Search NASA⌕ Search

SEARCH · Search NASA

Results for “coordinated scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 217 records · Page 12

The Transactive Energy Network Template Metamodel

While transactive energy, which is defined as an allocation of electricity based on dynamically discovered values or prices, has been extensively studied, its uptake and use has been slow. This report describes a tool, the transactive network template, which should hasten the creation and uptake of transactive energy networks. Some basic principles of transactive energy are familiar from existing wholesale electricity markets. Locational prices are calculated today for zones within bulk electric transmission systems. Locational prices differ while accounting for the locational costs of electricity generation and the losses and constraints incurred when electricity is transmitted from generators and distributed to consumers. A transactive energy network might include these transmission zones. However, current research strives to apply transactive energy also in electricity distribution circuits, buildings, and even for individual generating and consuming devices. At the same time, researchers explore how to apply transactive energy in real time during increasingly shorter time intervals. Automated computational agents become necessary as transactive energy becomes applied to smaller circuit zones and at faster dynamic timescales. A transactive energy network is an example of a multi-agent system. Each zone in the network is represented by its transactive agent, which makes decisions for and acts on behalf of a business entity that is responsible for and manages one of the circuit regions. A transactive energy network is also an example of a decentralized, distributed control system. Control decisions and responsibilities are distributed among the network’s transactive agents. The transactive agents are independent; that is, there typically is no centralized authority or oversight function. Instead, transactive agents exchange transactive signals and thereby negotiate the prices and quantities of electricity that they will exchange. Initially, the circuit regions and responsibilities of transactive agents appear to be very dissimilar. Each circuit region may comprise transmission, distribution, or building-level circuits. Each has a unique position and electrical connectivity within the transactive energy network. Each possesses unique assets that either generate or consume electricity, and these (e.g., renewable energy generator, diesel generator, aggregate utility load, building load, space conditioning, refrigerator, etc.) may further differ in their price flexibility and in their strategies for responding to dynamic electricity prices. Given such diversity, an implementer’s first inclination might be to start from scratch to define all these devices and to engineer their seemingly unique interactions. Given that each implementer’s perspective may be narrow within a transactive energy network, it is unlikely that uniquely engineered systems would interact well. This is where the transactive network template is applicable. The transactive network template is a metamodel that has been developed to guide implementers as they configure their own transactive agent within a network of such agents. The object-oriented design of the transactive network template provides basic code object types that may be used and extended by implementers to represent each of the assets in their circuit region. These objects further facilitate the transactive agent’s necessary computations, which are divided among responsibilities to schedule power usage, balance electric supply and demand, and coordinate the exchange of electricity with the other transactive agents. This report addresses the conceptual transactive network template design. Implementers are directed to more formal design documents and reference implementations. A Python™-based1 reference implementation of the transactive network template has been coded, and three implementations have been configured to represent a national laboratory and two university campuses. Version 2 of the transactive node template generalizes the market class and its methods to facilitate multiple, and more diverse market coordination mechanisms than were facilitated by and demonstrated using Version 1. Version 3 includes new Appendix B, which addresses the designs of methods that would make dynamic prices track approved electricity rates. In the future, the author wishes to make the transactive network template more generally applicable to networks that require more accurate power flow. Development of the transactive network template is jointly funded by the U.S. Department of Energy (DOE) Energy Efficiency and Renewable Energy and the DOE Office of Electricity. In late 2015, one of the first projects to be funded by the DOE Grid Laboratory Modernization Laboratory Consortium was the Clean Energy and Transactive Campus project, led by Pacific Northwest National Laboratory. DOE funds were matched by an investment by the Washington Department of Commerce through its Clean Energy Fund. The transactive network template was developed to guide the implementation of transactive energy networks within this project’s scope.

24 POWER TRANSMISSION AND DISTRIBUTION↗

International Jupiter Watch - A program to study the time variability of the Jovian system

The International Jupiter Watch is a program for the encouragement and coordination of the study of temporal variations in the Jovian system. It consists of six discipline working groups concerned with: the Io torus under N. Schneider; the Jovian atmosphere under R. West; the magnetosphere and radio emissions under I. de Peter and M. Klein; aurora under J. Caldwell; the Galilean satellites under W. Sinton and J. Goguen; and laboratory measurement and theory under B. Lutz. To date the IJW has held two workshops and selected several Jupiter Watch periods for coordinated observations. The next Jupiter Watch workshop is tentatively scheduled for 1990 in association with the next COSPAR meeting.

Russell, C. T.↗

An upper limit to coronal X-rays from single, magnetic white dwarfs

Pointed ROSAT Position Sensitive Proportional Counter (PSPC) exposures of 9277 and 6992 sec, directed toward the nearby, single, cool, magnetic white dwarfs GR 290 and EG 250 yielded no counts significantly above the expected background rate. The corresponding flux limits (for an assumed source temperature of 1 keV) are 1.0 and 1.7 x 10(exp -14) erg/sq cm/s, within the 0.1-2.5 keV bandpass of the instrument (99% confidence limits). This is more than an order of magnitude below the tentative detection level (for GR 290) and limits (for four other similar stars) obtained from archival Einstein data in 1991. The corresponding limits on coronal electron density are comparable with those implied if cyclotron emission is not responsible for any of the features observed in the optical spectra of magnetic white dwarfs. X-ray data currently provide no evidence for the existence of coronae around these stars. A final long observation (25,000 sec of GD 356) is scheduled for later this year on ROSAT, along with coordinated Extreme Ultraviolet Explorer (EUVE) observations.

Cavallo, Rob↗

MaROS: Information Management Service

This software is provided by the Mars Relay Operations Service (MaROS) task to a variety of Mars projects for the purpose of coordinating communications sessions between landed spacecraft assets and orbiting spacecraft assets at Mars. The Information Management Service centralizes a set of functions previously distributed across multiple spacecraft operations teams, and as such, greatly improves visibility into the end-to-end strategic coordination process. Most of the process revolves around the scheduling of communications sessions between the spacecraft during periods of time when a landed asset on Mars is geometrically visible by an orbiting spacecraft. These relay sessions are used to transfer data both to and from the landed asset via the orbiting asset on behalf of Earth-based spacecraft operators. This software component is an application process running as a Java virtual machine. The component provides all service interfaces via a Representational State Transfer (REST) protocol over https to external clients. There are two general interaction modes with the service: upload and download of data. For data upload, the service must execute logic specific to the upload data type and trigger any applicable calculations including pass delivery latencies and overflight conflicts. For data download, the software must retrieve and correlate requested information and deliver to the requesting client. The provision of this service enables several key advancements over legacy processes and systems. For one, this service represents the first time that end-to-end relay information is correlated into a single shared repository. The software also provides the first multimission latency calculator; previous latency calculations had been performed on a mission-by-mission basis.

Allard, Daniel A.↗

A Notional Artemis Lunar Surface Exploration Package (ArLSEP) based on the Gandalf Staff Platform

Introduction: The Artemis program is planning to deliver crew and cargo to the lunar surface, but there is no current package for supporting lunar in-struments and experiments similar to the Apollo Lunar Surface Exploration Package (ALSEP). This abstract provides a possible concept for such a package using the Gandalf Staff Platform as a common core. Gandalf Staff: The Gandalf Staff is an early prototype system developed over FY’21/FY’22 using NASA Science Technology Mission Directorate (STMD) Center Information Fund (CIF) grants to de-sign, build and test “proof-of-concept” components. These components include a 24v battery powered monopole that powers a suite of subsystems, including a Graphical User Interface (GUI) for crew, surface voice and data communications, Lunar Search and Rescue (LunaSAR) navigation and communications, LiDAR, field site external lighting, 360-degree camera, and a geothermal instrument for measuring sub-surface temperature gradient. The staff can be carried independently by an Extra-Vehicular Activity (EVA) astronaut, or can be mounted into a tripod for “hands free” support at a surface site being investigated. The staff can be attached to an external solar array and power storage system for long-duration operations. [1,2] ALSEP: An ASLEP flew on each mission Apollo 12 to Apollo 17. For Apollo 11, a simplified packaged called the Early Apollo Scientific Experiments Pack-age (EASEP) was flown. Each package included a “Central Station” that provided the power and communications connected to a variety of instruments and sensors. The power was provided by a Radioisotope Thermoelectric Generator (RTG) fueled by Plutoni-um-238 generating 70 watts of power (initially, decayed over time) [3]. The communications system provide for direct to Earth data transfer from the lunar surface. Each pack-age was stowed externally in the Lunar Module (LM) Scientific Equipment (SEQ) bay with a mass up to 163 kg (Apollo 17). The crew unloaded the ALSEP from the LM and deployed the instruments on the lunar surface. Although designed to operate for only 1 year, many sites operated for up to 8 years successfully [4]. The Active Seismic Experiment (ASE) included 3 geophones for detecting seismic waves created by mortars and thumpers deployed by the crew. Other active experiments measured the lunar atmosphere, the heat flow in the subsurface, the lunar gravity and potential gravity waves, the lunar magnetic field, the solar wind and plasma interactions in cislunar space. Passive experiments included collectors for dust and cosmic rays, and retroreflectors for precise measurements of distance using a laser from Earth. The ALSEP program continues to generate insights into lunar formation and evolution. ArLSEP Concepts: The lunar surface science package for the Artemis program will hopefully exceed the capability of the ALSEP. There are multiple issues for discussion leading to the design of a new ArLSEP, needing requirements definition from the science community, NASA mission architecture, and NASA budget planners. 1. Delivery Mechanism Two possible projects currently provide capability to deliver scientific cargo to the lunar surface: 1) the Commercial Lunar Payload Services (CLPS) [5] and the Human Landing System (HLS) [6, 7]. Each project is controlled by a different organization within NASA and budgeted with different criteria although both support lunar exploration. The HLS system delivers crew (and potentially cargo) to human landing sites. If an ArLSEP is “predeployed” to such a site, the design must include power (either from the vehicle or independently) to keep the electronics functioning until deployed by the crew. If an ArLSEP is delivered on a vehicle after the crew is present on the lunar surface, safety protocols require adequate distance from the humans for impact from descent propelled sur-face regolith ejecta. This distance can not exceed the capability of the crew to walk (if no rover) to the vehicle for ArLSEP deployment. 2. Overall Guidelines The general design of ArLSEP will likely follow the ALSEP with a common system for communications and power; however, significant architecture differences between Apollo and Artemis exist. Power: The RTG will not be available for early Artemis missions nor likely follow-on Lunar Exploration Transportation Services (LETS) missions [8]. Thus, ArLSEP power must be supplied by solar arrays with sufficient battery capability to “keep alive” necessary electronics during any lunar surface eclipse period. Communication: The Artemis program is developing a series of communications satellites for lunar orbit to provide surface transmission of data and voice to Earth. Called “LunaNET”, this network is component useful for ArLSEP since south polar locations may not always have direct “line-of-sight” to Earth [9]. 3. Concept of Operations (ConOps) The general ConOps for ArLSEP is to deliver the package to lunar surface before the crew arrives, and then have the crew deploy the package after some period of time. This requires coordinated design (for power systems) and launch window (for schedule) on both the cargo and crew missions. Once the ArLSEP is deployed, it will operate autonomously for a number of years. It should be designed to be EVA compatible for crew maintenance and upgrade. 4. Notional Design (for discussion purpose only) The landing site near the South Pole is expected to have no eclipse cycle exceeding 5 days, so the “keep alive” power is 144 hours (6 days to include margin). A 12v ArLSEP will use rechargeable LiFePO4 cells, which are common in the Electric Vehicle (EV) industry. With a current of 5 amps and a 125 watt system, the mass is about 90kg. The comm. system and structure adds another 10kg, thus the “Central Station” is approximately 100kg. The solar power is collected on four arrays (each 2m above the surface), and the entire ArLSEP is designed to stow in a 2m x 1m x 1m volume. The experiment and instrument design will vary for each installation and add mass to the total (although they are expected to fit within the 2m3 volume). Seismic wave generation will likely not be provided with mortars, thus an electric “thumper” will be required. Active instruments such as imaging systems and sensing instruments will benefit from the additional power and communication capability provided by ArLSEP. Passive systems such as retroreflectors, witness plates, and cosmic dust collectors can be added to either the landing vehicle and/or the ArLSEP. With repeated HLS missions to the same human site, the ArLSEP can be expanded and easily maintained for long duration science collection on the lunar surface.

ALSEP↗

Improving the Availability of Supercomputer Job Input Data Using Temporal Replication

Storage systems in supercomputers are a major reason for service interruptions. RAID solutions alone cannot provide sufficient protection as (1) growing average disk recovery times make RAID groups increasingly vulnerable to disk failures during reconstruction, and (2) RAID does not help with higher-level faults such failed I/O nodes. This paper presents a complementary approach based on the observation that files in the supercomputer scratch space are typically accessed by batch jobs whose execution can be anticipated. Therefore, we propose to transparently, selectively, and temporarily replicate 'active' job input data by coordinating the parallel file system with the batch job scheduler. We have implemented the temporal replication scheme in the popular Lustre parallel file system and evaluated it with real-cluster experiments. Our results show that the scheme allows for fast online data reconstruction, with a reasonably low overall space and I/O bandwidth overhead.

99 GENERAL AND MISCELLANEOUS↗

Parallel-aware, dedicated job co-scheduling within/across symmetric multiprocessing nodes

In a parallel computing environment comprising a network of SMP nodes each having at least one processor, a parallel-aware co-scheduling method and system for improving the performance and scalability of a dedicated parallel job having synchronizing collective operations. The method and system uses a global co-scheduler and an operating system kernel dispatcher adapted to coordinate interfering system and daemon activities on a node and across nodes to promote intra-node and inter-node overlap of said interfering system and daemon activities as well as intra-node and inter-node overlap of said synchronizing collective operations. In this manner, the impact of random short-lived interruptions, such as timer-decrement processing and periodic daemon activity, on synchronizing collective operations is minimized on large processor-count SPMD bulk-synchronous programming styles.

Jones, Terry R↗

A BI-LEVEL APPROACH TO FUTURE POWER SYSTEM CO-OPTIMIZATION WITH HIGH PENETRATION OF RENEWABLE ENERGY AND RESPONSIVE DEMAND

Electricity generation accounts for nearly half of the total CO2 emissions in the United States. For this reason, the development and integration of renewable resources will play an essential role in achieving the societal objective of mitigating climate change through reduction of greenhouse gas emissions. In conjunction with the environmental benefits of renewable energy, the most common renewable sources, such as wind and solar, also increase the uncertainties surrounding generation in power systems, which adds significant challenges to the system operation and planning. The uncertainties and forecasting errors surrounding renewable generation are normally addressed through the use of reserves from traditional generators. At greater levels of renewable penetration, sufficient generator reserves may not be available or economically viable. In contrast, the promise of demand-side resources in this arena lies in the spatially widespread availability, rapid response potential, and lower cost of features that already exist in the system. However, the challenge of responsive demand arises from the need to understand, manage, and incentivize a very large number of resources to participate effectively in efficient operation of the complex power system. Since demand response comes from the distribution system, microgrids as the basic building blocks of future distribution systems will be a critical environment for the study of demand response. To support integration of microgrids with flexible loads in future power systems, the operational mode of power systems will need to evolve. Therefore, it is going to be critical to have new and efficient co-optimization methods for coordination of the various power market participants and the scheduling of resources in the power systems of the future. Motivated by the rapid increase in renewable penetration, the need for effective demand response programs, and a changing system structure, this dissertation seeks to define a new strategy that supports co-optimization of various participants in power systems with emphasis on high renewable penetration and demand response. This strategy has three components; 1) an exploration of the capabilities of different types of demand response programs in a microgrid, 2) development and implementation of a bi-level framework for co-optimization of the main grid with high renewable penetration and a microgrid with demand response capabilities, and 3) expansion of the bi-level framework from a microgrid to a general distribution system to explore the advantages of the bi-level co-optimization approach over the traditional optimization approach. Conclusions of this work illustrate that the stochastic rolling horizon approach could effectively manage the operation of a microgrid with various demand response programs. In addition, the bi-level approach is a promising co-optimization framework for the transmission and distribution levels that could increase system renewable penetration and reduce operation costs. Compared to the traditional framework, the bi-level framework yields more equitable cost sharing patterns among the market participants as well as better support for the power system evolution.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Automation in the Space Station module power management and distribution Breadboard

The Space Station Module Power Management and Distribution (SSM/PMAD) Breadboard, located at NASA's Marshall Space Flight Center (MSFC) in Huntsville, Alabama, models the power distribution within a Space Station Freedom Habitation or Laboratory module. Originally designed for 20 kHz ac power, the system is now being converted to high voltage dc power with power levels on a par with those expected for a space station module. In addition to the power distribution hardware, the system includes computer control through a hierarchy of processes. The lowest level process consists of fast, simple (from a computing standpoint) switchgear, capable of quickly safing the system. The next level consists of local load center processors called Lowest Level Processors (LLP's). These LLP's execute load scheduling, perform redundant switching, and shed loads which use more than scheduled power. The level above the LLP's contains a Communication and Algorithmic Controller (CAC) which coordinates communications with the highest level. Finally, at this highest level, three cooperating Artificial Intelligence (AI) systems manage load prioritization, load scheduling, load shedding, and fault recovery and management. The system provides an excellent venue for developing and examining advanced automation techniques. The current system and the plans for its future are examined.

Walls, Bryan↗

Provider of Services for Urban Air Mobility (PSU) Prototype Simulation (X5) Final Report

Urban Air Mobility (UAM) is a new air transportation service concept to carry passengers or cargo in metropolitan areas, leveraged by innovative aircraft and air traffic automation technologies. NASA has conducted a series of simulations, called the X-series simulation, to evaluate the UAM concept of operations and support the development of airspace procedures and services for UAM operations. The simulation called “X5” was conducted in 2023 to test a Provider of Services for UAM (PSU) prototype developed by NASA for UAM flight planning, strategic conflict management support, and data exchange between UAM operators. In this simulation, two strategic conflict management capabilities, Demand-Capacity Balancing and Sequencing and Scheduling, were further investigated. This document describes the UAM system architecture modeled, the X5 simulation environment to be executed (e.g., traffic scenario and UAM airspace construct), and the strategic conflict management processes developed and evaluated in this study. Then, the simulation results are provided using several system performance metrics, such as the number of operations planned and activated, demand-capacity imbalances detected and resolved, and pre-departure delays. Based on these metrics, the test findings and lessons learned from this simulation are discussed. NASA developed a PSU prototype as part of a reference implementation of UAM system architecture and evolved strategic conflict management capabilities for UAM operations from the previous collaborative simulations with industry partners. Below is the summary of the achievements: - Aligned NASA’s UAM reference architecture with the FAA’s UAM ConOps notional architecture - Extended UAM airspace management capabilities to include 1) Demand-Capacity Balancing (DCB) to ensure operators coordinate planned usage of shared vertiports, and 2) Sequencing and Scheduling (S&S) at UAM corridor entry and exit points to help facilitate an orderly flow of traffic - Defined the PSU information exchange APIs and requirements towards informing industry standards - Developed and tested a NASA PSU prototype as reference implementation to validate the requirements and APIs - Developed a prototype service connecting NASA’s PSU and the FAA system for testing future PSU-ATM interface requirements - Tested NASA-developed assumptions for UAM operations such as airspace design, procedures, vehicle performance, and strategic conflict management methods to inform future Cooperative Operating Practices (COPs) development with industry - Evaluated system performance metrics such as number of simultaneous operations and ground delays that can help define system-level requirements. The simulation results showed that the UAM traffic demand could be managed to minimize the needs of tactical separation provision with ground delays assigned by DCB and S&S. These accomplishments and the lessons learned from the PSU Prototype X5 simulation activities will be valuable inputs for the Air Mobility Pathfinders (AMP) project, which is NASA’s new project to create and evaluate a reference architecture for safe, secure, and scalable UAM operations.

Simulation↗

Autonomous Multi-Sensor Coordination: The Science Goal Monitor

Many dramatic earth phenomena are dynamic and coupled. In order to fully understand them, we need to obtain timely coordinated multi-sensor observations from widely dispersed instruments. Such a dynamic observing system must include the ability to Schedule flexibly and react autonomously to sciencehser driven events; Understand higher-level goals of a sciencehser defined campaign; Coordinate various space-based and ground-based resources/sensors effectively and efficiently to achieve goals. In order to capture transient events, such a 'sensor web' system must have an automated reactive capability built into its scientific operations. To do this, we must overcome a number of challenges inherent in infusing autonomy. The Science Goal Monitor (SGM) is a prototype software tool being developed to explore the nature of automation necessary to enable dynamic observing. The tools being developed in SGM improve our ability to autonomously monitor multiple independent sensors and coordinate reactions to better observe dynamic phenomena. The SGM system enables users to specify what to look for and how to react in descriptive rather than technical terms. The system monitors streams of data to identify occurrences of the key events previously specified by the scientisther. When an event occurs, the system autonomously coordinates the execution of the users' desired reactions between different sensors. The information can be used to rapidly respond to a variety of fast temporal events. Investigators will no longer have to rely on after-the-fact data analysis to determine what happened. Our paper describes a series of prototype demonstrations that we have developed using SGM and NASA's Earth Observing-1 (EO-1) satellite and Earth Observing Systems' Aqua/Terra spacecrafts' MODIS instrument. Our demonstrations show the promise of coordinating data from different sources, analyzing the data for a relevant event, autonomously updating and rapidly obtaining a follow-on relevant image. SGM was used to investigate forest fires, floods and volcanic eruptions. We are now identifying new Earth science scenarios that will have more complex SGM reasoning. By developing and testing a prototype in an operational environment, we are also establishing and gathering metrics to gauge the success of automating science campaigns.

Koratkar, Anuradha↗

Separation Assurance in Urban Air Mobility Systems Using Shared Scheduling Protocols

Ensuring safe separation between aircraft is a critical challenge in air traffic management, particularly in urban air mobility (UAM) environments where high traffic density and low altitudes require precise control. In these environments, conflicts often arise at the intersections of flight corridors, posing significant risks. We propose a tactical separation approach leveraging shared scheduling protocols, originally designed for Ethernet networks and operating systems, to coordinate access to these intersections. Using a decentralized Markov decision process framework, the proposed approach enables aircraft to autonomously adjust their speed and timing as they navigate these critical areas, maintaining safe separation without a central controller. We evaluate the effectiveness of this approach in simulated UAM scenarios, demonstrating its ability to reduce separation violations to zero while acknowledging trade-offs in flight times as traffic density increases. Additionally, we explore the impact of non-compliant aircraft, showing that while shared scheduling protocols can no longer guarantee safe separation, they still provide significant improvements over systems without scheduling protocols.

Separation Assurance↗

Separation Assurance in Urban Air Mobility Systems Using Shared Scheduling Protocols

Ensuring safe separation between aircraft is a critical challenge in air traffic management, particularly in urban air mobility (UAM) environments where high traffic density and low altitudes require precise control. In these environments, conflicts often arise at the intersections of flight corridors, posing significant risks. We propose a tactical separation approach leveraging shared scheduling protocols, originally designed for Ethernet networks and operating systems, to coordinate access to these intersections. Using a decentralized Markov decision process framework, the proposed approach enables aircraft to autonomously adjust their speed and timing as they navigate these critical areas, maintaining safe separation without a central controller. We evaluate the effectiveness of this approach in simulated UAM scenarios, demonstrating its ability to reduce separation violations to zero while acknowledging trade-offs in flight times as traffic density increases. Additionally, we explore the impact of non-compliant aircraft, showing that while shared scheduling protocols can no longer guarantee safe separation, they still provide significant improvements over systems without scheduling protocols.

system safety↗

FutureGen 2.0 Oxy-combustion Large Scale Test – Final Report

The primary objectives of the FutureGen 2.0 CO 2 Oxy-Combustion Large Scale Test Project were to site, permit, design, construct, and commission, an oxy-combustion boiler, gas quality control system, air separation unit, and CO 2 compression and purification unit, together with the necessary supporting and interconnection utilities. The project was to demonstrate at commercial scale (168MWe gross) the capability to cleanly produce electricity through coal combustion at a retrofitted, existing coal-fired power plant; thereby, resulting in near-zeroemissions of all commonly regulated air emissions, as well as 90% CO 2 capture in steady-state operations. The project was to be fully integrated in terms of project management, capacity, capabilities, technical scope, cost, and schedule with the companion FutureGen 2.0 CO 2 Pipeline and Storage Project, a separate but complementary project whose objective was to safely transport, permanently store and monitor the CO 2 captured by the Oxy-combustion Power Plant Project. The FutureGen 2.0 Oxy-Combustion Large Scale Test Project successfully achieved all technical objectives inclusive of front-end-engineering and design, and advanced design required to accurately estimate and contract for the construction, commissioning, and start-up of a commercial-scale "ready to build" power plant using oxy-combustion technology, including full integration with the companion CO 2 Pipeline and Storage project. Ultimately the project did not proceed to construction due to insufficient time to complete necessary EPC contract negotiations and commercial financing prior to expiration of federal co-funding, which triggered a DOE decision to closeout its participation in the project. Through the work that was completed, valuable technical, commercial, and programmatic lessons were learned. This project has significantly advanced the development of near-zero emission technology and will be helpful to plotting the course of, and successfully executing future large demonstration projects. This Final Scientific and Technical Report describes the technology and engineering basis of the project, inclusive of process systems, performance, effluents and emissions, and controls. Further, the project cost estimate, schedule, and permitting requirements are presented, along with a project risk and opportunity assessment. Lessons-learned related to these elements are summarized in this report. Companion reports Oxy-combustion further document the accomplishments and learnings of the project, including: A.01 Project Management Report which describes what was done to coordinate the various participants, and to track their performance with regard to schedule and budget B.02 Lessons Learned - Technology Integration, Value Improvements, and Program Management, which describes the innovations and conclusions that we arrived upon during the development of the project, and makes recommendations for improvement of future projects of a similar nature . B.03 Project Economics, which details the capital and operation costs and their basis, and also illustrates the cost of power produced by the plant with certain sensitivities. B.04 Power Plant, Pipeline, and Injection Site Interfaces, which details the interfaces between the two FutureGen projects B.05 Contractual Mechanisms for Design, Construction, and Operation, which describes the major EPC, and Operations Contracts required to execute the project.

54 ENVIRONMENTAL SCIENCES↗

Agent oriented programming

The goal of our research is a methodology for creating robust software in distributed and dynamic environments. The approach taken is to endow software objects with explicit information about one another, to have them interact through a commitment mechanism, and to equip them with a speech-acty communication language. System-level applications include software interoperation and compositionality. A government application of specific interest is an infrastructure for coordination among multiple planners. Daily activity applications include personal software assistants, such as programmable email, scheduling, and new group agents. Research topics include definition of mental state of agents, design of agent languages as well as interpreters for those languages, and mechanisms for coordination within agent societies such as artificial social laws and conventions.

Shoham, Yoav↗

Planning to Explore: Using a Coordinated Multisource Infrastructure to Overcome Present and Future Space Flight Planning Challenges

Few human endeavors present as much of a planning and scheduling challenge as space flight, particularly manned space flight. Just on the operational side of it, efforts of thousands of people across hundreds of organizations need to be coordinated. Numerous tasks of varying complexity and nature, from scientific to construction, need to be accomplished within limited mission time frames. Resources need to be carefully managed and contingencies worked out, often on a very short notice. From the beginning of the NASA space program, planning has been done by large teams of domain experts working months, sometimes years, to put together a single mission. This approach, while proven very reliable up to now, is becoming increasingly harder to sustain. Elevated levels of NASA space activities, from deployment of the new Crew Exploration Vehicle (CEV) and completion of the International Space Station (ISS), to the planned lunar missions and permanent lunar bases, will put an even greater strain on this largely manual process. While several attempts to automate it have been made in the past, none have fully succeeded. In this paper we describe the current NASA planning methods, outline their advantages and disadvantages, discuss the planning challenges of upcoming missions and propose a distributed planning/scheduling framework (CMMD) aimed at unifying and optimizing the planning effort. CMMD will not attempt to make the process completely automated, but rather serve in a decision support capacity for human managers and planners. It will help manage information gathering, creation of partial and consolidated schedules, inter-team negotiations, contingencies investigation, and rapid re-planning when the situation demands it. The fist area of CMMD application will be planning for Extravehicular Activities (EVA) and associated logistics. Other potential applications, not only in the space flight domain, and future research efforts will be discussed as well.

Balaban, Edward↗

Bonneville, Power Administration Timing System

Time is an integral part of the Bonneville Power Administration's (BPA) operational systems. Generation and power transfers are planned in advance. Utilities coordinate with each other by making these adjustments on a timed schedule. Price varies with demand, so billing is based on time. Outages for maintenance are scheduled to assure they do not interrupt reliable power delivery. Disturbance records are aligned with recorded timetags for analysis and comparison with related information. Advanced applications like traveling wave fault location and real-time phase measurement require continuous timing with high precision. Most of BPA is served by a Central Time System (CTS) at the Dittmer Control Center near Portland, OR. This system keeps time locally and supplies time to both the control center systems and field locations via a microwave signal. It is kept synchronized to national standard time and coordinated with interconnected utilities. It is the official BPA time. Powwer system control and operation is described, followed by a description of BPA timing systems including CTS, the Fault Location Acquisition Reporter, time dissemination, and phasor measurements. References are provided for further reading.

Martin, Kenneth E.↗

Coordinating Multiple Spacecraft Assets for Joint Science Campaigns

This paper describes technology to support a new paradigm of space science campaigns. These campaigns enable opportunistic science observations to be autonomously coordinated between multiple spacecraft. Coordinated spacecraft can consist of multiple orbiters, landers, rovers, or other in-situ vehicles (such as an aerobot). In this paradigm, opportunistic science detections can be cued by any of these assets where additional spacecraft are requested to take further observations characterizing the identified event or surface feature. Such coordination will enable a number of science campaigns not possible with present spacecraft technology. Examples from Mars include enabling rapid data collection from multiple craft on dynamic events such as new Mars dark slope streaks, dust-devils or trace gases. Technology to support the identification of opportunistic science events and/or the re-tasking of a spacecraft to take new measurements of the event is already in place on several individual missions such as the Mars Exploration Rover (MER) Mission and the Earth Observing One (EO1) Mission. This technology includes onboard data analysis techniques as well as capabilities for planning and scheduling. This paper describes how these techniques can be cue and coordinate multiple spacecraft in observing the same science event from their different vantage points.

automated commanding↗