival water samples and evaluates their compliance with ISS water quality standards. The WAFAL also received and analyzed aliquots of some Russian potable water samples collected in-flight and pre-flight samples of Rodnik potable water delivered to the Station on the Russian Progress vehicle during Expeditions 21 to 25. These additional analytical results are also reported and discussed in this paper.

Straub, John E., II↗

IT Security Support for the Spaceport Command Control Systems Development Ground Support Development Operations

Security is one of the most if not the most important areas today. After the several attacks on the United States, security everywhere was heightened from Airports to the communication among the military branches legionnaires. With advanced persistent threats (APTs) on the rise following Stuxnet, government branches and agencies are required, more than ever, to follow several standards, policies and procedures to reduce the likelihood of a breach. Attack vectors today are very advanced and are going to continue to get more and more advanced as security controls advance. This creates a need for networks and systems to be in an updated and secured state in a launch control system environment. FISMA is a law that is mandated by the government to follow when government agencies secure networks and devices. My role on this project is to ensure network devices and systems are in compliance with NIST, as outlined in FISMA. I will achieve this by providing assistance with security plan documentation and collection, system hardware and software inventory, malicious code and malware scanning and configuration of network devices i.e. routers and IDSsIPSs. In addition I will be completing security assessments on software and hardware, vulnerability assessments and reporting, conducting patch management and risk assessments. A guideline that will help with compliance with NIST is the SANS Top 20 Critical Controls. SANS Top 20 Critical Controls as well as numerous security tools, security software and the conduction of research will be used to successfully complete the tasks given to me. This will ensure compliance with FISMA and NIST, secure systems and a secured network. By the end of this project, I hope to have carried out stated above as well as gain an immense knowledge about compliance, security tools, networks and network devices, policies and procedures.

computer information security↗

U.S. Renewables Portfolio Standards 2021 Status Update: Early Release

Berkeley Lab’s annual status report on U.S. renewables portfolio standards (RPS) provides an overview of key trends associated with U.S. state RPS policies. The report, published in slide-deck form, describes recent legislative revisions, key policy design features, compliance with interim targets, past and projected impacts on renewables development, and compliance costs. The 2021 Early Release, published in lieu of a 2020 edition, presents historical data through year-end 2019, with some limited results for the year 2020. Key trends from this edition of the report include the following: Evolution of state RPS programs: States continue to refine and revise their RPS policies. Among other significant changes since the start of 2019, eight states enacted higher RPS targets or created new clean-energy/zero-carbon targets (AZ, DC, MD, NM, NV, VA, WA), in most cases setting targets equal to at least 50% of retail sales. Historical impacts on renewables development: Roughly half of all growth in U.S. renewable electricity (RE) generation and capacity since 2000 is associated with state RPS requirements, though that percentage has declined in recent years, representing 23% of all U.S. RE capacity additions in 2019. However, within particular regions-namely, the Northeast and Mid-Atlantic-RPS policies continue to serve a central role in motivating RE growth. Future RPS demand and incremental needs: RPS demand growth through 2030 will require roughly 90 GW of new RE capacity and will require total U.S. non-hydro RE generation to reach 17% of electricity sales (compared to 12% in 2019). Relative to EIA projections, this amounts to roughly one-third of projected RE growth over the next decade. RPS target achievement to-date: States have generally met their interim RPS targets in recent years, with only a few exceptions reflecting unique, state-specific issues. REC pricing trends: Prices for NEPOOL Class I RECs rose steeply over 2019, reaching $40/MWh and remaining at roughly that level over 2020. PJM Tier I REC prices continued to rise at a modest pace over the course of 2020, reaching $10/MWh by year-end. Prices for solar RECs remained relatively stable over 2020, and continue to exhibit wide variation across states, with the highest prices ($200-450/MWh) in NJ, MA, and DC.RPS compliance costs and cost caps: RPS compliance costs in 2019 averaged roughly 2.6% of retail electricity bills in RPS states, compared to 2.3% in 2018, with costs in most states ranging from 0.5% to 4.5% of retail electricity bills.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Certification Rules and Standards Review

This report characterizes the certification practices for electric propulsion systems by modeling changes to current engine and propeller certification practices (14 CFR 23, 33 and 35 and means of compliance in standards developed by ASTM Committee F39 and F44). Industry technology paths are varied, so this report focuses on insights from the NASA X-57 Maxwell Distributed Electric Propulsion flight demonstrator system technology project. There are 122 sections of the regulation reviewed, where 28 needed tailoring or revision. A second report will examine the regulations to the X-57 system development products. A final report will describe a general regulatory gaps method for new vehicle concepts.

Schlickenmaier, Herbert↗

Environmental projects. Volume 5, part 1: Study of subsurface contamination. Part 2: Guide to implement environmental compliance programs

In support of the national goal for the preservation of the environment and the protection of human health and safety, NASA, the Jet Propulsion Laboratory, and the Goldstone Deep Space Communications Complex have adopted the position that their operating installations shall maintain a high level of compliance in regard to regulations concerning environmental hazards. An investigation carried out by Engineering Science, Inc. focused on possible underground contamination that may have resulted from leaks and/or spills from storage facilities at the Goldstone Communications Complex. It also involved the cleanup of a non-hazardous waste dumpsite at the Mojave Base Site at the Goldstone complex. The report also includes details of the management duties and responsibilities needed to maintain compliance with environmental laws and regulations.

Bengelsdorf, I.↗

Site Environmental Report for Sandia National Laboratories California (2019)

Sandia National Laboratories, California (SNL/CA) is a Department of Energy (DOE) facility. The management and operations of the facility are under a contract with the DOE's National Nuclear Security Administration (NNSA). On May 1, 2017, the name of the management and operating contractor changed from Sandia Corporation to National Technology & Engineering Solutions of Sandia, LLC (NTESS). The DOE, NNSA, Sandia Field Office administers the contract and oversees contractor operations at the site. DOE and its management and operating contractor for Sandia are committed to safeguarding environmental protection, compliance, and sustainability and to ensuring the validity and accuracy of the monitoring data presented in this Annual Site Environmental Report. This Site Environmental Report for 2019 was prepared in accordance with DOE Order 231.1B, Environment, S afro and Health &potting (DOE 2012). The report provides a summary of environmental monitoring information and compliance activities that occurred at SNL/CA during calendar year 2019, unless noted otherwise. General site and environmental program information is also included.

54 ENVIRONMENTAL SCIENCES↗

Site Environmental Report for 2020, Sandia National Laboratories, California

Sandia National Laboratories, California (SNL/CA) is a Department of Energy (DOE) facility. The management and operations of the facility are under a contract with the DOE's National Nuclear Security Administration (NNSA). On May 1, 2017, the name of the management and operating contractor changed from Sandia Corporation to National Technology & Engineering Solutions of Sandia, LLC (NTESS). The DOE, NNSA, Sandia Field Office administers the contract and oversees contractor operations at the site. DOE and its management and operating contractor for Sandia are committed to safeguarding environmental protection, compliance, and sustainability and to ensuring the validity and accuracy of the monitoring data presented in this Annual Site Environmental Report. This Site Environmental Report for 2020 was prepared in accordance with DOE Order 231.1B, Environment, Safety and Health Reporting (DOE 2012). The report provides a summary of environmental monitoring information and compliance activities that occurred at SNL/CA during calendar year 2020, unless noted otherwise. General site and environmental program information is also included.

54 ENVIRONMENTAL SCIENCES↗

Measurement Adequacy for Monitoring Data Center Oscillations

Artificial intelligence (AI) training data centers with periodic load profiles can induce sustained grid oscillations across a wide frequency range, making accurate monitoring essential for reliable power system operation. This report evaluates the adequacy of existing measurement systems for monitoring such oscillations, focusing on phasor measurement units (PMUs) and point-on-wave (POW) measurement systems. The analysis shows that while PMUs are highly effective for monitoring low-frequency electromechanical oscillations, they have inherent limitations in accurately representing higher-frequency oscillations due to constraints imposed by reporting rates and the bandwidth of phasor estimation filters. Even when configured with higher reporting rates, the filtering inherent in the phasor estimation process can significantly attenuate oscillation magnitudes, potentially leading to underestimation of oscillatory behavior. This has important implications for compliance and performance monitoring of large loads. To address the limitations associated with PMU-based monitoring, the report examines the use of high-resolution POW measurements, which can capture oscillations across a broader frequency range. However, continuous POW monitoring introduces practical challenges related to large data volumes, communication bandwidth, and real-time data processing. For this reason, the report also discusses emerging approaches that use POW measurements as a complementary capability alongside PMUs to improve observability of oscillations from large data center loads.

47 OTHER INSTRUMENTATION↗

Online and Offline Analytical Techniques to Quantify Chloride Salts

This report serves as the deliverable for Milestone- M3FT-26AN080502017: Summary of Accomplishments for Online and Offline Analytical Qualification of Chloride Fuel Salts. The qualification of chloride fuel salts is a critical challenge for the development and deployment of molten salt reactors (MSRs), requiring precise control and verification of chemical and isotopic composition to ensure predictable neutronics, manageable radiological behavior, and safe plant operation. Currently, there is no universally accepted standard for fuel salt qualification, particularly for chloride-based systems, which underscores the need for robust, science-based analytical methodologies. This report presents a comprehensive evaluation of both online and offline techniques for quantifying chloride fuel salts, including multielectrode array voltammetry, differential thermal analysis (DTA) probes, inert gas fusion (IGF) analyzers, and gamma spectrometry using the Mirion NAIS-2x2 NaI(Tl) detector. The integration of these methods enables real-time monitoring of actinide concentrations, redox state, and thermophysical properties, as well as high-precision measurement of impurities and isotopic composition. The acquisition of advanced instruments such as the Bruker Leonardo G6 for IGF and the Mirion NaI detector enhances analytical capabilities, supporting the establishment of operational envelopes and impurity thresholds. These approaches provide essential data for neutronic impact evaluation, feedstock documentation, and compliance with nuclear safety standards. The methodologies developed and validated in this report lay the groundwork for future standardized protocols, bridging the gap between laboratory research and commercial reactor operation, and advancing the safe and efficient deployment of chloride-fueled MSRs.

Polke, Amber↗

U.S. State Renewables Portfolio & Clean Electricity Standards: 2024 Status Update [Slides]

This report provides an overview and status update on U.S. state renewables portfolio standards (RPS) and has been expanded from previous editions to also cover 100% clean electricity standards (CES) adopted by a growing number of states. The report, published in slide-deck form along with accompanying data files, describes recent legislative revisions, key policy design features, compliance with interim targets, past and projected impacts on clean electricity development, and compliance costs. The 2023 edition presents historical data through year-end 2023 and projections out to 2050. Key trends from this edition of the report include the following: -Evolution of state RPS and CES programs: States continue to refine and revise their RPS policies, often by adopting higher targets and/or broader CES policies. Among the 29 states plus DC with an RPS, 16 have RPS targets of at least 50% of retail sales, and 4 states have a 100% RPS. An additional 16 states have adopted a broader 100% CES. -Historical impacts on renewables development: Almost half of all growth in U.S. renewable electricity (RE) generation and capacity since 2000 is nominally associated with state RPS requirements. That percentage has declined over time to 35% of all U.S. RE capacity additions in 2023, though in certain regions RPS policies continue to play a dominant role in driving RE growth. -Future RPS and CES demand and incremental needs: The combined demand for clean electricity from RPS and CES policies will grow from roughly 500 TWh today to 1700 TWh by 2050. Accounting for current supplies—including existing nuclear and hydroelectric generation eligible for CES targets—RPS and CES policies will require 900 TWh of new clean electricity by 2050, equivalent to roughly 3x the historical rate of RPS-buildout. -RPS target achievement to-date: States have generally met their interim RPS targets in recent years, with only a few exceptions reflecting unique, state-specific issues. Most CES targets are not yet in force, and so little compliance experience to-date. -REC pricing trends: Prices for NEPOOL Class I RECs remained at roughly $\$40$/MWh over the past year, just below ACP rates in the larger state markets, while PJM Tier I REC prices continued to rise, reaching $\$35$/MWh by year-end 2023 and surpassing ACP levels in some states. Prices for solar RECs remained relatively stable, and continue to exhibit wide variation across states, with the highest prices ($200-450/MWh) in NJ, MA, and DC. -RPS compliance costs: RPS compliance costs average roughly 4% of retail electricity bills across RPS states, though vary widely from state to state, with the highest costs (11-12% of retail bills) in states with solar carve-outs and high SREC prices.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

U.S. State Renewables Portfolio & Clean Electricity Standards: 2023 Status Update [Slides]

This report provides an overview and status update on U.S. state renewables portfolio standards (RPS) and has been expanded from previous editions to also cover 100% clean electricity standards (CES) adopted by a growing number of states. The report, published in slide-deck form along with accompanying data files, describes recent legislative revisions, key policy design features, compliance with interim targets, past and projected impacts on clean electricity development, and compliance costs. The 2023 edition presents historical data through year-end 2022 and projections out to 2050. Key trends from this edition of the report include the following: -Evolution of state RPS and CES programs: States continue to refine and revise their RPS policies, often by adopting higher targets and/or broader CES policies. Among the 29 states plus DC with an RPS, 16 states have RPS targets of at least 50% of retail sales, and 17 states have a 100% CES or RPS target. -Historical impacts on renewables development: Roughly half of all growth in U.S. renewable electricity (RE) generation and capacity since 2000 is associated with state RPS requirements, though that percentage has declined in recent years, representing 30% of all U.S. RE capacity additions in 2022. Within some regions, particularly the Northeast and Mid-Atlantic, RPS policies play a more central role in motivating RE growth. -Future RPS and CES demand and incremental needs: RPS and CES policies will require roughly 300 terawatt-hours (TWh) of additional clean electricity supply by 2030 and 800 TWh by 2050, requiring total U.S. non-hydro RE generation to reach 28% of electricity sales by 2050 (compared to 17% today). This amounts to roughly one-quarter of EIA’s projected RE growth through 2050. -RPS target achievement to-date: States have generally met their interim RPS targets in recent years, with only a few exceptions reflecting unique, state-specific issues. Most CES targets are not yet in force. -Renewable energy certificate (REC) pricing trends: Prices for NEPOOL Class I RECs remained at roughly $\$40$ /MWh over the past year, just below alternative compliance payment (ACP) rates in the larger state markets, while PJM Tier I REC prices continued to rise, reaching $\$30$ /MWh by year-end. Prices for solar RECs (or SRECs) remained relatively stable, and continue to exhibit wide variation across states, with the highest prices ($\$200-450$ /MWh) in NJ, MA, and DC. -RPS compliance costs: RPS compliance costs average roughly 3.5% of retail electricity bills across RPS states, though vary widely from state to state, with the highest costs (8-12% of retail bills) in states with solar carve-outs and high SREC prices.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Distributed Wind and Impacts of FERC Order No. 2222 Implementation

In September of 2020, FERC issued Order No. 2222, directing ISOs to adjust their long-standing tariffs and participation models to enable the operation of distributed energy resource (DER) aggregators in wholesale energy markets. The rule sought to bring wholesale markets under its jurisdiction up to speed with existing expansion of DERs across the United States and to capture the potential benefits that these technologies can provide. This report describes the implementation of FERC Order No. 2222 and the compliance plans that have been submitted so far, attempt to understand the potential impact the rule may have on distributed wind, and provide opportunities for future work to analyze and encourage deployment under these policy conditions. There is an information gap for the type of market interactions distributed wind may have or how it could be best deployed in DER aggregations under future market conditions. There is significant potential for profitable deployment of distributed wind in states that are served by ISOs and covered under Order No. 2222. Distributed wind and other DERs provide local energy that does not need to travel those distances and avoids the losses typically associated with long-distance energy transmission. Deployment of distributed wind can benefit communities that exist away from large load centers by providing local, clean, and affordable energy. Aggregating DERs that include distributed wind could provide these benefits across multiple far-ranging communities if they have access to participate in wholesale markets. A new baseline valuation of distributed wind in areas covered by Order No. 2222 is required to accurately gauge where it is profitable and how it can compete or complement existing or future DER deployment, including as part of an aggregate.

17 WIND ENERGY↗