Search NASA⌕ Search

SEARCH · Search NASA

Results for “contingency control”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 217 records · Page 12

Deep Learning-Based Negotiation Strategy Selection for Cooperative Conflict Resolution in Urban Air Mobility

This paper presents a collaborative conflict resolution technique using deep neural network-based intelligent search of the solution space. This approach offers a rapid convergence to a mutually acceptable solution for real-time conflict resolution, suitable for urban air mobility operations. Furthermore, the presented technique allows operational flexibility to the urban air mobility agents where these agents can collaboratively devise the solution via integrative negotiation, based on their local utility functions, as long as such a solution does not violate the global safety thresholds. The presented machine-to-machine negotiation method is built on our prior work on holistic assessment of the airspace and potential conflict detection implemented at-the-edge, onboard the unmanned aircraft systems. This paper extends the prior work to augment decision-making at-the-edge, thereby, promising a true distributed control architecture for urban air mobility. In this approach, each agent (a) builds a potential in-flight conflict map, (b) identifies the conflicting agents, (c) dynamically prepares a list of alternatives based on its current utility functions, (d) negotiates with the conflicting agents to pick one of these alternatives, and (e) implements the negotiated alternative to mutually resolve the conflict. Note that such an approach does not require a contingency plan to be made pre-flight, as the conflict resolution strategies are decided and negotiated in real time based on the present state of the agent. The contingency plan, if available, can serve as an input to the real-time conflict resolution strategy formulation, and also can be used as a fallback plan in case the negotiation fails and the impacted agents need to switch to a rule-based/supervisory resolution mode from the discussed distributed resolution mode. The presented collaborative negotiation-based conflict resolution technique incorporates a time-dependent reward function to catalyze collaborative resolution by incentivizing the agents with local and global rewards beneficial to their business operations.

Advanced Air Mobility↗

Integration of On-board EOS Schedule Revision with Space Communication Emulation System

The need for on-board decision-making for planning science observations on Earth Observing Satellites is based on the fact that the desirability of acquiring an image can change dynamically, because of changes in meteorological conditions (e.g. cloud cover), unforeseen events such as fires, floods, or volcanic eruptions, or unexpected changes in satellite or ground station capability. In such cases, satellite resources, such as power and SSR capacity can potentially be better utilized taking another image that is of higher quality. Currently, typical Earth observing satellites cannot communicate directly with each other, and can only communicate with ground stations about 5% to 10% of the time. Because of the limited communication windows, as well as the cost and effort that would need to be expended in revising a mission schedule, a ground-based scheduler would have little or no opportunity to revise the schedule in response to the contingencies that may arise. For this reason, a distributed science planning system combining a ground-based scheduler with on-board schedule revision capabilities is warranted. This paper will describe algorithms for on-board decision-making for science planning and their integration with the advanced satellite control and communications technology developed at the Space Communication Emulation Facility (SCEF) at NASA Glenn Research Center. Our objective of demonstrating how advanced communications and scheduling technology can be combined to improve the scientific utility of images acquired by Earth observing systems will be discussed via a description of a number of realistic flight scenarios.

Khatib, Lina↗

Creating Formal Characterizations of Routine Contingency Management in Commercial Aviation

The identification, modelling, and analysis of root causes of accidents and incidents dominate conventional safety management approaches. However, the effect of humans’ safety-producing behavior on the overall resilience of the system is often neglected. Additionally, emerging aviation markets are giving rise to concepts of operation, such as urban air mobility and optionally piloted air cargo operations, that are leading to a shift in locus of control between humans and automation. Without an understanding of the human contribution to safety, it is difficult to assess the effects of these novel role allocations on overall system safety. In this work, safety-producing behaviors are identified and abstracted into resilient performance strategies. Production rules that encapsulate these strategies are then generated and classified in the Soar cognitive architecture. The strategies are then applied to a remotely-operated air cargo example to demonstrate how safe learning is facilitated. The learned rules and strategies are then formally verified.

Safety Critical Systems↗

An Evidence-based Approach to Developing a Management Strategy for Medical Contingencies on the Lunar Surface: The NASA/Haughton-Mars Project (HMP) 2006 Lunar Medical Contingency Simulation at Devon Island

The lunar architecture for future sortie and outpost missions will require humans to serve on the lunar surface considerably longer than the Apollo moon missions. Although the Apollo crewmembers sustained few injuries during their brief lunar surface activity, injuries did occur and are a concern for the longer lunar stays. Interestingly, lunar medical contingency plans were not developed during Apollo. In order to develop an evidence-base for handling a medical contingency on the lunar surface, a simulation using the moon-Mars analog environment at Devon Island, Nunavut, high Canadian Arctic was conducted. Objectives of this study included developing an effective management strategy for dealing with an incapacitated crewmember on the lunar surface, establishing audio/visual and biomedical data connectivity to multiple centers, testing rescue/extraction hardware and procedures, and evaluating in suit increased oxygen consumption. Methods: A review of the Apollo lunar surface activities and personal communications with Apollo lunar crewmembers provided the knowledge base of plausible scenarios that could potentially injure an astronaut during a lunar extravehicular activity (EVA). Objectives were established to demonstrate stabilization and transfer of an injured crewmember and communication with ground controllers at multiple mission control centers. Results: The project objectives were successfully achieved during the simulation. Among these objectives were extraction from a sloped terrain by a two-member crew in a 1 g analog environment, establishing real-time communication to multiple centers, providing biomedical data to flight controllers and crewmembers, and establishing a medical diagnosis and treatment plan from a remote site. Discussion: The simulation provided evidence for the types of equipment and methods for performing extraction of an injured crewmember from a sloped terrain. Additionally, the necessary communications infrastructure to connect multiple centers worldwide was established from a remote site. The surface crewmembers were confronted with a number of unexpected scenarios including environmental, communications, EVA suit, and navigation challenges during the course of the simulation which provided insight into the challenges of carrying out a medical contingency in an austere environment. The knowledge gained from completing the objectives will be incorporated into the exploration medical requirements involving an incapacitated astronaut on the lunar surface.

Scheuring, R. A.↗

Manned space flight nuclear system safety. Volume 4: Space shuttle nuclear system transportation. Part 1: Space shuttle nuclear safety

An analysis of the nuclear safety aspects (design and operational considerations) in the transport of nuclear payloads to and from earth orbit by the space shuttle is presented. Three representative nuclear payloads used in the study were: (1) the zirconium hydride reactor Brayton power module, (2) the large isotope Brayton power system and (3) small isotopic heat sources which can be a part of an upper stage or part of a logistics module. Reference data on the space shuttle and nuclear payloads are presented in an appendix. Safety oriented design and operational requirements were identified to integrate the nuclear payloads in the shuttle mission. Contingency situations were discussed and operations and design features were recommended to minimize the nuclear hazards. The study indicates the safety, design and operational advantages in the use of a nuclear payload transfer module. The transfer module can provide many of the safety related support functions (blast and fragmentation protection, environmental control, payload ejection) minimizing the direct impact on the shuttle.

Source record↗

Planning the Voyager spacecraft's mission to Uranus

The application of the systems engineering process to the planning of the Voyager spacecraft mission is described. The Mission Planning Office prepared guidelines that controlled the use of the project and multimission resources and spacecraft consumables in order to obtain valuable scientific data at an acceptable risk level. Examples of mission planning which are concerned with the design of the Deep Space Network antenna, the uplink window for transmitting computer command subsystem loads, and the contingency and risk assessment functions are presented.

Plagemann, Stephen H.↗

Operational Experience with Long Duration Wildfire Mapping: UAS Missions Over the Western United States

The National Aeronautics and Space Administration, United States Forest Service, and National Interagency Fire Center have developed a partnership to develop and demonstrate technology to improve airborne wildfire imaging and data dissemination. In the summer of 2007, a multi-spectral infrared scanner was integrated into NASA's Ikhana Unmanned Aircraft System (UAS) (a General Atomics Predator-B) and launched on four long duration wildfire mapping demonstration missions covering eight western states. Extensive safety analysis, contingency planning, and mission coordination were key to securing an FAA certificate of authorization (COA) to operate in the national airspace. Infrared images were autonomously geo-rectified, transmitted to the ground station by satellite communications, and networked to fire incident commanders within 15 minutes of acquisition. Close coordination with air traffic control ensured a safe operation, and allowed real-time redirection around inclement weather and other minor changes to the flight plan. All objectives of the mission demonstrations were achieved. In late October, wind-driven wildfires erupted in five southern California counties. State and national emergency operations agencies requested Ikhana to help assess and manage the wildfires. Four additional missions were launched over a 5-day period, with near realtime images delivered to multiple emergency operations centers and fire incident commands managing 10 fires.

Hall, Philip↗

Development of a Smart Release Algorithm for Mid-Air Separation of Parachute Test Articles

The Crew Exploration Vehicle Parachute Assembly System (CPAS) project is currently developing an autonomous method to separate a capsule-shaped parachute test vehicle from an air-drop platform for use in the test program to develop and validate the parachute system for the Orion spacecraft. The CPAS project seeks to perform air-drop tests of an Orion-like boilerplate capsule. Delivery of the boilerplate capsule to the test condition has proven to be a critical and complicated task. In the current concept, the boilerplate vehicle is extracted from an aircraft on top of a Type V pallet and then separated from the pallet in mid-air. The attitude of the vehicles at separation is critical to avoiding re-contact and successfully deploying the boilerplate into a heatshield-down orientation. Neither the pallet nor the boilerplate has an active control system. However, the attitude of the mated vehicle as a function of time is somewhat predictable. CPAS engineers have designed an avionics system to monitor the attitude of the mated vehicle as it is extracted from the aircraft and command a release when the desired conditions are met. The algorithm includes contingency capabilities designed to release the test vehicle before undesirable orientations occur. The algorithm was verified with simulation and ground testing. The pre-flight development and testing is discussed and limitations of ground testing are noted. The CPAS project performed a series of three drop tests as a proof-of-concept of the release technique. These tests helped to refine the attitude instrumentation and software algorithm to be used on future tests. The drop tests are described in detail and the evolution of the release system with each test is described.

Moore, James W.↗

Assured Contingency Landing Management for Advanced Air Mobility

Advanced Air Mobility (AAM) is quickly developing as a new air transportation system that moves people and packages in the regions previously not / less served by the current aviation systems. Such AAM must operate safely despite the potential to encounter hazards and experience anomalies and failures in-flight. It becomes especially important to have systematic auto-mitigation strategies to perform safe contingency actions in AAM flight operations, as pilots have limited Situational Awareness (SA) and limited time to make prompt decisions when encountering failures/anomalies in high-density low altitude airspace. This paper presents Assured Contingency Landing Management (ACLM) with an online landing strategy selection to decide between the following three options when a contingency landing is required: (1) Return-to-launch landing site, (2) Land immediately at a nearby clear but unprepared site, (3) Land at a prepared landing site from the approximate footprint. Our presented algorithm shows a real-time auto-mitigation loop with multiple threads that run simultaneously to check controllability, reachability, and intermediate decisions to hold/ loiter or continue the flight plan as the landing strategy solution is being computed. Case study simulation is demonstrated with the safety-critical propulsion system and battery system and shows how different failure scenarios impact the landing strategy selection.

Autonomous Mitigation↗

Role of the manned maneuvering unit for the Space Station

The performance specifications to be realized in the Manned Maneuvering Unit (MMU) for Space Station operations will be the culmination of design efforts which began during the Gemini project. The types of MMUs which have been built and tested over the past two decades are described, including handheld, jet shoe, and initial rigid backpack configurations. Efforts to enhance the control laws and human factors aspects of the Skylab MMU to meet long-duration, flexible use Space Station requirements are summarized, noting the successes and deficiencies with the Shuttle MMU. The design requirements which must be met to allow the Space Station MMU to be used to perform rescue, transportation, inspection, assembly, contingency, and programmatic missions are explored.

Whitsett, C. E.↗

Illumination requirements for operating a space remote manipulator

Critical issues and requirements involved in illuminating remote manipulator operations in space help establish engineering designs for these manipulators. A remote manipulator is defined as any mechanical device that is controlled indirectly or from a distance by a human operator for the purpose of performing potentially dangerous or hazardous tasks to increase safety, reliability, and efficiency. Future space flights will rely on remote manipulators for a variety of tasks including satellite repair and servicing, structural assembly, data collection and analysis, and performance of contingency tasks. Carefully designed illumination of these manipulators will assure that these tasks will be completed efficiently and successfully. Studies concerning the influence of illumination on operation of a remote manipulator are few. Available results show that illumination can influence how successfully a human operates a remote manipulator. The intent of this study was to more fully examine this topic.

Chandlee, George O.↗

Backup Attitude Control Algorithms for the MAP Spacecraft

The Microwave Anisotropy Probe (MAP) is a follow-on to the Differential Microwave Radiometer (DMR) instrument on the Cosmic Background Explorer (COBE) spacecraft. The MAP spacecraft will perform its mission, studying the early origins of the universe, in a Lissajous orbit around the Earth-Sun L(sub 2) Lagrange point. Due to limited mass, power, and financial resources, a traditional reliability concept involving fully redundant components was not feasible. This paper will discuss the redundancy philosophy used on MAP, describe the hardware redundancy selected (and why), and present backup modes and algorithms that were designed in lieu of additional attitude control hardware redundancy to improve the odds of mission success. Three of these modes have been implemented in the spacecraft flight software. The first onboard mode allows the MAP Kalman filter to be used with digital sun sensor (DSS) derived rates, in case of the failure of one of MAP's two two-axis inertial reference units. Similarly, the second onboard mode allows a star tracker only mode, using attitude and derived rate from one or both of MAP's star trackers for onboard attitude determination and control. The last backup mode onboard allows a sun-line angle offset to be commanded that will allow solar radiation pressure to be used for momentum management and orbit stationkeeping. In addition to the backup modes implemented on the spacecraft, two backup algorithms have been developed in the event of less likely contingencies. One of these is an algorithm for implementing an alternative scan pattern to MAP's nominal dual-spin science mode using only one or two reaction wheels and thrusters. Finally, an algorithm has been developed that uses thruster one shots while in science mode for momentum management. This algorithm has been developed in case system momentum builds up faster than anticipated, to allow adequate momentum management while minimizing interruptions to science. In this paper, each mode and algorithm will be discussed, and simulation results presented.

ODonnell, James R., Jr.↗

Invariance and stability for bounded uncertain systems.

The positive limit sets of the solutions of a contingent differential equation are shown to possess an invariance property. In this connection the 'invariance principle' in the theory of Lyapunov stability is extended to systems with unknown, bounded, time-varying parameters, and thus to a large and important class of nonautonomous systems. Asymptotic stability criteria are obtained and applied to guaranteed cost control problems.

Peng, T. K. C.↗

Spacesuit Portable Life Support System Breadboard (PLSS 1.0) Development and Test Results

A multi-year effort has been carried out at the Johnson Space Center to develop an advanced EVA PLSS design intended to further the current state of the art by increasing operational flexibility, reducing consumables, and increasing robustness. This multi-year effort has culminated in the construction and operation of PLSS 1.0, a test rig that simulates full functionality of the advanced PLSS design. PLSS 1.0 integrates commercial off-the-shelf hardware with prototype technology development components, including the primary and secondary oxygen regulators, ventilation loop fan, Rapid Cycle Amine (RCA) swingbed, and Spacesuit Water Membrane Evaporator (SWME). PLSS 1.0 was tested from June 17th through September 30th, 2011. Testing accumulated 233 hours over 45 days, while executing 119 test points. An additional 164 hours of operational time were accrued during the test series, bringing the total operational time for PLSS 1.0 testing to 397 hours. Specific PLSS 1.0 test objectives assessed during this testing include: (1) Confirming prototype components perform in a system level test as they have performed during component level testing, (2) Identifying unexpected system-level interactions (3) Operating PLSS 1.0 in nominal steady-state EVA modes to baseline subsystem performance with respect to metabolic rate, ventilation loop pressure and flow rate, and environmental conditions (4) Simulating nominal transient EVA operational scenarios (5) Simulating contingency EVA operational scenarios (6) Further evaluating prototype technology development components Successful testing of the PLSS 1.0 provided a large database of test results that characterize system level and component performance. With the exception of several minor anomalies, the PLSS 1.0 test rig performed as expected. Documented anomalies and observations include: (1) Ventilation loop fan controller issues at high fan speeds (near 70,000 rpm, whereas the fan speed during nominal operations would be closer to 35,000 rpm) (2) RCA performance at boundary conditions, including carbon dioxide and water vapor saturation events, as well as reduced vacuum quality (3) SWME valve anomalies (4 documented cases where the SWME failed to respond to a control signal or physically jammed, preventing SWME control) (4) Reduction of SWME hollow fiber hydrophobicity and significant reduction of the SWME degassing capability after significant accumulated test time.

Watts, Carly A.↗

Alssat Development Status and Its Applications in Trade Studies

The development of the Advanced Life Support (ALS) Sizing Analysis Tool (ALSSAT) using Microsoft® Excel was initiated by the Crew and Thermal Systems Division (CTSD) of Johnson Space Center (JSC) in 1997 to support the ALS and Exploration Offices in Environmental Control and Life Support System (ECLSS) design and studies. It aids the user in performing detailed sizing of the ECLSS based on suggested default values or user inputs for different combinations of the ALS regenerative system technologies (Ref. 1, 2). This analysis tool will assist the user in performing ECLSS preliminary design and trade studies as well as system optimization efficiently and economically. Since ALSSAT's latest publication in ICES 2001 (Ref. 1) describing the development of ALSSAT with its Air Revitalization Subsystem (ARS), Water Management Subsystem (WMS), and Biomass Subsystem (Biomass) mass balance sheets, ALSSAT has been expanded to include mass balance and sizing models for the remaining three ALS subsystems, namely, the Solid Waste Management Subsystem (SWMS), the Food Management Subsystem (FMS), and the Thermal Control Subsystem (TCS). The external interfaces, including the Extravehicular Activities (EVA) and Human Accommodations (HA), were implemented into ALSSAT in 2002. The overall mass balance sheet, which integrates the six ALS subsystems and the external interfaces applicable to the ECLSS, was also developed. In 2003, ALSSAT was upgraded to include the consideration of redundancy and contingency options in the ECLSS, as well as more ALS regenerative technology selections. ALSSAT has been used for the Metric Calculation for FY02 and FY03 (Ref. 3). Several trade studies were conducted in 2003. The analytical results will be presented in this paper.

Yeh, H. Y. (Jannivine)↗

Predictive Model for Workload in Remote Operators During sUAS Contingency Scenarios

The increase in automated capabilities of small Uncrewed Aerial Systems (sUAS) has enabled the human operators to manage larger numbers of vehicles simultaneously. As this happens, the operational paradigm shifts to an m:N configuration where multiple operators (m) are managing multiple vehicles (N) together. However, many questions about how operators will interact with each other and share interaction across the vehicle pool are yet unanswered. Therefore, stakeholders from government and industry have partnered to develop ground control station concepts for such operations. The work presented in this paper aims to identify factors that contribute to operator workload. A supervised machine learning-based method built using Support Vector Machines and K-fold cross-validation was used to create workload prediction models for various NASA TLX subscales by leveraging features related to interactions and their relative timings during m:N operations. Results show that the models yielded fairly high predictive accuracies ranging from ~60-75%.

workload prediction↗

Contingency Operations during Failure of Inertial Attitude Acquisition Due to Star Tracker Blinding for Three-Axes-Stabilized Interplanetary Spacecraft

The three interplanetary ESA missions Mars-Express, Rosetta and Venus-Express (launched 2003, 2004 and 2005 resp.) are three-axes stabilized spacecraft (s/c) that estimate their inertial attitude (i.e. the attitude of the s/c w.r.t. the inertial frame) using measurements from a redundant set of star trackers (STR). Each s/c is equipped with four reaction wheels, a reaction control system based on thrusters and a redundant set of ring laser gyroscopes (gyros). The STR h/w layout of the three s/c is identical whereas there is a difference in the star pattern recognition algorithm of Rosetta which uses five neighbouring stars around a central star instead of star triads. The Rosetta algorithm has been implemented to cope with the presence of false stars which are expected to be seen during operations around the comet. The attitude acquisition capability from lost in space is different also in terms of AOCMS: The survival mode of Rosetta which is entered upon STR failure is presented. The AOCMS of Mars- and Venus-Express manages temporary STR outages during sky occultation by the planet not even by using redundancy. Though, a blinding of both STR during cruise lasting for the order of days confronts the ground operators with the limits of the AOCMS design. The operations and analyses that have been planned and partially been performed to compensate for the outage of the STR are demonstrated for Mars-Express. The caution measures taken before Venus orbit insertion of Venus-Express are detailed.

Keil, Joachim↗

Entry Debris Field Estimation Methods and Application to Compton Gamma Ray Observatory Disposal

For public safety reasons, the Compton Gamma Ray Observatory (CGRO) was intentionally deorbited on June 4, 2000. This deorbit was NASA's first intentional controlled deorbit of a satellite, and more will come including the eventual deorbit of the International Space Station. To maximize public safety, satellite deorbit planning requires conservative estimates of the debris footprint size and location. These estimates are needed to properly design a deorbit sequence that places the debris footprint over unpopulated areas, including protection for deorbit contingencies. This paper details a method for estimating the length (range), width (crossrange), and location of entry and breakup debris footprints. This method utilizes a three degree-of-freedom Monte Carlo simulation incorporating uncertainties in all aspects of the problem, including vehicle and environment uncertainties. The method incorporates a range of debris characteristics based on historical data in addition to any vehicle-specific debris catalog information. This paper describes the method in detail, and presents results of its application as used in planning the deorbit of the CGRO.

Mrozinski, Richard B.↗