Search NASA⌕ Search

SEARCH · Search NASA

Results for “crew scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 217 records · Page 12

STS-109 Flight Day 2 Highlights

Footage shows the cargo bay of the Columbia Orbiter, including the rigid array carrier, the solar arrays to be installed on the Hubble Space Telescope, and the robotic arm. Close-up shots show several components of the flight support system. STS-109 Commander Scott Altman, Payload Commander John Grunsfeld, and Mission Specialist Nancy Currie are seen on the flight deck, and they answer questions about the stabilization of the freon flow, details of the upcoming rendezvous and capture of the Hubble Space Telescope, the scheduled spacewalks, and the social dynamics of the flight crew.

Source record↗

Going Commercial

while the conditions are more rigorous today for the ISS than they were in the very early days of space travel, opportunities still abound, and we just need to overcome the hurdles. As Pogo put it, "By gosh, we seem to be surrounded by an insurmountable opportunity here." This really is a great time in human spaceflight. We re doing marvelous things up there from an engineering standpoint. We now have to put them to good use. We need to optimize the 30 percent of the ISS that our federal government and the international partners have available in terms of the Station s power, volume, and crew time. Despite the recent issues with cost and schedule, as Mr. Goldin has said, this Agency will find a way. This country and the partners will find a way to restore the ISS s capability. We need help from this government, from our Congress, from our partners to do that, but it will be done, and then this facility is going to be world class--nah, it will out-of-this- world class. I m pleased to be a part of not only the history of spaceflight and the history of industry s participation in spaceflight, but I m also pleased to be a part of the future, the future applications, the future benefits that our spaceflight program is going to bring to our economy, to our careers, and to those of us that are both taxpayers and participants as well, to the great joy of seeing success as part of this country, as a part of our intellect, applied to the great beyond.

Walker, Charles↗

A Countermeasure for Space Motion Sickness

Overall, the results obtained in both the U.S. and the Russian space programs indicate that most space crews will experience some symptoms of motion sickness (MS) causing significant impact on the operational objectives that must be accomplished to assure mission success. At this time the primary countermeasure for MS requires the administration of Promethazine. Promethazine is not a benign drug, and is most frequently administered just prior to the sleep cycle to prevent its side effects from further compromising mission objectives. Clearly other countermeasures for SMS must be developed. Currently the primary focus is on two different technologies: (1) developing new and different pharmacological compounds with less significant side effects, (2) preflight training. The primary problem with all of these methods for controlling MS is time. New drugs that may be beneficial are years from testing and development, and preflight training requires a significant investment of crew time during an already intensive pre-launch schedule. Granted, motion sickness symptoms can be minimized with either of the two methods detailed above, however, it may be possible to develop a countermeasure that does not require either extensive adaptation time or exposure to motion sickness. Approximately 25 years ago Professor Geoffrey Melvill Jones presented his work on adaptation of the vestibuloocular reflex (VOR) using optically reversed vision (left-right prisms) during head rotations in the horizontal plane. It was of no surprise that most subjects experienced motion sickness while wearing the optically reversing prisms. However, a serendipitous finding emerged during this research showing that the same subjects did not experience motion sickness symptoms when wearing the reversing prisms under stroboscopic illumination. The mechanism, by which this side-effect was believed to have occurred, is not clearly understood. However, the fact that no motion sickness was ever noted, suggests the possibility of producing functionally useful adaptation during space flight without the penalty of disabling motion sickness by controlling the rate of the adaptive process by means of an appropriate stroboscopically presented environment. After several recent meetings with Professor Melvill Jones, we were encouraged to repeat the motion sickness portions of his and Mandl's 1981 stroboscopic experiment. In conducting this experiment we used a randomized cross-over design where subjects were randomly assigned to either a stroboscopic flash or no strobe for their first exposure in the experimental design. Twenty subjects (19 subjects completed the study) read a short passage from Treasure Island mounted on the wall approximately 1 m from their eyes while wearing left-right reversing prisms. The strobe on time of 3 microseconds and flash frequency of 4 Hz was set to equal that used in the original study. Motion sickness was scored using a modified Miller and Graybiel scale that we constructed to include symptoms that may be elicited under conditions where reversing prisms are worn. On this scale a score of 5 represented Malaise IIa (mild motion sickness) and a score of 8 or above is approaching frank sickness. Symptoms were tracked and recorded every 5 min during the task. Testing was limited to 30 min unless the subject had reached the MIIa score, at which time the test was terminated. Performance under stroboscopic illumination was significantly better than when the subjects read under normal room illumination while wearing the left-right reversing prisms. Based on these results we developed a goggle system using LCD material that can be strobed. To evaluate the effectiveness of stroboscopic goggles we tested an additional 9 subjects in addition to retesting 10 used in the stroboscopic pilot study described above. These 19 subjects wore a pair of strobing LCD goggles that could be cycled at 4 Hz. These subjects wore the goggles while also wearing left-right reversg prisms. Results while wearing the goggles showed that none of the 19 subjects scored at the MIIa level on the motion sickness rating scale. When the goggles did not flash (no strobe), 11 of the 19 developed symptoms above the MIIa criteria. As a countermeasure the goggles seem to be effective, even with an on time of 10 msec (time the goggles are clear). We have also collected anecdotal data, from our personnel in the Neuroscience Laboratory at the Johnson Space Center, suggesting that the goggles may effective in preventing carsickness.

Reschke, M. F.↗

IV&V Project Assessment Process Validation

The Space Launch System (SLS) will launch NASA's Multi-Purpose Crew Vehicle (MPCV). This launch vehicle will provide American launch capability for human exploration and travelling beyond Earth orbit. SLS is designed to be flexible for crew or cargo missions. The first test flight is scheduled for December 2017. The SLS SRR/SDR provided insight into the project development life cycle. NASA IV&V ran the standard Risk Based Assessment and Portfolio Based Risk Assessment to identify analysis tasking for the SLS program. This presentation examines the SLS System Requirements Review/System Definition Review (SRR/SDR), IV&V findings for IV&V process validation correlation to/from the selected IV&V tasking and capabilities. It also provides a reusable IEEE 1012 scorecard for programmatic completeness across the software development life cycle.

Driskell, Stephen↗

WetLab-2: Tools for Conducting On-Orbit Quantitative Real-Time Gene Expression Analysis on ISS

The objective of NASA Ames Research Centers WetLab-2 Project is to place on the ISS a research platform capable of conducting gene expression analysis via quantitative real-time PCR (qRT-PCR) of biological specimens sampled or cultured on orbit. The project has selected a Commercial-Off-The-Shelf (COTS) qRT-PCR system, the Cepheid SmartCycler and will fly it in its COTS configuration. The SmartCycler has a number of advantages including modular design (16 independent PCR modules), low power consumption, rapid ramp times and the ability to detect up to four separate fluorescent channels at one time enabling multiplex assays that can be used for normalization and to study multiple genes of interest in each module. The team is currently working with Cepheid to enable the downlink of data from the ISS to the ground and provide uplink capabilities for programming, commanding, monitoring, and instrument maintenance. The project has adapted commercial technology to design a module that can lyse cells and extract RNA of sufficient quality and quantity for use in qRT-PCR reactions while using a housekeeping gene to normalize RNA concentration and integrity. The WetLab-2 system is capable of processing multiple sample types ranging from microbial cultures to animal tissues dissected on-orbit. The ability to conduct qRT-PCR on-orbit eliminates the confounding effects on gene expression of reentry stresses and shock acting on live cells and organisms or the concern of RNA degradation of fixed samples. The system can be used to validate terrestrial analyses of samples returned from ISS by providing on-orbit gene expression benchmarking prior to sample return. The ability to get on orbit data will provide investigators with the opportunity to adjust experiment parameters for subsequent trials based on the real-time data analysis without need for sample return and re-flight. Researchers will also be able to sample multigenerational changes in organisms. Finally, the system can be used for analysis of air, surface, water, and clinical samples to monitor environmental contaminants and crew health. The verification flight of the instrument is scheduled to launch on SpaceX-7 in June 2015.

quantitative PCR↗

WetLab-2: Providing Quantitative PCR Capabilities on ISS

The objective of NASA Ames Research Centers WetLab-2 Project is to place on the ISS a system capable of conducting gene expression analysis via quantitative real-time PCR (qRT-PCR) of biological specimens sampled or cultured on orbit. The WetLab-2 system is capable of processing sample types ranging from microbial cultures to animal tissues dissected on-orbit. The project has developed a RNA preparation module that can lyse cells and extract RNA of sufficient quality and quantity for use as templates in qRT-PCR reactions. Our protocol has the advantage that it uses non-toxic chemicals, alcohols or other organics. The resulting RNA is transferred into a pipette and then dispensed into reaction tubes that contain all lyophilized reagents needed to perform qRT-PCR reactions. These reaction tubes are mounted on rotors to centrifuge the liquid to the reaction window of the tube using a cordless drill. System operations require simple and limited crew actions including syringe pushes, valve turns and pipette dispenses. The resulting process takes less than 30 min to have tubes ready for loading into the qRT-PCR unit.The project has selected a Commercial-Off-The-Shelf (COTS) qRT-PCR unit, the Cepheid SmartCycler, that will fly in its COTS configuration. The SmartCycler has a number of advantages including modular design (16 independent PCR modules), low power consumption, rapid thermal ramp times and four-color detection. The ability to detect up to four fluorescent channels will enable multiplex assays that can be used to normalize for RNA concentration and integrity, and to study multiple genes of interest in each module. The WetLab-2 system will have the capability to downlink data from the ISS to the ground after a completed run and to uplink new programs. The ability to conduct qRT-PCR on-orbit eliminates the confounding effects on gene expression of reentry stresses and shock acting on live cells and organisms or the concern of RNA degradation of fixed samples. The system can be used to validate terrestrial analyses of samples returned from ISS by providing on-orbit gene expression benchmarking prior to sample return. The ability to get on-orbit data will provide investigators with the opportunity to adjust experimental parameters in real time for subsequent trials, without the need for sample return and re-flight to sample multigenerational changes. The system can also be used for analysis of air, surface, water, and clinical samples to monitor environmental contaminants and crew health. The verification flight of the instrument is scheduled to launch on SpaceX-7 in June 2015. The WetLab-2 Project is supported by NASAs ISS Program at JSC, Code OZ.

ISS tools↗

Inferring Collaboration Strategies and Usability from Remote Observations in a Spaceflight Analog Environment

Collecting usability and user evaluations of novel software in spaceflight analog missions is challenging. For one such analog mission, we collected audio recordings of crew members as they completed their assigned self-scheduling task using novel software. Conversation analysis provided insight about collaborative nature of task and potential new evaluation measures.

human computer interaction↗

Advanced timeline systems

The Mission Planning Division of the Mission Operations Laboratory at NASA's Marshall Space Flight Center is responsible for scheduling experiment activities for space missions controlled at MSFC. In order to draw statistically relevant conclusions, all experiments must be scheduled at least once and may have repeated performances during the mission. An experiment consists of a series of steps which, when performed, provide results pertinent to the experiment's functional objective. Since these experiments require a set of resources such as crew and power, the task of creating a timeline of experiment activities for the mission is one of resource constrained scheduling. For each experiment, a computer model with detailed information of the steps involved in running the experiment, including crew requirements, processing times, and resource requirements is created. These models are then loaded into the Experiment Scheduling Program (ESP) which attempts to create a schedule which satisfies all resource constraints. ESP uses a depth-first search technique to place each experiment into a time interval, and a scoring function to evaluate the schedule. The mission planners generate several schedules and choose one with a high value of the scoring function to send through the approval process. The process of approving a mission timeline can take several months. Each timeline must meet the requirements of the scientists, the crew, and various engineering departments as well as enforce all resource restrictions. No single objective is considered in creating a timeline. The experiment scheduling problem is: given a set of experiments, place each experiment along the mission timeline so that all resource requirements and temporal constraints are met and the timeline is acceptable to all who must approve it. Much work has been done on multicriteria decision making (MCDM). When there are two criteria, schedules which perform well with respect to one criterion will often perform poorly with respect to the other. One schedule dominates another if it performs strictly better on one criterion, and no worse on the other. Clearly, dominated schedules are undesireable. A nondominated schedule can be generated by some sort of optimization problem. Generally there are two approaches: the first is a hierarchical approach while the second requires optimizing a weighting or scoring function.

Bulfin, R. L.↗

Clinical Decision Support Project

As NASA plans for exploration missions into deep space, significant challenges are realized due to the distance from Earth. Beside the effects of microgravity and radiation exposure, the astronauts face the additional constraints of isolation, lack of resupply, increasingly difficult evacuation, and delayed and disrupted communication with ground-based medical care providers. These constraints require a paradigm shift from current medical care where crews rely on the real-time communications with ground-based medical care providers toward Earth-independent medical operations for astronaut medical care. Medical expertise and decision-making are ground-based for current International Space Station and planned Lunar missions. However, a deep space exploration crew will need to autonomously perform the detection, diagnosis, treatment, and prevention of medical conditions. One approach to provide Earth-independent medical operations is to augment the requisite knowledge, skills, and abilities (KSAs) of a time-constrained crew—operating under stressful conditions, combatting fatigue, and facing a potential medical crisis—with a robust clinical decision support system (CDSS). The CDSS is envisioned as an integrated, software-based tool deployed on a laptop computer or handheld device. The CDSS will assist the crew and ground support when interacting with knowledge/data bases (e.g. records, pharmacy, schedule), instrumentation (e.g. imaging, physiological monitoring devices), and habitat (e.g. wellness system, task performance system) and vehicle systems (e.g. environmental system, communication system). In addition, the human interface will employ a context-based approach that accounts for the crew’s situation. Thus, extraneous and clinically/operationally non-relevant information are reduced to avoid an increase in cognitive load. The framework of an ideal spaceflight CDSS is to include core and advanced analytical features that maintain a flexible platform for integrating new technology in the future. The Exploration Medical Capability (ExMC) Element of the Human Research Program (HRP) is expanding the boundaries of space medical systems to advance the care of astronauts on future exploration missions beyond low Earth orbit by actively identifying and testing next-generation medical care and crew health maintenance technologies. The Clinical Decision Support (CDS) project addressed ap Medical-701 within the Inflight Medical Conditions risk: “We need to increase inflight medical capabilities and identify new capabilities that (a) maximize benefit and/or (b) reduce “costs” on human system/mission/vehicle resources.” Though mass, volume, and power will face increasing constraints, the projected computational capabilities of spacecraft systems will increase exponentially as information technology advances in this decade and beyond. Hence, data, software, and computational resources will play an essential and synergistic role in maintaining crew health, wellness, and performance in deep space missions. The focus of the CDS project was to develop recommended requirements for an in-vehicle CDSS that acts as a ‘virtual assistant’ for delivering optimal health, performance, and medical care during exploration missions. In fiscal year 2022 (FY22), the CDS project was chartered to baseline and/or revise all CDS project related documentation and update the CDS project model to include the revised CDSS Concept of Operations, revised systems-based modeling language (SysML) activity diagrams, and baseline requirements. The focus of this presentation will be an overview of the CDS products and CDS model content.

Decision Support↗

NASA Ares I Crew Launch Vehicle Upper Stage Overview

By incorporating rigorous engineering practices, innovative manufacturing processes and test techniques, a unique multi-center government/contractor partnership, and a clean-sheet design developed around the primary requirements for the International Space Station (ISS) and Lunar missions, the Upper Stage Element of NASA's Crew Launch Vehicle (CLV), the "Ares I," is a vital part of the Constellation Program's transportation system. Constellation's exploration missions will include Ares I and Ares V launch vehicles required to place crew and cargo in low-Earth orbit (LEO), crew and cargo transportation systems required for human space travel, and transportation systems and scientific equipment required for human exploration of the Moon and Mars. Early Ares I configurations will support ISS re-supply missions. A self-supporting cylindrical structure, the Ares I Upper Stage will be approximately 84' long and 18' in diameter. The Upper Stage Element is being designed for increased supportability and increased reliability to meet human-rating requirements imposed by NASA standards. The design also incorporates state-of-the-art materials, hardware, design, and integrated logistics planning, thus facilitating a supportable, reliable, and operable system. With NASA retiring the Space Shuttle fleet in 2010, the success of the Ares I Project is essential to America's continued leadership in space. The first Ares I test flight, called Ares 1-X, is scheduled for 2009. Subsequent test flights will continue thereafter, with the first crewed flight of the Crew Exploration Vehicle (CEV), "Orion," planned for no later than 2015. Crew transportation to the ISS will follow within the same decade, and the first Lunar excursion is scheduled for the 2020 timeframe.

Davis, Daniel J.↗

NASA Ares I Crew Launch Vehicle Upper Stage Overview

By incorporating rigorous engineering practices, innovative manufacturing processes and test techniques, a unique multi-center government/contractor partnership, and a clean-sheet design developed around the primary requirements for the International Space Station (ISS) and Lunar missions, the Upper Stage Element of NASA's Crew Launch Vehicle (CLV), the "Ares I," is a vital part of the Constellation Program's transportation system. Constellation's exploration missions will include Ares I and Ares V launch vehicles required to place crew and cargo in low-Earth orbit (LEO), crew and cargo transportation systems required for human space travel, and transportation systems and scientific equipment required for human exploration of the Moon and Mars. Early Ares I configurations will support ISS re-supply missions. A self-supporting cylindrical structure, the Ares I Upper Stage will be approximately 84' long and 18' in diameter. The Upper Stage Element is being designed for increased supportability and increased reliability to meet human-rating requirements imposed by NASA standards. The design also incorporates state-of-the-art materials, hardware, design, and integrated logistics planning, thus facilitating a supportable, reliable, and operable system. With NASA retiring the Space Shuttle fleet in 2010, the success of the Ares I Project is essential to America's continued leadership in space. The first Ares I test flight, called Ares I-X, is scheduled for 2009. Subsequent test flights will continue thereafter, with the first crewed flight of the Crew Exploration Vehicle (CEV), "Orion," planned for no later than 2015. Crew transportation to the ISS will follow within the same decade, and the first Lunar excursion is scheduled for the 2020 timeframe.

McArthur, J. Craig↗

NASA Crew Launch Vehicle Overview

The US. Vision for Space Exploration, announced January 2004, outlines the National Aeronautics and Space Administration s (NASA) strategic goals and objectives. These include: 1) Flying the Shuttle as safely as possible until its retirement, not later than 2010. 2) Bringing a new Crew Exploration Vehicle (CEV) into service as soon as possible after Shuttle retirement. 3) Developing a balanced overall program of science, exploration, and aeronautics at NASA, consistent with the redirection of the human spaceflight program to focus on exploration. 4) Completing the International Space Station (ISS) in a manner consistent with international partner commitments and the needs of human exploration. 5) Encouraging the pursuit of appropriate partnerships with the emerging commercial space sector. 6) Establishing a lunar return program having the maximum possible utility for later missions to Mars and other destinations. Following the confirmation of the new NASA Administrator in April 2005, the Agency commissioned a team of aerospace subject matter experts from government and industry to perform the Exploration Systems Architecture Study (ESAS), which provided in-depth information for selecting the follow-on launch vehicle designs to enable these goals, The ESAS team analyzed a number of potential launch systems, with a focus on: (1) a human-rated launch vehicle for crew transport and (2) a heavy lift launch vehicle (HLLV) to carry cargo. After several months of intense study utilizing technical performance, budget, and schedule objectives, the results showed that the optimum architecture to meet the challenge of safe, reliable crew transport is a two-stage variant of the Space Shuttle propulsion system - utilizing the reusable Solid Rocket Booster (SRB) as the first stage, along with a new upper stage that uses a derivative of the RS-25 Space Shuttle Main Engine to deliver 25 metric tons to low-Earth orbit. The CEV that this new Crew Launch Vehicle (CLV) lofts into space early next decade will initially ferry astronauts to the Space Station and be capable of carrying crews back to lunar orbit and of supporting missions to Mars orbit. The HLLV system will utilize the Shuttle External Tank combined with SRBs. The focus of this paper is on the CLV system, giving an overview of plans and progress to date.

Dumbacher, Daniel L.↗

Part-Task Simulation of Synthetic and Enhanced Vision Concepts for Lunar Landing

During Apollo, the constraints placed by the design of the Lunar Module (LM) window for crew visibility and landing trajectory were a major problem. Lunar landing trajectories were tailored to provide crew visibility using nearly 70 degrees look-down angle from the canted LM windows. Apollo landings were scheduled only at specific times and locations to provide optimal sunlight on the landing site. The complications of trajectory design and crew visibility are still a problem today. Practical vehicle designs for lunar lander missions using optimal or near-optimal fuel trajectories render the natural vision of the crew from windows inadequate for the approach and landing task. Further, the sun angles for the desirable landing areas in the lunar polar regions create visually powerful, season-long shadow effects. Fortunately, Synthetic and Enhanced Vision (S/EV) technologies, conceived and developed in the aviation domain, may provide solutions to this visibility problem and enable additional benefits for safer, more efficient lunar operations. Piloted simulation evaluations have been conducted to assess the handling qualities of the various lunar landing concepts, including the influence of cockpit displays and the informational data and formats. Evaluation pilots flew various landing scenarios with S/EV displays. For some of the evaluation trials, an eye glasses-mounted, monochrome monocular display, coupled with head tracking, was worn. The head-worn display scene consisted of S/EV fusion concepts. The results of this experiment showed that a head-worn system did not increase the pilot s workload when compared to using just the head-down displays. As expected, the head-worn system did not provide an increase in performance measures. Some pilots commented that the head-worn system provided greater situational awareness compared to just head-down displays.

Arthur, Jarvis J., III↗

The Skylab orbital laboratory.

The Skylab orbital laboratory is described in terms of spacecraft design features, the experiment programs, and the schedule of planned missions. Attention is given to flight and crew operations, rescue measures, the Multiple Docking Adapter, the Airlock Module, the Workshop, the Apollo Telescope Mount, Saturn V booster, Command and Service Modules, the life support system, thermal and environmental control, electrical power, attitude and pointing control, instrumentation and communications, crew equipment, provisions, and stowage.

Schneider, W. C.↗

The evolution of automation and robotics in manned spaceflight

The evolution of automation on all manned spacecraft including the Space Shuttle is reviewed, and a concept for increasing automation and robotics from the current Shuttle Remote Manipulator System (RMS) to an autonomous system is presented. The requirements for robotic elements are identified for various functions on the Space Station, including extravehicular functions and functions within laboratory and habitation modules which expand man's capacity in space and allow selected teleoperation from the ground. The initial Space Station will employ a telerobot and necessary knowledge based systems as an advisory to the crew on monitoring, fault diagnosis, and short term planning and scheduling.

Moser, T. L.↗

Collaboration technology and space science

A summary of available collaboration technologies and their applications to space science is presented as well as investigations into remote coaching paradigms and the role of a specific collaboration tool for distributed task coordination in supporting such teleoperations. The applicability and effectiveness of different communication media and tools in supporting remote coaching are investigated. One investigation concerns a distributed check-list, a computer-based tool that allows a group of people, e.g., onboard crew, ground based investigator, and mission control, to synchronize their actions while providing full flexibility for the flight crew to set the pace and remain on their operational schedule. This autonomy is shown to contribute to morale and productivity.

Leiner, Barry M.↗

STS-88 Day 12 Highlights

On this twelth day of the STS-88 mission, the flight crew, Commander Robert D. Cabana, Pilot Frederick W. Sturckow, and Mission Specialists Nancy J. Currie, James H. Newman, Jerry L. Ross, and Sergei Krikalev are awakened by the sounds of James Brown's "I Got You (I Feel Good)". Crew members focus their activities today on preparing for their scheduled return to the Kennedy Space Center. Cabana and Sturckow spend a good part of the day checking out spacecraft systems for entry and landing.

Source record↗

Tests Narrowed

The space shuttle program is preparing three thermal protection system and wing leading edge repair tests that the STS-114 return-to-flight astronaut crew would perform during their mission on board Discovery, tentatively scheduled for mid-May.

Covault, Craig↗