Search NASA⌕ Search

SEARCH · Search NASA

Results for “contingency control”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 217 records · Page 12

Designing an Alternate Mission Operations Control Room

The Huntsville Operations Support Center (HOSC) is a multi-project facility that is responsible for 24x7 real-time International Space Station (ISS) payload operations management, integration, and control and has the capability to support small satellite projects and will provide real-time support for SLS launches. The HOSC is a serviceoriented/ highly available operations center for ISS payloads-directly supporting science teams across the world responsible for the payloads. The HOSC is required to endure an annual 2-day power outage event for facility preventive maintenance and safety inspection of the core electro-mechanical systems. While complete system shut-downs are against the grain of a highly available sub-system, the entire facility must be powered down for a weekend for environmental and safety purposes. The consequence of this ground system outage is far reaching: any science performed on ISS during this outage weekend is lost. Engineering efforts were focused to maximize the ISS investment by engineering a suitable solution capable of continuing HOSC services while supporting safety requirements. The HOSC Power Outage Contingency (HPOC) System is a physically diversified compliment of systems capable of providing identified real-time services for the duration of a planned power outage condition from an alternate control room. HPOC was designed to maintain ISS payload operations for approximately three continuous days during planned HOSC power outages and support a local Payload Operations Team, International Partners, as well as remote users from the alternate control room located in another building. This paper presents the HPOC architecture and lessons learned during testing and the planned maiden operational commissioning. Additionally, this paper documents the necessity of an HPOC capability given the unplanned HOSC Facility power outage on April 27th, 2011, as a result of the tornado outbreak that damaged the electrical grid to such a degree that significantly inhibited the Tennessee Valley Authority's ability to transmit electricity throughout the North Alabama region.

Montgomery, Patty↗

Designing an Alternate Mission Operations Control Room

The Huntsville Operations Support Center (HOSC) is a multi-project facility that is responsible for 24x7 real-time International Space Station (ISS) payload operations management, integration, and control and has the capability to support small satellite projects and will provide real-time support for SLS launches. The HOSC is a service-oriented/ highly available operations center for ISS payloads-directly supporting science teams across the world responsible for the payloads. The HOSC is required to endure an annual 2-day power outage event for facility preventive maintenance and safety inspection of the core electro-mechanical systems. While complete system shut-downs are against the grain of a highly available sub-system, the entire facility must be powered down for a weekend for environmental and safety purposes. The consequence of this ground system outage is far reaching: any science performed on ISS during this outage weekend is lost. Engineering efforts were focused to maximize the ISS investment by engineering a suitable solution capable of continuing HOSC services while supporting safety requirements. The HOSC Power Outage Contingency (HPOC) System is a physically diversified compliment of systems capable of providing identified real-time services for the duration of a planned power outage condition from an alternate control room. HPOC was designed to maintain ISS payload operations for approximately three continuous days during planned HOSC power outages and support a local Payload Operations Team, International Partners, as well as remote users from the alternate control room located in another building.

Montgomery, Patty↗

Feasibility Study of Two Candidate Reaction Wheel/thruster Hybrid Control Architecture Designs for the Cassini Spacecraft

As the first spacecraft to achieve orbit at Saturn in 2004, Cassini has collected science data throughout its four-year prime mission (2004-08), and has since been approved for a first and second extended mission through 2017. Cassini carries a set of three "fixed" reaction wheels and a backup reaction wheel (reaction wheel #4) is mounted on top of an articulable platform. If necessary, this platform could be articulated to orient the backup reaction wheel with the degraded wheel. The reaction wheels are used primarily for attitude control when precise and stable pointing of a science instrument such as the narrow angle camera is required. In 2001-02, reaction wheel #3 exhibited signs of bearing cage instability. As a result, reaction wheel #4 was articulated to align with reaction wheel #3. Beginning in July 2003, Cassini was controlled using wheel #1, #2, and #4. From their first use in the spring of 2000 until today, reaction wheels #1 and #2 have accumulated more than3.5 billions revolutions each. As such, in spite of very carefully management of the wheel spin rates by the mission operation team, there are some observed increases in the drag torque of the wheels' bearings. Hence, the mission operations team must prepare for the contingency scenario in which the reaction wheel #1 (in addition to wheel #3) had degraded. In this hypothetical fault scenario, the two remaining reaction wheels (#2 and #4) will not be able to provide precise and stable three-axis control of the spacecraft. In this study, we evaluate the feasibility of controlling Cassini using the two remaining reaction wheels and four thrusters to meet the science pointing requirements for two key science operational modes: the Optical Remote Sensing and Downlink, Fields, Particles, & Waves operation modes. The performance (e.g., pointing control error, pointing stability, hydrazine consumption rate, etc.) of the hybrid controllers in both operations scenarios will be compared with those achieved using an all-thruster controller design. Strength and weaknesses of the hybrid control architecture are assessed quantitatively.

Cassini↗

Teleoperator maneuvering system

The Teleoperator Maneuvering System (TMS) is a Shuttle launched, free-flying, remotely controlled reusable propulsive stage capable of performing spacecraft and payload placement services, retrieval functions, assembly/servicing support for large space systems, dexterous manipulator operations for planned or contingency satellite servicing, satellite viewing, and subsatellite science support. The basic TMS segments, subsystems and performance are described, beginning with the criteria and requirements derived from mission models. Examples of TMS benefits to the STS and user communities are demonstrated. TMS applications such as support and servicing of Space Station, materials processing and subsatellite missions are presented.

Turner, J. R.↗

Testing of Advanced Capabilities to Enable In-time Safety Management and Assurance for Future Flight Operations

In order to refine an initial Concept of Operations, explore Concepts of Use, and expose/validate requirements for future In-Time Aviation Safety Management Systems (IASMS), testing architectures were created, along with a set of capabilities and underlying information exchange protocols. These systems were conceived and developed based on hazards associated with two envisioned urban area flight domains: (1) highly autonomous small uncrewed aerial systems (sUAS) operating at low altitudes, and (2) highly autonomous air taxis. The initial scope of this development is described in [1]; this report provides an update, focusing on the subsequent developments and test activities. As stated in [1], it is important to note that there are many capabilities already in use by the industry (or soon to be in use) that will play critical roles in future IASMS designs. Those reported here were developed to address a gap in the current state-of-the-art regarding specific hazards/risks, and/or to allow for investigation of the interplay between and across hazard types — particularly regarding how overall safety risk can be reduced or managed effectively. Results of testing and development activities are organized by the operational phase wherein a particular capability would be employed (i.e., preflight, in-flight, and post-flight/off-line). Pre-flight: A set of capabilities were developed to help mitigate safety risk prior to flight (e.g., during flight and mission planning). Results of testing summarize (1) validation activities to raise the Technology Readiness Level (TRL) and (2) evaluation activities where the capabilities were applied to flight/mission planning procedures and used by operators/pilots. For the latter, flight plans were automatically assessed, and operators/pilots were notified of hazardous flight segments so as to enable adjustment of the flight plan and re-evaluation, and/or to better inform go/no-go decisions. Capabilities addressed hazards associated with power consumption, third-party risk, wind, navigation system performance, radiofrequency interference, and proximity to geo-spatial threats (e.g., buildings, trees, and no-fly zones). In-flight: Flight experiments tested capabilities that detect and respond to hazards encountered during flight. In the first series, safety hazards were monitored and assessed onboard, and system-generated mitigation maneuvers were recorded (but not acted upon by the vehicle). In the second series, mitigation maneuver commands directed the aircraft in response to safety hazards (i.e., auto-mitigation). The sUAS used for testing is described in full, as is the test architecture, which included commercial avionics, research avionics, and onboard software designed to detect, assess, and respond to hazards. The onboard system was designed as a run-time assurance framework, consistent with [2] and supportive of both supervisory and automated modes. The primary functions included: real-time risk assessment (RTRA), auto-pilot monitoring, constraint monitoring, and contingency select/triggering. RTRA performs integrated risk assessment considering data from several hazard-related monitors (e.g., battery, motors, navigation, communications, population density, and loss-of-control). Post-flight/off-line: Data monitored and recorded during flights can enable IASMS capabilities that execute after flights have completed (or “off-line”). These include: (1) the ability to identify anomalies and trends that may only be observable when comparing data spanning a number of similar flights; (2) the ability to update and validate pre-flight and in-flight capabilities and any underlying models to improve their performance; (3) the ability to report anomalies/off-nominals that may indicate design changes or maintenance actions are needed; and (4) the ability for humans involved in operations to report safety-relevant observations to help in understanding the flight data and/or the operational context of a flight. Progress on three such capabilities is summarized; the first investigates anomaly detection given a limited set of flight logs and applies an approach previously used for space operations. The second explores what could be identified using a larger set of flight logs, including from web-based forums where flight logs are posted by sUAS autopilot users. The third creates a new means of collecting information on UAS incidents and accidents via the Aviation Safety Reporting System (ASRS).

sUAS↗

Control Oriented Models for Co-Design: Technical Overview of MT HVDC, MVDC, and Solid State Transformer Building Blocks

The electric power system is shifting toward a power electronics–enabled grid, where converter based “building blocks” (e.g., high voltage direct current (HVDC) links, multi terminal HVDC (MT HVDC) networks, medium voltage DC (MVDC) links, and solid state transformers (SSTs)) provide fast, precise control of power flows, voltage, and frequency. This report develops and applies publicly shareable electromagnetic transient (EMT) and phasor models to examine how such building blocks can be composed and coordinated to support offshore wind integration, inter area transfers, feeder support, and resilience. Section 2 documents a modular multilevel converter (MMC)–based MT HVDC modeling framework and two use cases: a compact WSCC/IEEE 9 bus test system and a 240 bus “mini WECC” case with five offshore wind plants (OWFs). Phasor to EMT transfer, initialization, and sanity checks are summarized, and neutral demonstrations of normal and contingency operation are reported. Section 3 frames the problem of wind plant inertial frequency response (IFR): shaping energy release and recovery to improve nadir while avoiding aerodynamic stall; representative simulations illustrate the issues without disclosing proprietary control. Section 4 develops MVDC concepts through an IEEE 16 bus loop and an Olympic Peninsula case study that compares AC vs. MVDC corridors and shows how feeder headroom can be pooled via DC couplers. Section 5 surveys SST architectures and identifies a gap: scalable, communication free coordination of multiple SSTs for islanded feeder networks. Across the report, novel methods and configurations under separate publication and IP review are not disclosed; only topic oriented, replicable setups and non proprietary results are shown. These models and use cases are intended as foundations for future publications and co design studies on architecture, control, and coordination of PE enabled grids.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Skylab experiment performance evaluation manual. Appendix R: Experiment T020 foot controlled maneuvering unit (MSFC)

A series of analyses for experiment T020, foot controlled maneuvering unit (MSFC), to be used for evaluating the performance of the Skylab corollary experiments under preflight, inflight and post-flight conditions is reported. Experiment contingency plan procedure and malfunction analyses are presented in order to assist in making the experiment operationally successful.

Tonetti, B. B.↗

Experiences with neutral buoyance testing mockups

Contingency operations with neutral bouyancy simulation on a space platform is considered. Some task simulated are aft payload port deployment and retraction, removal and replacement of the control moment cyro, and deployment of the manual hand crank appendage. It is decided that crewmen can perform fine motor activities when simple aids are provided, certain tasks can be accomplished with less efforts when the crewman is afforded additional mobility, manual translation of large mass items is feasible, and that during the installation of replaceable units application of alignment indicators provide significant assistance to crewmen.

Dellacamera, B.↗

Development of a Two-Wheel Contingency Mode for the MAP Spacecraft

The Microwave Anisotropy Probe (MAP) is a follow-on mission to the Cosmic Background Explorer (COBE), and is currently collecting data from its orbit near the second Sun-Earth libration point. Due to limited mass, power, and financial resources, a traditional reliability concept including fully redundant components was not feasible for MAP. Instead, the MAP design employs selective hardware redundancy in tandem with contingency software modes and algorithms to improve the odds of mission success. One direction for such improvement has been the development of a two-wheel backup control strategy. This strategy would allow MAP to position itself for maneuvers and collect science data should one of its three reaction wheels fail. Along with operational considerations, the strategy includes three new control algorithms. These algorithms would use the remaining attitude control actuators-thrusters and two reaction wheels-in ways that achieve control goals while minimizing adverse impacts on the functionality of other subsystems and software.

Starin, Scott R.↗

An Autonomous Onboard Targeting Algorithm Using Finite Thrust Maneuvers

In earlier investigations, the adaptation and implementation of a modified two-level corrections process as the onboard targeting algorithm for the Trans-Earth Injection phase of Orion is presented. The objective of that targeting algorithm is to generate the times of ignition and magnitudes of the required maneuvers such that the desired state at entry interface is achieved. In an actual onboard flight software implementation, these times of ignition and maneuvers are relayed onto Flight Control for command and execution. Although this process works well when the burn durations or burn arcs are small, this might not be the case during a contingency situation when lower thrust engines are employed to perform the maneuvers. Therefore, a new version of the modified two-level corrections process is formulated to handle the case of finite burn arcs. This paper presents the development and formulation of that finite burn modified two-level corrections process which can again be used as an onboard targeting algorithm for the Trans-Earth Injection phase of Orion. Additionally, performance results and a comparison between the two methods are presented. The finite burn two-level corrector formulation presented here ensures the entry constraints at entry interface are still met without violating the available fuel budget, while still accounting for much longer burn times in its design.

Scarritt, Sara K.↗

An Autonomous Onboard Targeting Algorithm Using Finite Thrust Maneuvers

In earlier investigations, the adaptation and implementation of a modified two-level corrections (or targeting) process as the onboard targeting algorithm for the Trans-Earth Injection phase of Orion is presented. The objective of that targeting algorithm is to generate the times of ignition and magnitudes of the required maneuvers such that the desired state at entry interface is achieved. In an actual onboard flight software implementation, these times of ignition and maneuvers are relayed onto Flight Control for command and execution. Although this process works well when the burn durations or burn arcs are small, this might not be the case during a contingency situation when lower thrust engines are employed to perform the maneuvers. Therefore, a new model for the two-level corrections process is formulated here to accommodate finite burn arcs. This paper presents the development and formulation of the finite burn two-level corrector, used as an onboard targeting algorithm for the Trans-Earth Injection phase of Orion. A performance comparison between the impulsive and finite burn models is also presented. The present formulation ensures all entry constraints are met, without violating the available fuel budget, while allowing for low-thrust scenarios with long burn durations.

Scarritt, Sara K.↗

Airspace Automation Flight Tabletop Exercise

Interconnections of new systems are needed for airspace automation capabilities required in Urban Air Mobility (UAM). FAA Concept of Operations (CONOPS) V1.0 shows Provider of Services for UAM (PSU) at the center of the notional architecture; however, the functional role of the PSU in data exchange and the path to get there is unclear. In partnership with Wisk Aero, Avision, ANRA, Collins Aerospace, OneSky, SkyGrid, and AURA, the NASA National Campaign held discussions and tabletop exercises to test the functional allocations and work flows between an aircraft operator, airspace providers, Command and Control Communication Service Providers (C2CSP), and FAA air traffic in a real-world scenario. The exercise included preplanning and execution of a passenger mission with nominal, contingency, and conflict management scenarios for initial UAM operations. This working paper describes initial conditions for the flight tabletop exercise, exercise summaries, lessons learned, and recommendations for future work.

National Campaign↗

On-demand Command and Control of ASTERIA with Cloud-based Ground Station Services

ASTERIA (Arcsecond Space Telescope Enabling Research in Astrophysics) was a 6-unit CubeSat technology demonstration mission that deployed from the International Space Station on November 20th, 2017. After successfully completing its 90-day primary mission that demonstrated arcsecond-level line-of-sight pointing and focal plane thermal stability for exoplanet detection, it entered an extended mission performing onboard software demonstrations to mature technology both in space and on the ground. One of the technologies was a completely cloud-based ground system leveraging Amazon Web Services (AWS) Ground Station service. Announced in December 2018 and launched in May 2019, AWS Ground Station is a fully managed ground station service that aims to reduce the overhead associated with developing and maintaining ground system infrastructure throughout the mission lifecycle. AWS Ground Station makes available the suite of features required for any ground system in support of low-Earth orbit (LEO) and medium-Earth Orbit (MEO) satellite operations on-demand and without setting up or maintaining long-term contracts. Charges are incurred on a per-minute basis for antenna usage during scheduled tracks. Support is available for S-band uplink and downlink, along with X-band narrowband and wideband downlink. Missions that use the service may reserve tracks with any licensed AWS Ground Station antennas located across each service region and have direct access to any AWS services in support of mission operations. The cloud-based architecture built around the AWS Ground Station service greatly enhanced ASTERIA mission operations by enabling end-to-end pass automation, on-demand contact scheduling and contingency planning, along with more efficient data downlink through station availability and station-tostation handovers. It incorporated open-source software, particularly NASA's AMMOS Instrument Toolkit (AIT) and Open Mission Control Technologies (OpenMCT), along with the AWS application programming interfaces (API) to the Ground Station, Elastic Compute Cloud (EC2) and Simple Storage Service (S3) services. After showcasing operability in August 2019, the team continued using and improving this novel ground system architecture until the end of mission in December 2019. This paper describes the cloud-based ground system, how it was designed, tested, and evaluated with an inorbit spacecraft, the operational capabilities that it enabled, along with lessons learned and recommendations for future missions.

Fesq, Lorraine↗

Additive manufacturing and processing of architected materials

Architected materials are a unique and emerging class of materials where performance is fundamentally controlled by geometry at multiple length scales, from the nano- to the macroscale, rather than chemical composition alone. As a result, the realization of these remarkable materials is contingent upon the ability to faithfully reproduce the designed architecture. Furthermore, this presents fundamental challenges in fabrication due to the required three-dimensional complexity, multiple length scales, range of material constituents, possibility of multiple materials in a single architecture, and overall manufacturing throughput. Additive manufacturing (AM) processes can provide solutions to some of these challenges and are discussed in this article. Specifically, light-based and extrusion-based processes and associated materials are presented with an emphasis on recent developments, including volumetric additive manufacturing, and on-the-fly mixing of materials in extrusion-based printing systems. While remarkable advancements have been made in AM for architected materials, bringing these materials and processes to industrial realization remains a significant challenge.

36 MATERIALS SCIENCE↗

Solar-B X-ray Telescope (XRT) Concept Study Report

The X-ray observations from the Yohkoh SXT provided the greatest step forward in our understanding of the solar corona in nearly two decades. Expanding on the accomplishments of Yohkoh, we believe that the scientific objectives of the Solar-B mission are achieved with a significantly improved X-ray telescope (XRT) similar to the SXT. The Solar-B XRT will have twice the spatial resolution and a broader temperature response, while building on the knowledge gained from the successful Yohkoh mission. We present the scientific justification for this view, discuss the instrumental requirements that flow from the scientific objectives, and describe the instrumentation to meet these requirements. We then provide a detailed discussion of the design activities carried out during Phase A, noting the conclusions that were reached in terms of their implications for the detailed design activities which are now commencing. Details of the instrument that have changed as a result of the Phase A studied are specifically noted, and areas of concern going into Phase B are highlighted. XRT is a grazing-incidence (GI) modified Wolter I X-ray telescope, of 35cm inner diameter and 2.7m focal length. The 2048x2048 back-illuminated CCD (now an ISAS responsibility) has 13.5 micron pixels, corresponding to 1.0 arcsec and giving full Sun field of view. This will be the highest resolution GI X-ray telescope ever flown for Solar coronal studies, and it has been designed specifically to observe both the high and low temperature coronal plasma. A small optical telescope provides visible light images for co-alignment with the Solar-B optical and EUV instruments. The XRT science team is working in close cooperation with our Japanese colleagues in the design and construction of this instrument. All of the expertise and resources of the High Energy and Solar/Stellar Divisions of the Center for Astrophysics are being made available to this program, and our team will carry its full share of responsibility for mission operations, data reduction and education and public outreach. All aspects of the XRT design were reviewed during Phase A. The study focussed particularly on those aspects that have the greatest affect on instrument performance and extended lifetime, on the image quality error budget, and on the camera (mechanical and electrical) interface and the instrument mounting interfaces. The present instrument design differs in some details from that originally proposed. Selection of the XRT for Phase A study was contingent upon the removal of the camera and its associated electronics, and the acceptance of a stringent cost cap. The removal of the electronics left the XRT without control electronics for the instrument mechanisms. A mechanism controller was therefore added. The removal of the camera resulted in major complications to the integration and test plan. After many discussions, it was decided that the system would be less expensive, and the risk of unacceptable performance lower, if we include a focus mechanism. The remainder of the XRT design baseline matches the proposed configuration. Data requirements for the XRT are driven by the science plans, which are based on the physical processes in the solar outer atmosphere. Discussions to date of the XRT observing plan, both alone and in conjunction with the other Solar-B instruments, shows that the XRT needs 2 Gbits of on-board storage, at least one circulating buffer of 640 Mbits, and twelve 10- minute downlinks per day in order to carry out its required programs.

Golub, Leon↗

Medical countermeasures for extraterrestrial environments: Current status and future prospects with focus on acute injuries

In all space exploratory activities involving humans there are associated risks to health and well-being. Exposure to ionizing radiation represents one of the more serious health concerns. Although medical issues can arise shortly following the rare acute exposures, the more likely radiation-associated injuries will manifest in a delayed fashion following sub-acute exposures or protracted exposures to relatively low radiation doses. The radiological conditions that present these health risks during extraterrestrial space travel are presented in this article, along with current physical and medical countermeasures for such exposure contingencies. The aim of this article is to discuss radiation medical countermeasures that may be considered for future space exploration and travel. Biomedical advances have occurred toward the control and minimization of acute, sub-acute, and fractionated radiation exposure injuries, whether they stem from intentional application of radio-therapeutic procedures or unintentional, accidental terrestrial-based exposures. Those advances, based largely on novel bioengineering, genetic, and combinatorial pharmaceutical strategies, are briefly reviewed here, along with the promising prospects of additional, new and improved medical countering systems/agents that will be forthcoming with additional research and development efforts.

Acute/chronic radiation injuries↗

On-demand Command and Control of ASTERIA with Cloud-based Ground Station Services

ASTERIA (Arcsecond Space Telescope Enabling Research in Astrophysics) was a 6-unit CubeSat technology demonstration mission that deployed from the International Space Station on November 20th, 2017. After successfully completing its 90-day primary mission that demonstrated arcsecond-level line-of-sight pointing and focal plane thermal stability for exoplanet detection, it entered an extended mission performing onboard software demonstrations to mature technology both in space and on the ground. One of the technologies was a completely cloud-based ground system leveraging Amazon Web Services (AWS) Ground Station service.Announced in December 2018 and launched in May 2019, AWS Ground Station is a fully managed ground station service that aims to reduce the overhead associated with developing and maintaining ground system infrastructure throughout the mission lifecycle. AWS Ground Station makes available the suite of features required for any ground system in support of low-Earth orbit (LEO) and medium-Earth Orbit (MEO) satellite operations on-demand and without setting up or maintaining long-term contracts. Charges are incurred on a per-minute basis for antenna usage during scheduled tracks. Support is available for S-band uplink and downlink, along with X-band narrowband and wideband downlink. Missions that use the service may reserve tracks with any licensed AWS Ground Station antennas located across each service region and have direct access to any AWS services in support of mission operations.The cloud-based architecture built around the AWS Ground Station service greatly enhanced ASTERIA mission operations by enabling end-to-end pass automation, on-demand contact scheduling and contingency planning, along with more efficient data downlink through station availability and station-to-station handovers. It incorporated open-source software, particularly NASA's AMMOS Instrument Toolkit (AIT) and Open Mission Control Technologies (OpenMCT), along with the AWS application programming interfaces (API) to the Ground Station, Elastic Compute Cloud (EC2) and Simple Storage Service (S3) services. After showcasing operability in August 2019, the team continued using and improving this novel ground system architecture until the end of mission in December 2019. This paper describes the cloud-based ground system, how it was designed, tested, and evaluated with an in-orbit spacecraft, the operational capabilities that it enabled, along with lessons learned and recommendations for future missions.

Fesq, Lorraine↗

ATS-6 engineering performance report. Volume 2: Orbit and attitude controls

Attitude control is reviewed, encompassing the attitude control subsystem, spacecraft attitude precision pointing and slewing adaptive control experiment, and RF interferometer experiment. The spacecraft propulsion system (SPS) is discussed, including subsystem, SPS design description and validation, orbital operations and performance, in-orbit anomalies and contingency operations, and the cesium bombardment ion engine experiment. Thruster failure due to plugging of the propellant feed passages, a major cause for mission termination, are considered among the critical generic failures on the satellite.

Wales, R. O.↗